Loading...
HomeMy WebLinkAbout20190289 Ver 2_Preliminary application with final amendments_20190521Guilford County PRELIMINARY Stream Buffer Variance Application Guilford County Preliminary Stream Buffer Variance Application Page 1 of 6 Riparian Buffer Rules Applicable In Project Area: High Point East and West Fork Deep River Water Supply Watershed □Major Variance □Minor Variance Jamestown Deep River Water Supply Watershed □Major Variance □Minor Variance Jordan Lake Water Supply Nutrient Strategy (15A NCAC 02B.0267) □Major Variance □Minor Variance Polecat Creek Water Supply Watershed □Major Variance □Minor Variance Randleman Lake Water Supply Watershed (15A NCAC 02B.0250) □Major Variance □Minor Variance Sandy Creek Water Supply Watershed □Major Variance □Minor Variance 1.General Information A. Project Name (Subdivision, facility, or establishment name): B. Applicant’s Information (if other than the current property owner): Name: Title: V.P. Industrial Maintenance & Industrial Operations Purchsing Street Address: City, State & Zip: Telephone: Email: Randy.Barber@Publix.com C. Property Owner/Signing Official (person legally responsible for the property and its compliance): Name: Publix Distribution Center Publix Super Markets, Inc. Attn: Mr. Randy Barber 501 North Galloway Road Lakeland, FL 33815 (863) 688-1188 ext. 88425 X X See attached property owner list. Guilford County Preliminary Stream Buffer Variance Application Page 3 of 6 Date property was purchased: October 19, 2018 Deed book and page number Map book 198 and page number 86 Attach a copy of the recorded map that indicates when the lot was last platted. Appendix C G. List any permits/approvals that have been requested or obtained for this project in the past (including all prior phases). 2.Proposed Activity A. Project Description i.Provide a detailed description of the proposed activity including its purpose: ii. Attach a site plan showing the following items as applicable to the project:  Development/Project name  Revision number & date  North arrow  Scale (1” = 50’ is preferred)  Property/project boundary with dimensions  Adjacent streets and roads labeled with names  Original contours and proposed contours  Perennial and intermittent streams, ponds, lakes, rivers and estuaries  Mean high water line (if applicable)  Wetlands delineated, or a note on plans that none exist  Location of forest vegetation along the streams, ponds, lakes, rivers and estuaries  Extent of riparian buffers on the land including Zone 1 and Zone where applicable  Location and dimension of the proposed buffer impact (label the area of buffer impact in ft2 on the plan)  Details of roads, parking areas, cul-de-sacs, sidewalks, and curb and gutter systems The purpose of the proposed project is to establish as secure corporate campus which: (1) includes the following components arranged in a contiguous, functional, efficient manner: refrigerated warehouse, dry warehouse, return center, food manufacturing facility, parking and staging for tractor trailers, parking for associates and ancillary support facilities; and (2) is located at a site that will efficiently serve its current and future grocery stores within North Carolina, South Carolina and Virginia. The facility components include a 1.1 million square feet (sq.ft) refrigerated warehouse, 1.3 million sq.ft. dry warehouse, return center, 120,000 sq.ft. food manufacturing facility, parking and staging areas for tractor trailers, parking for associates, and ancillary support buildings (i.e fleet maintenance, fleet fueling, dispatch and site security). Guilford County Preliminary Stream Buffer Variance Application Page 4 of 6  Footprint of any proposed buildings or other structures  Discharge points of gutters on existing structures and proposed buildings  Existing drainage (including off-site), drainage easements, and pipe dimensions  Drainage areas delineated 3.Proposed Impacts and Mitigation A. Stream associated with riparian buffer to be impacted by the proposed activity: Feature Name of Stream Water Quality Classification B. Individually list the square footage of each proposed impact to the protected riparian buffers: Feature Buffer Impact Number1 – Permanent (P) or Temporary (T) Reason for Impact Buffer Mitigation Required Zone 1 Impact (square feet) Zone 2 Impact (square feet) B1 - P T □ Yes □ No B2 - P T □ Yes □ No B3 - P T □ Yes □ No Total Buffer Impacts 1Label on site plan C. Identify the square feet of impact to each zone of the riparian buffer that requires mitigation from the table above. Calculate the amount of mitigation required. Feature Buffer Number Zone Total Impact (square feet) Multiplier Required Mitigation (square feet) Zone 1 3 Zone 2 1.5 Zone 1 3 Zone 2 1.5 Total Buffer Mitigation Required: J UT to Little Alamance Creek WS-IV;NSW K UT to Little Alamance Creek WS-IV;NSW I UT to Little Alamance Creek WS-IV;NSW See attached table See attached Guilford County Preliminary Stream Buffer Variance Application Page 5 of 6 D. Provide a description of how mitigation will be achieved at your site pursuant to the mitigation requirements of the applicable river basin/watershed. i.Is buffer restoration or enhancement proposed?□ Yes □ No If yes, attach a detailed planting plan to include plant type, date of plantings, the date of the one-time fertilization in the protected riparian buffers, and a plan sheet showing the proposed location of the plantings. ii. Is payment into a buffer restoration fund proposed?□ Yes □ No If yes, attach an acceptance letter from the mitigation bank you propose to use or the NC Ecosystem Enhancement Program stating they have the mitigation credits available for the mitigation requested. 4.Demonstration of Need for a Variance The variance provision of the riparian buffer rules allows the Division or the Environmental Management Commission to grant a variance when there are practical difficulties or unnecessary hardships that prevent compliance with the strict letter of riparian buffer protection. A. Explain how complying with the provisions of the applicable rule would prevent you from securing a reasonable return from or make reasonable use of your property. Merely proving that the variance would permit a greater profit from the property shall not be considered adequate justification for a variance. The Division will consider whether the variance is the minimum possible deviation from the terms of the applicable Buffer Rule that shall make reasonable use of the property possible. All compensatory mitigation requirements for unavoidable buffer impacts can be satisfied by the purchase of buffer credits from both the South Fork Nutrient Offset and Buffer Mitigation Bank and the UT to Pine Hill Branch Nutrient Offset and Buffer Mitigation Bank. X B. Explain how the hardship results from application of the Buffer Rule to the property rather from other factors such as deed restrictions or other hardships (e.g. zoning setbacks, floodplains, etc). Attached Narrative C. Explain how the hardship results from physical nature of the property, such as its size, shape, or topography, which is different from that of neighboring property. See Attached Narrative D. Explain whether the hardship was caused by the applicant knowingly or unknowingly violating the applicable Buffer Rule. See Attached Narrative E. Did the applicant purchase the property after the effective date of the applicable Buffer Rule and then request a variance? See Attached Narrative F. Explain how the hardship is rare or unique to the applicant's property, rather than the result of conditions that are widespread. See Attached Narrative S. Applicant's Certification Signature: " &—, a r1 d y Ali r b er, v. P. % I , 0. lel a u J 3 Pu rc-h . Date: 9 Guilford County Preliminary Stream Buffer Variance Application Page 6 of 6 4A. Explain how complying with the provisions of the applicable rule would prevent you from securing a reasonable return from or make reasonable use of your property. Merely proving that the variance would permit a greater profit from the property shall not be considered adequate justification for a variance. The Division will consider whether the variance is the minimum possible deviation from the terms of the applicable Buffer Rule that shall make reasonable use of the property possible. Food warehousing and distribution facilities and systems must be well-designed and well- managed to ensure food safety. Grocery distribution sites area designed to assure the most efficient use of space and resources while maintaining a high level of associate safety. A typical grocery distribution center has significant space requirements to house the refrigerated warehouse, dry warehouse, return center, food manufacturing facility, tractor trailer and associate parking, and ancillary support facilities (i.e fleet maintenance, fleet fueling, dispatch and site security). These components must be contiguous in order to function and adjusting the layout on the site would require separation of these components and would not be suitable for proposed project. Safety on these sites starts with the separation of associates from forklift and tractor trailer traffic. This design concept begins with the associate parking areas being separate from all tractor trailer movement. Associates are required to use the dedicated entrance for personally owned vehicles and park in the secured parking area. From the secured parking area, associates enter the distribution center complex and make their way along elevated walkways to the center core support areas of the warehouses. Associates that work i n our dispatch office return center, and fleet maintenance garage are provided a separate entrance and secured parking area. This continues the design concept of separation of associates and personally owned vehicles from tractor trailer and forklift traffic. The proposed facility components include a 1.1 million square feet (sq.ft) refrigerated warehouse, 1.3 million sq.ft. dry warehouse, return center, 120,000 sq.ft. food manufacturing facility, parking and staging areas for tractor trailers, parking for associates, and ancillary support buildings (i.e fleet maintenance, fleet fueling, dispatch and site security). The proposed project is compliant with the Jordan Lake Buffer Rules in all but one area of the Site. Based on the table of allowable uses included in Section 7 of the Guilford County Unified Development Ordinance, proposed impacts to the buffers of stream S1, as shown on the attached figure, are prohibited. Impacts to S1 and its riparian buffer will result from the proposed parking lots, manufacturing expansion facility and loading docks proposed in the western portion of the development. As stated above, the proposed design allows for separate parking for the associates working in the refrigerated warehouse from the loading docks and tractor trailer parking. This lot also allows for a controlled access to the refrigerated warehouse in order to protect the products housed inside. In order to provide adequate room for the tractor trailer trucks to load, unload, and turn around 60-80 feet of pavement is required adjacent to each loading dock area. Therefore, impacts to S1 and its riparian buffer are unavoidable based on the minimum requirements for the proposed operations of the facility. Several design iterations of the proposed project were analyzed in order to examine alternative layouts that avoid and/or minimize impacts to environmentally sensitive area to the maximum extent practicable while meeting the development needs of the Client. The proposed layout provides sufficient area to construct the approximately 2.5 million square feet development and allows for separate entrances and parking for both tractor trailer and personal vehicles, a critical site criterion for the proposed development. 4B. Explain how the hardship results from application of the Buffer Rule to the property rather from other factors such as deed restrictions or other hardships (e.g. zoning setbacks, floodplains, etc). The proposed Project is compliant with all other federal, state and local regulations. No other site constraints such as deed restrictions, zoning setbacks, floodplains, etc. impact the proposed site plan. The facility components must be contiguous in order to function and adjusting the layout to avoid all riparian buffers on the site would require separation of these components and would not be suitable for proposed project. Therefore, the proposed hardship is a direct result of the application of the Jordan Lake Buffer Rules to the property. 4C. Explain how the hardship results from physical nature of the property, such as its size, shape or topography, which is different from that of neighboring property. Additional off-site properties were reviewed for the proposed Project, but similar site limitations were identified at all other locations. Furthermore, numerous on-site layout variations were considered for the proposed alternative. The selected alternative meets the purpose and need for the Project and results in the least overall environmental impacts. The project Site is bound by second order, perennial streams along the western and eastern boundary. The proposed layout provides sufficient area to construct the proposed distribution center along the existing ridgelines which will serve to avoid impacts to the second order streams and associated riparian buffers. Shifting the facility to avoid this particular impact would also be an unnecessary hardship as it would result in additional impacts to streams, buffers and wetlands in other parts of the Site. As stated above, the facility components must be contiguous in order to function and adjusting the layout to avoid all riparian buffers on the site would require separation of these components and would not be suitable for proposed project. The size and configuration of the parking areas, manufacturing expansion area and loading docks are specific to the intended use. For example, tractor trailers require approximately 60-80 feet of paved space to effectively turn around after they are loaded and unloaded. Adhering to the required specifications of the layout for the Project are critical for the facility’s success. 4D. Explain whether the hardship was caused by the applicant knowingly or unknowingly violating the applicable Buffer Rule. Due to the existing conditions of the preferred site location and the sizing and configuration requirements of the proposed distribution center, buffer impacts resulting from the proposed grading and fill required for the associates parking, tractor trailer parking and manufacturing expansion facility are unavoidable. The applicant is aware that a portion of the proposed activity is only applicable under the approval of a Major Variance. Multiple design variations were analyzed to potentially avoid or reduce impacts to environmentally sensitive areas. Design variations considered include utilizing a 2:1 slope verses a 3:1 slope and/or the installation of retaining walls to reduce impacts. A geotechnical investigation for the property concluded that the soils would not be able to structurally withstand steeper slopes, especially given the heavy level of traffic that the internal roads would be supporting. Furthermore, it was concluded that retaining walls would require the relocation of power and communication lines. Given the importance of these lines, the utility companies will not allow them to be placed behind walls or within a geogrid system. 4E. Did the applicant purchase the property after the effective date of the applicable Buffer Rule and then request a variance? Yes, the purchase of the property was completed after the effective date of the Buffer Rule. The applicant is aware that a portion of the proposed activity is only applicable under a Major Variance. However, numerous design variations were reviewed in order to avoid impacts to environmentally sensitive areas. The proposed layout provides sufficient area to construct the proposed distribution center along the existing ridgelines which will serve to avoid impacts to the second order streams and associated riparian buffers. Shifting the facility to avoid this particular impact would also be an unnecessary hardship as it would result in additional impacts to streams, buffers and wetlands in other parts of the Site. 4F. Explain how the hardship is rare or unique to the applicant’s property, rather than the result of conditions that are widespread? The preferred alternative meets the minimum site requirements for the distribution center and was determined to be the most practicable long-term solution to the distribution issues. In selecting a suitable option, the applicant applies criteria it has developed based on over 75 years of grocery distribution experience. Efficiency of design begins with the selection of the geographical area for the campus. Current growth projections include an average of 17 stores per year added outside of Florida through 2028, at total of 584 stores. The proposed Greensboro facility relieves capacity constraints existing refrigerated facilities, reduces transportation costs by $23 million, and meets the preferred site requirements since it is a centralized location where there will be more store growth, presence of a solid interstate system, and significant government incentives. This option also enables Publix to provide the expected level of service, quality and lead times throughout the network and allows for delivery using Publix’s fleet. Finally, the proposed Greensboro facility provides long-term capacity to support future growth, provides support to the existing networks during unexpected events as well as supports 144 stores in 2002 and 196 stores in 2028 based on current projections. Efficiency of operations and minimization of operating costs are crucial to company viability and success. Inefficiencies in site selection, layout or design would have long lasting negative effects. A typical grocery distribution center has significant space requirements to house the refrigerated warehouse, dry warehouse, return center, food manufacturing facility, tractor trailer and associate parking, and ancillary support facilities (i.e. fleet maintenance, fleet fueling, dispatch and site security). These components must be contiguous in order to function. The proposed project is compliant with the Jordan Lake Buffer Rules in all but one area of the Site. As stated above, numerous design variations were reviewed in order to avoid impacts to environmentally sensitive areas. The proposed layout provides sufficient area to construct the proposed distribution center along the existing ridgelines which will serve to avoid impacts to the second order streams and associated riparian buffers. Shifting the facility to avoid this particular impact would also be an unnecessary hardship as it would result in additional impacts to streams, buffers and wetlands in other parts of the Site. Therefore, this hardship is unique to the applicant’s property based on the size and configuration requirements of the Project. Feature Buffer Impact Number - Permanent (P) or Temporary (T) Reason for Impact Buffer Mitigation Required Zone 1 Impact (sq ft) Zone 2 Impact (sq ft) J B1-Z1 (P)Grading/Fill No 2784 J B1-Z2 (P)Grading/Fill No 0 1595 K B2-Z1 (P)Grading/Fill No 717 0 J B2-Z2 (P)Grading/Fill No 0 2523 K B3-Z1 (P)Grading/Fill Yes 54019 0 K B3-Z2 (P)Grading/Fill Yes 39616 I B4-Z2 (P)Grading/Fill No 843 K B5-Z2 (P)Grading/Fill No 3421 105518 Table 3B. Proposed Impacts to Riparian Buffer Total Buffer Impacts Feature Buffer Number Zone Total Impact (sq ft) Multiplier Required Mitigation (sq ft) J B1-Z1 Zone 1 2784 0 0 J B1-Z2 Zone 2 1595 0 0 K B2-Z1 Zone 1 717 0 0 J B2-Z2 Zone 2 2523 0 0 K B3-Z1 Zone 1 54019 3 162057 K B3-Z2 Zone 2 39616 1.5 59424 I B4-Z2 Zone 2 843 0 0 K B5-Z2 Zone 2 3421 0 0 Total Buffer Mitigation Required (sq.ft):221481 Table 3C. Buffer Mitigation Table APPENDIX A FIGURES U.S.G.S. QUADRANGLE(S):DATE(S):WATERSHED(S):HYDROLOGIC UNIT CODE(S): TIMMONS GROUP JOB NUMBER:PROJECT STUD Y LIMIT S:LATITUDE:LON GIT UDE: PUBLIX DIS TRIBUTION CENTERGUILFORD COUNTY, NORTH CAROLINAFIGURE 1: VICINITY MAP 42407 36.079016-79.663402 342.5 ACRES MCLEANSVILLE2016 03030002HAW (CAPE FEAR RIVER BASIN) These plans and associated docum ents are the exclusive property of TIM MONS GRO UP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP. Path: R:\805\42407-Publix Distribution Center\GIS\Common Shared Exhibits\42407-VIC.mxd 5 0 3,000 6,000 9,000 12,000Feet Site limits are approximate.Topographic imagery from USGS. Site Limits ^_ 03010102 03010103 03010104 03040101 03020101 03020201 03030002 0303000303040103 0303000403040104 03030006 Legend ^_Site Marker Haw (Cape Fear River Basin) Hydrologic Unit Code (03030002) DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE 1 DATE 11/29/2018 DESIGNED BY / DRAWN BY PROJECT NAME A. MEHFOUD PUBLIX DISTRIBUTION CENTER FIGURE 2:HYDROLOGICUNIT CODE MAP REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER42407PUBLIX DISTRIBUTION CENTERGUILFORD COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE03 6 Miles R:\805\42407-Publix Distribution Center\GIS\Common Shared Exhibits\42407-HUC.mxd NOTES:Site marker is approximate.HUC from USGS.Topographic basemap fromEsri Online. H:1 " = 3 Miles Sm a t h e r s LnMyrna RdBirchCreekRdCarlann Valley RdSun Lake DrHartsfieldForestDrL o o kout PlLou DrSmathers Ln Debanne Rd Burlington Rd Hooper RdHooper Rd RustyLnVerna Rd L o uDrEastcrest RdSprucetree DrPaisley Farm Rd Sue DrEnC EnC EnC EnC EnC WkE EnC EnC EnC EnBApB ApB EnB EnB EnB EnB EnB EnB EnC EnC EnC EnC EnB ChA VaB EnB EnB VaB W WwC W EnB EnB W EnD ChA WkD WkE EnC EnCEnC EnC W WkE MhB2 EnCWwC EnD EnB WkE W WkD EnC EnC EnBEnB EnB WkE EoC2 W ApB MhB2 W WkE CcB CcB EnB CrB Legend Project Study Limits - 342.5 Acres National Hydrography Dataset National Wetlands Inventory Zone A: 1% Annual Chance Flood Hazard Hydric Soil Classification Hydric Partially Hydric Non Hydric DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE1 DATE 11/29/2018 DESIGNED BY / DRAWN BY PROJECT NAME A. MEHFOUD PUBLIX DISTRIBUTION CENTER 1 " = 250 'H: FIGURE 3:ENVIRONMENTALINVENTORY MAP REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER42407PUBLIX DISTRIBUTION CENTERGUILFORD COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0250 500 SCALE (FEET) R:\805\42407-Publix Distribution Center\GIS\Common Shared Exhibits\42407-EIM.mxd NOTES:Project Limits areapproximate.NWI from US Fish andWildlife Service.Soils data from SSURGO.National HydrographyDataset from USGS.Aerial imagery from VGIN. Ma puni t Symbol Ma punit Na meApBAppling s andy loam, 2 t o 6 perc ent s lopesApCAppling s andy loam, 6 to 10 perc ent s lopesCcBCecil s andy loam, 2 t o 6 perc ent s lopesChAChewacla loam, 0 to 2 perc ent s lopes, frequently floodedCrBCoronaca c lay loam, 2 to 6 perc ent s lopesEnBEnon fine s andy loam, 2 to 6 perc ent s lopesEnCEnon fine s andy loam, 6 t o 10 percent s lopesEnDEnon fine s andy loam, 10 to 15 perc ent s lopesEoC2Enon c lay loam, 6 t o 10 perc ent s lopes , moderately erodedMhB2Mecklenburg sandy clay loam, 2 to 6 perc ent s lopes , moderat ely erodedVaBVance s andy loam, 2 to 6 perc ent s lopesWWaterWkDWilkes-Poindext er-W y not t c omplex , 10 to 15 percent s lopesWkEWilkes-Poindext er-W y not t c omplex , 15 to 45 percent s lopesWwCWynott-W ilkes-P oindex ter c omplex , 2 t o 10 perc ent s lopes Gui lford County S oil s U.S.G.S. QUADRANGLE(S):DATE(S):WATERSHED(S):HYDROLOGIC UNIT CODE(S): TIMMONS GROUP JOB NUMBER:PROJECT STUD Y LIMIT S:LATITUDE:LON GIT UDE: PUBLIX DIS TRIBUTION CENTERGUILFORD COUNTY, NORTH CAROLINAFIGURE 4: NR CS SOIL SURVEY MAP 42407 36.079016-79.663402 342.5 ACRES MCLEANSVILLE2016 03030002HAW (CAPE FEAR RIVER BASIN) These plans and associated docum ents are the exclusive property of TIM MONS GRO UP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP. Path: R:\805\42407-Publix Distribution Center\GIS\Common Shared Exhibits\42407-NRCS.mxd 5 0 1,000 2,000 3,000 4,000Feet Site limits are approximate.Soils data from NRCS w eb soil survey. Le gend Project Study Limits - 342.5 Acres APPENDIX B STREAM DETERMINATION March 14, 2018 Attn: Steven Ball Soil and Environmental Consultants PA 8412 Falls of the Neuse Road, Suite 104 Raleigh, NC 27615 Re: Birch Creek Road Site McLeansville, NC PINs: 8804299638, 8805302214, 8805305168, 8804493712, 8804388471, 8804696116, 8804778968 Dear Mr. Ball, This letter serves as confirmation of the stream determination performed by Sue Homewood from NCDEQ on February 1st, 2018 for the referenced property. Guilford County is the local delegated authority for enforcing the Jordan Lake Buffer Rules. Please see the Guilford County Development Ordinance Article 7-1.9. The feature(s) listed above have been located on the Soil Survey of Guilford County, North Carolina and/or the most recent copy of the USGS Topographic Map at a 1:24,000 scale. Each feature that is checked “Not Subject” has been determined not to be a stream or qualifying feature, or is not present on the property. Features that are checked “Subject” have been located on the property and possess characteristics that qualify it to be a stream. There may be other streams located on your property that do not show up on the maps referenced above but, still may be considered Feature Subject Not Subject Start Stop Soil Survey USGS Topo A X Throughout the property X X B X Off Site Confluence with J X X C X Off Site Confluence with A X J X Throughout the property X X K X Flag S14 Confluence with J X X I X Flag S02 Confluence with A X Pond 1 X X Pond 2 X X X GUILFORD COUNTY PLANNING & DEVELOPMENT DEPARTMENT Post Office Box 3427 Greensboro, North Carolina 27402 Phone: (336) 641-3334 http://www.myguilford.com/ Page 2 of 2 jurisdictional according to the US Army Corps of Engineers and/or to the Division of Water Quality. The Jordan Lake Stream Buffet Rules require a 50 foot wide riparian buffer directly adjacent to surface waters within the Jordan lake watershed, this includes intermittent streams, perennial streams, lakes, reservoirs, and ponds. The 50 foot buffer consists of two zones. Zone 1 begins at the top of the bank for streams, and at the normal water level for ponds, lakes, and reservoirs, and extends landward a distance of 30 feet. Zone 1 must remain undisturbed vegetation, except for the uses provided in Table 7-1-2 of the Guilford County Development Ordinance. Zone 2 begins at the outer edge of Zone 1 and extends landward 20 feet. Zone 2 can consist of managed vegetation as long as the health of the vegetation in Zone 1 is not compromised. Please see Table 7-1-2 in the Guilford County Development Ordinance for potential uses of Zone 2. Stream Buffer Width Requirements according to the Guilford County Development Ordinance 7-1.9.(A)5)a-d This determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by Guilford County may request a determination by NCDEQ. An appeal request must be made within sixty (60) days of date of this letter or from the date the affected party (including downstream and/or adjacent owners) is notified of this letter. A request for a determination by NCDEQ shall be referred to: (Win ion Salem Rgional Offen; 450 Wert Hanes Mill Road, Suite 300; Winston-Salem, NC 27105) This determination is final and binding unless, as detailed above, you ask for a hearing or appeal within sixty (60) days. The owner/future owners should notify the Watershed Protection/Stormwater Management Section (including any other Local, State, and Federal Agencies) of this decision concerning any future correspondences regarding the subject property (stated above). This project may require a Section 404/401 Pemut for the proposed activity. Any inquiries should be directed to the Division of Water Quality (central office) at (919) 791-4200, and the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919) 846-9332. If you have any questions, please call Teresa Andrews at: (336) 641-5565. Sincerely, Teresa ndrews Stonnwater Program Administrator Attachments: S&EC Comprehensive Site Map S&EC USGS Topographic Map 1:24,000 S&EC Soil Survey Map CC: Frank Park, Watershed Protection/Stormwater Management Burlington Rd (Hwy 70)Birch Creek Rd!? !? !? !? !? !? !? !? !? !?A B H C D E F G I S08 Start Ch S09 Stop Ch 256 TT Ch 278 TT Ch S10 Start Ch267 TT Ch 266 TT Ch 309 TT 300 310 TT 345 279 TT Ch 288 TT Ch 145 cl 2' 147 cl 2' TT Ch 173 & 174 TT Ch 162 & 163 TT Ch 148 TT Ch 184 TT Ch 215 TT Ch 208 TT Ch 202 to 207 TT Ch 185 TT Ch 189 TT Ch 190 TT Ch 196 TT Ch 197 TT Ch 199 TT Ch 200 to 201 TT Ch 216 TT Ch 219 TT Ch 255 cl TT Ch S06 Start Ch 247 cl252 cl 246 cl stop 245 cl TT 243244 TT 238 237 TT 230 cl 230 cl TT 231 223 cl 2' S07 Start Ch 220 cl 222 cl TT S07 144 cl stop 142 cl TT S05 144 cl TT S04 130 cl 2' 118 cl 4' 121 TT S03 S03 117 TT Ch 110 & 111 TT PL 121 TT S03 102 TT Ch 17 TT Ch 60 12 TT Ch 01 TT Ch 16 TT Ch 13 TT Ch S02 Start CH SB50 Start LW Start LW flag These flags missing; will need to be reflagged above 118; LW needs to be flagged Determined to be LW; not stream this section determined to be LW; previously stream Stream continues; no stop point Start Perennial point at confluence SB 14 Start LW CL 3' This area need to be flagged This area will be reflagged; wetlands will be broader than linear features break; ok !? !? !? !? J K O M L 425 TT 419 414 cl 4' 418 cl 4' TT Ch 413 cl 4' TT Ch 409 TT Ch 404 TT Ch 400 TT Ch 403 TT Ch S14 Start Ch S15 Start Ch S13 Start Ch 365 TT S12 S12 Start Ch 378 TT S12 369 cl 373 cl 368 & 374 365 cl TT Ch 361 cl 354 & 355 TT Ch 360 TT 350 Centerline widened in one area Linear wetland; not stream SB12 tt 412CL SB 06 tt 412 CL SB03-SB05 CL tt CH SB01 CL - SB02 CL Channel stops at culvert Not JD Not JD Wetland; needs to be flagged Wetland; needs to be flagged upper extent now linear wetland S01 Start Ch01-03 tt CH S02 Stop Ch/Start LW 04 tt Pond 22 tt Pond SB14-SB18 SB19-Sb21 NCCGIA Legend Perennial Channel Intermittent Channel Jurisdictional Linear Wetland Potential Guilford Co. Buffers Jurisdictional Wetland Pond Birch Creek Road Site Boundaries Detailed Delineation of Waters of the US Suitable for Preliminary Planning Only S&EC reserves the right to modify this map based on more fieldwork, and any other additional information. Approximations were mapped using topographic maps, air photos and ground truthing. If the site is going to be disturbed, S&EC’s detailed delineation should be approved and permitted by the U.S. Army Corps of Engineers as required. If the user of this work desires an accurate map of the regulated features flagged by S&EC, they should retain a NC Registered Professional Land Surveyor to locate S&EC’s flagging. NC OneMap Guilford County GIS Project No. 13038.W1 Project Mgr.: SB Scale: 1" = 200' 2/5/18 0 200 400 600 1" = 200'μ Figure 3 - Wetland Sketch Map Post USACE and DWR site visit Birch Creek Rd Site Guilford County, NC APPENDIX C PROPERTY OWNER INFORMATION N N N Do O N O C O 4) O .1 H g a U) fA x x N CP Iq C) O 03 G APPROVED BY THE PLANN/NG DEPARTMEMOFGUILFORO CIX/MY, NORTH CAROL INA ON 7)E IBJ �L DAY OF�•�.201B PURSUANT TO ARTICLE OF THE GUILFORD Cq/MYDEVELOPMEMORDINANCE. ag NG DIRECTOR �LS PLAT DOES NOTREQUIRED CERTIFICATE OF APPROVAL BYTNE D/V/SKN/OF HIGHWAYS//A,// RPA's40VV�Iq/ED /N N.C. G. S. 136102.6, SUBSECTION (G). SIGNED a/DATE I If •( PLANNING DIRECTOR OWNERSHIP AND DEDICATION CERTIFICATION WE ME UNDERSIGNED HEREBYACANOWLEDGE THAT WEARE THE OWNERS OF THE PROPERTY SHOWNAND DESCRIBED HEREON AND THAT WE HEREBY ADOPT THIS PLAT AND ALLOTMENT TO BEA FREE ACT AND HEREBY DEOICATF(S) 7O PUBLIC USERS STREETS, PLAYGROUNDS PARKS. DRAINAGFWAYS AND OPEN SPACEAND EASEMENTS FOREVER ALL AREAS SO SHOWN OR INDICATED ON SAID PLAT AND AUTHOR/2E THE COUNTY OF GUILFORD TO RECORD THIS PLAT IN THE OFFICE OF THE REGISTER OF DEEDS OF GUILFORD COUNTY, NORTH CAROLINA. / I 'EAsroso HOLDINGS, uc I r 117wsn•erl 12o/90'R/WBY0EEr�( ( I © I O J 0 0 K ® © 9i N86°152278 / 751.18' STATE OF NORT H CAROL INA COUMYOF I, PaJ\ L.OVJr<. REV/EW OFFICER OF GUILFORD COUNTY, CERTIFY THAT THE MAP OR PLAT TO WHOM THIS CERT/FICA TON /S AFFIXED MEETS ALL STATUTORY REQUIREMENTS FOR RECORDING. REVIEW OFFCER DATE IO- I9 - 1: SURVEYOR CERTIFICATION CURVE TABLE ®3-�- 3 O CENTER R, DELTA CHDROB54RMD CAVW �b h � � J 0 0 K ® © 9i N86°152278 / 751.18' STATE OF NORT H CAROL INA COUMYOF I, PaJ\ L.OVJr<. REV/EW OFFICER OF GUILFORD COUNTY, CERTIFY THAT THE MAP OR PLAT TO WHOM THIS CERT/FICA TON /S AFFIXED MEETS ALL STATUTORY REQUIREMENTS FOR RECORDING. REVIEW OFFCER DATE IO- I9 - 1: SURVEYOR CERTIFICATION CURVE TABLE CURVE RADIUS LENBTN TAN/FENT DELTA CHDROB54RMD CAVW CS 205000' 136.7 8903' 35125" SM -5336'E 137.97" C9 7994.85' 150.10' 7509' 4'1910' S89V452E 150.06' C10 1984.86' 18819' 6314' 414730' Nfi67140E 16614' DEED 0 7 © N3°40'57F PARCEL# 0119080 EAST GSO HOLDINGS, LLC DBj D11e,PG 18)1 0CENTER b � • I PAT 01161107 E4STGSO HOLDM/OS. LLC LTB otb.PGvw1 \ � a, I PARCEL#- 01191/3 EASTGSO HOLDINGS, LLC DB 156, PGA%31 0 AS SURVEYS OFAMOTHER CATEGORY SUCHAS A RECOMBINATION OF EXISTING PARCELS. A TE COURT ORDERED SURVEY OR OTNE ^EXCEPTION TO THE DEFINITION OF SUBDIVISION fKeVTuv,OA 1. MICHAEL S MILER, CERTIFY THAT THIS PLAT WAS DRAWN UNDER MYSUPERVISION FROMM ACTUAL SURVEYM40E UNDER MY SUPERVISION DEED DESCRIP770N RECORDED IN BOOK 31943, PAGE 512AND MAP BOOK 51 PAGE 169, THAT THE BOUNDARIES NOT SURVEYED ARE CLEARLYINDICATED AS DRAWN FROM INFORMATION FOUND IN BOOK PAGE (AS SHOWN); THAT THE RA TIO OF PRECISION AS CALCULATED IS 1: 10.000•: THAT THIS PLAT WAS PREPARED IN ACCORDANCE WITH G. S. 47-30 AS AMENDED. WITNESS MY ORIGINAL SIGNATURE, LCENSE NUMBERAND SEAL THIS 7 1 DAYOF a'q. A.D, AAAAp11111111/,,,' tieED, Ed r ` SEAL :r L-3677 QY6 SUR 0 BK: P198 IIIIIIIIIIIIIIIIIE111III LINE BEARING L6467N L1 S2.34'15'W 40.63' Ill II11111111 9.98' PG: 85-86 20IMS5255 FFIoFoIn L4 10-19-2018 GUILFORD COUNTY, NC 09:37:49 AM JEFF L. THIGPEN BY DEBORAH CITTY REGISTER OF DEEDS OFITI OF 4255' LINE TABLE LINE BEARING L6467N L1 S2.34'15'W 40.63' L1 A034'15'E 9.98' L3 AW5r44E 12064' L4 S2wwlIF 11397' L5 N88-J272'E 33.71' LB S483426E 4255' RESIDUAL AREA PARCEL#0117411 REBECCA LOWDERMILK DB 2333. PG 478 176,439SFOR4.OSOAC RAV 30' FROM CENTER e PARCEL# 0117421 EAST GSOHOLDINGS LLC PAVED PATH (TTP) PARCEL# 0117426 EASTGSOFOLDINGG-S.. LLC PG J N88Y4TNYY 1390 2B016'(TO7AL) S2 '7 z51�I 199.99' L) / ® 514.4r 1 THE FOLLOWING INFORMATION WAS USED TO PERFORM OPS SURVEY' (I)CLASSOFSURVEY.' "CL4SSA- (2) POSITIONAL ACCURACY 0.04- (3) TYPE OF GPS FIELD PROCEWRE NCVRS (4) DATE OF SURVEY' OIQ6018 (5)DATUM/EPOCH NAD83(2011)-EPOCH2Of0.00 (6) PUBLISHEDIF/XED-CONTROL USE I NCVRS (7) GEOID MODEL: 2012 /CONVSI (8) COMBINED GRID FACTORS): 0.99%4979 (9) UNITS: 1/S SURVEYFEET w FEEU2 W ZNjTO ARAp S87°3519'E 309r N2'54111 108.85' 14 BURL/NGrCWD SITE SCALE 1=2000' ® REFERENCES: Adoinin9 ® De 2153, PC 286 Key IT PARCEL4 2 1 0119087 Fre, ur $168-129 139-91 AG DB 2958. PG 595 2 0119092 T,, I, Cerw Church of God R7215-1959 13391 AG F PARCEL# 0117416 AND 0117473 EASTGSOHOLDIMCS,LI DBS(-, PGJUj DQ SOy(. Pe f$jl 429 COMBINED PARCEL CEL 5566 BURLINGTON ROAD 74.153710 SF fJR 338.6MACRE536 DB fi2D5, PG 196 la " -4 Pest PG94 0119691 pl, zrol 7 349 LI 01 15XI!*1 11 2"rminn T 5-07 011741- R 73711 GO -M 8 01114^. ,, 3a Gst Church Inc O/MCLearmvee 5726196 AG 9 O11Jen ,a a CNet Inc 2 15 21-15 R11 0117411 Net Inc 15 11-15 R 1 011741 =nn & Sara L Szoslak R7928,2&V 21-15 RS40 13 011741 m & Sero L Szoslak 879262602 21-15 RS40 14 011746, 1 R7Y28-2S02 21-15 RS40 1 471 n L S R792 -26(12 1-7 16 1174 -. n & Sara L Szosmk R'.928-2602 2145 RS40 17 01174 ^ A Sam L Szo nak 87928-2602 2145 RS40 18 01174Ir1' R7661-3026 2059 RS40 19 011741' R7741-1802 2059 RS40 20 01174 2242-305 2059 .JMr R714-5148 20-59 RS40 J & Cnansr H M whe0 R6610-2339 2059 RS40 A l?"—RAOnr.CchMn 1 59 RS -40 J;)7497 Dan L men h nn R R o+n5036- I� RS40 - /rout L,,M Tnrsf Les Cailbul Trrshw Rr'^?-IImp 21" RS -40 28 ',Rd Lin Tnrst Les Cailbul Trustee R.- -'119 20-60 8-40 1L1• Gera A ,119 RS-401AG o:: :.:1_ _errlanL'ym Trosf Tmsree 68 AG f 0117570 fat n, bymo Trus( C j9a Lama, Tcs- ii2 RS40 32 0117567 Wafter Lee Jr& Deborah S Chamber 'IJ3 _ RS40 33 0/175M Julian T&Lir Ma W Parham _r...::�552 RS40 31 0111392 WWinktn R%204-2019 AG 33 0117364 Della l WilM1 R72 4703 1787535 AG 0117374 L,• ., R 14-'- BIRCH CREEK ROAD _ AREA ABANDONED EAST GSO HOLDINGS, LLC OBr�G�c/ vy 37 0117370 RMAes Estn1, 30467e AG 011771 R Esta Hlddna.. 610527 A 39 0117 CPa LwI Tmn. 5462-1,105 AG 40 117417 MarMa Baleman R7 1677 A 42 0117425 Ngnng S 6183-1917 45 /7 47 0119106 Family TNsf of RoOw Warne Smith R7759-682 &195-292 AG 011 114 1 Andrea G,,' '' R7195-2735 AG 0119107 1 T n H S - t! Ir In i. RMOL1435 AG so 0'!9'^'I R6596-2171 1 6054-2363 17 94 53 1 R7719-776 17-94 RSAV RS -40 1794 58 01194z 59 011945, R7 1-959 7-94 R • q IN':I 1:I x2579-733 1794 61 011W14 73820' REFERENCES: ® De 2153, PC 286 DB 2333, PG 478 OB 23M PG 414 DB 2958. PG 595 DS 3572, PG 4 OB 3576 PG 1230 08 3697 PG 550 DB fi2D5, PG 196 DB 6226. PG 1416 Pest PG94 SCALE 1"= 300' 0 300' 600' SS RECOMBINATION PLAT FOR PUBLIX SUPERMARKETS, INC. 338.688 ACRES CASE # 18-08-GCPL-05162 MCLEANSVILLE, NORTH CAROLINA OWNER: EAST GSO HOLDINGS, LLC 1 DATE: Oct 16. 2018 1 SCALE: 1"= 300' 1 SHEET OF 0 z 0 E f C S K NOTES: 1. AREAS COMPUTED BY COORDINATE METHOD. 2 PROPERTY SHOWN HEREON IS SUBJECT TO ALL RIGHTS-OF-WAY EASEMENTS AND RESTRICTIONS OF RECORD 3. ALL DISTANCES SHOWN ON SURVEY ARE HORIZONTAL GROUND DISTANCES UNLESS OTHERWISE NOTED. 4. RIGHTS-OF-WAY INFORMATION IS BASED ON DEEDS AND MAPS OF RECORD. 5. BASIS OF BEARING SHOWN HEREON IS NC GRID NAD83 (2011) 6. BOUNDARY INFORMATION IS BASED IN PART, ON DEEDS AND MAPS OF RECORD, AND IN PART. BY AN ACTUAL FIELD SURVEY BY THIS FIRM 7 NO NGS MONUMENT LOCA TED WITHIN MIX FFEET OF THE SUBJECT TRACT. 8. SOME OF THE EXISTING SITE PLANIMETRIC FEA TURES ARE FROMAN AERIAL SURVEY PERFORMED BY TIMMONS GROUP AND TUCK MAPPING SCALE OF PHOTOGRAPHY. 115400(GSO 6CM). DA TE OF PHOTOGRAPHY 141-1B. GROUND CONTROL PROVIDED BY TIMMONS GROUP. 9. THE DESCRIPTION OF THE MONUMENTS FOUND OR SET AT THE CORNERS OF THE PROJECT TRACTS ARE SHOWN ON THE SURVEY III THE PUT CORRECTLYSHOWS THE SURVEYOF 14,753,140 SF -338.688 ACRES OF THE PROJECT TRACTS GUILFORD COUNTY, NORTH CAROLINA. 11. PROPERTYZONING IS LI BASED ONAPRIL 12, 2018 LETTER FROM GUILFORD COUNTYPLANN/NG BOARD REGARDING REZONING CASE0i8-03C'CPL-01499 12. THE PURPOSE OFTHIS PUT IS TO COMB/NEA PORTIONOFTAX PARCEL 117421 AND TAX PARCELS 119061. 117426, 11110110, 117441, 119113. 117416 AND 117423ARD AND THEABANDONED PORTION OFBIRCH CREEK ROAD RIGHTOF WAY. 13. OWNER: EASTGSO HOLDINGS. LLC. 201 N ELMSTREFT ffi 1. GREENSBORO, NC, 27401. (336) 274-8531. 14. BELCH CREEK ROAD ABANDONMENT -ADOPTED RESOLUTION CLOSINGAND REMOVING FROMDED/CATION,ROAD CLOSING CASE NUMBER 18-08-GCPL-05162 HEARD SEPTEMBER 4TH MIA DB 8093, PO, 1797, REFERENCES DB 2153, PG 286 DB 2333. PG 478 DB 2333 PG 484 082956 PG 595 OB 3572, PG 4 DB 3576 PG 1230 OR 3697 PG 550 OB 6205 PG 896 OB 6126 PG 1416 PB 92, PG 94 LEGEND N6 '14W 28016'(TO7AL) Qo /PF -IRON PIPE FOUND O ti , O IRF- IRON ROD FOUND CLASS OFSURVEY' 'CUSS A' �JQ?O ® IRS - IRON ROO SET S2°23'46'W 251 CP- COMPUTED EASEMENTPGNT 199.99' ED CMF- CONCRETE MONUMENT - SEAL : 2 Q MNF- MAO NAIL FOUND ) /Q-/ /,gIr- L-3677 �t • CP - COMPUTED POINT ° RCP- REINFORCED CONCRETE PIPE (® 514.4T CMP - CORRUGATED PIPE q7 LASTI CPP -CORRUGATED PLASTIC PIPE (6) PUBLISHEDiF'IXED-CONTROL USE NCVRS •. ,SURD.•• DIP- DUCTILE IRON PIPE – _ HOPE - HIGH DENSITY POLYETHYLENE PIPE FES - FLARED END SECTION R/W-RIGHT-OF-WRY PIL -PROPERTY LINE C/L -CENTERLINE NTS - NOT TO SCALE DB -DEED BOOK PS -PLAT BOOK PG -PAGE SF-SOUAREFEET -SITEADLMESS DEED LINE LINE NOTSURVEYED FENCELINE —X---% OVERHEAD POWER LINE — — — GHp— — — PA/NTED GAS LINE — — G— — PA/NTED TELEPHONE LINE — — — UGT— — PA/NTEDWATERLINE — —W— — PAINTED FIBER OPTIC LINE -- 11F0 © S67°35'4s'E IvryPupg.27"V0IUS.� LOTIH COMBINED PARCEL 5566 BURLINGTON ROAD 14,753,240 SF OR 336666 ACRES 30.97' NZ'S4'41'f i10685 430.14' 138 m Ui/IWAY PG. 657 Holm CENTER rs] 0 ` O " THE FOLLOW/NG INFORMATION WAS USED TO PERFORM GPS SURVEY: O ti V"1 CLASS OFSURVEY' 'CUSS A' �JQ?O (1) 9 � 2 (2) POSITIONAL ACCURACY: 0.04' - SEAL : 2 2 (3) TYPE OF GPS FIELD PROCEDURE NCVRS /Q-/ /,gIr- L-3677 �t (4) DATEOF SURVEY' 01416'X/18 N4D53(M11)-EPOCH2Of0. Y O (5)DATUMEPOCN q7 (6) PUBLISHEDiF'IXED-CONTROL USE NCVRS •. ,SURD.•• (7) GEOID MODEL ' 2012 (COMES ) �i y4,C-Nt '0 5. 41I2jIHAfWt``` (8)COOMBIN D RAD FA TOR((S): 0.99984979 P 8 BURL/AG7pA,,,, SCALE 1=20017 E SITE S3.36V7'W 44(TOTAL) S89'45TM"E 175.42' N � O \ t \ m N88'1450W56062' N66'4352W 70714' RECOMBINATION PLAT RK: P 198 IIIIIIIIIIIIIIIIUIIIIIIIIIIIIIIIIIIIIII FOR PG: 85-86 PUBLIX SUPER MARKETS, INC. Fa° M 2018065255 vc=7'r sn�s 10-19-2018 GUILFORD COUNTY, NC 338.688 ACRES 09:37:49 AM JEFF L TNIGPEN B. DEBT" 'rJv REG1$iM °`°M°� CASE #18-08-GCPL-05162 By X°a MCLEANSVILLE, NORTH CAROLINA OWNER: EAST GSO HOLDINGS, LLC SCALE 1"= 300' 0 300' 600' I JEFFERSON TOWNSHIP I Guilford County I SHEET2 OF 2 1 J.N.:410I0 z 0 f f APPENDIX D SITE PLAN XX N85°56'44"W 2484.7 7 ' ( T O T A L ) N88°14'50"W 560.62' S 6 0 ° 1 3 ' 1 7 " E 1 7 0 1 . 3 7 ' S73° 1 4 ' 3 6 " E 3 0 9 . 1 6 '108.83'N2°54'55"EN86°15'22"W 251.78'N2 8 °09 ' 5 4 "W 3 3 4 .74 ' N87°19'54"W 577.78'N1°07'21"E 1006.69'N88°44'04"W 1390.12' (TOTAL)N3°40'57"E 253.69'N87°54'03"W 953.10' 450.14' 238.21' 349.39' 1447.04' 875.65'514.47'406.12'24.77'126.40'101.05'304.53'102.69'199.67'L4S2°23'46"W199.99'N88°44'14"W 280.16' (TOTAL) 251.09'29.07'BIRCH CREEK ROADBIRCH CREEK ROADSANSANDNDN DN DN DN DN DNDN DN DN 1 2 3 4 5 6 7 8 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 40 41 42 43 44 454647 50 58 59 60 51 52 53 54 55 56 57 59 61 49 48 675675675 6956956906 7 5 6 8 0 685 690 695700695675695 695 695 700 700 6956906856806906 8 5 675655650675 650 700 690685685 690 695 JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.Site Development Residential Infrastructure TechnologyR:\107\42407-Publix_Distribution_Center_Greensboro\DWG\Sheet\Exhibit\Preliminary Site and Grading Exhibits\_Environmental Exhibits\Environmental Impacts Exhibit.dwg | Plotted on 4/3/2019 9:06 AM | by Jacob MooreVAR-1.0 STREAM BUFFER IMPACT EXHIBITJ. MOORE J. MOORE J. MATEY 04/03/2019 PUBLIX - GREENSBORO DISTRIBUTION CENTERGUILFORD COUNTY - NORTH CAROLINA42407 1" = 200'8642 W. Market Street Suite 136 | Greensboro, NC 27409TEL 336.662.0411 FAX 336.662.0420 www.timmons.comTHIS DRAWING PREPARED AT THEGREENSBORO OFFICE0 SCALE 1"=200' 400'200' STREAM BUFFER (TYP, SEE DIAGRAM) BURLINGTON RD (U S - 7 0 )BIRCH CREEK RDBUILDING #2 (DRY STORAGE WAREHOUSE) BUILDING #1 (REFRIGERATED WAREHOUSE) BUILDING #3 (PREPARED FOODS) BUILDING #5 (RETURN CENTER) BUILDING #6 (FLEET SERVICES) BUILDING #4 (ADMIN.) SCM #2 SCM #3 SCM #4 BIRCH CREEK RD TERMINUS NOT FOR CONSTRUCTION SUN LAKE DRLOU DRSUE DRSPRUCE TREE DRPUBLIX TRUCK CAB PARKING ASSOCIATE PARKING (TRUCK DRIVERS) OVER-THE-ROAD TRUCK STAGING AREA RESTROOM BUILDING #7 (DISPATCH) TRAILER STORAGE LOADING AREA TRAILER STORAGE LOADING AREATRAILER STORAGE SECURITY CHECKPOINT #2 ASSOCIATE PARKING ASSOCIATE PARKING LOADING AREATRAILER STORAGE SECURITY CHECKPOINT #1 DRIVEWAY #1 (ASSOCIATES) DRIVEWAY #2 (TRUCKS)GATEHOUSE #1 GATEHOUSE #2 DRIVEWAY #3 (AUXILIARY) Key # PARCEL # Owner Name Db-Pg Pb-Pg Zoning 1 0119082 Fred E & Kathy M Burgin, et ux 5168-129 139-91 AG 2 0119092 Triad Worship Center Church of God R7215-1959 139-91 AG 3 0119098 Gloria Poole 3207-975 70-53AG 4 0119691 Pierre A & Carolyn E Goria 2750-749 LI 5 0119090 Mary T Weddington 4391-1160 101-8 AG 6 0119098 David T Turner & Mary T Weddington R7355-452 101-8 AG 7 0117464 NSR Company R7079-711 GO-M 8 0117452 Calvary Baptist Church Inc Of McLeansville 5726-196 AG 8A 0228392 Rebecca P Lowdermilk 2333-478 AG 9 0117465 Southern Net, Inc 3442-81521-15 RS-40 10 0117452 Morris E & Barbara G Carter 4713-515 RS-40 11 0117466 Southern Net, Inc 3442-815 21-15 RS-40 12 0117467 Morris P Allison & Sara Lyn Szostak R7928-2602 21-15 RS-40 13 0117468 Morris P Allison & Sara Lyn Szostak R7928-2602 21-15 RS-40 14 0117469 Morris P Allison & Sara Lyn Szostak R7928-260221-15 RS-40 15 0117470 Morris P Allison & Sara Lyn Szostak R7928-2602 21-15 RS-40 16 0117472 Morris P Allison & Sara Lyn Szostak R7928-260221-15 RS-40 17 0117471 Morris P Allison & Sara Lyn Szostak R7928-2602 21-15 RS-40 18 0117490 Ahmad H Hamze R7661-302620-59 RS-40 19 0117491 Gladys Barrera Flores R7741-180220-59 RS-40 20 0117492 William S Hodgin 2242-305 20-59 RS-40 21 0117493 Thomas W & Carol J Miles R7142-968 20-59 RS-40 22 0117498 Paul J & Chanisty H Mitchell R6680-2339 20-59 RS-40 23 0117495 Leroy A Harper 3850-45320-59 RS-40 24 0117496 Roger B & Donna G Gannon 5036-1364 20-59 RS-40 25 0117497 Danielle Lehman & Joshua Mann R7794-2220 20-59 RS-40 26 0117486 Roger B & Donna G Gannon 5036-1364 20-59 RS-40 27 0117481 Caillout Living Trust, Les Caillout Trustee R6897-118920-59 RS-40 28 0117482 Caillout Living Trust, Les Caillout Trustee R6897-1189 20-60 RS-40 29 0117450 Eddie Gene & Laura Newsome R7524-1019 RS-40 / AG 30 0117342 Lamarr Living Trust, C Jack Lamarr Trustee 5107-568 AG 31 0117570 Lamarr Living Trust, C Jack Lamarr Trustee 5107-56229-37 RS-40 32 0117567 Walter Lee Jr & Deborah S Chambers 4346-1803 29-37 RS-40 33 0117570 Julian T & Linda W Parham 2653-552 29-37 RS-40 34 0117382 Joseph W Willien R7204-2019 AG 35 0117364 Della I Willien R7202-1703 AG 1787-535 36 0117374 James & Reita Tuttle Living Trust R7784-1422 AG 37 0117370 Daphne R Miles, Estates 3048-78 AG 38 0117371 Dees Real Estate Holdings, LLC 6105-27 AG 39 0117433 C Paisley Gordon Living Trust 5462-1205 AG 40 0117417 Martha Bateman R7560-1677 AG 41 0117432 Bernard F Gabriel 2800-766 AG 42 0117425 Norma S Bolejack 6183-1917 AG 43 0117424 Alma Miles Isley 5735-359 AG 44 0117431 Lowdermilk Family Irrevocable Trust of 2013 R7551-979 AG 45 0117420 Bennie S Bradley R7837-2143 190-30AG 46 0117427 Daphna L & Wayne Wagoner 1553-274 AG 47 0119106 Family Trust of Roger Wayne Smith R7759-682 AG 6495-292 48 0119114 Andrea Gail Williams R7195-2735 AG 49 0119107 Tanya L H & Tommy M Jr Ingle R7800-1435 AG 50 0119118 CM & DR Clapp, LLC R6596-2171 RS-40 51 0119464 Norman Lee Bridges, Jr R7398-46 17-94RS-40 52 0119463 Moses Jr & Brenda F Ortiz 6054-2363 17-94 RS-40 53 0119462 Joshua S Neas & Sarah C Gulley R7779-776 17-94 RS-40 54 0119461 Dolly R Pope 2720-34917-94 RS-40 55 0119460 Dolly R Pope 2720-34917-94 RS-40 56 0119459 Claude V & Pamela W Harvell 3040-582 17-94 RS-40 57 0119458 Gary L & Sherree B Roberts 2991-356 17-94 RS-40 58 0119457 Deborah H Coley 4901-122217-94 RS-40 59 0119456 Brian & Patricia Kelly R7941-959 17-94 RS-40 60 0119455 Roy A Jr & Martha F Wilson 2579-733 17-94 RS-40 61 0119414 Gerald D & Hazel J Powell 3002-126 17-94 RS-40 ADJOINING PROPERTIES 48 BUFFER ZONE 2: EXEMPT OR ALLOWABLE IMPACTS BUFFER ZONE 1: EXEMPT OR ALLOWABLE IMPACTS BUFFER ZONE 2: PROHIBITED IMPACTS BUFFER ZONE 1: PROHIBITED IMPACTS BUFFER IMPACTS LEGEND FEMA FLOODPLAIN FEMA FLOODWAY PROPOSED 5' CONTOURS EXISTING 5' CONTOURS PARCEL BOUNDARY RIGHT OF WAY PROPOSED STORM PIPE & OUTLET PROTECTION PROPOSED LEVEL SPREADER 800 800 SITE LEGEND BIRCH CREEK RDUS-70 ROAD WIDENING (BY NCDOT) SCM #1 STREAM TOP OF BANK 30' ZONE 1 BUFFER 20' ZONE 2 BUFFER 30' ZONE 1 BUFFER 20' ZONE 2 BUFFER STREAM BUFFER DIAGRAM 8A APPENDIX E BUFFER IMPACT MAPS DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE1 DATE 12/18/2018 DESIGNED BY / DRAWN BY PROJECT NAME L. MAJOR PU BLIX FUTURE DRYWAREHOUSE BUILDING(TRUCK DOCK COUNT TBD) MANUF.EXPANS. 57,000SQFT. FUEL BAY FUEL TANKS FUEL DELIVERY PAD FLEET SERVICESBUILDING DISPATCH BUILDINGPUBLIX TRUCK TRAFFIC ONLYPUBLIX TRUCK TRAFFIC ONLYALLTRUCKSENTER ALLTRUCKSEXIT GUARDBUILDING #1 GUARDBUILDING #2 FUTURE 100KSF BUILDING REFRIGERATEDWAREHOUSEW/ 162 TRUCK DOCKS REFRIGERATEDWAREHOUSEEXPANSION(216,800 SF)TRUCK DOCKCOUNT TBD 219 TRAILER SPACES 129 TRAILER SPACES 131 TRAILER SPACES 214 TRAILER SPACES 40 TRAILER SPACES54 TRAILER SPACES54 TRAILER SPACES54 TRAILER SPACES54 TRAILER SPACES54 TRAILER SPACES58 TRAILER SPACES31 TRAILER SPACES27 TRUCK &TRAILER SPACES38 TRAILER SPACES28 TRAILER SPACES12 17 33 33 2525 2525 2525 2525 2525 14 20 FUTURE PARKING(181 SPACES) 8' WI DE STREETYARD 50 ' BUIL DIN G SETBACK 8' WI DE STREETYARD 50' BUIL DIN G SETBACK 8' WI DE STREETYARD 50' BUILDIN G SETBACK 8' WIDE STREETYARD 50' BUILDING SETBACK 8' WIDE STREETYARD 50' BUILDING SETBACK 8' WIDE STREETYARD 50' BUILDING SETBACK 50' "TYPE-A" BUFFER25' BUILDING SETBACK50' "TYPE-A" BUFFER 25' BUILDING SETBACK 50' "T Y P E-A" B U FF E R 25' B UIL DIN G S E T B A C K 50' "TYPE-A" BUFFER 25' BUILDING SETBACK 50' "TYPE-A" BUFFER25' BUILDING SETBACK50' "TYPE-A" BUFFER 25' BUILDING SETBACK 50' "TYPE-A" BUFFER 25' BUILDING SETBACK 50' "TYPE-A" BUFFER 25' BUILDING SETBACK 50' "TYPE-A" BUFFER 25' BUILDING SETBACK 25' BUILDING SETBACK25' BUILDING SETBACK25' BUILDING SETBACK25' BUILDING SETBACKSTOPSTOPDO NOT ENTERSTOPSTOPSTOPEXITEXITSTOPSTOPSTOP STOP DO NOT ENTERDO NOT ENTERDOLDOLDOLDOLDOLDOLDOLDOLDOL DOLDOLDOL DOLDOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOLDOLDOL DOLDOL DOL DOL DOL DOL DOLDOLDOL DOL DOL DOL DOLDOLDOL DOL DOL DOLD O L DOLDOLDOLDOLDOLDOLDOLDOLDOL D OL DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL!(B1-Z1 !(B2-Z2 !(B3-Z2 !(B2-Z1 !(B3-Z1 !(B1-Z2 !(B4-Z2 !(B5-Z2 !(W9 !(W8 !(W7 !(W18!(W15 !(W6 !(W3 !(W13 !(W12 !(W11 !(W4 !(W5 !(W19 !(W14 !(W10 !(W17 !(W16!(W2 !(W1 ")S1 ")S5 ")S3 ")S4 ")S2 ")S6 ")S7 Myrna RdL ook out Pl Carlann Valley RdSun Lake DrSky Hill DrStoneyRun DrL o u D r S m athers Ln Sm a t h e r s LnDebanne Rd Burlington Rd Barbell Cir HartsfieldForestDrHooper Rd Groves Stone DrCliffDrBirchCreekRdHooper Rd ArborHill P l Verna Rd RustyLnEastcrest RdSprucetree DrPaisley Farm Rd Sue Dr1 " = 300 'H: PRELIMINARYJURISDICTIONALWATERS OF THEU.S. IMPACTS MAP REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER42407PUBLIX DISTRIBUTION CENTERGUILFORD COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0300600 SCALE (FEET) R:\805\42407-Publix Distribution Center\GIS\Wetland Impacts\42407-WTIM.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Legend Project Study Lim its - 342.5 Acres DOLDOL DOLDOLLimits of Dis tur bance - 219.9 Acres ")X Stream Impact !(X Wetland Impact Stream Buffers Zone 1 Buffer Impact Zone 2 Buffer Impact Perennial Stream (R3) Intermittent Stream (R4) Stream Impacts Stream Top of Bank Wetlands Wetland Impacts Te mpora ry Pe rmane nt (Ope n Wate r)Pe rma ne nt Temporary Pe rmane nt Temporary Pe rma ne nt Temporary Perma nent W 1 142W2764W36,203W41,468W566,963W6 2,281W79,160W8 255W9976W10261W11519W121,282W135,896W147,167W15132W1667W1787W183,354W194,932S1 1,030S2318S3192S4283S557S6373S72,249B1-Z1 2,784B1-Z2 1,595B2-Z1 717B2-Z2 2,523B3-Z1 54,019B3-Z2 39,616B4-Z2 843B5-Z2 3,4210 sq ft 76,123 sq ft 35,786 sq ft 0 sq ft 0 sq ft 0 sq ft 105,518 sq ft0.0 a c 1.8 a c 0.8 ac 0.0 a c 0.0 a c 0.0 a c 2.4 ac Strea m (lf)Impa ct Impa cts Table 0 lf 4,502 lfTotal W e tland (sq. ft)Stre am Buffers (sq. ft)Impact Conversion Impa ctImpact ID