Loading...
HomeMy WebLinkAbout20190222 Ver 1_More Info Request_20190319Strickland, Bev From: Annino, Amy M Sent: Tuesday, March 19, 2019 9:57 AM To: 'maparkerl @comcast.net' Subject: DWR # 19-0222 - Parker, 3039 E Paradise Harbor Dr Attachments: Catawba Notification Form.pdf, 20190222 Ver 1 -Shoreline Stabilization_20190215.pdf On February 15, 2019, the Division of Water Resources (Division) received your application dated February 12, 2019, requesting a 401 Water Quality Certification from the Division for the subject project. The Division has determined that your application is incomplete and cannot be processed. The application is on hold until all of the following items are addressed: 1. Please describe the construction access corridor(s) within the 50' Catawba Buffer, providing location, dimensions, and square feet of disturbance of proposed corridor(s) in the Catawba Buffer. 2. Please provide the shoreline stabilization dimensions and square footage where rip rap will be applied: a. Above normal lake level (example: 3'x85') b. Below normal lake level (example: 1' x 85') 3. Describe the dimensions and work area required for the proposed shoreline grading. 4. Provide the count and tree diameter size for all trees 3" or greater proposed for removal within the buffer. 5. Complete attached notification form. Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the proper consideration of the application. Please provide a response by April 19, 2019. Regards, Amy Annino Environmental Specialist -Asheville Regional Office Water Quality Regional Operations Section NCDEQ - Division of Water Resources 828 296 4656 office amy.annino(cDncdenr.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 -5:'-'Nothing Compares.] Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Name/Address: Land Owner: Print Contractor/Agent: County: Signature Print Signature The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B.0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B.0243(6)] Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover is not allowed. [15A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitations on the size of decks. [15A NCAC 02B .0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 0213 .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non-erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] Acknowledgement of Notification I, , hereby state that I have been informed of the Catawba Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. Signature (owner): Date: f State of North Carolina Department of Environment and Natural Resources rlo_ Division of Water Resources rvutef Rewurc e�. 15A NCAC 02H .0500— Water Quality Certification, Shoreline Stabilization ENVIRONMENTAL QUALITY FORM: SSGP 02-2017 Shoreline Stabilization Application Form 2 0 1 '902, Three copies of the application (including attachments) and the application tee should be sent to: If sending via US Postal Service If sending via delivery service (UPS FedEx, etc.) Karen Higgins Karen Higgins DWR — 401 & Buffer Permitting Branch DWR — 401 & Buffer Permitting$ncPA 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699-1617 Raleigh, NC 27604 A. Applicant Information [1SA NCAC 02H .0502(a)] 1. Owner Information Name: Av, r- /r jr� -�5� I C. Mailing Address: 'Z' r",(% Hnr P H 0 X06 6,I uec�-wnreH RE50URCl MUM Telephone Number: Fax Number: E-mail Address: Ma P� ✓ /1) ro m�A{f.V) (f t 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: htto://www.saw.usace.armv.mil/Portals/59/docs/reRulatory/reRdocs/Permits/SAMPLE AGENT AUTHORIZ ATION FORM.gdf) Name: Company Affiliation: Mailing Address: Telephone Number: E-mail Address: Fax Number: B. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. FORM: SSGP 02-2017 Page 1 of 3 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) // County: B)CLQ Nearest Town: Conl7e I►ll a T Lake/ river/ ocean adjacent to property: Property size (acres): Subdivision name or site address (include phase/lot number): ci Z) %Q )C V, CO' -N/ f V LV' I1 / (f)000 I /u <A -,-a P, r Directions to site - please include road names and numbdrs, landmarks, etc.: Latitude (in decimal degrees) 3S 177 ,yam_ Longitude (decimal degrees)—Y,1 q% kd 5. Describe the existing land use or condition of�he site at the time of this application (residential, undeveloped, etc.): „ vL n!11 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Er w�,, �� s�w� . 1 ��� �..� n� lb f ,n /Ii':LE a(rrax yS ° A S�� 6� It Le sLDKc �� r c � �1�Of� ✓� �I rT 4f� I rd"i 7. Will work be conducted from land? (� From water? n 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: Temporary impacts in square feet: 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward anent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: Temporary impacts (temporary clearing, construction corridor) in square feet: 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): / 7 if?C S l i rr v-/kjte 61, 11. Signature Owner/Agent's Signature* [15A NCAC 02H .0502(f)1 Date * Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 02-2017 Page 2 of 4 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Lake (At Full Pond/ Normal Water Level) Full Pond/ Normal Water Level yx zq Shoreline O Q z k 8o G7C! I fA r Plan View FORM: SSGP 02-2017 Full Pond/ Normal Water Lev 2ft. x 150 ft. adclitlonal cl—ky '6necessary Plan View Lake (At full Pond/N-1 Watm Level) Existing Dock /30ftxlft 3ftx150ft SOWN hall Vond/ NWL x�rxr� _ 4ftx150ft Above full pond/ NWL Page 3 of 4 f ' L F�. yFf N l� Lake (At Full Pond/ Normal Water Level) W N C E N L O t Z Vy 'a C Side View 0- ILL - 3 L 3 ft. below full pond water level 4 ft. above full pond water level 2 ft. additional clearing `if necessary Existing bank 10 ft. bank Side Vi "A n AM I r AIVIVLL� FORM: SSGP 02-2017 Page 4 of 4 --•_r-- - 1;} _ ;gyp. `� ni 779 J•r..•••y �—.• II I i I, II II I x ■ IIIZ•_ COnneIISr I n 3039 E PARADISE R60R gg:'Cannelly prings, NC, 28612 November 28, 2017 Burke County, NC Owne r: PIN: 2764870921 PIN EXT: 000 REID: 59378 LENOIR, NC 28645 Property Value: $129,932 Acreage: 1.5 Property 3039 E PARADISE HARBOR DR Deed Book: 002073 Address: CONNELLY SPRINGS 28612 Deed Page: 00850 PROPERTY DESC — Deed Date: 02/27/2013 o 100 200 aet e 1:1,295. ' 1 inch = 108 feet t Disclaimer The information contained on this page is taken from aerial mapping, tax mapping, and public records and is NOT to be construed or used as a survey or'legal desaiption' Only a licensed professional land surveyor can legally determine precise locations, elevations, length and direction of a line, and areas. �3S �Nm le, \`fat.`t �\>7 :§ t 3039: PARADI.SE � AR80R [fit`, ion Iv Springs. NC, 28612 • c.r� V r i Y November 28, 2017 Owner: -10110110 LENOIR, NC 28645 Property 3039 E PARADISE HARBOR DR Address: CONNELLY SPRINGS 28612 PROPERTY DESC Burke County, NC PIN: 2764870921 PIN EXT: 000 REID: 59378 Property Value: $129,932 Acreage: 1.5 Deed Book: 002073 Deed Page: 00850 Deed Date: 02127/2013 0 100 200 ��� ���rr �� �r� L r s• f f" Fazt m 1:1,295 , 1 inch = 108 feet Disclaimer. The information contained on Mis page is taken from serial rnapping, tax mapping, and puW,, records and is NOT tc be Construed or usod as a survey orYegal description' Only a licensed professional land surveyor can legally delarmine precise 1008N01M. e1e0960ns, length and direction of a line, and areas. ok 1'6 ,J (9. 15�` 6� ISHED FLOOD PLAIN 209.1 0 i Jonathan Abraham ir Bk. 1581 Pg 691 Z 100 y", flood Line William P. Nunn Bk. 1888, Pg. 31. o ,209) T\) rn 1.50 Acres_ Co By Coordinate COMPutGtiOn U? Ref Deed Bk. 1705, P9. 509 W ID, S" Cp IL Sight l_' (Tie Line) 'N 11'04109'E 3380 W4kwli Aff ............. y�, , ,; � + e — ', �' �� ..�. .. :S. � _ ' � `� , . �� :� ��, V �l �. ! � � .b ^ __ �h '� .�' Y t� _� � �IJ ��- 1C �.. �- - �, ,;,5 -. _ - �J� �� • 1 � 3S �, �' `�- Aa I`.ft ..... ..... V a t l.,�'�l i� 1 1 t. POW I wb! - ;' E AQ jr j AQ jr e t 1 e t