HomeMy WebLinkAbout20180542 Ver 2_Beaufort 249 permit modification and moratorium relief request_20190522 (2)Carpenter,Kristi
From: Johnson, Jay B
Sent: Wednesday, May 22, 2019 5:30 PM
To: Steffens, Thomas A CIV USARMY CESAW (USA); Lane,
Stephen; Ward, Garcy
Cc: Lentine, Sarah F; Horner, Kenneth V; Capehart,
Cadmus; Lane, Heather C; Speagle, Madison G;
Carpenter,Kristi; Chapman, Amy
Subject: RE: [External] RE: Beaufort 249 permit modification
and moratorium relief request (UNCLASSIFIED)
Follow Up Flag: Follow up
Flag Status: Flagged
Thanks Tom!
-----Original Message -----
From: Steffens, Thomas A CIV USARMY CESAW (USA)
<Thomas.A.Steffens@usace.army.mil>
Sent: Wednesday, May 22, 2019 9:10 AM
To: Johnson, Jay B <jbjohnson@ncdot.gov>; Lane, Stephen <stephen.lane@ncdenr.gov>;
Ward, Garcy <garcy.ward@ncdenr.gov>
Cc: Lentine, Sarah F <sflentine@ncdot.gov>; Horner, Kenneth V <kvhorner@ncdot.gov>;
Capehart, Cadmus <ccapehart@ncdot.gov>; Lane, Heather C <hclane@ncdot.gov>;
Speagle, Madison G <mgspeagle@ncdot.gov>; Carpenter,Kristi
<kristilynn.carpenter@ncdenr.gov>; Chapman, Amy <amy.chapman@ncdenr.gov>
Subject: [External] RE: Beaufort 249 permit modification and moratorium relief request
(UNCLASSIFIED)
CAUTION: External email. Do not click links or open attachments unless you verify. Send
all suspicious email as an attachment to
report.Spam@nc.gov<maiIto: report.spam@nc.gov>
CLASSIFICATION: UNCLASSIFIED
Jay,
Review of the request for moratorium relief on the Beaufort 249 project has been
completed. As such, you may consider this transmission as official approval to move
forward with the proposed work as soon as possible. Questions/comments, please call
or write.
Thomas A Steffens
Regulatory Project Manager
US Army Corps of Engineers
2407 West 5th Street
Washington, NC 27889
(910)-251-4615
We would appreciate your feedback on how we are performing our duties. Our
automated Customer Service Survey is located at:
http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0
Thank you for taking the time to visit this site and complete the survey.
-----Original Message -----
From: Johnson, Jay B [mailto:jbjohnson@ncdot.gov]
Sent: Thursday, May 16, 2019 4:09 PM
To: Lane, Stephen <stephen.lane@ncdenr.gov>; Ward, Garcy
<garcy.ward@ncdenr.gov>; Steffens, Thomas A CIV USARMY CESAW (USA)
<Thomas.A.Steffens@usace.army.mil>
Cc: Lentine, Sarah F <sflentine@ncdot.gov>; Horner, Kenneth V <kvhorner@ncdot.gov>;
Capehart, Cadmus <ccapehart@ncdot.gov>; Lane, Heather C <hclane@ncdot.gov>;
Speagle, Madison G <mgspeagle@ncdot.gov>; Carpenter,Kristi
<kristilynn.carpenter@ncdenr.gov>; Chapman, Amy <amy.chapman@ncdenr.gov>
Subject: [Non-DoD Source] FW: Beaufort 249 permit modification and moratorium relief
request
Sirs, Based on the meeting today (see below) please find attached the revised drawing
for the permit mod request.
From: Lentine, Sarah F <sflentine@ncdot.gov>
Sent: Thursday, May 16, 2019 3:49 PM
To: Johnson, Jay B <jbjohnson@ncdot.gov>
Subject: RE: Beaufort 249 permit modification and moratorium relief request
Jay,
During the land quality review today, on this project, we discussed this with Garcy and
the contractor. Through the conversation it was decided it would be better to build the
slop with Class II rip rap, as opposed to just keying in the rip rap on a soil slope. All
thought it would be better for securing the slope.
Garcy stated he just needs a revised plan sheet, since we are not going outside of the
permitted area.
Sorry for the change. Can you please pass this info on?
Thanks,
Sarah F. Lentine, PE
From: Johnson, Jay B <jbjohnson@ncdot.gov <mailto:jbjohnson@ncdot.gov> >
Sent: Thursday, May 16, 2019 12:04 PM
To: Lane, Stephen <stephen.lane@ncdenr.gov<mailto:stephen.lane@ncdenr.gov> >;
Ward, Garcy <garcy.ward@ncdenr.gov <mailto:garcy.ward@ncdenr.gov> >; Steffens,
Thomas A SAW (Thomas.A.Steffens@usace.army. miI
<mailto:Thomas.A.Steffens@usace.army.mil> ) <Thomas.A.Steffens@usace.army. miI
<mailto:Thomas.A.Steffens@usace.army.mil> >
Cc: Lentine, Sarah F <sflentine@ncdot.gov <mailto:sflentine@ncdot.gov> >; Horner,
Kenneth V <kvhorner@ncdot.gov <maiIto: kvhorner@ncdot.gov> >; Capehart, Cadmus
<ccapehart@ncdot.gov <mailto:ccapehart@ncdot.gov> >; Lane, Heather C
<hclane@ncdot.gov <mailto:hclane@ncdot.gov> >; Speagle, Madison G
<mgspeagle@ncdot.gov <mailto:mgspeagle@ncdot.gov> >; Carpenter,Kristi
<kristilynn.carpenter@ncdenr.gov <mailto:kristilynn.carpenter@ncdenr.gov> >;
Chapman, Amy <amy.chapman@ncdenr.gov <mailto:amy.chapman@ncdenr.gov> >
Subject: Beaufort 249 permit modification and moratorium relief request
Gentlemen, Please find attached Beaufort 249 permit modification and moratorium
relief request. FYI. Stephen is sending this request to Travis and Shane for written
comments.
Jay Johnson
Division 2 Environmental Officer
North Carolina Department of Transportation
252 439 2821 office
252 3419802 mobile
jbjohnson@ncdot.gov <mailto:jbjohnson@ncdot.gov>
1037 W H Smith Blvd
Greenville, NC 27834
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law
and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law
and may be disclosed to third parties.
CLASSIFICATION: UNCLASSIFIED