Loading...
HomeMy WebLinkAbout20180542 Ver 2_Beaufort 249 permit modification and moratorium relief request_20190522 (2)Carpenter,Kristi From: Johnson, Jay B Sent: Wednesday, May 22, 2019 5:30 PM To: Steffens, Thomas A CIV USARMY CESAW (USA); Lane, Stephen; Ward, Garcy Cc: Lentine, Sarah F; Horner, Kenneth V; Capehart, Cadmus; Lane, Heather C; Speagle, Madison G; Carpenter,Kristi; Chapman, Amy Subject: RE: [External] RE: Beaufort 249 permit modification and moratorium relief request (UNCLASSIFIED) Follow Up Flag: Follow up Flag Status: Flagged Thanks Tom! -----Original Message ----- From: Steffens, Thomas A CIV USARMY CESAW (USA) <Thomas.A.Steffens@usace.army.mil> Sent: Wednesday, May 22, 2019 9:10 AM To: Johnson, Jay B <jbjohnson@ncdot.gov>; Lane, Stephen <stephen.lane@ncdenr.gov>; Ward, Garcy <garcy.ward@ncdenr.gov> Cc: Lentine, Sarah F <sflentine@ncdot.gov>; Horner, Kenneth V <kvhorner@ncdot.gov>; Capehart, Cadmus <ccapehart@ncdot.gov>; Lane, Heather C <hclane@ncdot.gov>; Speagle, Madison G <mgspeagle@ncdot.gov>; Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov>; Chapman, Amy <amy.chapman@ncdenr.gov> Subject: [External] RE: Beaufort 249 permit modification and moratorium relief request (UNCLASSIFIED) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.Spam@nc.gov<maiIto: report.spam@nc.gov> CLASSIFICATION: UNCLASSIFIED Jay, Review of the request for moratorium relief on the Beaufort 249 project has been completed. As such, you may consider this transmission as official approval to move forward with the proposed work as soon as possible. Questions/comments, please call or write. Thomas A Steffens Regulatory Project Manager US Army Corps of Engineers 2407 West 5th Street Washington, NC 27889 (910)-251-4615 We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. -----Original Message ----- From: Johnson, Jay B [mailto:jbjohnson@ncdot.gov] Sent: Thursday, May 16, 2019 4:09 PM To: Lane, Stephen <stephen.lane@ncdenr.gov>; Ward, Garcy <garcy.ward@ncdenr.gov>; Steffens, Thomas A CIV USARMY CESAW (USA) <Thomas.A.Steffens@usace.army.mil> Cc: Lentine, Sarah F <sflentine@ncdot.gov>; Horner, Kenneth V <kvhorner@ncdot.gov>; Capehart, Cadmus <ccapehart@ncdot.gov>; Lane, Heather C <hclane@ncdot.gov>; Speagle, Madison G <mgspeagle@ncdot.gov>; Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov>; Chapman, Amy <amy.chapman@ncdenr.gov> Subject: [Non-DoD Source] FW: Beaufort 249 permit modification and moratorium relief request Sirs, Based on the meeting today (see below) please find attached the revised drawing for the permit mod request. From: Lentine, Sarah F <sflentine@ncdot.gov> Sent: Thursday, May 16, 2019 3:49 PM To: Johnson, Jay B <jbjohnson@ncdot.gov> Subject: RE: Beaufort 249 permit modification and moratorium relief request Jay, During the land quality review today, on this project, we discussed this with Garcy and the contractor. Through the conversation it was decided it would be better to build the slop with Class II rip rap, as opposed to just keying in the rip rap on a soil slope. All thought it would be better for securing the slope. Garcy stated he just needs a revised plan sheet, since we are not going outside of the permitted area. Sorry for the change. Can you please pass this info on? Thanks, Sarah F. Lentine, PE From: Johnson, Jay B <jbjohnson@ncdot.gov <mailto:jbjohnson@ncdot.gov> > Sent: Thursday, May 16, 2019 12:04 PM To: Lane, Stephen <stephen.lane@ncdenr.gov<mailto:stephen.lane@ncdenr.gov> >; Ward, Garcy <garcy.ward@ncdenr.gov <mailto:garcy.ward@ncdenr.gov> >; Steffens, Thomas A SAW (Thomas.A.Steffens@usace.army. miI <mailto:Thomas.A.Steffens@usace.army.mil> ) <Thomas.A.Steffens@usace.army. miI <mailto:Thomas.A.Steffens@usace.army.mil> > Cc: Lentine, Sarah F <sflentine@ncdot.gov <mailto:sflentine@ncdot.gov> >; Horner, Kenneth V <kvhorner@ncdot.gov <maiIto: kvhorner@ncdot.gov> >; Capehart, Cadmus <ccapehart@ncdot.gov <mailto:ccapehart@ncdot.gov> >; Lane, Heather C <hclane@ncdot.gov <mailto:hclane@ncdot.gov> >; Speagle, Madison G <mgspeagle@ncdot.gov <mailto:mgspeagle@ncdot.gov> >; Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov <mailto:kristilynn.carpenter@ncdenr.gov> >; Chapman, Amy <amy.chapman@ncdenr.gov <mailto:amy.chapman@ncdenr.gov> > Subject: Beaufort 249 permit modification and moratorium relief request Gentlemen, Please find attached Beaufort 249 permit modification and moratorium relief request. FYI. Stephen is sending this request to Travis and Shane for written comments. Jay Johnson Division 2 Environmental Officer North Carolina Department of Transportation 252 439 2821 office 252 3419802 mobile jbjohnson@ncdot.gov <mailto:jbjohnson@ncdot.gov> 1037 W H Smith Blvd Greenville, NC 27834 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. CLASSIFICATION: UNCLASSIFIED