HomeMy WebLinkAboutNC0000396_Correspondence_20190529DUKE
ENERGY.
PROGRESS
April 11, 2019
Sergei Chernikov, Ph.D.
Division of Water Resources
1617 Mail Service Center
Raleigh, NC 27699-1617
Subject: Comments on the Draft NPDES Major Modification for
Asheville Steam Electric Generating Plant
Permit No.: NCO000396
Buncombe County
Dear Dr. Chernikov:
Garry A. Whlsnant
Plant General Manager
Ashev„!e Steam Eleark Plant
Duke Energy Progress
Asn PLTf 200 CP&L Or
Arden, NC28704
or 828.687.5201
t 828.687-5204
gaay. wh;snant0duke-energyconl
Duke Energy Progress, LLC (Duke Energy) submits the following comments on the draft Major
Modification of the National Pollutant Discharge Elimination System (NPDES) Permit for the Asheville
Steam Electric Generation Plant (Plant), issued for public comment by the North Carolina Department of
Environmental Quality ("NCDEQ") on March 22, 2019. Duke Energy appreciates NCDEQ's efforts to
develop the Major Modification, which addresses the operation of the new Combined Cycle facility located
at the Plant. Duke energy offers the following comments and requests for modification and/or clarification
on specific provisions of the draft Major Modification:
On pages 10 and 11 of 19 of the Draft Permit, Duke Energy requests that the number of
internal outfalls is reduced to one (Outfall 001A). The four (4) internal outfalls currently
listing in the draft permit flow to a common point and have the same required sampling
parameters. For these reasons, Duke Energy requests the removal of three internal
outfalls. Please see proposed location of the internal outfall included as an
attachment to this letter.
Should you have any questions regarding this letter or require additional information, please contact Ms.
Tina Woodward at (704) 382-4585 or at Tina.Woodward@Duke-Energy.com.
Sincerely,
, JAVA
Garry Whisnant
Asheville Steam Plant Manager
Attachment
Comments on the Draft NPDES Major Modification
Asheville Steam Electric Generating Plant
Permit No.: NCO000396
Buncombe County
cc: DWR-Wastewater Permitting
Attn: Asheville Permit
1617 Mail Service Center
Raleigh, N.C., 27699-1617
April 2019
Comments on the Draft NPDES Major Modification
Asheville Steam Electric Generating Plant
Permit No.: NC0000396
Buncombe County
bc: Teresa Williams
Anne Pifer
Erika Tuchbaum
Tina Woodward
Jim Wells
Richard Baker
Paul Draovitch
Shannon Langley
Reid Garrett
Linda Hickok
Mary Ann Ogle
Matt Pickett
Jana Ackerman
Jeff Blackwood
FileNet
9
April 2019
k
!
_
q
!go}§
!
!!
go
o
�§
I
�
_
!
q
k#
%|
!
|
f#
$
Ln
�
-B
i!
2
��
!
C,4
I
!
L
CD
!
:
!!
!!
1!
C
\w
�
2}`
|2
cc"j
U�
R
7
J
�
3
@
a
|
■
n
~
cn
2
f
|
k�lq
r
W
k
4M
!
!
m
o
�
U�
■
C
!
LO
Go
k
2
-
cn