Loading...
HomeMy WebLinkAbout1215 Long Ferry Road - Project Kodiak - SuppEZ_2018_SignedSUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 1 Project Name Project Area ac Coastal Wetland Area ac Surface Water Area ac Is this project High or Low Density? PROJECT KODIAK 78.86 N/A N/A High 2 3 4 5 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003( 7 Width of vegetated setbacks provided feet n/a 8 Will the vegetated setback remain vegetated? Yes 9 Is BUA other that as listed in .1 0034 c-d out of the setback? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMS: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 1 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Ba filter 0 26 Filterra 0 FORMS LOADED SIGNER CERTIFICATION 27 Name and Title: R. Blake Day, P.E. - Project Engineer 28 Or anization: Kimle -Hom 29 Street address: 200 South Tryon Street, Suite 200 30 City, State, Zip: Charlotte, NC 28202 31 Phone numbers : 704-319-5691 32 Email: blake.day@kimley-hom.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. •� ,�, CAR '• �• 0z =�•e�oF �ss���9r��- SEAL 045238 = �•++Lu�tit�� 2119.05.1316�11-14'00' Signature of Designer 5/13/2019 Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 1 3 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM SandFilter SandFilter 5 Total BUA in project (sq ft 1480626 sf 1480626 sf 6permitting) New BUA on subdivided lots (subject to s ft n/a n/a 7permitting) New BUA outside of subdivided lots (subject to s JOffsite -total area (sq ft) Offsite BUA (sq ft) n/a n/a 8 n/a n/a 9 n/a n/a 10 Breakdown of new BUA outside subdivided lots: -Parking s ft 669147 sf 669147 sf - Sidewalk (sq ft 6435 sf 6435 sf - Roof (sq ft 690000 sf 690000 sf - Roadway s ft sf sf - Future (sq ft 109000 sf 109000 sf - Other, please specify in the comment box below (sq ft) 29072 sf 29072 sf 11 New infiltrating permeable pavement on subdivided lots (sq ft sf sf 12 New infiltrating permeable pavement outside of Isubdivided lots (sq ft) sf sf 13permitting) Exisitng BUA that will remain (not subject to s ft sf sf 14 Existing BUA that is already permitted (sq ft sf sf 15 Existing BUA that will be removed (sq ft sf sf 16 Percent BUA 39% 70% 17 Design storm inches 1" 1" 18 Desi n volume of SCM cu ft 29967 cf 29967 cf 19 Calculation method for design volume Simple Simple DDITIONAL INFORMATION Please use this space to provide any additional information about the 20 drainage area(s): Other impervious areas include gravel edging for trailer parking and sheet flow dissipation. DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM N/A Sand Filter 5 Total BUA from project (sq ft) 6 1995 rules SL 2006-246 2008 rules 2017 rules 1480626 sf 7 New BUA on subdivided lots (subject to permitting) (sq ft) 1995 rules SL 2006-246 2008 rules 2017 rules n/a 8 New BUA outside of subdivided lots (subject to permitting) (sf) 1995 rules SL 2006-246 2008 rules 2017 rules 9 Offsite - total area (sq ft) 1995 rules SL 2006-246 2008 rules 2017 rules 10 Offsite BUA (sq ft) 1995 rules SL 2006-246 2008 rules 2017 rules 11 Design storm (inches) 1995 rules SL 2006-246 2008 rules 2017 rules 1" 12 Breakdown of new BUA: - Parking (sq ft 669147 sf - Sidewalk (sq ft 6435 sf - Roof (sq ft 690000 sf - Roadway s ft - Future (sq ft 109000 sf - Other, please specify in the comment box below (sq ft 29072 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement outside of subdivided lots (sq ft) 15permitting) Exisitng BUA that will remain (not subject to s ft sf 16 Existing BUA that is already permitted (sq ft sf 17 Existina BUA that will be removed (sq ft sf 18 Percent BUA 70% 19 Design volume of SCM cu ft 29967 cf 20 lCalculation method for design volume Simple DDITIONAL INFORMATION 21 Please use this space to provide any additional information about the drainage area(s): Other impervious areas include Gravel areas SAND FILTER 18 SHWT elevation (fmsl) 628 19 Type of sand filter (open or closed) Open 20 If closed, will the filter will be pre -cast or pour -in -place? 21 If closed, top of grate elevation (fmsl) 22 Is this sand filter designed to attenuate peak flows? No Sediment Chamber 23 Volume that can be retained in the sediment chamber (cubic feet) 243564 cf 24 Will there be a permanent pool in the sediment chamber? Yes 25 Bottom of the sediment chamber (fmsl) 633.00 26 Area of the sediment chamber (square feet) 50688 sf 27 Physical depth of the sediment chamber (inches) 84 in 28 Ponding depth in the sediment chamber, above any permanent pool (inches) 36 in 29 Elevation of top of weir between chambers (fmsl) 637 Sand Chamber 30 Volume that can be retained in the sand chamber (cubic feet) 89902 cf Bottom of the sand chamber (fmsl) 635.50 Area of the sand chamber (square feet) 30500 sf 31 32 33 Physical depth of the sand chamber (inches) 36 in 34 Ponding depth in the sand chamber, above any permanent pool (inches) 36 in 35 Elevation of the bypass device (fmsl) 638.5 36 Type of bypass device Permanent Control Structure 37 Mechanism for distributing flow over the sand surface Rock Berm 38 Sand specification for sand chamber ASTM C33 39 Depth above underdrain pipe (inches) Will the media be maintained to drain at least two inches per hour at the sand surface? 6 in 40 41 Is at least one clean -out pipe provided at the low point of each underdrain line? LL 42 i clean -out pipes a capped? RONAL INFORMATION IIriease use mis space To proviae any aaanionai inTormauon aoouT me I 43 Sand Filter(s): The proposed sediment basin will be converted to a sand filter following stabilization of the upstream areas. To limit earthwork the proposed sediment chamber is proposed to have a permanent pool elevation. Sand Filter 4 10:16 AM 5/3/2019