May 28, 2019
Brad Corcoran, City Manager
City of Eden
P.O. Box 70
Eden, NC 27289
Subject: Permit No. WQ0040895
City of Eden
Eden Remediation Plan
Wastewater Collection System Extension Permit
Rockingham County
Dear Mr. Corcoran:
In accordance with your application received April 5, 2019, and additional information received on May
22, 2019, we are forwarding herewith Permit No. WQ0040895 dated May 28, 2019, to the City of Eden
(Permittee) for the construction and operation upon certification of the subject wastewater collection
system extension. This permit shall be effective from the date of issuance until rescinded and shall be
subject to the conditions and limitations as specified therein. This cover letter shall be considered a part
of this permit and is therefore incorporated therein by reference.
Please pay particular attention to the following conditions contained within this permit:
Condition 11.1: This permit shall not be automatically transferable; a request must be made and
approved.
Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained
in accordance with 15A NCAC 02T.0403 or any individual system-wide collection system
permit issued to the Permittee.
Condition 11.7: Upon completion of construction and prior to operation of these permitted facilities,the
completed Engineering Certification form with checklist attached to this permit shall be
submitted with the required supporting documents to the address provided on the form.
Permit modifications are required for any changes resulting in non-compliance with
this permit, regulations, or the Minimum Design Criteria. [15A NCAC 02T.0116]
It shall be responsibility of the Permittee to ensure that the as-constructed project meets the appropriate
design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina
General Statute §143-215.6A through §143-215.6C, construction of additional or replacement
wastewater collection facilities, and/or referral of the North Carolina-licensed Professional Engineer to
the licensing board.
Moan.cnaouraaD E
dryhnml M EnWrenmenb]Oual�
North Carolina Department of Environmental Quality I Division of Water Resources
Winston-Salem Regional Office 1 450 W Hanes Mill Road,Suite 300 Winston-Salem, NC 27105
(336)776-9800
City of Eden
Permit No.WQ0040895
If any parts, requirements, or limitations contained in this permit are unacceptable,you have the right to
request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This
request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General
Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC
27699-6714. Unless such demands are made,this permit shall be final and binding.
If you need additional information concerning this matter, please contact Justin Henderson at (336) 776-
9701 or via e-mail at justin.henderson@ncdenr.gov.
Sincerely,
DocuSigned by:
E
for 11 a'�ui�pepper
Director, Division of Water Resources
by Lon Snider, Regional Supervisor
Water Quality Regional Operations Section
Winston-Salem Regional Office
Division of Water Resources, NCDEQ
cc: T. Carter Hubard, P.E.-W.K. Dickson &Co., Inc.-tchubard@wkdickson.com
Winston-Salem Regional Office Files
Water Resources Central Files
PERCS (electronic copy)
Page 2 of 8
�OuoNVL�
NORTH CAROLINA
Environmental Quality
WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the
City of Eden
Rockingham County
for the construction and operation of approximately 1,358 linear feet of 8-inch gravity sewer; 424 linear
feet of 10-inch gravity sewer; 388 linear feet of 12-inch gravity sewer; 1,331 linear feet of 16-inch gravity
sewer; 235 linear feet of 18-inch gravity sewer to replace/rehabilitate existing sewers with no new
connections as part of the Eden Remediation Plan project, and the discharge of "0" gallons per day of
collected domestic wastewater into the City of Eden's existing sewerage system, pursuant to the
application received April 5,2019,and additional information received on May 22,2019 and in conformity
with 15A NCAC 02T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as
applicable; the Division's Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and
Force Mains adopted June 1, 2000 as applicable; and other supporting data subsequently filed and
approved by the Department of Environmental Quality and considered a part of this permit.
This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified
conditions and limitations contained therein.
EDocuSigned by:
/.uti T SMdcr
-4'ME225C94EA...
for Linda Culpepper
Director, Division of Water Resources
By Authority of The Environmental Management Commission
Permit Number: WQ0040895
Permit Issued: May 28, 2019
Page 3 of 8
SUPPLEMENT TO PERMIT COVER SHEET
City of Eden is hereby authorized to:
Construct,and then operate upon certification the aforementioned wastewater collection extension. The
sewage and wastewater collected by this system shall be treated in the City of Eden's Mebane Bridge
Wastewater Treatment Facility in accordance with Permit Number NC0025071.
Permitting of this project does not constitute an acceptance of any part of the project that does not meet
15A NCAC 02T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as
applicable;and the Division's Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and
Force Mains adopted June 1, 2000 as applicable, unless specifically mentioned herein. Division approval
is based on acceptance of the certification provided by a North Carolina-licensed Professional Engineer in
the application. It shall be the Permittee's responsibility to ensure that the as-constructed project meets
the appropriate design criteria and rules.
Construction and operation is contingent upon compliance with the Standard Conditions and any Special
Conditions identified below.
I. SPECIAL CONDITIONS
1. No flow in excess of the quantity permitted herein, "0" GPD, shall be made tributary to the subject
sewer system until an application for permit modification for an increase in flow has been submitted
to and approved by the Division. [15A NCAC 02T.0304(b)]
II. STANDARD CONDITIONS
1. This permit shall not be transferable. In the event there is a desire for the wastewater collection
facilities to change ownership, or there is a name change of the Permittee, a formal permit request
shall be submitted to the Division accompanied by documentation from the parties involved, and
other supporting materials as may be appropriate. The approval of this request shall be considered
on its merits and may or may not be approved. [15A NCAC 02T.0116; G.S 143-215.1(d3)]
2. This permit shall become voidable unless the wastewater collection facilities are constructed in
accordance with the conditions of this permit; 15A NCAC 02T; the Division's Gravity Sewer Minimum
Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for
the Fast-Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and
other supporting materials unless specifically mentioned herein. [15A NCAC 02T.0110]
3. This permit shall be effective only with respect to the nature and volume of wastes described in the
application and other supporting data. [15A NCAC 02T.0110]
4. The wastewater collection facilities shall be properly maintained and operated at all times. The
Permittee shall maintain compliance with an individual system-wide collection system permit for the
operation and maintenance of these facilities as required by 15A NCAC 02T .0403. If an individual
permit is not required,the following performance criteria shall be met:
Page 4 of 8
a. The sewer system shall be effectively maintained and operated at all times to prevent discharge
to land or surface waters, and to prevent any contravention of groundwater standards or surface
water standards.
b. A map of the sewer system shall be developed and shall be actively maintained.
c. An operation and maintenance plan including pump station inspection frequency, preventative
maintenance schedule, spare parts inventory and overflow response has been developed and
implemented.
d. Pump stations that are not connected to a telemetry system shall be inspected every day(i.e. 365
days per year). Pump stations that are connected to a telemetry system shall be inspected at
least once per week.
e. High-priority sewer lines shall be inspected at least once per every six-months and inspections are
documented.
f. A general observation of the entire sewer system shall be conducted at least once per year.
g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance
with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina
General Statute §143-215.1C.
h. A Grease Control Program is in place as follows:
1. For public owned collection systems, the Grease Control Program shall include at least
biannual distribution of educational materials for both commercial and residential users and
the legal means to require grease interceptors at existing establishments. The plan shall also
include legal means for inspections of the grease interceptors, enforcement for violators and
the legal means to control grease entering the system from other public and private satellite
sewer systems.
2. For privately owned collection systems, the Grease Control Program shall include at least bi-
annual distribution of grease education materials to users of the collection system by the
permittee or its representative.
3. Grease education materials shall be distributed more often than required in Parts (1) and (2)
of this Subparagraph if necessary to prevent grease-related sanitary sewer overflows.
i. Right-of-ways and easements shall be maintained in the full easement width for personnel and
equipment accessibility.
j. Documentation shall be kept for Subparagraphs(a)through (i)of this Rule for a minimum of three
years with exception of the map, which shall be maintained for the life of the system.
5. The Permittee shall report by telephone to a water resources staff member at the Winston-Salem
Regional Office,telephone number (336) 776-9800, as soon as possible, but in no case more than 24
hours,following the occurrence or first knowledge of the occurrence of either of the following:
a. Any process unit failure,due to known or unknown reasons,that renders the facility incapable
of adequate wastewater transport, such as mechanical or electrical failures of pumps, line
blockage or breakage, etc.; or
b. Any SSO and/or spill over 1,000 gallons; or
c. Any SSO and/or spill, regardless of volume,that reaches surface water
Page 5 of 8
Voice mail messages or faxed information is permissible, but this shall not be considered as the initial
verbal report. Overflows and spills occurring outside normal business hours may also be reported to
the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300.
Persons reporting any of the above occurrences shall file a spill report by completing and submitting
Part I of Form CS-SSO (or the most current Division approved form) within five days following first
knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to
ensure that the problem does not recur. Part 11 of Form CS-SSO(or the most current Division approved
form) can also be completed to show that the SSO was beyond control. [G.S. 143-215.1C(a1)]
6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to
interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater
to the surface waters of the State. [15A NCAC 02T.0108(b)]
7. Upon completion of construction and prior to operation of these permitted facilities, the completed
Engineering Certification form with checklist attached to this permit shall be submitted with the
required supporting documents to the address provided on the form. A complete certification is one
where the form is fully executed, and the supporting documents are provided as applicable. Any
wastewater flow made tributary to the wastewater collection system extension prior to completion
of this Engineer's Certification shall be considered a violation of the permit and shall subject the
Permittee to appropriate enforcement actions.
A complete certification is one where the form is fully executed, and the supporting documents are
provided as applicable. Supporting documentation shall include the following:
a. One copy of the project construction record drawings(plan & profile views of sewer lines&force
mains) of the wastewater collection system extension. Final record drawings should be clear on
the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are
marked up or annotated with after construction information and show required buffers,
separation distances, material changes, etc.
b. One copy of the supporting applicable design calculations including pipe and pump sizing,velocity,
pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge
protection, detention time in the wet well, and force main, ability to flush low points in force
mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or
pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities
and the rotation schedule of the portable power source or pump, include travel timeframes, shall
be provided.
c. Changes to the project that do not result in non-compliance with this permit, regulations, or the
Minimum Design Criteria should be clearly identified on the record drawings, on the certification
in the space provided, or in written summary form.
Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting
in non-compliance with this permit (including but not limited to pipe length changes of 10% or
greater, increased flow, pump station design capacity design increases of 5% or greater and
increases in the number/type of connections), regulations, or the Minimum Design Criteria.
Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case-by-
case basis and each on its own merit. Please note that variances to the Minimum Design Criteria
should be requested and approved during the permitting process prior to construction. After-
Page 6 of 8
construction requests are discouraged by the Division and may not be approved, thus requiring
replacement or repair prior to certification &activation. [15A NCAC 02T .0116]
8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's
Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until
corrected. If there is an unforeseen obstacle in the field where all viable solutions have been
examined, a slope variance can be requested from the Division with firm supporting documentation.
This shall be done through a permit modification with fee. Such variance requests will be evaluated
on a case-by-case basis. Resolution of such request shall be evident prior to completing and submitting
the construction certification. [ 15A NCAC 02T.0105(n)]
9. A copy of the individual permit and construction record drawings shall be maintained on file by the
Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .01161
10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 02T; the
Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's
Minimum Design Criteria for the Fast-Track Permitting of Pump Station and Force Mains adopted June
1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement
action by the Division, in accordance with North Carolina General Statutes§143-215.6A through §143-
215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of
the North Carolina-licensed Professional Engineer to the licensing board. [15A NCAC 02T.0108(b-c)]
11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the
creation of nuisance conditions,the Permittee shall take immediate corrective action, including those
as may be required by this Division, such as the construction of additional or replacement facilities.
[15A NCAC 02T.0110; 15A NCAC 02T.0108(b)]
12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes,
rules, regulations,or ordinances that may be imposed by the Division any other Federal,State,or Local
government agencies which have jurisdiction or obtaining other permits which maybe required by the
Division or any other Federal, State, of Local government agencies. [G.S. 143-215.1(b)]
Page 7 of 8
CERTIFICATION CHECKLIST
To be completed by the certifying engineer prior to operation of the permitted sewers, per 15A NCAC 02T.0116.
Certifying Engineer:
Certification Review Date:
Eden Remediation Plan:
WQ00 Project County:
1) Has permittee information changed since the permit was issued (or last modified): change of mailing address,
change of ownership, transfer from developer to HOA/POA, etc. ❑ Yes ❑ No
• If yes, please provide either a change of ownership form or new contact information. Note that transfer of
permits from the developer to the HOA/POA must occur with the first certification.
2) Have the as-built drawings have been signed,sealed,and dated by an N.C. PE? ❑ Yes ❑ No
3) Final Engineering certification? ❑ Yes ❑ No
• If Partial Engineering certification, provide detailed narrative including what is being certified in the current
phase,what was previously certified (if applicable),and what is left to be certified.
4) Adequate information related to sewer lines: ❑ Yes ❑ No ❑ N/A
• Three feet minimum cover has been provided for all sewers unless ferrous pipe was installed.
• Minimum diameters for gravity sewers are 8-inches for public lines and 6-inches for private lines.
• Manholes have been installed: At the end of each line, at all changes in grade, size, or alignment, at all
intersections, and at distances not greater than 425 feet; minimum diameter shall be 4 feet (48-inches).
5) Adequate information related to pump stations: ❑ Yes ❑ No ❑ N/A
• Ensure power reliability option was selected per 15A NCAC 02T.0305(h).
6) Was project construction completed in accordance with all of the following: ❑ Yes ❑ No ❑ N/A
• 15A NCAC 02T, Minimum Design Criteria (MDC)for the permitting of Gravity Sewers (latest version), and MDC
for the Permitting of Pump Stations and Force Mains (latest version)?
If not, a variance approval is required in accordance with 15A NCAC 02T.0105(b), prior to certification and operation.
• Contact the Central Office to discuss the variance to determine a course of action.
• Applicant must submit two copies of the variance request form, plans, specifications, calculations, and any other
pertinent information to the Central Office (one hard copy, one digital copy).
• The central office will review the variance request, and if approvable, specific language regarding the variance
will be incorporated into the permit, either via a special condition or a supplementary letter. A copy of the
reissued permit with variance language or the variance letter must be maintained with the original documents.
7) Does the project contains high priority lines(15A NCAC 02T .0402(2))? ❑ Yes ❑ No
• If yes,ensure that the permit already contains the necessary condition related to high priority lines 15A NCAC
02T.0403 (a)(5). If the permit does not include this language,the Fast Track reviewer will reissue the permit with
the appropriate language.
8) Are Permit modifications are required for any changes resulting in non-compliance with this permit(including but not
limited to pipe length changes of 10%or greater,change in flow,pump station design capacity design change of 5%or
greater,and/or change in the number/type of connections)? ❑ Yes ❑ No
• If yes, a permit modification request must be submitted to the appropriate Regional Office, and a modified
permit with revised certification must be issued prior to certification and operation.
NC DWR—Water Quality Regional Operations Section 450 W Hanes Mill Road,Suite 300 Winston-Salem,NC 27105
Winston-Salem Regional Office Phone:(336)776-9800 FAX:(336)776-9797
FAST TRACK SEWER ENGINEERING CERTIFICATION
PERMITTEE: CITY OF EDEN
PERMIT#: WQ0040895
PROJECT: EDEN REMEDIATION PLAN
ISSUE DATE: MAY 28, 2019
This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of
this permit until the Division has received this Certification and all required supporting documentation. It
should be submitted in a mannerthat documents the Division's receipt. Send the required documentation
the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom.
Any wastewater flow made tributary to the wastewater collection system extension prior to completion
of this Certification shall be considered a violation of the permit and shall subject the Permittee to
appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up
until a final certification is received. A Final Certification shall be a complete set of record drawings and
design calculations regardless of whether partials have been submitted.
PERMITTEE'S CERTIFICATION
I,the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant
to the applicable standards & requirements, the Professional Engineer below has provided applicable
design/construction information to the Permittee, and the Permittee is prepared to operate & maintain
the wastewater collection system permitted herein or portions thereof.
Printed Name,Title Signature Date
ENGINEERS CERTIFICATION
I, as a duly registered Professional Engineer in the State of North Carolina,
having been authorized to observe(❑ periodically, ❑weekly, ❑full time)the construction of the Eden
Remediation Plan and location as referenced above for the above Permittee hereby state that,to the best
of my abilities, due care and diligence was used in the observation of the following construction:
for the construction and operation of approximately 1,358 linear feet of 8-inch gravity sewer; 424 linear
feet of 10-inch gravity sewer; 388 linear feet of 12-inch gravity sewer; 1,331 linear feet of 16-inch gravity
sewer; 235 linear feet of 18-inch gravity sewer to replace/rehabilitate existing sewers with no new
connections as part of the Eden Remediation Plan project, and the discharge of "0" gallons per day of
collected domestic wastewater into the City of Eden's existing sewerage system.
; such that the construction was observed to be built within substantial compliance of this permit; 15A
NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted
February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast-Track Permitting of
Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials.
................................................:
North Carolina Professional Engineer's Seal w/signature &date:
❑ Final ❑ Partial (include description)
Certification Comments/Qualifiers(attach if necessary):
...............................................:
NC DWR—Water Quality Regional Operations Section 450 W Hanes Mill Road,Suite 300 Winston-Salem,NC 27105
Winston-Salem Regional Office Phone:(336)776-9800 FAX:(336)776-9797
�WK
DICKSON
community Infrastructure consultants
May 22,2019
Mr.Justin Henderson
Division of Water Resources
NCDEQ—Winston-Salem Regional Office
450 W.Hanes Mill Road
Winston-Salem,NC 27105
RE: Fast Track Sewer System Extension Permit Modification Revised
Eden Remediation Plan-Fourth street and Dogwood Drive Pump Station Replacement
and Gravity Sewer System Relocation as Part of Rehabilitation
City of Eden,North Carolina
WKD Project No.20120031.01.RA
Dear Mr.Henderson:
i
This letter and the attached information are being submitted as supplemental information to the
Fast Track Permit Modification Application dated April 3,2019. Two pages of the fast track
application have been revised to remove the previous reference to the Dogwood and Fourth Street
pump station rehabilitation projects. As the rehabilitation of these pump stations will not increase
in capacity and are designed to be rehabilitated in conformance with current regulations and
minimum design criteria. The attached table has been revised to accurately represent the design of
the sewer realignment information.
Please do not hesitate to contact us if you have any questions or comments.
Sincerely,
W.K.Dickson&Co, Inc.
T. Carter Hubard,P.E.
Project Manager
Enclosures
cc: Mark Bullins,City of Eden Construction Projects Manager
300 N.Third Street,Suite 301
Wilmington,NC 28401
Tel.910.762.4200
Fax 910.762.4201
www.wkdickson.com Transportation • Water Resources • Urban Development Gcomnflcs
rD ICl<S4N Pi Nartnentof
Environmental Quality
community Infrastructure consultants Received
APR 0 5 2019
April 3,2019 Winston-Salem
Regional Office
Mr.Justin Henderson
Division of Water Resources
NCDEQ—Winston-Salem Regional Office
450 W. Hanes Mill Road
Winston-Salem, NC 27105
RE: Fast Track Sewer System Extension Permit Modification
Eden Remediation Plan-Fourth street and Dogwood Drive Pump Station Replacement
and Gravity Sewer System Relocation as Part of Rehabilitation
City of Eden, North Carolina
WKD Project No.20120031.01.RA
Dear Mr. Henderson:
The City of Eden plans to replace two pump stations and rehabilitate/replace portions of its gravity
sewer system through a 19-phase remediation project. The submitted application below is meant to
cover phases 16, 17, 18, and 19 of the remediation project.This project aims to repair or replace
damaged sewer, reduce inflow and infiltration, and ultimately extend the reliability and longevity
of the City of Eden's collection system.
The majority of the gravity sewer replacement work is to be performed without alteration to the
existing alignment of the sewer. However, several pipe segments are proposed for replacement in
i
new alignments from that of the existing. A compiled pipe inventory table including data on all
proposed gravity sewer pipes is attached as part of this application submittal. As seen on the pipe
inventory table, a section does not meet minimum slope. A variance request has been submitted for
this section.
The Dogwood Drive and Fourth Street pump stations are planned to undergo a full replacement
including the installation of duplex grinder pump stations complete with backup generators and
lockable site access.
The two pump stations are each detailed in Section VIII: "Pump Station Design Criteria' of the Fast
Track Application(page 3)which subsequently means there are duplicates of page 3 printed in the
application being provided.
300 N.Third Street,Suite 301
Wilmington,NC 28401
Tel.910.762.4200
Fax 910.762.4201
wwvw.wkdickson.com Transportation • Water Resources • Urban Development • Geomatics
Mr.Henderson
April 3, 2019
Page 2
We are requesting that a modification be made to the sewer collection system permit WQCS00018
to allow for the rehabilitation of the proposed sewer outside of the existing alignment as outlined in
the pipe inventory table and the replacement of the existing Dogwood Drive and Fourth Street
pump stations.
As part of this submittal, please find enclosed the following documents for the referenced permit
modification:
• One(1) original of the completed Fast Track Application(Form FTA 04-16)
• One(1) copy of the completed Fast Track Application (Form FTA 04-16)
• One(1) color copy of a USGS topographic map depicting the project area and closest
surface waters for each phase regarding sewer rehabilitation and one for the pump
stations(Figure 1)
• One(1) color copy of a street-level map showing the project area for each phase
regarding sewer rehabilitation and one for the pump stations (Figure 2)
• One (1)copy of the approved Permit No. WQCS00018
• One(1)check payable to NCDEQ in the amount of$480.00
Please do not hesitate to contact us if you have any questions or comments. We look forward to
hearing back from you.
Sincerely,
W.K.Dickson&&CCo.,Inc.
T. Carter Hubard,P.E.
Project Manager
Enclosures (6)
cc: Mark Bullins, City of Eden Public Utilities Director
D EKSON
State of North Carolina
DWR Department of Environmental Quality
Division of Water Resources
I SA NCAC 02T.0300—FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources d FTA 04-16&SUPPORTING DOCUMENTATION
Application Number: 0 0p (to be completed by DWR)
All items must be completed or the application will be returned
i
L APPLICANT INFORMATION:
I. Applicant's name: City of Eden,NC(company,municipality,HOA,utility,etc.)
2. Applicant type: ❑Individual ❑Corporation ❑General Partnership ❑Privately-Owned Public Utility
❑Federal ❑ State/County ® Municipal ❑Other
3. Signature authority's name:_ per 15A NCAC 02T.0106(b)
Title: NC t;ep@rtrrtent of
Enviro Received
ertai uality
4. Applicant's mailing address:P.O.Box 70
City:Eden State:NC Zip: 27289-0070 A DR Q 5 2019
5. Applicant's contact information:
Winston-Salem
Phone number: (_-)__ Email Address:
Regional Office
II. PROJECT INFORMATION:
I. Project name: Eden Remediation Plan
2. Application/Project status: I ❑Proposed(New Permit) ®Existing Permit/Project
If a modification,provide the existing permit number: WQOOO 18 and issued date: 09/28/2004
If new construction but part of a master plan,provide the existing permit number:W000_
3. County where project is located:Rockingham
4. Approximate Coordinates(Decimal Degrees): Latitude: 36.4880 Longitude:-79_770
5. Parcel ID(if applicable):
(or Parcel ID to closest downstream sewer)
11I. CONSULTANT INFORMATION:
I. Professional Engineer: T. Carter Hubard License Number: 24984
Firm: W.K.Dickson&Co.,Inc.
Mailing address: 300 N.Third Street, Suite 301
City: Wilmington State:NC Zip: 28401-4099
Phone number: 910 762-4200 Email Address: tchubard@wkdickson.com
IV. WASTEWATER TREATMENT FACILITY(WWTF)INFORMATION: C
1. Facility Name:Mebane Bridge Treatment Facility Permit Number:NCO025071
Owner Name: City of Eden
V. RECEIVING DOWNSTREAM SEWER INFORMATION(if different than W WTF):
i
1. Permit Number(s): WQ Downstream(Receiving)Sewer Size: inch
System Wide Collection System Permit Number(s)(if applicable): WQCS00018
Owner Name(s): City of Eden
FORM: FTA 04-16 Page I of 5
VI. GENERAL REQUIREMENTS
l. If the Applicant is a Privately-Owned Public Utility,has a Certificate of Public Convenience and Necessity been attached?
❑Yes ❑No NN/A
2. If the Applicant is a Developer of lots to be sold,has a Developer's Operational Agreement(FORM: DEV)been attached?
❑Yes ❑No NN/A
3. If the Applicant is a Home/Property Owners'Association has an Operational Agreement(FORM: HOA)been attached?
❑Yes ❑No NN/A
4. Origin of wastewater: (check all that apply):
N Residential Owned N Retail(stores,centers,malls) ❑ Car Wash
❑Residential Leased ❑Retail with food preparation/service ❑Hotel and/or Motels
❑ School/preschool/day care ❑Medical/dental/veterinary facilities ❑ Swimming Pool/Clubhouse
❑Food and drink facilities N Church ❑ Swimming Pool/Filter Backwash
❑Businesses/offices/factories ❑Nursing Home ❑Other(Explain in Attachment)
5. Nature of wastewater: %Domestic/Commercial %Commercial
_%Industrial(See 15A NCAC 02T .0103(20))
"Is there a Pretreatment Program in effect? ❑ Yes ❑No
6. Hasa flow reduction been approved under 15A NCAC 02T.0114(fl? ❑ Yes N No
➢ If Yes provide a cony of flow reduction approval letter
7. Summarize wastewater generated by project:
Establishment Type(see 02T.0114(f11 Daily Design Flow'b No.of Units Flow
gal/ GPD
gal/ GPD
gal/ GPD
gaV GPD
gal/ GPD
gal/ GPD
Total GPD
a See I SA NCAC 02T 0114(b), (d). (e)(I) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per
dwelling;proposed unknown non-residential development uses;public access facilities located near high public use areas;
and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined
in G.S.42A-4).
b Per 15A NCAC 02T.0114(c),design flow rates for establishments not identified[in table 15A NCAC 02T.0114] shall be
determined using available flow data,water using fixtures,occupancy or operation patterns, and other measured data.
8. Wastewater generated by project:_GPD(per 15A NCAC 02T .0114)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero,indicate why:
❑Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line
❑Flow has already been allocated in Permit Number:
N Rehabilitation or replacement of existing sewer with no new flow expected
❑ Other(Explain):
FORM: FTA 04-16 Page 2 of 5
VIL GRAVITY SEWER DESIGN CRITERIA(If Applicable)-02T.0305& MDC(Gravity Sewersl:
1. Summarize gravity sewer to be permitted:
Size(inches) Length(feet) Material
See Attached Table
➢ Section II&III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC
VIII. PUMP STATION DESIGN CRITERIA(If Applicable)—02T.0305& MDC(Pump Stations/Force Mains):
COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name:
2. Approximate Coordinates(Decimal Degrees): Latitude: Longitude: -
3. Design flow of the pump station: _millions gallons per day(firm capacity)
4. Operational point(s)of the pump(s): gallons per minute at_feet total dynamic head(TDH)
5. Summarize the force main to be permitted(for this Pump Station):
Size(inches) Length(feet) Material
6. Power reliability in accordance with 15A NCAC 02T 0305(h)(1):
❑ Standby power source or pump with automatic activation and telemetry- 15A NCAC 02T.0305(h)(1)(B):
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility
Or if the pump station has an average daily flow less than 15,000 gallons per day:
❑ Portable power source with manual activation,quick-connection receptacle and telemetry- 15A NCAC 02T
.0305(h)(1)(C)
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry- 15A NCAC 02T.0305(h)(1)(C):
➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant(draft agreement)
and is compatible with the station.
If the portable power source or pump is dedicated to multiple pump stations,an evaluation of all the pump stations'storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes,shall be provided
in the case of a multiple station power outage.
FORM:FTA 04-16 Page 3 of 5
IX. SETBACKS&SEPARATIONS—(02B.0200 & 15A NCAC 02T.0305(t)):
I. Does the project comply with all separations found in 15A NCAC 02T.0305(f)&W ® Yes ❑No
➢ 15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems:
Setback Parameter* Separation Required
Storm sewers and other utilities not listed below vertical 24 inches
Water mains vertical-water over sewer including in benched trenches 18 inches
Water mauls horizontal 10 feet
Reclaimed water lines vertical-reclaimed over sewer 18 inches
Reclaimed water lines horizontal-reclaimed over sewer 2 feet
**Any private or public water supply source, including any wells,WS-I waters of Class I or
Class II impounded reservoirs used as a source of drinking water 100 feet
**Waters classified WS(except WS-I or WS-V),B,SA,ORW,HQW,or SB from normal
high water or tide elevation and wetlands see item IX.2 50 feet
**Any other stream,lake,impoundment,or ground water lowering and surface drainage
ditches 10 feet
Anv building foundation 5 feet
Any basement 10 feet
Top slope of embankment or cuts of 2 feet or more vertical height 10 feet
Drainage systems and interceptor drains 5 feet
Any swimming pools 10 feet
Final earth grade vertical 36 inches
➢ 15A NCAC 02T.030560 contains alternatives where separations in 02T.0305(f)cannot be achieved.
➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webnage
➢ If noncompliance with 02T.0305(f)or W,see Section X of this application
2. Does the project comply with separation requirements for wetlands?(50 feet of separation) ®Yes ❑No ❑N/A
➢ See the Division's draft separation requirements for situations where separation cannot be meet
➢ No variance is required if the alternative design criteria specified is utilized in design and construction
➢ As built documents should reference the location of areas effected
3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B.0200? [] Yes ❑No ®N/A
➢ This would include Trout Buffered Streams per 15A NCAC 213.0202
4. Does the project require coverage/authorization under a 404 Nationwide or ❑Yes ®No
individual permits or 401 Water Quality Certifications?
➢ Information can be obtained from the 401 &Buffer Permitting Branch
5. Does project comply with 15A NCAC 02T.0 I 05(c)(6)(additional permits/certifications)? ®Yes []No
Per 15A NCAC 02T.0105(cl(6), directly related environmental permits or certification applications are being prepared,have
been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits(erosion and
sedimentation control plans, stormwater management plans,etc.).
6. Does this project include any sewer collection lines that are deemed"high-priority?"
Per 15A NCAC 02T.0402,"high-priority sewer"means"any aerial sewer,sewer contacting surface waters,siphon,or sewer
positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer.
® Yes ❑No ❑N/A
➢ If yes,include an attachment with details for each line,including type(aerial line,size,material,and location).
High priority lines shall be inspected by the permittee or its representative at least once every six-months and inspections
documented per 15A NCAC 02T.0403(a)(5)or the permitee's individual System-Wide Collection permit.
FORM: FTA 04-16 See Attached Table and Variance Request Submitted 01/04/19 Page 4 of 5
II
X. CERTIFICATIONS!
I, Does file submitted System comply with 1 ti A NCAC(12T.the 1\4j iijAwn tygsigtt Crilcria for ilia Parawlifing of plyyt p g§fo
and Puma Mains(latest version( And the Gravity Scwcr i\1iniunmt Design Critcr't 2tEyt ySt lQttl its applicable?
El Yes Ej No Variance Request Submitted 01/04/19
IfNo,complete and submit file Variance/Ahcrnative Design Request application(VADC 10-1 d)and supporting documents for
review. Anuroval of(lie renuest is required nt-inr to subliminal of Ilia pasiTrach Application and ssu tntorthte docuryanls
2. Professlohal Fogineces Cc5i tcation:
G
� abcsl that Ibis application for
(Professioofil fdngfncer's naive front Application licm 111.1.)
has been reviewed by nta and is accurate,complete and consistent with the information supplied in ilia plans,specifications,
engineering calculations,and all ether supponhig documentation to the best of lily knowledge. I Onther attest that to the best
or my knowledge the proposed design has been prepared In accordance with Ilia applicable regulations, Gravity Sewer
Minimum Design Criteria for Gravity Sewers(latest version),and the Minimum Design Criteria for the Fnst-rmck Pcrntllling
of Pump Stations laid Force Mains(latest version). Although other professionals may have developed certain portions of this
su1HUR11l package, hIClnSlea Of these materials tinder my signuiure and seal signifies iliac 1 have reviewed this material and
havejudged it to be consistent with ilia proposed design.
NOTE — lit accordance with Gamest Statutes 143-21SAA and 143-215.613, any person who knowingly makes tiny 1•alsc
stntcnienl, representation, or certilicatirnt in any application package shall be guilty of a Class 2 misdealeanor, which may
include a fine not to exceed$10,000,as well as civil penalties tip to$25,000 per violation.
North Carolina Professional Engineers sent,signature,mid(Intel
T, . ...1
3, Appliamfs Certificat.Iionpper I SA NCAC 02T.0106(b)q
1 Pp PtCd Cp f GO f ti r, i Ct M rt,„ apes(that this application for
(Signature Authority's name&title from Application lici L3.)
has been reviewed by me and is accurate find complete to ilia best of lily knowledge, I luldorsland that If all required parts of
this application are not completed and that if all required supporting documentation and 0001111lents are not included, Oils
application package is subject to being returned as incomplete. I understand Ilim uny discharge of wastewater from this non-
discharge system to surrm waters or the land will result in ail hnnhcdiato emforeament action that may include civil pennithis,
injunctive relief,anditiro'iniinal prosecution. l will make no claim agninsl the Division(if Waler Resources should aconditiol
of this pennit be violated. I also understand that if all required parts or this application package arc not completed and ittat if
all required supporting infoination and aliachnientt ara not included, this application package will be returned to ilia as
incomplete,
NOTE — In accordance with General Statutes 143.215.6A and 14,- 15 , any parson who knowingly mukes aoy false
statoneM, representation,or certification in any uppiionlion package shall be guilty of a Class 2 misdenionor, which nifty
include a One nol to exceed$1 000 as well its civil penalties tip to$25,000 per violation,
Signature: Date:
FORM: PTA 04-I6 Page 5 of 5
r ; r rrrrr ; �
o 6 a 6 6 0 o d 6 d 6 a o o d o 0 0 0
m
np6moe '° N
0 0 No n m a o a m
o -
E
E e E - E
j E -
E
a
E
c
m m < rva, o
3
a
z
a d d a adds d d d
`o o `0 2 `o o` o `o `o `o `o `o
- � �
vn � � � G GGCG .� tl G Muir iiu G
c . o oo' o a' o' o' an o' o' o odnda o
v
N � � o 0 o 'nooao �n no o �n oo E
m x x xosxxx oo x0000
y �2 %2 �Q Q � 3 x x x c
0
n eo n aNamm. o nm m n v
N 3 3 3 3 3 3 «
0
m o a na mm "' m � a � o1O
o d o 6 0 0 o v ry
u.
a
m
0 0 o m m m m _
N o c
%
V m
d N u o
- g O O O U O 9 2 N
V V V U V V V U V U V U V V Uy _ C_
n " e a; a z E
m
i
: ! § §
\ \� { {
{
» § :
i F
{ uu [ [ !
17
ƒ Im,
; § ; §
Phase 16 and Phase 17 - Proposed Pipes in New Alignment from Existing Gravity Sewer
Existing Mains
Total Length of Removed/Abandoned Sum of Change to
New Alignments by New Alignments Existing Length
Row Labels (LF) (LF) (LF)
8-inch Totals 1,358 1,408 -49.9
8 inch DIP 305 278 26.6
8 inch PVC Pipe 1,053 1,130 -76.5
10-inch Totals 424 404 20.6
10inch DIP 424 404 20.6
12-inch Totals 388 318 69.8
12inch DIP 388 318 69.8
16-inch Totals 1,331 1,321 9.8
16 inch DIP 1,331 1,321 9.8
I8-inch Totals 235 - 235.2
18 inch DIP 235 - 235.2
Grand Totals 3,737 3,451 571
WK Dickson & Co., Inc.
300 N Third Street, Suite 301
Wilmington NC 28401
910-762-4200