Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20051413 Ver 1_Complete File_20050728
Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality August 15, 2005 Robert Wiseman, County Manager Avery County Post Office Box 640 Newland, NC 28657 DWQ Project # 05-1413 Avery County Subject Property: Grassy Prong, UT to Clark Branch,& White Pine Creek EWP (DSR - UNT7) Approval of 401 Water Quality Certification with Additional Conditions Dear Mr. Wiseman: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 6,050 feet of streams for the purpose of streambank stabilization and woody debris removal / trash removal at the subject properties, as described within your application received by the N.C. Division of Water Quality (DWQ) on July 27, 2005. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3367 (3367). The Certification (s) allows you to use Nationwide Permit(s) 37 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge, and stormwater regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose that you described in your application. (Nothing in this approval should be interpreted as giving permission to remove bedload material from the existing channel, nor allowing for the construction of berms which would not allow the stream access to it's floodplain.) As "stable" and "pre-storm" are not interchangeable terms, all work must be to ensure stability, regardless of channel location. Additionally, channels cannot be returned to it's pre-storm location unless there is documented instability is submitted and approved as part of the application package. If you change your project beyond the approval here, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. 401 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 ohone: 919-733-1786 / FAX 919-733-68931 Internet: http://h2o.enr.state.nc.us/ncwetiands ,DU `f An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper Avery County: Page 2 of 6 ' August 15, 2005 The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Plan Location or Reference Approved (Units) Stream 6,050 (feet) Grassy Prong, UT to Clark Branch & White Pine Creek 2. Erosion & Sediment Control Practices Erosion and sediment control practices must _ be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. a I Avery County: Page 3 of 6 August 15, 2005 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 5. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 6. Construction in this creek and disturbance within a 25-foot trout buffer, where applicable, should be avoided during the October 15 to April 15 trout spawning period to avoid adverse effects of sediment on eggs and larvae, where applicable. However, Wildlife Resources Commission will not object to construction of Natural Resources Conservation Service "urgent and compelling" sites during the spawning period provided these projects are, to the extent appropriate and practical, constructed by: (1) using flow diversion structures such as sand bags, (2) placing large-sized rock toes and filter cloth backing for stabilization sites before backfilling, and (3) excavating new channel alignments in dry areas. Construction at the other non-"urgent and compelling" sites should not occur during the spawning period to minimize the potential adverse effects of multiple construction activities on trout resources in this creek. 7. Sediment and erosion control measures must be implemented prior to construction and maintained on the sites to minimize sediment in downstream areas. Seeding for a temporary cover of wheat, millet, or similar annual grain or permanent herbaceous cover should occur on all bare soil within five (5) days of ground disturbing activities to provide long-term erosion control. The projects should be accomplished in stages instead of leaving large tracts exposed to further storm events. Erosion control matting should be used in conjunction with appropriate seeding on disturbed soils in steep slope and riparian areas. Matting should be secured in place with staples, stakes, or, wherever possible, live stakes of native trees. Straw mulch and tall fescue should not be used in riparian areas. In addition, because of an anticipated difficulty in establishing ground cover during the winter, reseeding should be conducted, as necessary, in the spring-time with a native annual and perennial seed mix with a temporary nursery crop of wheat, millet or other grain. Avery County: Page 4 of 6 August 15, 2005 8. Only clean, large, angular rock, large woody material, or other natural stream design materials and techniques should be used for bank stabilization. Rock should not be placed in the stream channel in a manner that constricts stream flow or that will impede aquatic life movements during low flow conditions. Filter cloth should be placed behind large rock that is used for bank stabilization. Properly designed rock vanes should be constructed wherever appropriate on bank stabilization and channel realignment stream reaches to improve channel stability and to improve aquatic habitat. Root wads should be installed low enough in the bank so that a significant portion (at least one-third) the root wad is inundated during normal flows. 9. The channel should be restored to a more stable condition. However, under no circumstances should river rock, sand or other materials be dredged from the stream channel under authorization of this permit except, if necessary, in the immediate vicinity of the eroding banks for the explicit purpose of anchoring stabilizing or flow/grade control structures or for reestablishing the natural and more stable stream channel dimensions. Stream bed materials are unstable in flowing-water situations and are unsuitable for bank stabilization. In stream dredging has catastrophic effects on aquatic life and disturbance of the natural form of the stream channel can cause downstream erosion problems. The natural dimension, pattern, and profile of the stream upstream and downstream of the permitted area should not be modified by widening the stream channel or changing its depth. 10. Stabilization measures should only be applied on or near existing erosion sites, leaving other stable stream bank areas in a natural condition. Grading and backfilling should be minimized and tree and shrub growth should be retained where possible to ensure long term availability of stream bank cover for aquatic life and wildlife. Backfill materials should be obtained from upland sites except in cases where excess stream bed materials are available. Berms should not be permitted because they block the floodplain, constrict and accelerate flood flows, and often fail and sometimes impede drainage during large flood events. 11. Repairs to eroded banks should be conducted in a dry work area where possible. Sandbags or other clean diversion structures should be used where possible to minimize excavation in flowing water. Channel realignments should be constructed by excavating the new channel from downstream to upstream before connecting it to the old channel. 12. Heavy equipment should be operated from the bank whenever possible. All mechanized equipment operated near surface waters should be inspected and maintained regularly to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids or other toxic materials. Equipment used in stream channel must be clean, new or low hour equipment. 13. Disturbed stream banks and a 25-foot vegetated zone, or the widest width that is practical under the site conditions, should be restored along the construction sites to natural riparian conditions with native trees and shrubs (e.g., silky dogwood, rhododendron, dog hobble, red maple, silky willow, tag alder, black willow, sycamore) to provide long-term bank stability and stream shading. Note, silky dogwood, silky willow and black willow can be planted as live stakes collected during the dormant growing season. Cuttings should be randomly planted on four (4) foot centers from the waters edge to the top of the bank. Trees should be planted on ten _? Avery County: Page 5 of 6 August 15, 2005 (10) to twelve (12) foot centers. Stream banks in these areas should also be seeded with a native annual and perennial seed mix with a temporary nursery crop of wheat, millet or other grain. 14. If pasture along the stream is to be used for grazing, a fence must be constructed outside of the riparian zone and the stream to prevent livestock from entering these areas. 15. Diffuse Flow All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at non-erosive velocities through the protected riparian zones such that it will not re-concentrate before discharging into a stream. If this is not possible, it may be necessary to provide stormwater facilities that are considered to remove nitrogen. This may require additional approval from this Office. 16. Riparian Zone Replanting Replanting of vegetation within disturbed areas located within 30 feet of the streambank associated with any land disturbing activity, repair, replacement and/or maintenance must be done in a manner consistant with the Guidelines for Riparian Buffer Restoration immediately following construction. (Please see attached.) 17. Deed Notifications Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective woody riparian zones in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place prior to impacting any wetlands, waters and/or buffers approved for impact under this Certification Approval and Authorization Certificate. A sample deed notification can be downloaded from the 401JWetlands Unit web site at http://h2o.enr.state.nc.us/ncwetiands. The text of the sample deed notification may be modified as appropriate to suit to this project. 18. Turbidity Standard The turbidity standard of 10 NTUs (Nephelometric Turbidity Units) shall not be exceeded as described in 15 A NCAC 2B. .0200. Appropriate sediment and erosion control practices must be used to meet this standard. 19. No Sediment and Erosion Control Measures in Wetlands Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources or locally delegated program has released the project. Avery County: Page 6 of 6 August 15, 2005 Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Cyndi Karoly in the Central Office in Raleigh at 919-733-9721 or Mr. Kevin Barnett in the DWQ Asheville Regional Office at 828-296-4657. Sincerely, AW K1khb er 4ef . Alan W. Klimek, P.E., Director Division of Water Quality Enclosures: GC 3367 Certificate of Completion Guidelines for Riparian Buffer Restoration -, cc: Doug Smith, Buck Engineering, PC 8000 Regency Parkway Suite 200 Cary, NC 27511 USACE Asheville Regulatory Field Office DWQ 401 Central Office DLR Asheville Regional Office File Copy Central Files \NJ 2?a5 arc ? z ,dIslu%a'a, Filename: 05-1413.EWP.GrassyProngUTtoClarkBranch&White Pine Creek.Approval Triage Check List Date: 07/28/05 1 Project Name: Avery County EWP Group 13 DSR LR-4, GP-1, TCB-1, WP-1 and WP-2 DWQ #:05-1413 Kevin Barnett, Asheville Regional Office County: Yancey To: 60-day Processing Time: 7/28/05 to 9/26/05 From: Cyndi Karoly Telephone: (919) 733-9721 The file attached is being forwarded to you for your evaluation. Please call if you need assistance. ? Stream length impacted ? Stream determination Wetland determination and distance to blue-line surface waters on USFW topo maps ? Minimization/avoidance issues ? Buffer Rules (Neuse, Tar-Pamlico, Catawba, Randleman) ? Pond fill Mitigation Ratios ? Ditching ? Are the stream and or wetland mitigation sites available and viable? ? Check drawings for accuracy Is the application consistent with pre-application meetings? ? Cumulative impact concern Comments: As per our discussion regarding revision of the triage and delegation processes, please review the attached file. Note that you are the first reviewer, so this file will need to be reviewed for administrative as well as technical details. If you elect to place this project on hold, please ask the applicant to provide your requested information to both the Central Office in Raleigh as well as the Asheville Regional Office. As we discussed, this is an experimental, interim procedure as we slowly transition to electronic applications. Please apprise me of any complications you encounter, whether related to workload, processing times, or lack of a "second reviewer" as the triage process in Central had previously provided. Also, if you think of ways to improve this process, especially so that we can plan for the electronic applications, let me know. Thanks! FILE COPY EWP - Avery County, North Carolina Group 13 - DSR Sites: LR-4, GP-1, TCB-1, WP-1, and WP-2 Catawba River Basin Scope of Work 20051413 These sites are only a portion of DSR Group 13 (see Index Map) located in southcentral Avery County. This submittal contains 5 of the total 7 sites for this group. Because site LR-4 will only require debris removal and landscaping, it will not require a permit. GP- 1, TCB-1, WP-1, and WP-2 all require adjustment to a combination of their cross-section geometry, alignment, or profile and/or will require installation of in-stream structures. These sites will therefore require a Pre-Construction Notification (permit application) to be submitted to the United States Army Corps of Engineers. Site specific plans are attached and show site location, existing conditions, estimated repair quantities and planned repairs. All repair work is being proposed under the Emergency Watershed Protection Program that Avery County is administering. Questions about this package should be directed to Buck Engineering's Doug Smith at 919-463-5488. Contents • Avery County EWP Index Map of DSR Groups • Table 1. Property owners of sites proposed for repair under EWP. • Repair plan (including a Recommendations for Repair narrative, Plan Sheet Sketch Map, Site Photos, and Design Calculations where applicable) for sites: o LR-4, o GP-l, o TCB-1, o WP-1, o WP-2. • Avery County Plant List and Riparian Seed Mix • Erosion and Sediment Control Plan • Construction Details 0 W ? Q ?? D JUL 2 8 2005 DENR - WATER QUALITY WETLANDS AND STOr'iMWATER BRANCH Office Use Only: 2 0 0 5 Form versio`?n May 2002 1 1 USACE Action ID No. DWQ No. /TF -. 7 . . I,-- 'J k1 --....»•.-- 11- - - aFpii? avic w uub FIViCUL, Please enter "1Vot Appllcable" or "N/A".) I. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide 37 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete section VIII and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Mana ement Area of Environmental Concern (see the top of page 2 for further deta pow?gm II. Applicant Information JUL 2 8 2005 1. Owner/Applicant Information DENk -WATER QUALITY Name: Robert Wiseman (County Manager) WETLANDS AND STORMWATER BRANCH Mailing Address: County Administrative Offices P.O. Box 640 Newland NC 28657 Telephone Number: 828-733-8201 Fax Number: 828-737-9395 E-mail Address: Robert.wisemanPncmail.net 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Doug Smith Company Affiliation: Buck Engineering PC Mailing Address:8000 Re2ency Parkway. Suite 200 Cary, NC 27511 Telephone Number: 919-463-5488 Fax Number: 919-463-5490 E-mail Address: dsmith(a)bucken2ineerinLy.com Pagel of 9 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Avery County EWP, GP-1, Grassy Prong 2. TCB-1, Unnamed Tributary to Clark Branch WP-1, White Pine Creek WP-2 White Pine Creek 3. T.I.P. Project Number or State Project Number (NCDOT Only): N/A 4. Property Identification Number (Tax PIN): See attached Table 1. 5. Location County: Avery Nearest Town: Linville Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): The location of each site is identified on the attached EWP Index Mai) and provided in each individual site repair plan. 6. Site coordinates, if available (UTM or Lat/Long): Attached in site repair plan. (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 7. Property size (acres): N/A 8. Nearest body of water (stream/river/sound/ocean/lake): Linville River 9. River Basin: Catawba River (Note = this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.ne.us/admin/maps/.) 10. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: A site specific description is in each site repair plan. Page 2 of 9 11. Describe the overall project in detail, including the type of equipment to be used: Specific repair activities for the site are provided in the site repair plans which are attached Repair activities proposed for the site include: adjusting channel cross-section profile and installing grade control structures and bank protection structures to improve bed and bank stability. This work will require the use of a trackhoe with hydraulic thumb and a dump truck to haul and place boulders. A bulldozer may be needed for some of the grading work 12. Explain the purpose of the proposed work: This work is being done as part of the Emergency Watershed Protection program that counties impacted by two hurricanes in the fall of 2004 are carrying out. The purpose of the work is to repair damaged stream reaches that are unstable and continuing to cause losses to personal and public property and to public resources by degrading water quality and other natural resources IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. To our knowledge permits have not been issued for work at these sites in the past V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. No VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream Page 3 of 9 mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: Impacts from this work will be minimized whenever possible. However to accomplish these needed repairs impacts may be realized from temporary increased turbidity, removal of aggraded bed material and temporary loss of herbaceous vegetation. Long-term impacts will be an increase in stream bank stability, stable dimension and profile, and improved vegetative cover. 2. Individually list wetland impacts below: Wetland Impact Site Number (indicate on ma) Type of Impact* Area of Impact acres) Located within 100-year Floodplain** (es/no) Distance to Nearest Stream (linear feet) Type of Wetland*** * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at bttp://www.fema.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: 0 Total area of wetland impact proposed: 0 3. Individually list all intermittent and perennial stream impacts below: Stream Impact Site Number (indicate on map) Type of Impact* Length of Impact (linear feet Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? (please specify) Stream bank GP-1 stabilization and rock 350 LF Grassy Prong 5'- 10' Perennial vane structure installation Stream bank TCB-1 stabilization and grade 1,000 Unnamed Tributary to 5'- 10' Perennial control structure LF Clark Branch installation Page 4 of 9 Stream bank WP_1 stabilization and grade control structure 1,700 LF White Pine Creek 10' - 15' Perennial installation Stream bank WP-2 stabilization and grade control structure 3,000 LF White Pine Creek 12'- 16' Perennial installation * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at ww-%v.usgs.Qov. Several intemet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, www.map2quest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 6,050 LF 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.) below: Open Water Impact Site Number (indicate on ma Type of Impact* Area of Impact (acres) (if Name p Waterbody applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) N/A List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: Page 5 of 9 VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Access to each site will be over the most stable route possible and movement of vehicles over access routes will be minimized. Wherever possible equipment work will be done from the stream bank. Operating equipment within the channel will be done when this is the only way to accomplish needed work. Excavated material will be moved directly to trucks for hauling to disposal sites when it will not be used on site. When excavated material will be used on site, it will be handled as few times as possible. Work at each site will be accomplished as quickly possible and the site will be stabilized with erosion control matting and seeding within 5 days of site completion. Trees will be planted during the next dormant season. Equipment leaking any_ fluids will not be used and if leaks occur during construction the equipment will be replaced or repaired immediately. The attached sediment and erosion control plan outlines measures that will be employed to minimize sediment movement off site. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at hqp://h2o.enr.state.nc.us/ncwetlands/strmgide.htrnl. Page 6 of 9 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCWRP, check the NCWRP website at htip://h2o.enr.state.ne.us/wrp/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a Page 7 of 9 map, whether or not Regional Office may applicant's discretion. impacts are proposed to the buffers. Correspondence from the DWQ be included as appropriate. Photographs may also be included at the Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 213 .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ® If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet Multiplier Required Mitigation 1 3 2 1.5 Total * Zone I extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 213 .0242 or.0260. XI. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. There will be no chance in impervious acreage. Existing proiect sites are forested/aQricultural lands and will remain in this land use. Proposed repair work will not alter runoff of stormwater from each site. The end result of this proposed work will be stream banks that are better able to withstand the erosive forces generated by storm flows. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A, waste water will not be generated by this project Page 8 of 9 XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes E] No XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). N/A (Agent's "/7-Ar -os- 'Agent's Signature Date is valid only if an authorization letter from the applicant is provided.) Page 9 of 9 To Whom It May Concern: I, Robert Wiseman, County Manager for Avery County, attest to the fact that Avery County has entered into a contract with Buck Engineering PC, a North Carolina professional corporation. Buck Engineering will be providing engineering services and permitting assistance in support of the Emergency Watershed Protection Program. In this contractual relationship, Buck Engineering will act as the County's agent for the purpose of accomplishing this work. Specifically, employees of Buck Engineering may take those actions necessary to obtain environmental permits from the U. S. Army Corps of Engineers, N. C. Division of Water Quality, and N. C. Division of Land Quality. i Robert Wiseman, , County Manager for Avery County Date: 1 `' ??- Cq S-- Office: Avery County Courthouse, Newland, NC 28657 Table 1. Property owners of sites proposed for repair under the EWP program in Avery County. DSR site relates to the number shown on the Index Map. Lat. & Lona (dd.dddd) DSR NUMBER DSR SITE PIN NAME 1 ADDRESS 2 CITYISTATE ZIPCODE North West 13 TCB-1 183400428942 VANCE, LAWRENCE JEROME BILL & PATSY 728 WALT CLARK RD NEWLAND NC 28657 36.0152 81.5534 13 WP-1 183400588654 LYNN, IDA OWANA CLARK 1146 OLD LINVILLE ROAD MARION NC 28752 36.0250 81.5523 13 WP-1 183400588365 CLARK, DEWAYNE & NANCY 795 WHITE PINE RD NEWLAND NC 28657 36.0247 81.5523 13 WP-1 183400682081 CLARK, DEWAYNE & NANCY 795 WHITE PINE RD NEWLAND NC 28657 36.0243 81.5523 13 WP-2 183400559534 PHILLIPS, RICHARD E & JANICE 1199 WHITE PINE RD NEWLAND NC 28657 36.0219 81.5522 13 WP-2 183400657586 WISE, GLORIA CLARK PO BOX 65 CROSSNORE NC 28657 36.0219 81.5511 13 WP-2 183400659278 ALDRIDGE, DALE EDWIN BOX 408 CROSSNORE NC 28657 36.0217 81.5509 13 WP-2 183400752537 OLLIS, LLOYD L, JR PO BOX 296 PINEOLA NC 28662 36.0219 81.5506 13 MT-2 183400846272 WRIGHT BERYL & DONNA GAIL PO BOX 302 CROSSNORE NC 28616 36.0202 81.5449 13 MT-2 183400940285 WRIGHT BERYL & DONNA GAIL PO BOX 302 CROSSNORE NC 28616 36.0200 81.5449 13 MT-2 183400836125 TENNANT TOMASINE BOX 548 CROSSNORE NC 28616 36.0156 81.5448 13 GP-1 186400842858 HUX, REGINA ANN ECKARD & RANDY S 1558 HARDY DR FARMVILLE VA 23901-0000 36.0390 81.8133 GP-1 186400945452 COFFEY, RANDY BOX 325 LINVILLE NC 28646-0000 36.0378 81.8133 13 LR-4 184400327274 BLACKBURN, JUDITH L PO BOX 539 NEWLAND NC E28657 36.0300 81.8960 Plan Review Checklist EVVP-.very County, North Carolina DSR L R_ 4 I the Natural Resource Conservation Service Agent for Avery County, have reviewed the stream repair plans listed below. These plans have been prepared by Buck Engineering PC to accomplish stream repair under the Emergency Watershed Protection Program being administered by Avery County. The following table summarizes my comments on these plans: DSR Approve Disapprove A rove with Modifications I, Additional comments: Natural Resource Conservation Service Agent Ag=t's Signantn; p"J V DSR No. LR-4 Site Assessed By: DJS, AC Date Assessed: 5/12/2005 County: Avery Location: Avery Co., Hwy 221 Bridge / Linville R. Lat.: 36° 01'46" / Long.: 81° 53'45" Length of Assessment: Approximately 800 feet Waterbody: Linville River X Debris removal _ Bank sloping Bank stabilization Channel realignment _ In-stream structures X Riparian planting X Seeding Adjust channel dimension Summary Evaluation of Conditions: The reach begins where Pineola Road previously crossed the Linville River (the bridge has since been abandoned and removed) and the reach extends along the Linville River to the US Highway 221 bridge crossing. Although some areas are highly vegetated, access to this relatively level site is good and may be obtained through private property. This reach suffers from excessive deposits of woody debris where large trees that have fallen into the river, reducing channel conveyance capacity, or where large trees have fallen and have been deposited onto the banks, reducing floodplain flood conveyance capacity. The fallen trees and associated debris jams are a hazard and could become a problem in future storm events. Damage to the US Highway 221 bridge could occur if the trees strike the bridge during flooding. Recommendations for Improvements: Prior to performing any clearing, grubbing or debris removal activities, inventory, under engineer approval, any adequate root wad or transplant material. These items should be stockpiled and installed at the appropriate time. Remove the large trees and associated debris (branches and leaf pack) along this reach. Five (5) large debris piles were identified during the site visit. Minor discing/grading using a farm tractor may be helpful in preparing disturbed areas for seeding and mulching. Install erosion control matting (see detail) on steep bare slopes (per engineer's instruction). All work should be performed in conformance with the "Erosion & Sediment Control Plan" (see attached Quantities: Item Unit Quantity Wood Debris Removal CY 350 -Grading bank preparation) CY 25 Live Stakes EA 25 Erosion Control Matting SY 15 -Temporary Seeding LB 35 Grain Straw Mulch EA bales 21 Permanent Seeding LB 5 LR4 Photo 2 - WD2 (see Plan Sheet Sketch Map) LR4 Photo 4 - WD4 (see Plan Sheet Sketch Map) LR4 Photo 5 - WDS (see Plan Sheet Sketch Map) Plan Review Checklist EWP-Avery County, North Carolina DSR I the Natural Resource Conservation Service Agent for Avery County, have reviewed the stream repair plans listed below. These plans have been prepared by Buck Engineering PC to accomplish stream repair under the Emergency Watershed Protection Program being administered by Avery County. The following table summarizes my comments on these plans: DSR Approve Disapprove Approve with Modifications Additional comments: ?4'k? Natural Resource Conservation Service Agent ngmt's signamre v DSR No. GP-1 Site Assessed By: DJS / AC Date Assessed: 5/11/2005 Location: Grassy Prong Rd County: Avery Lat.: 36° 02' 19" / Long.: 81 ° 48'34" Length of Grassy Prong / "Gragg Prong" (-3.1 Assessment: Approximately 350 feet Waterbody: mil) X Debris removal Channel realignment X Seeding Bank sloping X In-stream structures Adjust channel dimension X Bank stabilization X Riparian planting Summary Evaluation of Conditions: The reach is located at the end of Grassy Prong Road (see Reference Map), also identified as Webb Creek Road or Gragg Prong on some maps. This is a short reach, approximately 350 feet immediately adjacent to the end of pavement of Grassy Prong Road. Access may be obtained through adjacent private property. In response to last fall's hurricane events, the stream deposited excess material to form a point bar and bank vegetation has been adversely impacted. The point bar development encouraged migration and scour of the right bank and undermined pavement to the point of failure into the stream. The lateral migration also has scoured around an existing utility pole, leaving the pole currently located mid-channel. As a result of the lateral migration, flows are accessing an adjacent private manmade pond, degrading the embankment separating the impoundment from the stream, and posing a threat to the impoundment's integrity. Recommendations for Improvements: Prior to performing any clearing, grubbing or debris removal activities, inventory, under engineer approval, any adequate root wad or transplant material. These items should be stockpiled and installed at the appropriate time. Relocating the two threatened utility poles and lines may not be feasible. If relocation is not possible at this time, the poles may be armored in place using two courses of boulders around the toe (Photos 1, 3 and 4). Perform minor grading to prepare banks for live staking and matting (see associated details and plant species list). In order to address the lateral migration, install in-stream structures (3 rock vanes, see detail) to reduce near bank shear stress and promote a more stable channel alignment. Exact tie-in locations shall be located per engineer's instruction. Associated bank tie-in armor shall be placed adjacent to the rock vane structures and excess excavated material shall be used to reinforce the existing impoundment where failure has occurred. Remove any remaining woody debris and stabilize disturbed areas. Eliminate mowing practices to edge of bank and allow for re- establishment of riparian buffer, minimum 15 feet from centerline of the stream. All work should be performed in conformance with the Erosion & Sediment Control Plan (see attached). Quantities: Item Unit Quantity Wood Debris Removal CY 22 Grading (bank preparation, vane installation and impoundment reinforcement CY 100 Live Stakes EA 50 Class A Stone TON 31 Class 1 Stone TON 42 Boulders TON 245 Filter Fabric SY 145 Erosion Control Matting SY 25 Temporary Seeding LB 33 Grain Straw Mulch EA bales 20 Permanent Seeding LB 4 Pv ?C rl !? W ? Y c wt-"O r=-W" N1, IN o e' ?_;.. LN ltd ?12?IOFL?/? 10l l. f'4 C', N "11z E14 inn Z w . S EZc D AN r M-LA 4 GC- D 1ST t2 r??j D g?-N'c .?1 1 ?, s T -g IFA hn t r A 1 -c- MfM I t, MrtD L.tva F ?r xc Ac,la r 22 ? i APptzoX ?1 RteoQ (~ k1S-nt.-I 61 vr- lL_tT-V LovA.???,? J PO L. S Ihl Ac-C- i (?? ILITY fVI _/ / ? (h-t b vtl2t> Y) '4 ` Fio t ?Cp.?u c 1 j ?•?` 1 FEp tR?FtT1r-?Fo0-e-C IM •?rJt`sa? z t ?M A041 a.t= t? r 1 ? ? t »? ..,, o ,?? awl' S •?--,?. {Y ?, ?., 4 T ? C- 1.1 N ' EXis,r,.1?..j C? 3 N i Avery C unty LEGEND (Group 13) Site:GP-1 G ''°••?° V-:?-?'-'? Avery County EWP 1 (i I N 1 I P I (i ,•, O DSR Site I-- Parcels w 1\f Topo (5' Contours) L 0 50 100 200 Field Crew: ° s:: GP•1 Feet rcea O M•a O Streams r M-4 Time/Date: G ^ ro • • Date of aerial photography: 1998 1 W„ V3 BOTTOM WIDTH OF CHANNEL FLOW w 03 20° TO J A in E NO GAPS BETWEEN )A vet SCOURPOOy BOTTOM WIDTH PLAN VIEW SCOUR POOL (EXCAVATED) PER DIRECTION OF ENGINEER NOTES FOR ALL VANE STRUCTURES: 1. BOULDERS MUST BE AT LEAST 4'xTxr. 2. INSTALL FILTER FABRIC FOR DRAINAGE BEGINNING AT THE MIDDLE OF THE HEADER ROCKS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER ROCK AND THEN UPSTREAM TO A MINIMUM OF TEN FEET. 3. DIG A TRENCH BELOW THE BED FOR FOOTER ROCKS AND PLACE FILL ON UPSTREAM SIDE OF VANE ARM, BETWEEN THE ARM AND STREAMBANK 4. START AT BANK AND PLACE FOOTER ROCKS FIRST AND THEN HEADER (TOP) ROCK 5. CONTINUE WITH STRUCTURE, FOLLOWING ANGLE AND SLOPE SPECIFICATIONS. 6. AN EXTRA BOULDER CAN BE PLACED IN SCOUR POOL FOR HABITAT IMPROVEMENT. 7. USE CLASS 1 STONE TO FILL GAPS ON UPSTREAM SIDE OF BOULDERS, AND CLASS A STONE TO FILL GAPS ON UPSTREAM SIDE OF CLASS 1 STONE. 8. AFTER ALL STONE HAS BEEN PLACED, FILL IN THE UPSTREAM SIDE OF THE STRUCTURE WITH ON-SITE ALLUVIUM TO THE ELEVATION OF THE TOP OF THE HEADER ROCK 9. START SLOPE AT 213 TO 1 TIMES THE BANKFULL STAGE. ?"9 8000 Regency Parkway Suite 200 {Li1?. Cary, North Carolina S27511 uite Phone: 919-4635488 Fa)c 919483-5490 ROCK VANE FLOW --r STREAMBED-I'T ELEVATION BACKFILL (ON-SITE ALLUVIUM) `' CLASS A STONE CLASS 1 STONE- TOP OF $-y ROCK aST " Lv p v n. Rvi td 4 4 7 7? '? ?z rv? to 2 7°? ti SECTION A - A ROCK VANE 4o.JG4 A3c1,S / HEADER ROCK ?,?IrEQMED?A : ? q?t ?5 FOOTER ROCK CLASS 1 STONE °-I TO FOOTER ROCK SCOUR POOL (EXCAVATED) PROFILE VIEW CLASS A STONE BACKFILL (ON-SITE ALLUVIUM) h? J'A FILTER FABRIC L 1-r 10 MINIh1U Photo 2 - Facing downstream point bar aggradation and right bank migration from Photo 1 GP1 I migration. Armor (in place) existing grading in preparation for in GP1 pole. Perform minor bank and live staking. Photo 4 - Right bank migration and scour. Armor (in place) existing utility pole. Install rock vanes and associated tie-in armor. Pho Photo 5 - Right bank breach of iml excess excavation material. Install GP1 Repair and reinforce using and associated tie-in armor. wh Plan Review Checklist EWP-Avery County, North Carolina I the Natural Resource Conservation Service Agent for Avery County, have reviewed the stream repair plans listed below. These plans have been prepared by Buck Engineering PC to accomplish stream repair under the Emergency Watershed Protection Program being administered by Avery County. The following table summarizes my comments on these plans: DSR Approve Disapprove Approve with Modifications TG B- Additional comments: Natural Resource Conservation Service Agent Ag=t's Signamm p"J V v IA-) r k w i II 0-4 '50 nY-ojecF- Law r-oa.j new l,?Aj Id P YYZ? DSR No. TCB-1 Site Assessed By: SDW / JBG Date Assessed: 5/17/2005 Length of Approximately 1,000 feet Assessment. X Debris removal X Bank sloping X Bank stabilization Location: Immediately north of the town of Crossnore County: Avery Lat.: 36° 01' 47" / Long.: 81 ° 55' 34" Waterbody: Unnamed Tributary to Clark Branch Channel realignment X In-stream structures X Riparian planting X Seeding X Adjust channel dimension Summary Evaluation of Conditions: The reach is located adjacent to a private farm road on the west side of Walt Clark Road, between Crossnore Drive and Ginger Hollow Lane (see reference map) and is situated between a tree farm and a grazing pasture. Access is open and available throughout the entire length of the site along a private farm road. The project reach suffers from deposition (upstream and downstream sections) and scour (middle section) throughout resulting from stream flow and sediment processes that occurred during the hurricane events of last fall. In response to flood flows and increased sediment loads, the stream deposited excess material throughout the upstream portion of the project reach, forcing the active channel to be abandoned. Flows then became unconsolidated throughout the area of deposition, resulting in the development of an anastomized, or braided channel, from Existing Profile Station 00+50 to 02+15, (see attached design materials). Toward the middle of the reach (Station 02+15 to 04+75), the channel experienced severe down-cutting and widening. Material lost during this process was transported to the downstream portion of the project reach (Station 07+50 to 10+00) and deposited near the confluence with the mainstem, where flows have been forced out and onto grazing pasture. Recommendations for Improvements: Prior to performing any clearing, grubbing or debris removal activities, inventory, under engineer approval, any adequate root wad or transplant material. These items should be stockpiled and installed at the appropriate time. In order to return the condition of the channel to that prior to the hurricane events, the in-channel deposition (upstream and downstream portions of the project reach) must be removed and flows consolidated to a stable, single-thread channel. Without changing the alignment, the best method of improving the stability of the channel profile is to install a series of 3 log-step pool sequences at the upstream end of the project reach. Each log-step shall be reinforced on the upstream side with rock cross vane structures (see detail and related design specifications) and will function as grade control and flow directing structures. Additional modifications to the profile include constructed riffles and pools throughout the middle and downstream sections of the project reach. Similar to upstream step-pools, the riffles (existing and constructed) shall be stabilized using rock cross vanes. A change in cross-section geometry (see typical sections) corresponding to the profile modification will allow for effective conveyance of flood flows and will accommodate the associated sediment discharge. Any excess excavation material shall be salvaged on-site at a location designated and approved by the owner and engineer. Fiber-mat and live-stakes shall be installed throughout the bankfull bench and active channel banks. Permanent seed and mulch shall be placed throughout the disturbed and constructed areas. In order to maintain a stable and functioning constructed channel, eliminate mowing and grazing practices to edge of bank and allow for re-establishment of riparian buffer, minimum 15 feet from centerline of the stream. All work should be performed in conformance with the "Erosion & Sediment Control Plan" (see attachments). Quantities: Item Unit Quantity Wood Debris Removal CY 5 Grading CY 1245 Live Stakes EA 475 Class A Stone for Rock Cross Vanes TON 21 Class B Stone for Rock Cross Vanes TON 21 Class 1 Stone for Constructed Riffles TON 5 Boulders for Rock Cross Vanes TON 63 Filter Fabric SY 160 Root Wads EA 12 Erosion Control Matting SY 170 -Temporary Seeding LB 24 Grain Straw Mulch EA bales 35 Wood Vegetation STEMS 265 Permanent Seeding LB 5 WIM-f fC \ C I ti I 1 R! `: (: ?,,, O D SR Site Parcels r Topo (5' Contours) 0 50 100 200 Field Crew: ° •2 s„ GP-, Feet TCB-2?_4 (`i Streatns Y Time/Date: DRC??„Ie ? ? ' Date of aerial photography: 1998 mold TCB-1 (Unnamed Tributary to Clark Branch) Existing and Proposed Profile STA 0+00 LOCATED 10 ?-EX'G BED EX'G WSEL o BANKFULL ID A SURVEYED CS - EX'G TOB ------ PROP'D BED -PROP'D TOB LF US OF FENCLINE 92 - Gloss - JA_ _AZ' th1% of EAck of ? 1 G TIE INTO EXISTING ' BEDROCK STA 3+19 88 CUT 84 MATERIAL FILL TIE INTO EXISTING co's-rK"` - BEGIN PROFILE MATERIAL Rti=F L- ADJUSTMENT WITH STEP- 3 ??IS-ryZ,.?,r GRADE c POOL SEQUENCE 80 CONSTRUCTION STA 0+61 SCE Loll STEP• PooL TIE INTO EXISTING 76 GRADE AT •. CONFLUENCE vAOS TV 1 " CUT CUT - -- - 72 10.0 MATERIAL ------360.8 MATERIAL _ _ _ _ • _?,?`, ,•,• t •y " 760.0 , ,•? ? 68 ? v ? `A o` o f ?Srt- SETA??? -,- 0+00.0 2+00.0 4+00.0 6+00.0 8+00.0 10+00.0 Channel Distance (ft) 12+00.0 Elevation (ft) 0 o 0 0 ° a ? - o 0 00 ? 0 o v 0 o ? o CD . 00 CD o ( + -. ? cfl o n x c0 tv CD o 0 c o r-t• cf) -• cn c CD 0 Elevation (ft) 0 0 0 tv - 0 o W cn o ° w o v K (n C• - o Q. 2) o Cl) no + 0 CD 0) _f. Q o ° ? rn -• to (D Cf) CD 0 (u o 0 ? (D 0 Elevation (ft) o 44, ? o 0 ? W o ' -a o Cl) C CL o ? v 0 N. r"tL ?¦ 0 n o - cfl CD + m r"h `- a o - -? 0 co U a 0 . . a o 0 3 0 cf) cf) CD 0 FLOW 1/3 TOP WIDTH C B GRADE J POINT M zY ,e Z k O C T. Y 0 4 ? C7 ~ a A gyn. 0 F' \ A I F..., VANE SILL - •:: '7 B 1 I SCOUR POOL 1 ? NO GAPS VANE ANGLE BETWEEN 20•T030• BOULDERS C PLAN VIEW ROCK CROSS VANE TYPE 1 (SC-7F ry?? P CEF>r tc ?s ->F-rc e•b S? TYPE 1 CROSS VANE FOR GRAVEUCOBBLE BED RIVERS WITH DRAINAGE AREAS GREATER THAN 12m? FLOW -----a- TOE OF BANK 2' MINI SECTION A - A ... ? . • .;t Slu VANE ARM LENGTH FT INVERT WIDTH FT VANE ARM SLOPE % VANE ANGLE NOTES FOR ALL VANE STRUCTURES: 1. BOULDERS MUST BE AT LEAST 4'x Y x Z. 2. INSTALL FILTER FABRIC FOR DRAINAGE BEGINNING AT THE MIDDLE OF THE HEADER ROCKS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER ROCK, AND THEN UPSTREAM TO A MINIMUM OF SLK FEET. 3. DIG ATRENCH BELOW THE BED FOR FOOTER ROCKS AND PLACE FILL ON UPSTREAM SIDE OF VANE ARM. BETWEEN THE ARM AND STREAMBANK 4. CONSTRUCT FOLLOWING ANGLE AND SLOPE SPECIFICATIONS. 5. USE CLASS 1 STONE TO FILL GAPS ON UPSTREAM SIDE OF BOULDERS, AND CLASS A STONE TO FILL GAPS ON UPSTREAM SIDE OF CLASS 1 STONE 6. AFTER ALL STONE HAS BEEN PLACED, FILL IN THE UPSTREAM SIDE OF THE STRUCTURE WITH ON-SITE ALLUVIUM TO THE ELEVATION OF ONE HALF THE HEADER ROCK 8000 Regency Parkway State 200 Cary, Nort Garonne 27511 Phone: 919463-5488 Fax: 919.483-5490 BANKFULL STAGE HEADER ROCK STREAM BANK B B FLOW TO r/ VM'£ AR" SLOPE STREAM BED ELEVATION \//\j\ FOOTER ROCK PROFILE VIEW B - B VANE ARM FILTER PROFILE VIEW C - C ROCK CROSS VANE TYPE 1 CROSS VANE INVERT/GRADE POINT -r-i O I 1 t- le- G? fr oS-'S V A tsa E Ll>, r Enter `? loN S C GPS ?? . Design Data in the Blue Boxes: Riffle Bankfull Width (C) = Riffle Max Bankfull Depth = Riffle Bottom Width (D) _ Invert Length (B) _ Sill Length (E) = Vane Arm Angle (F) _ Build Vane to : 12.0 ft 1.8 ft 7.0 ft 3.0 ft 3.0 ft 20.0° 1 X bankfull Calculated Values: A Vane Arm Length 13.2 ft B Invert Length 3.0 ft C Bankfull Width 12.0 ft D Bottom Width 7.0 ft E Sill Length 3.0 ft F Vane Arm Angle 20.0° G Vane Arm Sloe 13.7% H Structure Length 12.4 ft Typical Cross-vane 14.0- 12.0- 10.0 8.0- 6.0 4.0 2.0- 0.0 0.0 5.0 10.0 15.0 20.0 __b_j = I PLAN VIEW 1 TOP OF BANK 1 G i PROFILE VIEW _.n_1 // CFr, bSS VA t4CE C5 el0 SPEctI=-l GA [lol4s Gvt.1T `f ?:, CTe-(?,- - I) Enter Design Data in the Blue Boxes: Length of Boulders = 4.0 ft Width of Boulders = 3.0 ft Height of Boulders = 2.0 ft Density of Boulders = 165.0 Ibs/cu ft Number of Footer Rows= 1 Width of Filter Fabric Upstream of Structure (F) = 6.0 ft Width of Aggregate A Layer (A)= 2.0 ft Width of Aggregate B Layer (B = 2.0 ft Density of Aggregate A = 120.0 Ibs/cu ft Density of Aggregate B = 106.0 Ibs/cu ft A Vane Arm Length 13.2 ft B Invert Length 3.0 ft C Bankfull Width 12.0 ft D Bottom Width 7.0 ft E Sill Length 3.0 ft F Vane Arm Angle 20.0° G Vane Arm Slope 13.7% H Structure Length 12.4 ft Calculated Values from Layout Sheet: Typical Rock Density Data: Solid Granite = 165.0 Ibs/cu ft Granite Rip-Rap = 120.0 Ibs/cu ft Granite Gravel = 106.0 Ibs/cu ft Estimated Amount of Material Necessary per Structure: Number of Boulders Necessary to Build Structure = 9 Tons of Boulders = 12.5 Volume of Aggregate A = 2.6 cu ds Volume of Aggregate B = 2.6 cu ds Tons of Aggregate A = 4.2 Tons of A re ate B = 3.7 Amount of Filter Fabric = 31.4 sq ds Assumptions: 1.) Number of footer rocks per row = number of header rocks. 1 ? L -y Backfill Aggregate B Filter Fabric Aggregate A SECTION A-A' -r-11 Q._I 2/ Photo 2 - Upstream section of project reach where flows are unconsolidated and channel is braided. TCg/ Photo 1 - Upstream section of project reach where flows become unconsolidated and channel is braided. 1 e?' Photo 4 - Channel incision and widening throughout the middle of the project reach -FzLq/ /921 gouoa loofoid oql jo oippiut ogj inoonotgl Butuopi s gouot 13ofotd oql jo olppiut ogj inogSnozgl Suiuop!m putt, fdl ologd ologd { I t?/ Plan Review Checklist EWP-Avery County, Forth Carolina DSR W /0- / I ?2? - the Natural Resource Conservation Service Agent for Avery County, have reviewed the stream repair plans listed below. These plans have been prepared by Buck Engineering PC to accomplish stream repair under the Emergency Watershed Protection Program being administered by Avery County. The following table summarizes my comments on these plans: DSR Approve Disapprove Approve with Modifications Additional comments: I'L I -")- - -, Natural Resource Conservation Service Agent Agmrs sign== ti DSR No. WP-1 Site Assessed By: SDW / JBG Date Assessed: 5/18/2005 Location: North and west of intersection of Hwy 221 and 194 County: Avery Lat.: 36° 01'47" / Long.: 81 ° 55'34" Length of Approximately 1,700 feet Waterbody: White Pine Creek (- 0.35 mil) Assessment: X Debris removal X Bank sloping X Bank stabilization X Channel realignment X In-stream structures X Riparian planting X Seeding X Adjust channel dimension Summary Evaluation of Conditions: The damage surveyed along White Pine Creek (WP-1) begins upstream adjacent to a spur road near a fork in White Pine Road. The spur road, the left fork, continues north and west a short distance up valley, while White Pine Road, the right fork, continues northeast to State Route 194 (Miller Gap Highway). The total disturbed reach of DSR site WP-1 extends throughout a 1,700 LF length of stream to the bridge crossing where White Pine Road crosses White Pine Creek. Because of its length, this site has been divided into an upstream and downstream portion. The upstream portion of reach WP-1 begins on private property off of the unnamed spur road, to the left of the fork on White Pine (see site map WP-1a). The upstream portion continues approximately 1,000 LF to Match Line 1, where the downstream portion begins and continues 700 LF downstream (see Site Map WP-1 b). Access throughout WP-1 (both the upstream and downstream portions) is good and the property owners are accommodating to access needs. In general, the project reach exhibits severe to extreme scour (upstream section) initiated by uncharacteristic discharge and sediment introduced during the hurricane events of fall 2004. Throughout the upstream section, bedrock has arrested vertical adjustment resulting in increased lateral scour. Although this process may seem isolated and incidental to an anomalous event, once initiated, this process is persistent, ongoing, and currently threatens the safety and property of private citizens who dwell and travel throughout the valley. As the stream approaches the bridge on White Pine Road, near the intersection with an unnamed private drive/spur road that enters from the west (near Match Line 1 Map WP-1 a), flood flows are slowed down and backed up by the bridge and adjacent roadway embankments reducing the valley's effective flow area. This change in the flow conditions forces deposition, resulting in overland migration of the primary flow path, reduced conveyance and increased risk in flooding. Recommendations for Repair: Prior to performing any clearing, grubbing or debris removal activities, perform inventory (under engineer approval) of any adequate root wad or transplant material. The following treatments proposed for the upstream portion of WP-1 correspond to those called out on the Site Map/Plan Sketch Design WP-1 a. Along both banks of the upstream reach between the 2-48" CMP and the bridge (see Photo land Photo 2), perform cross-section adjustment (see Typical Riffle Section CS1 and CS2 and Typical Pool Cross Section). Install Class 2 Riprap scour protection at the upstream and downstream cemetery access bridge abutments/wing walls. Along the left bank below the bridge (Photo 3), perform minor grading operations in preparation for live stake, bare root, tree and shrub planting (see associated details and plant species list). Install erosion control matting (see detail) on steep (slope steeper than 3:1) bare slopes where necessary. Approximately 150 LF downstream, the stream experiences an unstable 90-degree right meander, threatening an existing utility structure. At this location, install a two rock vanes (RV1 & 2) to reduce near bank shear stress and promote a natural adjustment of alignment. Additionally, install multiple root wads to serve as bank protection. Similarly, at the downstream left meander 100 LF downstream, install a single rock vane (RV3) and another single rock vane (RV4) at the subsequent left meander. Between the two single rock vanes, install seeding, matting (where necessary) and live stakes for point bar and bank stabilization. Seed all disturbed areas and eliminate mowing practices to edge of bank and allow for re- establishment of riparian buffer, minimum 15-feet from centerline of the stream. Similarly, the following treatments apply to the downstream portion of WP-1, as called out on the Site Map/Plan Sketch Design WP-1 b. Throughout the top of the downstream portion, a downstream debris jam has forced deposition and encouraged unconsolidated flow. Prior to performing adjacent upstream structural installation, remove the downstream debris jam (Photo 4) and allow for flows to induce natural channel adjustment. Then begin treatments upstream to just below Match Line 1. Install a double-drop rock cross vane (CV1) to arrest the existing head cut. Immediately downstream, install live stakes and bare-root/containerized planting along the right incised unprotected bank and multiple root wads along the outside of the meander to serve as bank protection. Install a sequence of 4 structures to serve as log step-pool (see detail) and tie-in to the existing channel bed. An additional J-hook Rock Vane may be installed below the debris removal if necessary. At the downstream-most location of WP-1, perform channel relocation and associated structural placement to promote stable conveyance of discharge and sediment through the existing bridge crossing (see Site Map / Sketch Design WP- 1 b, PS01 of 01, Typical Riffle Cross Section CS4 and Typical Riffle Pool Cross Section CS5)). All work should be performed in conformance with the "Erosion & Sediment Control Plan" (see attached). Quantities: Item Unit Quantity Debris Removal CY 11 Grading (cross-section adjustment, relocate, and bank preparation) CY 1060 Class A Stone TON 12 Class 1 Stone TON 18 Boulders TON 126 Filter Fabric SY 36 Root Wads EA 16 Live Stakes EA 125 Bare Root Planting EA 50 Tree and Shrub Container Planting EA 25 Erosion Control Matting SY 250 Temporary Seeding LB 25 Grain Straw Mulch EA bales 20 Permanent Seeding LB 25 Map Inset a° a dpCr U C K CSTA 4r,". :, MuD?rY Elvis ? ??-I •• •; 1 '? ?? -rN-? -n c 1 q 1* ,b v.•r Ap,r'^ ° R- A• ` c' P! c-A.L Pero L ,' De ISTIII C>eAj C-7 r ? ? 111 + a,t a) r (Zv t-+! O ?? ?-?? f C•:? is ? rz fi'r' {: I YO J7: ?``?.. • . ? ', (ryL, A. Ds ` '?-r'? eta. G1'41 c...? r c- e t J i. dEyV { ! rI FMn M(C Avery C unty c .? LEGEND (Group 13) Site:WP-1a Avery County EWP I \ C. i N I' i R i \ C. ?,,, O DSR Site Parcels L------ I Field Crew: G -1 GP-I Topo (5' Contours) 0 50 100 200 TT!TnFeet tta•= G NT-= G o Str[am5 Time/Date: c r.. Date of aerial photography: 1998 1 r L/??, Extti•rl,-1t? ? k Avg Cou " ry Iy�rr LEGEND (Group 13) Site: WP-�a.� 1� e ____ Avery County EWP 1'. \ G I \ I' I R I \' ( O DSR Site Parcels c,w WP -1° P-: �;;� GP -1 Topo (5' Contours) 0 50 100 200 Field Crew: *�e., ° M Feet "'I Stf[ams CYI l Tlme/Date: 4" ' Date of aerial photography: 1998 r` (O m c4 m m m In O r r V M O M N co O r( V M m O N M n m Cl -T IT -T r r 0 0 0 0 O O O O O O r N W W W O W m (O m (D r0 V M r O a0 r m co m co Y N 7 7 7 7 W (O ? r O ? N M O W N co v r c:) W m r0 N O m W N M (D O (D M V' (O n m O (D '7 M W m O m m c! r- W m (O ?'. 9 CO c N M W M (O W M (D r m W W W O (D m.--Nm-'T (D wm C) No n wm? N r- Lo to V n O r N r M M M M M M .- :f V V .- `7 V' W W W W r c0 m r r r r r r .-- .- M r .-- r V - .V - r r r r r r N Inm0 r, (n r?M NW r. 01 v) r- m(D W M W(D(DW W N mr, MMN 0 h(DO C30 rO LO (Mmr.- u?0 C. W W to Q>M O V WmowNyyMN(nmO Ny W V W OvuQ W rn F- W (p P-7 r, r. O m r, O m 0 1" (D W m Oi In r` W N co Q J r-r (Om(M MMN(V M(V M(V N (Y (V M(n l: W 00000 0 O O O O O W m m Q1 m m m m m m m m m m m m m m m m m c3 mmm mmmmmmmmmmmmmm00) -.-.-.- O W W tO N O m W W M (D O b M (D 1` W O W M W m ?j QOmmNI? W mrn .-'4700NM W an (DM(Dh co (DN Q F-O(Rm NMa MMWON(n(O P-wm NPUi z 0 yyt` N O- N M M M M M M M V V-" V V V V( O N W (D - W m N L L U U C: C: U 'O d cl D H 7 m L L m 7 d O p U Y Y U 0 0 ?? an d R R N m(? C O1.C m co N CD N m m C pa) c r O C C O O C 3 C O O C C d y m d n R W R O. N C MN W m1-OFO-U~UFO-FO-m W 0 Cr NM V LO (D r- co (D O a Q h M •- W W W W N N CO tO cLin(O m N 66 Cj Mm 7. 7 C m N n ,a W (D N n W N r M N o D'o CI) M Y M m M U) IO r N O V co o N d N V 'O d 0 0 CD ESv E mvv R? n p O N (`'i 'v m '' o a Q ao m r ?_vv? m .- 0 u V C U V C O d d d d C C - n n d d d C C X R O d d R d d d 0 0 0 0 0 0 03 ca mmwwwww(n Q 9 99 rnv v,(noo09 ?ooor"i "T roooo Y C 1>7 C O ?m(Drn O Oo(nWn »?r.=ooorruiM W C O C V14: O (D W M (V V '2 14: P, ED (? N r r W N W Wr LO co .(nm V"W r- n r-- m r O c? c?2 N h r N d E R IL a ^an^ c d o O d C CL V) V1 0. R =-=--o C C U14 a v R c co co c vm mUUm L Q Qd n ? N(O ujr C? w d O w 0 V W W n x Y C Y t d d C d C X R C S?S d d d n 0 .2 ?g -2 m? ?m S?(nN(n d _ C O t` W U W N N O U R M U CL N T O O O O a- N N U C O w O U d N p U O 0 c O V CL T O ? N a ? } O M ( O O N c o s t O (41 ) U OI IUA0 I3 N 00 N 0 M (C) O a) r to O co N O r O r r II II 11 11 11 pl c c 0 L E N 0 0 n CL o _ x O O N x O x z (D X rn O O (D O m O ?N II II II II W T T T T W pl a c c ] R Q `? L E y 0 U J Q Z 0 0 W ac N C. O N n M m U)N(i N M V NNO U)NMN V V'r O)MOON 1?v M M r O Ci 00000 O CI O r r M V V V oc) LO On UJ MN O O N M 0(D 1- mA4 mM MN7 N M u) ? ? OMOO U)OmMN V mN V a0 U)m(D V 0 t-- U)a) O O h M M M V.- D O O M U) ( D O V' M I S N 0 OM m.-N u) m I-00 M O).-N M U)I- .-NN h.-- Or rM MMM MMMM'0' .V E V V u)tl')0f?m r ? r r .ay? O Q> jI? O(h O N 1?2 m 001`1\(20 GN 9p NM-_ H W rZmsvow V MN( v10Mr IO hrM Q J 66 Whhhh r.: hhhop C). C5 fV O W mm0) ON1 mmmmmmmco W 00 co cCD Ln mcQp? OM0 O0 0mMN Vm V ?Om(")nN?O QOOh M M M V r0 U)M , F-C1 MM (V 10 r- C, IN M Nh NfV^ Q (l1O??MMMMMM?? V 7.0N(Dnm r .- r r r r r ?- r r r r - r r r r L t U U C C ?-p a? dv d 7 m t t m O C) U ,C ?C U p 0 O C7 0) (u m N N U)o C OCmco 0) 5mm S p, C Q) C CL a C o o c 3 c o o C a xN_x m a) n co m m n a? 'm wX W m1-p FO'U FL -U FI-pm W ?_rNMV co r- wC) O a Q N O '- aD au O O (O m `t m Nci 4 UN m(VOO N m V' ~O t` n U1 c O N M N N N( O • r N N M Cl) I.- N O h N ? ? N t > N d ? ? > ? ? O O m £ E mCU n 0 p (V M m O' O aQ ani Do m?.Nvcvmr U U X C U U p O p p O p C C X N C C n n n n n n a a) ? N a) a) a) 0 0 0 0 0 0 m m 2 co m (n cn cn U) U) U) a1Oi Q O O O U) M M U) 0 0 0 0 3000.-- V'v.-0000 C m c O O) U) U) O U) U) mv0 > V'Mrr 000-'.--M'Q W c pto rNrMOMr V toM .~?. N m(D 6OM(D r 4N N U7 U1 mN m (O 0U)0 L"O??2 Nnr-? N d £ 2 co CL 6 n n? C O O N C 0.15 N n nJ d N ? U?.?''nv?6 c m m c mm?-?a? mLL ?a d ?$? L m U U m Q, d N U) Co n co w a)p v(n(5t? Y C y a) O Q) a) C x m Ca_ nann m22m?v)UU)U) d m C o U 0 N N V N ,n O U ,p CO U 'd N a F O (D O LO O (l N U) U O C N O w U O U) O '^ N .. . d 0 C ? O co r".. 0 O i e? V 'n . ~ N r , CL y O M ( C3 7 O N 0 0 I T O (11 ) U OI JU A0 13 N 00 N LO M 0 O IA IA O co N (O O r 11 II II II II (D 1 S D c L u"i O 0 _ x o? o U) x C x Z (O x w O O U) r O f- ? N r Q II II 11 11 Lli ?. ?. A W O) Q S > co " L N_ 0 U J Q Z O 0 W Q' 0 0 a c rn 0 u N N O n O 0 A u o m H v M N L L U U C C U U a) a) 'O N C m m C O 7 L L 7 0,6 U Y a) Y U p 0 ? (7 m a?i m e ro? rn (7 (a im (a tm 76 02 0) o C c o o U 3 r o o c a Nx rn a) CL N R m a) 'o) ?C 111m F FO- FL- 0 Fes- Fes-m W in c.-NMV(n(onoorn°? 'o a R (U ann(oLo 0co N?Nn v V O V'cc6 V'?Q1 tONCOO)A C d m O Q -' o 0 0 .- Fn 7 v o C? o 0 ..x ooh -NWN o6oo Y c m c O omOnnaornmo > 000.-.-N N O 000 0 W c o Mon-7 vrnn(o0o 060 N m co G V 6 Lo c3 MinLo c0?(Dw 12 rn O N r O O r M U co c 0 a? (A O ? U N O O co U N o 0 p a ? O C) ? CL a N O N O O r O O (31 ) u 01 O r ;e O C n0 V 13 O C' 7 O O M M M M r CA MCOn 000 O O (n?Mto r ? 0w CNi ci OM ?N co M... N?2 CI) U') L D Lad C > U d v?-$p N O OmR E co 12 R Vr, 0- R Q) X, n0 O N ? `TOlO aQ pmF-????m 0)i U U C U C U R O R R R O C C R C CL ta. CL CL n n o ry 0 0 0 9 00 00 00 0 _O O ca ca m m cn (n cn to u) cn V co O O M- N O m M a a 12 o o a) ci C N 6 O a O R a) a) - E s - U C C Y CL mr,?.'oUUm mv dQ CL(D ?)nCOnao ? D 4? to (O r- L Y C y O R R R C X R C U CL CL CL Cl URR 0 R 0 0 0 >>-o N N O O O) OI O F- W U)O U)O U) if '77N r ""I: OJN U) 0r00I"? Q J 1p 1[j p M r r r 0 0 0 0 0 0 0 0 0 0 0 r N M 7 n O W S Fa- nm NO MNro NNU)O? M0 7OUJ W N NNN?Onn O N 0 h N O tT 0 0 M UJ O 0 M V UO n CO O c0 ? M 0 0) O N n N tT 1p r h O O N M N (P Mkq n C) aD O 0 O N M '7 10 W 0 O N 1n t0 n of O N n N N O r N M M M c7 M M M a a 7 V ?t N N h ?O n of r r r r r r r r r r r .- r r r r r r r .- r r r ¢ > ON07 N 777?ON1MVNAs?1yy ?O? ??o? o WB??0?p??pp?op07y?p???7dg8pp?? ¢ 8 M 10 ? t 0 a Y N O ? t! 1010 N 410- 9 i `m ? i m n F-pp11?0pptt00 ?7n n C Nci V 10 p N?1cV 1? 9 9 9 S 41 Ol'710N 1010 U7 ?.n-.P ^-^ ^?.n- W 0101?NN U C C ? ? m m y m O m U Y Y U m 0 O O O V' O) N N N W MQ c rncmm m?¢1 [05 0 a r c `o `o c 3 c `o o c ?'rnm n1v 'm m nmo1? m O O L L L O O m l?mF-F-UF-OF-F-[0 O Or o 1+MjNOM 7 ri m N Q N a ? (n L CL 0 ` `o m o ° v ¢ n n 7 W 0 0 7 n n o L N 0 7 N o m _ w ^' v mLL U ^ A E N O O N u 1 . _. . _. O $ O O a? ?Qm?vNv?d7? C S u U c m m m m m m c c? D c c a n n a n n m m m m m o 0 0 0 0 0 m m?2 m m N w w w w n Q =OOO U7 W C)qq 000 co oa N 000o0 3000 r v vr0000 Y ?N rr ?2 ?2 N co cd m r C m N E a e 0 a '?omrnnu?01n1nrnrnr nn? > 107.-.-0 00 ?-?-r {V m O O m ul m 6 A I+1 0- V .N-. ? v o w c c N ?O v? C L C 17 tO ? Q] ? ? (0 L L tp c Sa)UUm m rJ. ? p rNM1p ?p 000 UJONO yy ? nNy NNUJ ncO MNr?1'?OMO?NN " r ^ C4 hUSr ? 6 C y yY??. m m m m Y c ? 1a c ?_ nnnn H:Em?wwww m k O K c g w n m U) N N 7 V7 O U A M U CL T F O N O M N N U C .0 u d N ? p O .. U c © N_ OO U_ a o ? r N CL M 0 N c o 7 O (u ) U OI ILA0 13 N a_ 2 N Z 5 W w W D U J Q Z W n 00 co N cD ?O O CO 1n n N V ?00 41D N O II II II II II m 5 Q p m Y n a s3 ? L E N ? 0 X x Q 7 x x 10 X N ? t0 r O r r N 11 II 11 11 T T T T m m n Q L H O 0 a o 0) U N O U o J D O ~ v ch N L t U U C C U U d N y 7 m L L m -ld a) O C c C C C O O (7 Ol N (6 C (O N m ? C O.C m m ro O m m C p? c L N c aac o`oU3coocz- xN• x rn N d2 , ro m d N ,rn .?X W 0001--r-00 ? I-F•m W C.--04 MIT Oc01l 00?Z: O a .a d Lr-n"rn(D?U-) o.corv J O V (D 1 O (V LL) O d m a 0 0 0 1? N c D 1? 0 0 0 0 0000'- V (DN 0000 Y C R m c O C; - O cOOn cO OO)cq C) '4 > 7 C( M0000 d W C O 6 c c) Lo 0 V 6 0 0 000OicDW0 V N 0 N r O O r to U o c co o U d a+ N O O ? r.. V U N °o O ? O V ? Q T r a O N O O O O O O O O N r O N M ();) uOIJenO13 °o M 10 M M m v,...M<Dt?ocD?noch rn r- 0w O O OC'i6 610 ?: N O N ?2 U) U) U) L D .? L d d U Q U U N v U N O O m N ON 'r's d0 OdNC7 "?OO' a? romt- vvco rn J V o C V cl N N N N N C C ?x( O C C d d d d d d w a) N ii w O 0 0 0 0 0 0 ca co mmwwoowo moo M'o - ?v n o a) 2 ? w c u) N d O! ••.-. O N N N O E .?? a cLi c c y fpY???LL C CL Q) ??ql dN NOtDhcO c ago o46t6 t Y o c Y n n n a U m a°i ° o 0 0 0 m??m?cgtqu?in W X11 1/3 BOTTOM WIDTH OF CHANNEL FLOW w 0' 70 30 4 6 m 1 A lb$ v? COURPOOy NO GAPS BETWEEN BOULDERS BOTTOM WIDTH t t? - t ? "lam PROFILE VIEW SCOUR POOL (EXCAVATED) PER DIRECTION OF ENGINEER ROCK VANE W - VN JE °' L-, `° L-A - v IN N 7 t-'zM ry c? ; 1 + ?- I'l I+o '4-1 Z o ..1 ?i L. A L-1 61 rj +`A l ?J G' V %IZ'rl G I- A i- i C1 IJ ?,/) L-rJ i TOP OF STREAMBANK-- ? r HEADER ROCK FLOW 4) STREAMBED ELEVATION BACKFILL (ONSITEALLUVIUM)J `? /.??\ CLASS A STONE CLASS 1 STONE CLASS A STONE--\\ ? PLAN VIEW NOTES FOR ALL VANE STRUCTURES 1. BOULDERS MUSTBEATLEAST4'x3'xY. 2 INSTALL FILTER FABRIC FOR DRAINAGE BEGINNING AT THE 161IDDLE OF THE HEADER ROCKS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER ROCK AND THEN UPSTREAM TO A MINIMUM OF TEN FEET. 3. DIG A TRENCH BELOW THE BED FOR FOOTER ROCKS AND PLACE FILL ON UPSTREAM SIDE OF VANE ARM, BETWEEN THE ARM AND STREAMBANK 4. START AT BANK AND PLACE FOOTER ROCKS FIRST AND THEN HEADER (TOP) ROCK 5. CONTINUE WITH STRUCTURE, FOLLOWNG ANGLE AND SLOPE SPECIFICATIONS. 6. AN EXTRA BOULDER CAN BE PLACED IN SCOUR POOL FOR HABITAT IMPROVEMENT. 7. USE CLASS 1 STONE TO FILL GAPS ON UPSTREAM SIDE OF BOULDERS, AND CLASS A STONE TO FILL GAPS ON UPSTREAM SIDE OF CLASS 1 STONE. 8. AFTER ALL STONE HAS BEEN PLACED, FILL IN THE UPSTREAM SIDE OF THE STRUCTURE WITH ON-SITE ALLUVIUM TO THE ELEVATION OF THE TOP OF THE HEADER ROCK 9. START SLOPE AT 713 T01 TIMES THE BANKFULL STAGE 8000 Regency Parkway Suite 200 Cary, North Carolina 27511 Phone: 819-483-5488 Fax: 91983-5480 BACKFILL (ON-SITE ALLUVIUM) FILTER FABRICS --la4 1' 1-2' L10' MINIMUM-- SECTION A-A ROCK VANE '-- FOOTER ROCK SCOURPOOL (EXCAVATED) HEADER ROCK FOOTER ROCK CLASS 1 STONE Wp-1 J-HOOK VANE (,J CHANNEL 0' TO 30* A w to '? J z Q m CHANNEL FLOW I LEAVE 1' - 2' GAPS WP. NO GAPS BETWEEN BOULDERS _ o SCOUR V67 ... ?• ® v POOL i 7•?? ?- SCOUR POOL (EXCAVATED) - PER DIRECTION OF ENGINEER PLAN VIEW 1R TO 213 BANKFULL FLOW -_i STREAMBED ELEVATION 13ACKFILL (ON-SITE ALLUVIUM OR NO. 57 STONE) CLASS A STONE -/ CLASS 1 STONE- PROFILE VIEW NOTES FOR ALL VANE STRUCTURES: 1. BOULDERS MUST BE AT LEAST 4'x 3'x2'. 2 INSTALL FILTER FABRIC FOR DRAINAGE BEGINNING AT THE MIDDLE OF THE HEADER ROCKS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER ROCK, AND THEN UPSTREAM TO A MINIMUM OF TEN FEET. 3. DIG A TRENCH BELOW THE BED FOR FOOTER ROCKS AND PLACE FILL ON UPSTREAM SIDE OF VANE ARM, BETWEEN THE ARM AND STREAMBANK 4. START AT BANKAND PLACE FOOTER ROCKS FIRST AND THEN HEADER (TOP) ROCK 5. CONTINUE WITH STRUCTURE, FOLLOWING ANGLE AND SLOPE SPECIFICATIONS. 8. AN EXTRA BOULDER CAN BE PLACED IN SCOUR POOL FOR HABITAT IMPROVEMENT. 7. USE CLASS 1 STONE TO FILL GAPS ON UPSTREAM SIDE OF BOULDERS, AND CLASS A STONE TO FILL GAPS ON UPSTREAM SIDE OF CLASS 1 STONE. 8. AFTER ALL STONE HAS BEEN PLACED, FILL IN THE UPSTREAM SIDE OF THE STRUCTURE WITH ON-SITE ALLUVIUM TO THE ELEVATION OF THE TOP OF THE HEADER ROCK 8000 Regency Parkway Suite 200 Gary, North Carolina 27511 Phone: 818483-5488 F" 819483-5490 CLASS A STONE STREAMBED? i° BACKFILL (ON-SITE ALLUVIUM OR N0.57 STONE) FILTER FABRIC'. -?1 1' 1-2'-? 10' MINIMUM -? SECTION A - A "J" HOOK VANE HEADER ROCK -- FOOTER ROCK SCOURPOOL (EXCAVATED) HEADER ROCK CLASS 1 STONE ROCK Wp-I FLOOW 1 , 1/3 TOP WIDTH C B GRADE /-., f-POiNT VANE ` B ?S ROCK CROSS VANE TYPE 1 TYPE 1 CROSS VANE FOR GRAVEL/COBBLE BED RIVERS WITH DRAINAGE AREAS GREATER THAN 12mi' Wp?L o TOE OF PLAN VIEW VANE ARM LENGTH INVERT WIDTH VANE ARM SLOPE VANE ANGLE NOTES FOR ALL VANE STRUCTURES: 1. BOULDERS MUST BE AT LEAST 4•xTxZ. 2. INSTALL FILTER FABRIC FOR DRAINAGE BEGINNING AT THE MIDDLE OF THE HEADER ROCKS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER ROCK, AND THEN UPSTREAM TO A MINIMUM OF SIX FEET. 3. DIG A TRENCH BELOW THE BED FOR FOOTER ROCKS AND PLACE FILL ON UPSTREAM SIDE OF VANE ARM, BETWEEN THE ARM AND STREAMBANK 4. CONSTRUCT FOLLOWING ANGLE AND SLOPE SPECIFICATIONS. 5. USE CLASS 1 STONE TO FILL GAPS ON UPSTREAM SIDE OF BOULDERS, AND CLASS A STONE TO FILL GAPS ON UPSTREAM SIDE OF CLASS 1 STONE 8. AFTER ALL STONE HAS BEEN PLACED, FILL IN THE UPSTREAM SIDE OF THE STRUCTURE WITH ON-SITE ALLUVIUM TO THE ELEVATION OF ONE HALF THE HEADER ROCK 8000 Regency Parkway Suite 200 Cary, North Carolina 27511 Phone: 919483-5488 Fax: 919-4835490 Fl ni BANKFULL STAGE HEADER ROCK STREAM BANK 1 SCOUR POOL B 1 FLOW i 4X TO 72 VANE ARAI SLOPE B STREAM BED ELEVATION/`o FOOTER ROCK NO GAPS VANEANGLE 20'TO30* BOULDERS I I PROFILE VIEW B - B 0 VANEARM FT FT 0 FILTER SECTION A - A PROFILE VIEW C - C ROCK CROSS VANE TYPE 1 CROSS VANE INVERT/GRADE POINT \A r 1 NOTES TOPOGRAPHICAL DATA DOES NOT CORRESPOND TO ANY REAL-WORLD DATUM BCP-1 NI 5000 Es 5000 ELEV, 1000 f tA. irG (z tF:F_G GS? .. c C.S= i=r-s tr_ PI?1!). 1 YPt t_ 601 ? TOR TAIL OF RIFFLE p?'t1P.tLt-? CSLo4$- 5 HOR HEAD OF RIFFLE N a QI_ co mm m m vI a m.v N ? i? ? a:. m o m,v i m;N +Im aa,,?? <u? umi +, ? . ? TIE TIE INTO EXISTING +i-7 o?m + ar r o m ? N v v +?p .+-. n .+.lin l 00 ^I( ..I?m or, ~? m a M al o ~ a` i? u, Q <I ~ a` I N N I N W Q N N W Q N w N F ? Q N V). Vl. W W N Ol > J W , Z W W W , 11 J W J J G' W ? J J ? Xi Q J W ? w W .. ~ ?. W F a) C, w O W a W ~ W ?_ > W = F ... _ . I . -, - .. . _ .. I _ - ? I .. 1016 ..; __. . .. ... { I _. , ..._._ ._. _. . _. _ .. _ _ _. 1008 .._ .,. ._.._ 1000 :Ln n - - m` I 992 .a m ? m m r N , m ' W ? . . a, Co v r _ N r r - r m u m N 61 a m m m m I m ... n , 984 DATUM ELEV 1' m _. _ w .. m m m m _ . Pi ° m _ .,.. 980.00 10+00 N 10+50 11+00 11+50 Z. 12+00 12+50 a 13+00 Vr r U N Vr r to N V) co ? v ? m ? M VI o N O M y VI VI V) ? ? ? ? ? ? PaaTTtcFLd pa-FC- -r-t &j 4> o-17 : 3 o f& 1,.14t>TM CZha?•xS oP Z S ?'? c N tRvh-. --.-JAE M?AndCt?t? : X20 ?t NOTE- OFFSET PULLED PERPENDICULAR FROM EXISTING THALWEG Emu 0 C=LJCK ENGINEERING 1347 Harding Place Suite 100 Charlotte, North Carolina 28204 Phone: 704-3344454 Fax: 704334-4492 W I- II-?I vI F_ r-4 Z n? D 3 U W ? Q D rY d W Q DRAWN BY: DHJ APPROVED BY: JG SHEET: PS01 OF 01 PROJECT NO.: 0251C SCALE: 1:30 EXISTING BRIDGE 0HU EXISTING BRIDGE EXISTING BUILDING BUCK CONTROL POINT GUY WIRE POWER POLE 4-,r ss tll?,wl? ? C J U\ProJects\0251C\EWP\Avery County\Group 13\WPI\aeslgn\WH-D.awg jut u, cuuw Photo 1 - Upstream portion of WP-1 where cross-section modification is from downstream bridge. Photo 2 - Same reach as facing downstream from culvert. taken wPl dam, F ?, ,,..'"•"'.'I"- Photo 3 - Upstream section of project reach where are unconsolidated and channel is braided. Plan Review Checklist EWP-Avery County, North Carolina DSR C? ?- - LC?, I t the Natural Resource Conservation Service Agent for Avery County, have reviewed the stream repair plans listed below. These plans have been prepared by Buck Engineering PC to accomplish stream repair under the Emergency Watershed Protection Program being administered by Avery County. The following table summarizes my comments on these plans: DSR Approve Disapprove Approve with Modifications .t) ?z Additional comments: a 4-Natural Resource Conservation Service Agent agars signamre DSR No. WP-2 Location: North and west of intersection of Hwy 221 and 194 Site Assessed By: SDW / JBG County: Avery Date Assessed: 5/18/2005 Lat.: 36° 02' 28" / Long.: 81 ° 55' 23" Length of Approximately 3000 feet Waterbody: White Pine Creek (- 0.75 mi) Assessment. X Debris removal X Channel realignment X Seeding X Bank sloping X In-stream structures X Adjust channel dimension X Bank stabilization X Riparian planting Summary Evaluation of Conditions: The damage surveyed along White Pine Creek (WP-2) is a continuation of that observed along WP-1. WP2 begins immediately below the White Pine Road bridge over White Pine Creek and continues 3000 LF downstream. The upstream-most portion consists of 500 LF through a grazing pasture from the bridge to the "Match Line Sheet 213" (Site Map Sketch Plan Sheet WP-1a). The middle portion includes the full length, approximately 2100 LF through a rhododendron farm and nursery, between match lines on Sheet WP-2b, which passes through 2-60" CMP culverts. The lower reach includes approximately 400 LF through a grazing pasture to the private driveway bridge crossing on Sheet WP-2c. Access to the entire reach is good. In general, the White Pine Creek exhibits a pattern of scouring and deposition throughout the project reach. Throughout the upstream portion, the existing roadway embankments and limited bridge section impose a backwater condition during flood flows (such as those experienced during the hurricane events of fall; 2004) and result in sediment-starved water being forced through an inadequate bridge opening only to experience excessive exit energy losses as they enter the upstream portion of WP-2a. Additionally, the channel throughout WP-2a is forced up against the valley wall and has denuded the left bank of all vegetation, resulting in reduced ability to lose energy. This flume- like condition allows for flood flows impacts to continue downstream into the middle portion unmitigated. Further into the middle portion, downstream structures (2-60" CMP culverts) impose backwater conditions and subsequent deposition during flood flows. This deposition permits unconsolidated flows to migrate throughout private property threatening crops and homes with flooding. Toward the downstream end of the middle portion, where White Pine Creek flows through the culverts, a similar phenomenon that occurs upstream at the bridge repeats itself. Sediment-starved water being forced through an inadequate opening experiences excessive exit energy losses resulting in extreme scour. Again the scour is arrested vertically by natural bedrock, unimpeded along the right bank and the problem continues downstream until another valley blockage is introduced. The best solution to this problem lies in adequately sizing flow through structures that also accommodate floodplain connectivity. However, other more feasible alternatives exist to address the damage and return the channel to the condition prior to events of last fall. Recommendations for Repair: Prior to performing any clearing, grubbing or debris removal activities, perform inventory (under engineer approval) any adequate root wad or transplant material. The following treatments proposed for WP-2 correspond to those called out on the Site Map Sketch Design Sheets WP-2a. Just below the bridge on White Pine Road, adjust existing channel alignment and introduce structure to accommodate energy loss (see PS01) and promote development of a stable natural channel by providing access and flood relief to overbank areas. In areas indicated, perform minor grading operations in preparation for live stake, bare root, tree and shrub planting (see associated details and plant species list). Install erosion control matting (see detail) on steep (slope steeper than 3:1) bare slopes where necessary. The upstream area of the middle portion of WP-2 (near Match Line Sheet 2A) install a series of grade control structures, Cross Vane 1 and two identical Double-Drop Cross Vanes (see details and design specifications), to serve as a transition between the scour and deposition zones and to maintain pre-existing consumptive use by promoting naturally maintaining pools. Below these proposed structures, the landowner has repaired the channel banks and approximately 300 ft of bare root and container planting will be planted to serve as vegetative armor and promote bank stability. Below the culvert crossing adjust the existing channel alignment and cross-sectional geometry for approximately 700 LF (see PS02). Similar to the proposed upstream channel adjustment, adjustments here will promote development of a stable natural channel by providing access and flood relief to overbank areas. Downstream approximately 200 LF, a rock vane will be installed (see details and design specifications) to protect an existing structure and provide a stable transition between the proposed channel adjustment and downstream channel adjustments performed by others. In all locations where the alignment and cross-sections adjustments are performed, adjust channel banks and perform minor grading operations in preparation for live stake, bare root, tree and shrub planting (see associated details and plant species list). Install erosion control matting (see detail) on steep (slope steeper than 3:1) bare slopes where necessary. Install seeding, matting (where necessary) and live stakes for point bar and bank stabilization. Exact tie-in and location of all structures are to be verified by the field engineer. All work should be performed in conformance with the "Erosion & Sediment Control Plan" (see attached). Quantities: Item Unit Quantity Debris Removal CY 11 Grading (cross-section adjustment, relocate, and bank preparation) CY 750 Class A Stone TON 34 Class 1 Stone TON 49 Boulders TON 270 Filter Fabric SY 115 Live Stakes EA 450 Bare Root Planting EA 120 Tree and Shrub Container Planting EA 120 Erosion Control Matting SY 250 Temporary Seeding LB 23.4 Grain Straw Mulch EA bales 14 Permanent Seeding LB 12 a7 �sxA LI u 9'S .( LL dei ualllLy Pooh o! a � aa�d aJ!y.5 Walt Clark Rd • • .. { dye+ O O N' m LL VI m InCL snJ _ p dj W z 3 ��ti5 CL cay ; '+ L.�- ' M u j o • • .. { dye+ O O N' m LL VI m InCL T t dj W z 3 A CL cay ; '+ L.�- ' M u j o to O q m O o o > O O O I • -sr co 04; yZZ N -C� �`I {i• ~V V 7 / 3 U � O O N' m LL VI m InCL T t dj W z 3 A �, t7 M o t a T O Q" V O q m O o o > O O O I • -C� �`I {i• ~V V 7 / 3 U � VI z 3 i zU:p 0.- JG 1???? 3V1??}?W 4 r / ? d C k via, t W r o aqo 2 0 o d a Q F vyi O ?Q U Q 3 , 1-- CD O li O N 1 a N O ?3 t w e wa Z N " C o o M ° a T CL V o A a` ? A p o ' V O N o y ? 0 F I I I I T t 6 A O O L O. A m R O O N Q r d N C a ca n r 1 r t v NOTE: TOPOGRAPHICAL DATA DOES NOT CORRESPOND TO ANY REAL-WORLD DATUM L-0 1 g90p / END POOL /BEGIN GL DE 920 , 32.00- TIE INTO EXISTING CHANNEL CHU Ao BUCK CONTROL POINT GUY WIRE POWER POLE Bu (C ;NGINEERIAIG7 1947 Harding Place Suite 100 Charlotte. North Carolina 28204 Phone: 7043344454 Fax: 704334-4492 j LEND RIFFLE \ +00 +_ PLAN FORM PROPERTIES GIN RUN END GLIDE ? MEANDER BELT WIDTH rare 2,9 1 pp /BEGIN RADIUS OF CURVATURE 90.92' RIFFLE MEANDER WAVELENGTH 142.73 ft W ry \ TI?IN H EXISTIN EN RUN BCP-64 EXISTING ?? 0 \99 CHANNEL END RIFFLE /BEGIN POOL N 4791 BACKFILL V PQ? \ \ /BEGIN RUN E: 4972 ~ 'Ir/F ERIDGE G \ 1 l \ EV 989.16' N z 1 I ? CORNER EXIST NG \ U Ci 1 BOX W ?D 1 PL \ cy) I \ \ } Ld N \ > BCP-1 ? N: 5000/ E: 5000 ?= W 1.A T Y c ? Q. ELEV: 1000' 3 2rrFL.C hN> tom- Q l?. i l- L C l? v 5 t _. S ?C o ti,? cl? LL? r I = w w in 10 cn 10 w%Q in f7 %D oN ?mN IUmN JmP .?I7 Q; ?`InN JN? ?RI01 + -gom vm mm O+m of (L xQLa QW QW QW I- WNW QF-J F-J I.- _j J _._. _. _... _. .._. ..-- --. _S KW._. NW NW,. ------- 1020 - -- -- - - --- - o I co ? PROPOSED -a N L. _- - -- - = __ __,I - - - - ---- --- - 0'! CD as, i PROFILE N i J N J - --- - - - ---- - -- - -'i - - - -- -- - - -- _..- -- - Iw 1000 x i x 1.1/. SLOPE w w 77 :3,2% SLOPE m m N n cl __.' o N a o CT! 980 a a- ro _ M N -- o ?- m - N _N N ?i _-N N m. co co DA777M ELEV mN -_ ° -- P. ° Jl 10+00 10+50 11+00 11+50 12+00 12+50 13+00 DRAWN BY: LMF APPROVED BY: JG SHEET: PS01 OF 02 PROJECT NO.: 0251C SCALE: 1:30 END RUN /BEGIN POOL END POOL /'BEGIN GLIDE__??_? mo=t p ,2 r 1=>0? r i? c. 12 0??S - S Q c- t c: ---i -5 }` ;;' `f k? X02 CN L sC- <- 1c="'S BCP-75 72 IN CONCRETE N; 4633 E: 5243 PIPE LEV: 1012.30' \ -- WHITE PINE ROAD ro` J CONCRETE - -- , BASIN CONSTRUCT RIFFLE - \ - - (X3 TYPICAL) _ CON& UCT I LE TIE INTO % EXISTING _ 00 - _ 13 pp t _ (X4 TYPICAL) CHANNEL OND EDGE CONSTRUCT RIFFLE (X3 TYPICAL) DOUBLE DROP CROSS VANE STEP POOL BCP-2 N; 5066 E: 4651 ELEV: 1003.31' RODODENDRUM FARM CONSTRUCT RIFFLE (X4 TYPICAL) DOUBLE DROP CROSS VANE CHU BUCK CONTROL POINT POWER POLE PLAN FORM PROPERTIES RADIUS OF CURVATURE 165.6' MEANDER WAVELENGTH 178,37 ft MEANDER BELT WIDTH Rs 2,4 BCP-1 N; 5000 E, 5000 ELEV: 1000' INTO NO CN 1347 Harding Place Suite 100 Charlotte, North Carolina 28204 Phone: 704-3344454 Far: 704334-4492 F- I/-?-1 V1 N 3 r-4 L7 ry Q z u Q Ld z x P N ^ J. n >= m Q °? p, u 1- %o a nl Woo J? m WNP Jn D\ agNP WN WN "Go w CD .p JN aWWN 01 R .. 1.1'1 G75 0, W W° K Y 4.p JP J mP Wpj W QnN P ?UI ,-,IP 1. -110 ?° JN '?'?? L,? Oi1r ...?Wn W-"-j N itl tY o ? ?1tl K+ IWi+ Q. QI'Itl nl I'1 ??+tl 1+ IQIf)tl +N W 0o a.. .. z^ n? a?or r u') j»j m w j ud q< aa?j ?JJa- XIQW ?d Q %dW l'J 4'. 2 0 INW N WZ~ N NINW 7%FW I w Q F-J WI- 1- QI- J W F- h QI- J WI- V NW_._._JAN ......-. N _._- _IN W.. W N _IN 41W EXISTING rom'? - 1020 CHANNEL - _ - - - nh - - - = -- - - - - Cn - - -F 7 - - _- t-- p 1000 Q _o CU! ' N-- - °; - 9' IQ; ELEVI ° _ °_ _-- - - o -o - o- iW - o - a, - P 0 ? xIW P CY a% 0 0: 70 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 DRAWN BY: LMF z.37 Y sLbrL 1•s -L/! <4..u PL APPROVED BY: JG SHEET, PS020F02 PROJECT NO.: 0251C SCALE: 160 m d c 0 u ? C) N ? N ? N O U ? M a N to a? U U !' C C ?a a? n?aaa C m Y Cfl C C C C 7 7 7 O p U co 0 0 Y V/ N p 0 0 0 6 m N c: c m m m C? C? (7 C m C m co M'3 C C C C O C m m m O C O O C O= C C C C 6 C "" Fom.NN.in = aNma?a? mCa Co CU X N O O L L L L L L L N X X X Y W mF- I- v. c?000U Jm W W W fC 0 ..? V M O Ptn N v M w co O co CO N ? Crnrnrnw w OONNNOC-r-(D(D(DCD O W i. r o. X x C O 1O vmr? U.)m O e-•OvOM co OOOO N O?U)M.-v6C-i 6 N-Mv000O ? C N m 0 L U d Q 00 v O coN co CAN (D 000000 OOO Y C A 'U a m ~ D' c C, 'O M o d M= C) (D In (n N N O m co (n co f-- (n v O C> p 0 0 N M M M N N 0 0 0 0 0 0-.!R w O o a. 0 C 1 V 00 Cl LO m r-- M(n N(n v m O M UNm (a CA CD CA O^ U7 CA N N h c; M M N N e .3 p -v00.-.- ;??! ?! ?! ?2 :E (Dm N oR N X W 0 O. O 0 N o a 1 Y d N ? N e- CL ?. m C = O .O. o N U d N ? 0 N N O U 0 N R O O O O ? O N . (11) UOI ILA D13 U U C C cia c CD CD aaa 0 O J m L C L m 7> O 215 0 (V U p 0 0 0 Y ?(9C7 mo (CO = mm.cml] m? Om C mmm a) c: CL 'r- a a a '!"2 m (D Cl O O F- O m N .N N W W mtO- U?UJI-mWW W F- O v m n r? N CO ? O co p co t, (D U7 = rn rn rn N N N N N ? n m o o m C a co rnNo cq IR A V MU)0 U) N N (O ? v N Cl) Mv Lvmnn(D NN C0 ?r^000 C 00 aCL L cU) o n a U CL O _ `C a 0 -2 d V I a d oO m v E? E? mm 0) R? Cl o.Q a?oN coo Ho N ?C?M AY C6m m (? U C U U N O 0 0 0 = C (X9 0= C 0 CL CL CL CL CL 0 0 _O O a ii n (D Q) ca mmowwww Q = 0 0 0 0 N (O (D N O O O O O O ..,.0000 ? M Mr 000000 C R m c 0 p o n (n 0 N o w c0 to co r- in v > p O O N M N 0 0 0 0 O d -w u N x C MO O Cl LO CA M M O 1? h LO M LO N 0) N C) (O 6(D 6N V r? MMMN aN O a co CA vOnU to to M N ?.M•- O N d E 2 a m a o O CL C O• ? O = O CL N (n .L O U) N N N U ?aL C C ?av9cc(Cam O m L O M L L ` ?atmm_U_U_ w [l Q n0? Q -(n(QnN .? (D v to to 1- Y C Y-0 0 0 0 0 C X [6 C as Cl [1 [l d 0 C w n O .J (D d v o N O U M m U N CL T F 0 v y N N ? •X a • o I N N o 0 N O v co r d _ C O N_ r ? O r 0 N r N co X c O .J d (n N 0 U A v T H R N a 3 O IA O O O O N O (1)) UOl;ene13 O O c co r U U T V a d Y Y d C a a N ? m C m C 7 r d p p m U m 0 0 0 0 0 0 Cl) r-/ C O C O d d N d d d d d O C 0) O a) O C _C O C C C C C C D- C 'w 'J .C r- co m m co ca ca d L •C m L L L L L d X X X Y tiSmo u U 31-0000 co www c0 ? O ?i m O n (O co '7 CM ?- O w O w(0 CO m / crnrnwwwwwwwnrcD(D(D(D C N a X_ N C O 1O . 44 V a10 Cl) mwCD N w ?o CO 6 C; O(•N) C,4 N(D I-wNU)OOOO N c U) m (n O U m ? E ao(DocomU (wO V'oC)0o000 ? Y 0.--000. M (O h (O? O 0000 V C m CL to A ~ m c 'p crn? o W C) r?NNOO a) WOO M'mm d O c CL .0 w 0 9 a. r o N 1 V C pO ?f w.? (D 10C)w'-h MC) 10 (Q 0) O(D wrnrnOCD Nvi w(O.6 Mw N c 3 r^ w w w w a) O N N a Vl N r N N N N w C C V O d d a a a 7 m L C d C o O 7 7 O `p U m U m 0 p U 0 0 0 U 0)d?! 'C m aci moo(7 C 0) C m 0 7 0) O m. C rn rn rn N d C:L a. •C C O O i C O C .C C C a y 0) d Fo d 0).N N N W mF--C? 3 FL-U? I-pm W W W 2 '7 M0r- (O VMO wCD W r-- co u7 C m m m w w w w w r r co (D cow 'o a m a (n n (o o (y o IT m (n w O O O U (N) Mc; O c; MN cl 0000 co a -0000w0)wO0000o0 000 N M 4 ?-0000000 C m m a rn 0 ,;; c) N O O w N w (O 0 0 0 m m M C > O•-e--N vi vi ('7N N p M O N w N X C N 10 O 0 0 0 (o w u) co h M O u l N y p(D w --r 1,D)N to co co r- Mw ?wwOOO "4 N 0.N .?-•-- NNN O E U O ? O N 0 CR N M n (D O) Cl O q O w N O V• h U) U) t to -0 u o_ 0 c Y = a o a c o a/ m m E 1 m?^N v m « O r R d L-. d O O N M C, U U C U U d d d d d e c x m c c n n n n n d d m d d d 0 0 0 0 0 mminv?u? mm22in in 'q- Lo r(,) cj N (D w N d d E m 0. a dd m n n CD C Q) O O d C o__ m ? o O L ? ... O d d V Cv«.N C C? I[ 1] C m m a (1J m m L L m d ?'o ?mUUm L n Q nLo yr co d rO. u r _ ? V u) (D 1? Y C y d d d d c x m cv (nnp.a m22m?iU)U) n O O c (11) UOgene13 L? O O CL o °i L) d N N N p n O U ? o u o t > o ? - M N L L U U C C L; v m a) a N J m L L m 7 d O 0 U Y N Y J 0 O 0 c c c c C (7 O) N co a m a) D7 (7 C 0)5; mm m rn6co m.G O) c C L N C C c a •- c `o o U S c o o c 0) (D as m m a( rnN wmHF? -EFL-UFO-F?-mw O C ?Nm V LO to nwm 'o a a m QnnnonoNnoon v ?ovc vr?6C'ir)6 o6 C d m m N Q -gRg7 IgC 00000 6C)CD -v'o-C)6CD CD Y C m m a O ?: p cD (I0 M Of O) c0 cq p > 0 0 0 0 7 7 7 0 0 0 0 d w c O Moncovrncooo O H O m m m m v O'0 '0 C:l M co 0 c0 c0 w ? 0 N r O O r C ° O co U N (A N - O d U c°o c o U.g O a o R - U T ? f6 N a ° N 0 0 0 0 0 0 0 0 N r O r N M 1 (;;) UOIJUA013 0 o n o °) o N M co N C', cD ° ^ c0 w N n e- O c0 N ? co N ? ul 0- CL 0 d S? V V a C c O O N N v U O O O m E :° m L o m ?'= no o aN")Ycp o dQa?000 C? Avm. U U C U U 0 0 0 a Q) N C C C c _O CL CL CL CL CL CL O _O O _O _O cam mmw oUnoww co W N W O 7 o M n v, (n N N N N 0 0 ^ O w C N N 4 d V N N N 0 (N? 0 L C c u) c` v c Y v'? y C c Y Y L L cr -q m m C m m m L L m d? Y Sv_ Y? U U m a? Q L S v> m n o0 X c m Y c C N N L Y c X C a d O. CL 2 U m m d m O O O O m22m$i4U)V)UA L L U U C C 'O N N U 7 m L L m 7 O 0 U Y Y U p 0 (7 0) N co m N O) U 0).C co m B 0)3 in m C m c m c c o o: 3 c o o c 0) O d m N m a m O) !? w m FO- F-- U FL- U F O- F O- m w m ^ 0 co v m N ? N O U co ro U . N Q T r ?t ti M r R co Cl X M C O U m N N O L U L L U U C C U 'O a) a) 'O 'O 'O N C co co c C C 7 0 p d L 0 0 O Y Y U p 0 0 0 m? ro ro m 0 0 (7 Y •rn ?.C m ? m ? ? m m 'C_r.. ? ? m 0 •C C O C O C C O O C ,C C C (L n c 3 mE: a ro 'm •N •y n to L wmH L)75 vloFom W W W O a+ ^ O O V^ M O O N M V' C N N M M M M M M- V? V- •? ------------- L ro V m c) V N D? c0 N LO U t(j r r r M 0 L (0 C N d m ro d Q N Cl) M M'l: w m 0 0 0 C) c) 0 VO„ V r 0 0 r N 0 0 0 0 0 0 Y ' C ro m C Cl) o O m= C) C3 ?v^r0^ooCOW O N MO > O O Q 0 0 0 r N C O 0 Q, 0 r W i7 Q. C 0 V pC: rrl- (D M fl- CO V O ,Q m w O C6 to t- to N V N O M m O ( (0^^tbOm N C a rNM V ;! V r r r a- r r 1i N r. w L U t U C U "O a) C N 7 m m 7 7 7 d O p Y Y L U p 0 0 0 m co ro iJ a) O) (7 (7 (J c M C: Ic o o CO 1E ? c o c 3 a 'rn a (U (0 0. , a) 0 ).LO .9) N wml-o v UL I-o w Fomwww ...^m0 't^c0 m0 NM•7 C N N M M M M M - V- •p r r r r r r - r r r - r - r r r CL ro L M V' m (0 (O N V M N m M N Cl) U N M V '7 M OLj? T a0 (0 C N Q m ro d Q OU? M ',t T O O O O O O O O w 6 9 C 6 6 6 0 0 0 0 0 0 0 Y C ro m c 0 '? O M 0 cR m w to N O^ ao c0 a0 C> p O O r r 9 0 0 0 p r N W U a) N X r (p r (0 M CO M f? M 'ct O -O O O Cl) a) +? O M C3) (V Lo ^ N N O Cl) r 10 O ONrr M VV V to (D r- r- M Mm O N r r r r r r r 0 CL 0) r m^ r^^ Cl) O ?r C'i6 vNMto W CL U U) 6? U) , U L L O a) Y U Y U O C C C E m m m ' a . N L d O OaN (7 Q aai a m h- r v?c?? N U U o C U U O a o a N a N a a - ac) m 0 aci aci 0 0 0 0 0 mmn2- mco U)U) ncn(n 7 tO m N V (010 (o O r r M w tv E ro a a) a a a) C O O C U) -in- CL 0 ro U •` ,-• - c c N L (? Y .•'.? C C Y U CU Cl C: r- v Y cl? L L M a) 0m?a'o-UUmm Q a?? Q) tn(q^oo a)Om f to(Dt- Y C x ro Y c ? w O a O a O a a O c _ m?'? m?in(ninin O) e ? n 0 ? c d y 0 U Cl) U N CL H CL O •x 6 0 ° N O r N a N p a ? - d <! C c ? O - y d co y - y O - U 0 N r O O r O O O 10 (;;) UOIICA013 V o a a a O 'o '0 'O 'a -o C C C C C C C C C y 7 7 7 7 N 7 7 L L 7 7 7 d O Y Y 0 0 0 d 0 0 0 Y Y 0 0 0 0 ?0 R ca0c70 ??? d R R do (D0 C Cn rn- (n c_ mm- tT-mm . of m d d Ca of Ca CT d UI d d N O O O O Y C C C d C C .C. .C-. C O c c C d C Y Y Y - ,- -- -- O O 3 O O •- -- O O - N N d m Cp R R O. d N Ln N a N CL R R R R co R d.N N N a WF-00uHuuF-WWW WWt-F-0f-uF-F-WWW 0 Cl) NM V'wl n to tap Np V n00 ?n O(AO NM ?O)O 10 co C,) tn(n Yl C to (0 O to CD (0 (0 nn n n n CN.22 2-.2- 2 •O .O e-- M (D ? N N N 4? a a n M + o <D N to D T- r- oo yr ID M rn O v, O co N? co (" QMh MOnn O°W.-''"' ? vE mm ) V U) r (o (+o C-? rn C?i ° t m m (D r C° 00 0 1 C v G ? R d wt'- ? (h tt Od0 00 aQ a°ip[°vvcv? X V U C U U d d d d d C C C C _O _O O Q. Q. CL _O _O Q R R d d U Q O) Q Q1 ?C6 Lqw 0NN M OO OO NOO v N OOOO q"tm CD°OO V ? w y O N T O n MO V O O O O OO?O M N N M O 0000 RCN 6.2:1 M ?2 !g M Y ? Y d N m m E O ` U ? R c c a a Mo o d roN V,rnnorn(D. rn V ?oN`f (noornco(nvn7'4t c o o^ N CO >p O C'i 66 YM M N'-•"O O >pONC C mnNN ?.-0 ? O.. U7 y a O O W W O 0 C C Q. -t •0 U !? Y j .Y C C Y V N Y 1o Y C R R C C R (n R L L R IL o c X c d =-a=MOOm / U O 0) M y O M M V M n M O) 'p O (O (c> U') M M M M t co W Q L-. d d N - D.d dO?nO M a7 p? n N M(O O M CO N a) LO d:+pNnNnrn 10 vrn(n N e ??(nwmmnnno00° 09 .2 .2 (nm '2 o°?n?oo- m NO w d? ?U V (nom CL y N y ? .- .- .- ? Y D C y L d d N d O C X R C V d d d O. C', C13 22co U)ininv) ?w a m O O a o °' a U d N N N ? n O U ID u co N U L U C V N 0) fl N? Co L CO C d O p U Y N Y U p 0 (7 OI N N C ro v O) (7 o ca C13 ro mvmm. Q C C L a) C C C 0- c `o `o U 3 c `° o c a .N m cl) a ro n. (L) 0"0 )C v o 0- L L O O o x W mF-I-?FUF-1-m w 0 c.-Nr)vv)(onwrn°? 'o a A v Q O° 0) O v) n 0 '° O O 0 q O) Nu - CC) 0 0 d m N Q 0 0 O g 0 7 (O 0 0 0 0 Y 0 0 O N to N O O O O m c O (O ntO ?--NO W > 7 N M I I N W !" 0 O N .- V O W (O 0 c a ori(6 ro 1: q. m a U) a O M N - - - - - - - - - - - - - - - - -------------- - -------------- O - - - - - - - - - - - - - - - - N - - - - - - - - - - --- - - - -------------- 0 - rn r -------- ------ ------- ------ ------- ------- O d c ? c o (+S d ? N a- O - - - - - - - - - - - - - - N Vl O U CD Cl) r O - - - - - - - - - - - - - - - - r r ---------------- - - - - - Alt O 07 0 0 0 0 0 0 0 0 0 N e- O r N M I N (O ()J) UogenO13 (ti - n 0° N O .1 M O_ N N n 0 U N 7 `f }t?NN ?D U U N U t y y?.?.. Laa ? d } C O O U v O o m tE?-gE 3 m.W..? ^ ep ro d? nN M ^m O^ •- ? O aQ vp mi--?vA a6 a) U (L) C (Lj C U7 co w O N N C C ??(( ro c c n d d O. O. O. y° tp c) N N O o o 0 0 0 ca co mm u)NN v) u) u) IQ Lo O n OR N ro O r) Cl) N h d a^ C O O N ? N w a E °r c ?N ?? n v ro Y m m c ro ro m?$ ?? L L ro a v --$ ? ra ? U U m NQ$ a? v(O(onw c n an)OO0OV6(t5r, L C? lo C o.nQn U(aca)ro-oooo 0 0 a o 0) U a1 VI co H n p U co u o ? v M N U U V V N a) a 7 m L m U O p U L Y d Y U a O7 C C C C C C C7 fT N m C m. tT (? pl C m m L c m m C Of no. c c o `o U 3 c `o `o c a W m 10-1-O AFL-UI-O FO-m W 0 C? N f7 v in co r, co 0) ^- O a m a. 0 L O 0 O O C O a 0 m O N 0 0 m d x 0 0 0 h a7 7 c7 0 0 0 0 a o a Q N m O O 0 0 0 Y m c 0 c0 f? c0 N .-- W a0 19 C? ar N W O O c ONrnv?a7 0 CL O c") cD c0 N '7 O Q m m 2 ? m N a Co M N ------------- ---------------- ---------------- O ----------------- - N ------------- 0 r -------- ------- 0 °o a v c ? o c U., N ?- D N - - - - - - - - - - - - - - - N O L U o M r ---------------- ----------------- O - - - - - - - - - - - - - r r O 0 0 0 0 0 0 0 0 0 N r O r N M e? wj lD ();) UOIILA013 In oo?-rio MN ciao CNV ONN? ytaONN O_O In U ) N L 10 'n ?? Ld4. U C d C U C U E E'o doom m _ an Z cL N M; G O Ci a¢ vmm°f0-vvA U V C V V a) a) N N N N c c x m c c n n n a n n m a,wmwow2oooo0 UA N O 01 O r y rn d d `m coo al a w a o v alb E cv? L c c NmY.YL.. rJ' ?? m m C L L a d m m rte. ° U U m cQ naai? roo c al0 ?avuimri LYE c.ie ?a nnnn U 'n? ami ,ca o 0 o o o m??m?tn fn to In c1c ui OW /\\ K N'z \ Q \\ /\ \/ W ? :J z m o ui /\ U U- w 0: 2 /\ /\ n 1 Z a > (Y) o CO O U \\/? m U O _ >._ 0 O W o p O m Z CL m z m v~i U. O U) ra 2' O z cc LL ?U) a i 0 U) 0 WW o LLw ? ? o 0 U N> Y ? U) U 00 ct: y !? U W paW F- i- IL O T1nTANVfl 1NNY© -40 dol Z in z =w= ? =. LZ w o F W> W is= O O Q ?K ,Olf Q' Z Op Vl w9W 1INVfl 30 301 ?s f SA' - Q Z ? > 00 w 9 ° _ a?,,,raa,',:, U N 7 ul w o tA,l Z Q 0 Z m Id Ci F`4 > wm °YFDO0 m^m to ?2 Q5 6W41? NCi q W. M=A w 00 C.) go z q3z C C? r4 a Zmm ` (WW1-0 pw wo2z ?i ;LAW o m j T Z mwuWLpzdOaw?F oZ o F- d'S p Nw2 O NOOLLQ m Lly o 0CZ0 w u x O Q of U lll?iii 2' w + .W; LL ?°?FuJ°d gw _o m F'° °wZ c? aZ? {? d QNQzwW?LLjWO Up?? zozmm 1IN\/9=10301 z?ZOOO 'd?OZp W? {{ttl1 -' m N???m F-. UQU'Ii.?C lln-DINVB/HN\/BdOd01 OLL?=?ovW? j?UZ QwZsup??y1 m Z w 1120 t)U7t0 Eli J ' ?' CI 6 Y ui 6 /L 3113 O )INVH j0 dOl M31A Ndld T L OSZ ON 0'SL ON 09 00 00 0"Z 0'6 09 --\j 09 0'0 L 0'Z L auen-ssaC) le3ld tl u Z'04 41 ual amionilS H %9-9 a o!S way auen J .0-OZ a! uV wJV au en 110'9 W-551 ll!S 3 11 4'9 41P!M wollo8 a 318'OL 41P!M!IngUe8 14 4'E 41 ual uanul a 4 8'04 41 ual wJV auen b :sanlen palepialea IlnlMueq X S'0 : of auen pl!n8 o0"OZ = (3) OIOUV way auen 310'9 = (3) 416ua1 II!S u VC _ (8) 4l6ual uanul 114'9 = (G) qlP!AA W01108 OWN 314' L = 41da(i lInlNue8 xeIN agl!a 318'0 L = (0) 41PLM Ilnh{ue8 agl!a :saxog onl9 541 ul elea u lsoa -ja1u3 4 auen sswZ) Z-dM ?I U F - Q E 0 w y UI 7 ? o °? o o o v, ?n w L-. ? w L. ? N w N N N Q O U) O J J E J - E E J E ¢ ¢ Q C C O m N O U C co m m co > > U) Q m U O W W C7 2 a? 0 O LL O N E 7 z U a ro LL L d O m C CJ ? Y U O ca U c 0 E Q d w E d a> v rn rn Q Q Q Q Q m m Z LLI 61 iVti Y U m m N 01 rn f N `- N =3 U Q) to =3 U to N -- C7 D f7 cn Cr N ?t O M m O O cn N O U 11 II I1 O Z Q m II II .?? (D m II ca 0 N m Q) -o m 2 u 2 m is LL - 7 (D a) O - co II N 0 CO O O Q Q O O O O 0 0 V N E 7 E to fn 7 O 7 0 0 Z 6) > I > I h I--' Q N C O i=w E N N Q N d (4 N N ? O n. U Y C X °Q y N Iq ONO O O co d 11 11 L II O ? II so Y > m II O 3 75 m W c C x O c »-E C r N N N? J O 'O U - tY?? ??>m U C.) z 1¢ 0 1 1 I 1 I 1 1 I 1 ` w J CL O w a = N = N = N ? O 0 6 a I- = V' L L L L t N N L N N ? ? a) ¢ O (n a) J J w o J = E E J O E ?c tn ¢ ¢ ¢ ? c c c m m c c > co > > 65 Q m U O W u. U' 2 0 0 ui N 0 N d c N N O U R o a o 0 Lo 0 0 0 0 0 0 0 0 0 0 v N O co (o V N O Q In d X O m N ar ? C C W R N N O CL 50 N N N O to O CO O N ? to V' 04 w O w C J C J O >> a >> > C J C Q 0 U) C J j E E E Q C C O O O U C m m C: co C: (0 CU > > cn Q m U ? W LL (D 2 11 N 3 O m N .n E 7 Z 14 ? :N C d ? Y v O R U H O E Q d v rn rn Q y Q Q Q (n m m d) Y U m 0) a1 Q U a U. U N O M N "O U i-- M N 'O U c- C7 r tLj L 4 En •N N V V .j CD O (9 N N O U II II II O Q m 11 II V O w Q m . y O II M U Co (M 0 0 co LL O -0 U, cr m O ¢ a 11 0 p? m O O Q Q O `' N 7 w-- 0 c N m ?•- O •- O C E C : > > o O Z? F >l> R- l < 1L N C O E 7 In N Q W y OF U K W 0 R g ? °O F 00 z/ O N z O cc o ° W? = 0 W w(]UFo2 ` LL' LL W p0 =8• w.o0? 1 = oo w 5,wLg9u~i°w H 2r g ?W OyN? ''^^ Q w°m °°zdoLL`o v, W o O > C? E ¢? _?JOU a?- W U W ? Z LL y O y U> W ?' 6r LL O..W S as z ?O? z r?W mwZ? o¢zc? 01 U)i 0 a w Zw z Q w t4wF-DOMW °v z KW?DO Qw Ojw Y 6i L; Hwo z wac3No a o WWO?m? wo O H, .. N W?oom??oo? N Z °wZ w w = 3 v?i"?mxN9°wo nL mo W z z U ?` O,?i aSZw ~o?p?'? (L? OJ a O z0 O C O .? NJO=z¢ Wwco 11 U. N Q lo Ul Ld ui ¢°FrN¢az O 0 00 l< F- L,u 44 z ow 0 cc 8 U5 U) L) Du P! M 46,6,4 c0 ^/? Q J Y 1..1 F? m 44 W m J 0 N ~ l? W Z O O a O ° O U Q °P aW V3 m _z 2) WO ) U. U. 3JV1S llf1zNNVB 6 O / ^ M OW? O mow ay??r / o O Z ?. ° N? m U° ?`*? '30°000 mod ?•cc?eyymy 0 z 12 :30 oo LL ° QZ 8`??? LL -i z U) ? o 0'. pp CL c CL oow % / 9 ou m° a k°`x , Zmm J i w Y C o d x co "T 00 10 O LO O .- to - CO N O N II II L n s _ +• C ° ?. U N ? II m :: I I d CL O f9 ? > > Y m II O O L c C v c ° > ?? .N C X? C L C d d o cu cd j 0 .+ C - m:E Q `? y d O O? J 0 v V Q / C > = N 7 f4 04 rn W C(5 >m U CL o U 1a = N c-J = t0 .-- = 00 = -f to = to cD b N o O a0 V N L L w.. L L L ~ N ' N L .J s N d 26 V Q _O (n N J E E J E E > Y ? O (n Q Q 7 C C O N d U O - Co m m C C M >> in Q m (? ? W IL (9 2 0 i i r i i 1 w J LL 0 w a 0 N O O N CD o c R N O U o o V ' a T F LO 0 0 0 0 0 0 0 0 0 O oD c0 V N O d 00 d N N O U Q, N 0-0 ? C N .? ? C ?a> Q a a 0) a? rn 01 Q Q i-CLO ?Q m T T IL m d a d ? 17 a Y Q ?. V C/ a m LL 11 3 O N O O LL Q Q O h- U LLJ M '(n O U U) U M - U.) "NO N 1- LO L:3 Z m 0 c cu N N O II U II II Z Q m II II N N co .N.. N II N 0) (o Cy) ? N LL 'O N d ` d ? (0 (6 7 O N O ' E E N _-. ¢ ¢ u M E II 0 O O m O O Q U Q - O a) ° d ° C: ? E E E 5.5 c 0 > 0 > 0 c 0 c 0 ° E Z cn F- > > t- h Q N C O E N N Q Y U O U I \?? O cr Y O cc C W O O Z LL + > Y w I\ ? \ M I r- J° 081-- W N TS O C3 O\ O cc p O cl: U) C7 00 Q O XX y v U L M cz N w > Q = d C'j 0 U) Q a z 3g LL n? / cl o w o n U) C-q w z o i Q Z 3 U 0 O y \ o mo J y LL Q y U z p J LL ti w 0 U) ui r-+ C14 0 p ? ? F•?i F•?•i Y U ? O ? W a 0 >w W LL 00 z U k t? OVj "ZWQ ap O ?F :30 w? Q> W t ?7d O tSa_ U. LL 2 pulK 00 ? zd pwLLLC pap U)a 1 N~n p ULL Z41? _1-LL 2 wa?m0 LL ?pZa w = G.?°OyLLw-?O W F p nom. „ ww Q 0 ?Z°zJ°_vQNi a_F c? Q QQNg g.- ? 0 ZW? F OZ ' ' ? V1N W NC? ?O O . EL O S > Z LLU LL =LL p?...zK? QOOOZ_= {pi, Y 0 W F ?yro mdiyy u. • Q K \ 'O I U o F Z m?00WOZNOtA lLL.O ¢ XwU, F5-OLL pCyZZS ?"' m ?QaKKO°pa?? W UwA O' C' 0a mZcS? J z ?• m ` Z xZpLL70 WWm =100 0 09 ~ a?o ' a li ci ?koo o8` . F 0.a w Z Ww a co, ? o o 0? m U ° w? a " 0 F ZwWU t LL m- o w 7d } C14 - ?, •?'?..: _ u u ul o r U o U y Q? ?3>aOUF- viz ?-• w?°°o°?u?z3oy ?o HR - H nn- 3JV1S DiNV9 w n mw° J Z j?u? Q Q z LLN CE wti r?ZU WmNO o zmm , n: ? yy 9? ? 7 z?UO _ u CY cf. ? ? :30 E OQN?p<pzz~w?d ~p m?20 ~ 7 wo °0( UQ n .= C) 6 a 6 m n cd ai C-A J w z z o W w \\//\\//\\// J O Z fe c t; a O 0 N O W- O m? W CL , Z W U) U O F- w N U) 3 ? o / 0 U w j/ (L LL LLJ 9z a ° a OIL 0 Z033 WO luc nn-4>INvi3 rN M38 if3NNI .?C CLM W a0 mz o -9 12 CL LL - Z p0 V J m EL <t W2l3H 213NN1 nn-INve Photo 1: View of natural wing wall. Stabilize existing trees and repair eroded bank. Photo 2: Adjust channel (refer to PS 1). Layback existing bank and use fiber matting and livestaking to stabilize bank. Photo 3: tting and Photo 4 (facing upstream): Realign channel (refer to PSI). Layback existing bank and use fiber matting and livestaking to stabilize bank. Photo 6: Remove debris just downstream of proposed double drop cross vanes. k?a Photo 5: Map/Sketch Sheet 2B. View of right Bank scour. Photo 7: Upstream of the culvert crossing under White Pine Rd. Approximate location of proposed rock vane and double drop. F-ASKI Photo 8: Livestaking, fiber matting, bare root and container planting are proposed for this barren bank slope. The property owner has prepared the earthwork on the channel banks. 4 p Photo 9: Livestaking, fiber matting, bare root, and container planting are proposed for this barren bank slope. A no mow zone will be needed to protect the channel from erosion. Photo 10: Map/Sketch Sheet 2B. Property owner has adjusted channel and added slope protection to channel banks. A rock vane will be placed near the blue shed to protect the structure from bank erosion and undermining. Photo 11: Property owner has adjusted channel and added slope protection to channel banks. Photo 12: Downstream of project reach. This portion of the stream is stable and resembles a typical proposed riffle. wf'c;?, r Erosion and Sediment Control Plan Emergency Watershed Protection Program Avery County The following erosion and sediment control measures will be incorporated into all stream repair sites. 1. The Contractor shall minimize vegetation disturbance by only working on the stream bank and channel that is in need of repair. Existing buffers shall not be disturbed unless directed by the designer. 2. The Contractor shall only enter the stream channel as shown on the plans or directed by the designer. These stream accesses shall conform to the design standards shown in the attached detail drawings. Timber mats may be used as a substitute for rock per the approval of the designer. 3. The Contractor shall limit all bank and channel disturbance to activities that can be completed by the end of each working day such that the work would remain in place during an overnight storm event. 4. All equipment and uninstalled materials shall be removed from the channel at the end of each working day and secured safely from potential out-of-bank flow events that may occur prior to performing additional work. 5. Graded stream banks shall be stabilized with temporary and permanent seed and coir fiber matting at the end of each working day. Seeding and coir fiber matting specifications are included with this plan. 6. Stockpiles shall remain at least fifteen feet from flowing water and outside of the top of bank. Silt fence shall be placed at the base of the stockpile between the stockpile and the channel and must function to receive stockpile runoff before entering the channel. Silt fence shall conform to design standards shown in the detail drawings. 7. Temporary vegetation and permanent herbaceous vegetation shall be established on all disturbed areas not already stabilized with matting, within five days after construction is completed. 8. Permanent woody vegetations species are listed in the vegetation specifications; planting details are also included. Buck Engineering 1 of 8 River Works TECHNICAL SPECIFICATION Vegetation Planting General Seeding Seeding should be done immediately upon completion of final grading. Apply seed prior to installing matting. Prepare the soil surface so that it is smooth and free from stones, clods, or debris that will prevent the contact of the matting with the soil. Fertilizer and lime are generally not necessary on most projects, particularly not on sites that have been used for agriculture production or cattle grazing. Urban soils may require amendments. Seed should be broadcast with a centrifugal seeder or by hand, at the full rate along stream banks and in stockpile areas. In all areas where permanent seeding is used in addition to the temporary seed, mixing of the seed for broadcasting is acceptable. Seed and amendments (if needed) should be covered to a depth of 1/2 to 1 inch with soil by using a hand rake, drag or other tillage equipment. Seeding may also be done with a hydroseeder. Wood cellulose fiber will not be acceptable as a substitute for straw mulch. A suitable tracer shall be used to clearly identify areas hydroseeded. A minimum of 5001bs. per acre of wood cellulose fiber or a non-toxic water base dye may be used as a tracer. Seed shall not remain in water containing fertilizer more than 45 minutes before being used. All products used to hydroseed shall be non-toxic to aquatic organisms. Temporary Seeding For temporary seeding, apply the following vegetation at the listed rates and times. Temporary Seeding (September to March): Rye grain 3 lbs per 1,000 sq ft or 1301bs per acre Temporary Seeding (April to August): Foxtail Millet 1 lb per 1,000 sq ft or 401bs per acre A combination of the two temporary seed types shall be used during the boundary months of March, April, August and September to ensure survival. In all disturbed areas where no permanent seed is being used (i.e. yard or agricultural field) and temporary seed is not desired at the higher rate, broadcast temporary seed at the lower rate of approximately 1/2 the full lbs/acre stocking rate. When used in conjunction with permanent seed mix, apply at %2 the full lbs/acre rate. Permanent Seeding Permanent seeding will be accomplished using the mix listed below: Buck Engineering 2 of 8 River Works Riparian Seed List Scientific name Agrostis alba Carex vulpinoidea Elylnus virgincus Juncus effisus Panicum clandestinum Polygonum pennsylvanicum Bidens frondosa Coreopsis lancolata Cassia fasciculata Verbesina alter folia Common Name % of Mix Redtop 15% Fox Sedge 10% Virginia Wild Rye 20% Soft Rush 5% Deer Tongue 15% Smartweed 5% Beggers Ticks 5% Lance leafed Coreopsis 15% Partridge Pea 5% Wingstem 5% Seed at full rate of 15 lbs/acre along stream banks and in any stream buffer and wetland areas. Riparian Buffers Trees and Shrubs Trees and shrubs will be used to provide permanent vegetation for EWP repair sites. Species used shall be selected from the following list: Shrub and Small Trees Scientific name Common name Salix sericea Silky Willow Xanthorhiza simplicissima Yellowroot Physocarpus opulifolius Ninebark Corpus antonum Silky Dogwood Hainantelis virginiana Witch-hazel Carpinus caroliniana Ironwood Corylus americana Hazel-nut Ahms serrulata Tag Alder Ostrya virginiana Hornbeam Spirea tonientosa Hardhack Rhododendron arborescens Smooth Azalea Rhododendron maximum Rosebay Rhododendron Cephalanthus occidentalis Button Bush Itea virginica Virginia Sweetspire Calycanthus floridus Sweet Shrub Lettcothoe axillaris var. editorum Dog Hobble Hydrangea arborescens Mountain Hydrangea Santbucus canadensis Elderberry Buck Engineering 3 of 8 River Works LargeTrees Scientific name Common name Aesculus octandra Buckeye Tsuga canadensis Canadian Hemlock Platanus occidentalis Sycamore Acer rubmm Red Maple Quercus alba White Oak Quercus rubra Red Oak Liriodendron tulipifera Tulip Poplar Tsuga carolinianum Carolina Hemlock Betula lenta Cherry Birch Trees shall be planted as either bare rooted or containerized material. Trees should be planted at a rate of 400 stems/acre (roughly 10 feet on center) where EWP repairs have been accomplished. Planting of this material will be done during the dormant season (late fall and winter of 2005-2006). Refer to the attached details and specifications for more information. Stream banks Live Staking Species used for live staking shall be taken from the following species: Scientific name Common name Cornus amoinum Silky Dogwood Salix sericea Silky Willow Sambucus canadensis Elderberry Cephalanthus occidentalis Buttonbush Salix nigra Black Willow Stake at 2-3 foot spacing on the outside of all meander bends. Stake at 6-7 foot spacing on the inside of meander bends and all tangent sections. Note this is appropriate for most rural systems. Urban or flashy systems should be staked at higher rates. Utilize as diverse a species group as feasible and make sure that black willow constitutes less than 25% of total stakes used. Containerized Plants: Containerized shrub material may also be used on the stream banks to increase the diversity. Applications and spacing should reflect that of live stake material. Mulching Mulching shall be used to provide temporary protection of soil surfaces from erosion. Mulching should be performed within 48 hours of seeding. Grain straw mulch should be applied on seeded areas at a rate of 75 bales per acre. Apply mulch uniformly. Buck Engineering 4 of 8 River Works Erosion Control Matting Ecostakes Provide wooden stake not less than 12 in. (300 mm) in length with a notch cut 1 in. (25 nun) from the top. These stakes shall be used to stake the matting along the slopes. Wooden 3 ft. stakes spaced approximately 4 ft. apart shall be used to secure the matting at the toe of slope. The toe stakes shall have a minimum 1-inch by 1-inch cross-section and shall be designed so that the matting can not slide past the exposed end of the stake. Refer to the attached details and specifications for EWP work for more information. Coir Fiber Matting The erosion control matting shall be a machine-produced mat of 100% coconut fiber with the following properties: Matrix 100% Coconut Fiber Weight 20 oz/SY (678 gm/m2) Tensile Strength 1348 x 626 lb/ft minimum (1650.5 x 766.5 kg/m) Elongation 34% x 38% Open Area (measured) 50% Thickness 0.30 in minimum (7.6 mm) Flexibility (mg -cm) 65030 x 29590 Recommended Flow 11 feet/second (3.35 m/s) Size 6.6 x 164 ft (120 SY) or (100 SM) ".`C" Factor 0.002 Place the coir fiber matting immediately upon final grading. Provide a smooth soil surface free from stones, clods, or debris that will prevent the contact of the matting with the soil. Apply seed prior to installing matting. Begin at the bottom of the slope by anchoring the matting in a 6-inch (15 cm) deep by 6-inch (15 cm) wide trench. Backfill and compact the trench after staking. Walking backward down the stream, allow the matting to unroll slowly; ideally the matting roll will rest against your shin as you walk. Stake the matting according to recommended stake pattern for specific product and slope. (See stake pattern guide that comes with the product.) Place matting in full contact with the soil. The edges of the parallel matting must be staked with approximately 2 inches (5 cm) of overlap such that the edge of the downstream matting is under the one just upstream. When matting must be spliced down the slope, place matting end over end (shingle style) with approximately 6 inches overlap. Drive stakes through the overlapped area. Place stakes across the matting at ends, junctions and trenches approximately 1.3 ft apart. Place stakes along the outer edges, down the center of each strip of matting and along all lapped edges approximately 2 ft apart. Cut excess matting and anchor at the end of the slope. Buck Engineering 5 of 8 River Works Temporary Stream Access Ramps Stream access ramps shall be constructed using either rock or timber mats in locations as shown on the plans or as directed. Grading shall be performed only to the extent needed to form a stable ramp connecting the stream bank grade to the streambed. The Contractor shall determine the appropriate number of timber mats and ramp angle according to the equipment that will be using the ramp. Stream access ramps are temporary and shall be removed and the areas restored to their original state when they are no longer needed or permanent measures are installed. Sediment Fence Geotextile sediment fences shall be used to trap sediment from areas of limited runoff. Sediment fences shall be properly anchored to prevent erosion under them. These works are temporary and shall be removed and the areas restored to their original state when they are no longer needed or permanent measures are installed. Locations for sediment filters are shown on the plans. Refer to sediment fence specifications (6.62) in the NC Erosion and Sediment Control Planning and Design Manual for material and installation requirements. Gravel Construction Entrance/Exit Temporary gravel construction entrances shall be constructed as shown on the plans and according to specification 6.06 of the NC Erosion and Sediment Control Planning and Design Manual. In-stream Structures In-stream structures include w-weirs, cross vanes, j-hook vanes, log vanes, and wing deflectors. The quantity of in-stream structures to be constructed shall follow approved plans, but may be affected by conditions encountered during construction Boulders used for in-stream structures shall be relatively flat on either side in the same dimension, preferably the long dimension, and must have relatively smooth ends. No more than 5% of the boulders shall be smaller than 3'x2'x2'. Boulders larger than 6'x4'x3' shall be permitted. Boulders found on-site and approved for use by the Developer will be used to the extent feasible. The Contractor shall construct in-stream structures with equipment capable of moving and accurately placing boulders of approximate dimensions 6'x4'x3'. If suitable for backfill, excavated material shall be placed on the upstream side of structures or as directed. Unless otherwise approved by the Developer, excavation to prepare the subgrade for the installation of in-stream structures shall be consecutive and continuous. Once the excavation of a structure has begun, the structure shall be completed by the end of the workday. All equipment shall be removed from the stream at the end of each workday. Any accumulation of sediment in the channel shall be cleaned as needed during construction and at the end of construction. No separate payment will be made for this clean-up work. Buck Engineering 6 of 8 River Works Construction Sequence of Events Construction shall be performed at the EWP site in accordance with the plans and in general accordance with the following sequence: 1. Mobilize equipment and materials to the site. 2. Set up construction access pads, staging areas, haul roads, and silt fences. 3. Install stream access ramps. 4. Excavate and grade banks and construct in-stream structures. 5. Seed and mat graded banks and immediately upon reaching final grades. 6. Stabilize all disturbed soil with temporary and permanent seed prior to leaving the site each day and prior to moving to the next work area. 7. Dispose of excess materials at approved off-site locations. 8. Remove stream access ramps. 9. Remove silt fence and seed and mulch staging areas to restore these areas to pre- project conditions. 10. Demobilize grading equipment from the site. Remove construction access pads. 11. Plant bank, floodplain and buffer woody vegetation and live stakes during the dormant season. Buck Engineering 7 of 8 River Works Details and Specifications for EWP Work Planting • Bare Root/Container Planting • Brush Mattress • Tree & Shrub Planting Details • Live Staking Erosion Control • Erosion Control Matting • Silt Check • Silt Fence • Typical Pump Around Operation • Temporary Gravel Construction Entrance • Ford Stream Crossing • Ford Stream Crossing 2 • Temporary Ford Stream Crossing W/ Flume Pipe Stream Repair Structures • Typical Structure Placement • Typical Plan View & Profile • Constructed Riffle • Double Drop Rock Cross Vane • Double Wing Deflector • "J" Hook Vane • Log Vane • Log Vane 2 • Log Step Pool • Rock Vane • Rock Cross Vane Type 1 • Rock Cross Vane Type 2 • Root Wads • Single Wing Deflector • Step Pool Channel Buck Engineering 8 of 8 River Works 0 Z yJy_, Z J X W h- w ° {???jj 70 N ZLL W ?.j N =KYF-? °W =W N O ? } ?? p ya0? ?? LL O a CL 0:1 i o z c? o a ° w a F a°O,w ? w pzs°=?w ? v°iN W Z o m =ooN??J Qwwpo$?oaac? W =5? Na o wom ?w oN z.:o7N= ?Na ? ow???7N ow opOzow za 4$ °?ym=' Zz wowLL-? ?"i w w a .. U) o om mN °°at52w?s?S. Z Z? wq?u o O> LL fO o.>. 1 C a ]K LL 0 C) H ° FO> U ?O1J O ~O $ W U " O , W W O w O .. Z V Q 2°x?a'g? 0 ?z z ILluz i? ? xw ° F- U LL ° ?QOUW7a w .. p _ Wy?o=?=g°?° m ? w or ?zOU ? aOUZwz oNa° a om!!:- wao LL LL ° F aa? F ci vi .f viol d U ° N O /LU m?°'o?O U) 0 m=a .. z LL Ne LL //LL/? C1 M Y 1ri t0 n .. .. O a Z Z :. m o W d N Z z Q p LL O o U p U O ? 7hop0 NN.t ayt n q ? '7 ILU?c6 T?W r U ? 0 L lL ?Oa °oU w V?iI y U V' J r-? Q ? o M e33 G ` a i Iej ?=a? x f i? ya 0 g co x O Z g? a m? I. x K tom w J 0 Z g? x 0 w w FJ W O zZ U if! 9?? H i S "y 'S2 3 o qqi > All, J o ? F w 0 L R o Q Y C e 5 V , J 0 z I- 4z J U) 06 Nw avoy oZOV K rd` $u° a ,15 asst 5 Z U a k U p w Y? N O (7 p0 ?D Y LL 0 0 fyZ ry (7 O p ?QIFY1 vi N?oN7 ?YF- O p mNQ 01 ? LLYNI a Z W L QLLW J J - F H LL. O ?- gN50 0 C) f o ? W °z z. F a O? W -W•-?WN ozp( 4D . z.3 5; - 4D .4w, -z oz V W zp r ° K O 5U J v o..;. lu F~ Qz SEzO Uo UIF-v _ L) 0. ca m D3 La i g n a -3? ?° 9?m999 1?.' •.'.'o. 4 o a ?M °zmooo u3 N LL N? 1NNfp X o ul v) o u) N OSY ui td w I (A Y W a 0 LL co C7 ° U. Z 0 w 0 Y H o W Z z C) L) Q a > a J N N to fV to N W 2 aZ ' U LL 0 .., O'' r'.'.. O ' m o ?q 0 NNQmm 0 ~ ZZ m C y W U J°d?v O a aUma u aOnz a N??y ? t; a LL 4. ? 4 U o° 0 eo LL N O F- Ina O t- C pp Or QZW K OOU O 0 5 a U a0 a? Z LL azw O m °w oo?mg w O NVO24w a? U V V W V U?p co WWtn ?cO NLu V °LLO [DLR.0 -? j z z z Q =wocR?"O zo 8?9ci,98 wa UWWLLZ W ?O`ryON mO N YUUO?° FO ?LL a ZZIIaa? ma = Y w o ri 0-Z o QW ow V) 90 NdCO7 ??Y w? = LL y WZ S?5?U?Z Z H O ? U W7 SS WS?OVJ O O co w? O ?6 LL J=ZJJO • 1 0 0 1¦Y•Yy? Y o f to 0 0 io1 O O (n o f l 0 0 0 0 I I O Vr Z I•I e o Z o l l0 0 0 1 I Q lel o 0 Q o 1 10 0 o Z J U 101 O O 0 O • 1 10 • 0 _ I I O 101 O O 01 10 o • > O I I Z Z 101 O o g ? • ?o e 0 a Z lol o 0 0 W Q o 1 is o 0 (n 1.1 • o Q z 0 1 l0 0 0 I I W w t- 101 0 • °a o 0 1 Io O 0 z? o l01 0 0 z° O I 10 0 O m z? 101 o e 0 0 0 0 U O W U W Y N w W U Sa LLuj .. NNUV?m fti ZV LLO p$a n5r1 m° N US Q d.eygm Zz O wU .. .. OVyFFK- pn,Uc?A ab Z Y w a z fo- a? mZ u iU¢ fn Ix 20. Wm .. (? oU LL c U Q U= 0- .. .. .. .. .. oz LL 111111 LL! w _o 1 T N z a LU ? '?I II - N ?I? Ifl ?it?? .. - lime E`3) f- w •'" !i ' I?Il tit ?? 'J.? : Jt•:it' U. Of t LL 1. I { III ZO O o &D t I?il'?CIICI ?' O W ? W Z 0 Q N ? °o m? LL O? WN > w NNy ?yWy/j 2? LL NS?e3 ZO Oo OF-C?.Jd ? 0 0) y ? mZ ? d ?ozk-"? ccm`a?'' w?Nw oV y o JzWZW?W pWN 7 LL 0 w w m Uw J ? z J O m U- `v W ° LL N zz m W U m ?' N ?-. 5 OZ O O j O Q O z? U m ccU Q y W l W No E V LLIZ oa ?y?? d ? o 0 m? -j $ J LL 'r n^ LL LL U m O LL LL O w w U U I- U) Z O U O m U CL z 0 F ? w w w St z 0 U o o N lp, oz z T v 0 m°L e m tie U ao? Y °??,° p ?mL ° m°E 0 a a W u E? W c00S? ? ?ZOW K Z 0 CL 0 c? oU a o (7 W ? O C} yN m U N d Cuff co z U m00 a o? C? w z 0 ? o z w F- w U E2 m LL J Q c1 ? a 0 Z W t o ^ J t LL rim W LL w w ` cn a (0 r 0 W o o m 0 1 r CO _1 0 ==0 5 CD ° J2 W to o ? O ? J a w ?a CL w 3 m O J ? z E? ~QQ 0? Y ? J YQz WKw mr m ?, 0 a W >-i, u i o ?LL? m n a N >.rua > U. mv?? 9 ?x fn Nv!?a?o d IL / aN /- 000 ?` 3 z ell OJ-? A? 0000 tL 'L a.'PT! ma 60 \ / / oc m a w ZQY ' QQ FFFF ---- C ? QI 57 I ? Q¢ fVcc -0 0 ct: rmM Ha C/) l7 co } p W wD} xoui 9 Y 2'OW ?aOWJ K h J9 wo D s ?" Hm o a V) sto 9 ej o O a o '0 w:0) o F?? ao 20Y y p000 i wawtwirgcz?wz ? zz O O w 3? o o9ow O QUO z EL ?_mxU 55FO0 room-am Otu t Y O OWE WWpi~pmz m g ?pOO tn P? 0: o?o ow,z??Zww W? n.o 41 pia<?Swm? KE) qgg f- Z Zf?WLuW YV ya0? LM r-F av? odm Lu, w?o jw 000a? 01 iL 00?OZ pO w?0 c3oooOpO -gO WM(L- U) o? ,r1 0 w w O ¢¢Z Z u6 Cc w w FAO 90 LLL F Mw y}?m 0Fm0oF-°9opoz tz Wnlzo . z? owo?'?0 OZFwowir N ZwOO?NQ?Q? N tu?d?dwZ??Up`h O m?wwO06Z0 o ?Y_Q?gwx O z ?zmu. o ?u z ?v?tu 5a'!?'v O o 0 w co w m Y Y O N O h O? - OJ 10-O L m W Z Ow U) OK w w 1- O W g N Z L ? ? w J Z Ilz ? Z m o uDw F Z co 19 0 o W J ca . ?K ?. o _ III 10 Jm Z ICI =m I> Ef. 0Q ^a, _ O NO N ^K U' ?""' (n IL - W O W Z W? III OIL L W~ w?? III 0 0a OO ) ?-'' m O Z m 00. JO C/) 30: M 0 0 -1 cn LL fn ?m or- p U) z0 0m pF '?nwo U CAN , op Q 0 OLL fn N -,t hyyg v A??m 0 """((( U) O V z op0 Q V a00m? N Hy n W h U IL di W O 03 Z :3 It / i UZ O m tau " ? ou Z Y a vi 0 Z J D LU z 0? Z o -A o ^ o o J U. N LL t0 A 6/28/05 Subject: Cultural Resources Literature Search and Survey Results for Avery County NRCS Planned EWP Undertakings To: Jane Shaw, NRCS District Conservationist Date of Survey: 6/14 - 15/2005 From : Jim Errante USDA-NRCS, CRS SC & NC 1835 Assembly St., Rm 950 Columbia SC 29201 Phone: (803)253-3937 The following list of DSR's were reviewed by Jim Errante, NRCS Cultural Resources Specialist (CRS). A literature search for each planed practice location took place in the Archaeological Map room of the NC Office of State Archaeology. Each location was reviewed for the potential of NRCS planned activities to effect cultural resources (CR's). In addition, photographs of the APE's were reviewed and discussions were held with knowledgeable field office and the engineering staff in order to determine the potential of planned activities to effect CR's at each EWP practice location. Each practice location received a ranking of a low, medium or high potential to effect CR's. All EWP practice locations receiving a medium or high ranking to effect cultural resources were archeologically surveyed by the NRCS CRS. Archaeological survey procedures included reconnaissance survey of all visible soils in the area including river bank profiles, and shovel testing. All shovel tested soils were screened through Y4 inch hardware mesh. The following Excel file list of EWP locations includes a statement describing the results of this survey work. The NRCS CRS maintains the field work details of the archaeological survey at each APE. Any questions concerning the results of these survey results as listed below should contact the NRCS CRS for further explanation. DSR #s CR Review Comments BC 1 Elk Mills Low potential for impact to CR's FO to survey BC 1 Elk Park Low potential for impact to CR's FO to survey BC 2 Low potential for impact to CR's FO to survey CB 1 Low potential for impact to CR's FO to survey cc 1 No previous recorded CR's. Very low terrace over stream & disturbed soils in APE. Surveyed by CRS. Ok to proceed. CC 2 No previous recorded CR's. Very low terrace over stream & disturbed soils in APE. Surveyed by CRS. Ok to proceed. CC 3 No previous recorded CR's. Very low terrace over stream & disturbed soils in APE. Surveyed by CRS. Ok to proceed. DSR #s CR Review Comments CC 4 Low potential for impact to CR's FO to survey CH 1 Low potential for impact to CR's FO to survey Cross Cr 1 Low potential for impact to CR's FO to survey Cross Cr 2 Low potential for impact to CR's FO to survey Curtis Cr 1 Low potential for impact to CR's FO to survey Dellinger Br 1 Low potential for impact to CR's FO to survey ER 1 Low potential for impact to CR's FO to survey ER 2 Low potential for impact to CR's FO to survey ER 3 No impact to CR's in area. All CR's are outside of APE. All work planned in-stream. Primarily debris removal. Surveyed by CRS. Ok to proceed. ER 5 No previously recorded CR's in area. Very disturbed soils in APE. No CR's. Surveyed by CRS. OK to proceed. ER 6 Low potential for impact to CR's FO to survey ER 7 No previous recorded CR's. Alluvial, silty soils. Surveyed by CRS. Ok to proceed. FC 1 Small Area, OK for FO to Survey FC 2 Low potential for impact to CR's FO to survey GP 1 Low potential for impact to CR's FO to survey HB 1 Low potential for impact to CR's FO to survey HP 1 Low potential for impact to CR's FO to survey K 3 Low potential for impact to CR's FO to survey K 4 Low potential for impact to CR's FO to survey KC 1 Low potential for impact to CR's FO to survey KC 2 Low potential for impact to CR's FO to survey LEC 1 Low potential for impact to CR's FO to survey LHC 1 Low potential for impact to CR's FO to survey LL 1 Low potential for impact to CR's FO to survey LR 1 No previously recorded CR's area. APE is roadside. Soils are disturbed. No CR's. Surveyed by CR Specialist. OK to proceed. LR 2 No previously CR's recorded in APE. This reach is primarily just debris removal or requiring fill. No CR's in APE. Surveyed by CRS. Ok to proceed. LR 3 No previously recorded CR's in APE. Only debris removal scheduled. No CR's in APE. Surveyed by CRS. Ok to proceed. LR 4 Low potential for impact to CR's FO to survey LR 5 Low potential for impact to CR's FO to survey LR 6 Low potential for impact to CR's FO to survey LS 1 Low potential for impact to CR's FO to survey LS 2 Low potential for impact to CR's FO to survey LS 3 Low potential for impact to CR's FO to survey LS 5 Low potential for impact to CR's FO to survey LS 6 Low potential for impact to CR's FO to survey LS 7 Low potential for impact to CR's FO to survey LS 8 Low potential for impact to CR's FO to survey LS 9 Low potential for impact to CR's FO to survey LS 10 Low potential for impact to CR's FO to survey LS 11 Low potential for impact to CR's FO to survey LS 12 Low potential for impact to CR's FO to survey MB 1 Low potential for impact to CR's FO to survey Mrk 123 Low potential for impact to CR's FO to survey MT 1 Low potential for impact to CR's FO to survey MT 2 Low potential for impact to CR's FO to survey MT 3 Low potential for impact to CR's FO to survey MT 4 Low potential for impact to CR's FO to survey NT 1 Low potential for impact to CR's FO to survey NT 2 No CR's previously recorded in area. Location will primarily involve debris removal. Low banks in area and no evidence of CR's found. Surveyed by CRS. Ok to proceed. DSR #s CR Review Comments NT 3 Low potential for impact to CR's FO to survey - primarily debris removal. NT 4 No CR's previously recorded in area. Location will primarily involve debris removal. Low banks in area and no evidence of CR's found. Surveyed by CRS. Ok to proceed. NT 5 No CR's previously recorded in area. Location will primarily involve debris removal. Low banks in area and no evidence of CR's found. Surveyed by CRS. Ok to proceed. NT 6 No CR's previously recorded in area. Location will primarily involve debris removal. Low banks in area and no evidence of CR's found. Surveyed by CRS. Ok to proceed. NT 7 Low potential for impact to CR's FO to survey (previously surveyed - No CR's) NT 8 No CR's previously recorded in area. Location will primarily involve debris removal. Low banks in area and no evidence of CR's found. Surveyed by CRS. Ok to proceed. NT 9 No CR's previously recorded in area. Location will primarily involve debris removal. Low banks in area and no evidence of CR's found. Surveyed by CRS. Ok to proceed. NT 10 No CR's previously recorded in area. Location will primarily involve debris removal. Low banks in area and no evidence of CR's found. Surveyed by CRS. Ok to proceed. NT 11 No previously recorded CR's in area. Impacts planned are adjacent to bridge and are disturbed and heavily scoured. No CR's. Surveyed by CRS. Ok to proceed. NT 12 No previously recorded CR's in area. No CR's. Surveyed by CRS. Ok to proceed. NT 13 No previously recorded CR's in area. Survey focused on streambank stabilization areas. No CR's discovered. Location will primarily involve debris removal. Surveyed by CRS. Ok to proceed. NT 14 No previously recorded CR's in area. Survey focused on streambank stabilization areas. Significant nursery agricultural impacts in area. No CR's discovered. Location will primarily involve debris removal. Surveyed by CRS. Ok to proceed. NT 15 No previously recorded CR's in area. Survey focused on streambank stabilization areas. Significant nursery agricultural impacts in area. No CR's discovered. Location will primarily involve debris removal. Surveyed by CRS. Ok to proceed. NT 16 No CR's previously recorded in area. Location will primarily involve debris removal. No evidence of CR's found. Surveyed by CRS. Ok to proceed. NT 17 Low potential for impact to CR's FO to survey NT 18 No previously recorded CR's in area. Very low terrace, and very scoured area. Area floods frequently. No CR's. Surveyed by CRS. Ok to proceed. NT 19 Low potential for impact to CR's FO to survey PC 1 Low potential for impact to CR's FO to survey PM1 Low potential for impact to CR's FO to survey RB 1 Low potential for impact to CR's FO to survey RC 1 No previously recorded CR's in area. Very disturbed soils in APE - re-routed stream & scoured area. No CR's. Surveyed by CRS. OK to proceed. SB 1 Newland Low potential for impact to CR's FO to survey SB 1 V.Crucis Low potential for impact to CR's FO to survey SC 1 Low potential for impact to CR's FO to survey Sol Low potential for impact to CR's FO to survey TMC 1 Low potential for impact to CR's FO to survey TMC 2 Low potential for impact to CR's FO to survey TMC 3 Low potential for impact to CR's FO to survey TMC 4 Low potential for impact to CR's FO to survey TMC 5 Low potential for impact to CR's FO to survey UNR 4 Low potential for impact to CR's FO to survey LINT 1 Low potential for impact to CR's FO to survey LINT 2 Low potential for impact to CR's FO to survey LINT 3 Low potential for impact to CR's FO to survey LINT 5 Low potential for impact to CR's FO to survey LINT 6 Low potential for impact to CR's FO to survey LINT 7 Low potential for impact to CR's FO to survey LINT 8 Low potential for impact to CR's FO to survey DSR #s CR Review Comments WC 1 Low potential for impact to CR's FO to survey WF 1 Low potential for impact to CR's FO to survey WF 2 Low potential for impact to CR's FO to survey (previously surveyed - No CR's) WO 1 Low potential for impact to CR's FO to survey WO 2 Low potential for impact to CR's FO to survey WO 3 Low potential for impact to CR's FO to survey WP 1 Low potential for impact to CR's FO to survey WP 2 Low potential for impact to CR's FO to survey Federally Threatened and Endangered Species Review Based upon a memo submitted by Brian Cole of the United States Fish and Wildlife Service (USFWS), dated June 21, 2005, no listed species or their habitats occur on this site. The USFWS concur with the determination that the activities proposed at this site will not affect endangered or threatened species or their habitats.