Loading...
HomeMy WebLinkAbout20160742 Ver 2_Access Area Site Plans_20190516_20190519=V 2 3 4 5 6 7 8t3 I CCL -0103-012 If 1 / i / O / / / / / / // /'/'.' // ' r .- / ♦ l / / ' ' / / / / / ' / r / / //. / , /, /, / / / / ,., CEDAR CLIFF RESERVOIR I , l , / / / / / / ,' // / /' / ' \ / / / /' /' /'♦' /'/ice ' ` '/ ' ' �/ / , , , , �/ // / / / / / / , / / /' //iii /' / / ,' / / ,/ r / / / / \.. DRAWDOWN EL 2300.00 / / 0` / , , ' ! /' '' / / ' / \ // / / '�, / / / / / / u / / / � / / r / / � / / / / / / / , ! ••. ` \ / / / / / ♦// / / // /// / / / / 7 O'/ / / / ', '♦/ '///,,/ / %♦ - ii /' / / ♦ / / ' ' ' / '/ ' ♦ /' /i%' /r // // ' �, Jam'"+', `\ -_i-\ \ `\ `\\ ��, It ' ' ,/, 'PROPERTY LINE (TYP)/ I ' ' ' ' " / ' TURBIDITY CURTAIN (TYPE\ ,;' / �� �\ ♦// _ ,,, r / / , ♦ / / / ,, /O,,Ir�\ .-�_/ �/ / / , / , / , / / ! /♦ / �' // , , / /� ----_ 2 SILT FENCE �i / // , , O " r�, I / - ♦' - . / ' . , ♦ / / , / . / ./ / / / '� / \ ROCK OUTLET TYP `+•,. ' \ ` \ /'ter—_'— � , // ♦ / , / ! / / / ry/ / `V //� ,��%// O^ . �/ / , , , ♦ , / , , ,/ !/' / / / /\ � 0105007 ( ) ' / / / / / / / / / / / // / / r / / n� / •,. / / / / / /, / / / CEDAR CLIFF RESERVOIR ' / / / , / / �// / I / �/� / '/ ♦ ,/ /' .! �0 ' ' / ' /' / / / / /'/ ' / / ' FULL POND EL 2330.00 I '` ''♦ `' \ I ` \ \ '' r—''' � / / / / / , //1 /, l ♦ , /,,♦ /,, / , /, 23 � /' / / �O ///�/ ♦ , 11 / I/ / / / / / \ 1 r +''••.\ � I \ \ / / / l I \ ♦ / / / ♦ , / / i / / O / / \ J / / ! / / / SILT FENCE TYP "(3o '' r ♦,/,'♦ / //// IJ/ ? // FERC LICENSE/ / /--- `V , 0105007 PROJECT BOUNDARY, � _ , ! / l�M _ - _ _ \� \ � '� / � `, •. \ \ \ \ \ o 10 /- r - /' �' riii%I :T /' /l'/' /ii/// , ! ,' ! ,' /♦' ,/r♦ I 1 �_�' �/ , // / �.' 2 SILT FENCE 0105 -007J -HOOK (TYP) - t� \ \ \ \ \ \ \ \ \ 10 / / / / / / / / / // , / ♦ / / 1 / �/ �, �, /, �♦/, � / / , ,/, , , , , / / , , , / , , , �, ! , � CONSTRUCTION ACCESS ROAD I / / / ' /' /' /�/ / I I ♦ / / / l , / / r / / / I l / l / / / / / /, / / / / / , / / / ♦ / / / / r / 013 fy' /�///� /'///� /� /;' ,�' •� \\ \ 2305 -' f 1 1 / / ./, / r I // �/ / / l 1 l i / l -.' ``BOAT RAMP _... / / l 1 , 1 , 11 // / , /, / / / / _'/ , l , l l / r �,.,.�.........� �, � .•.... I , 2310 , .' I \ \ BOAT DOCK 2k � / / , /,/ ! , / /� , ,' / 1 , 1 \ \\ / ..•'`-•'" ROCK CHECK DAM 0105-007 fit \ l I11 /1/,/ r 1, , / , / �- ♦ / / 1 ` \ \ '� \\ `\ \ \ \ \ \ LIMITS OF DISTURBANCE %I DITCH #6 CL CAUTION: OVERHEAD----_ ` POWER LINE \\ \ � // / r'/ I //// / // // //,/,/ ♦/ /, //!_--- 1 \ _ Imo' �_--�f•_—' �' \ \ `I I / \ // �----__�_ \\ \\\ `\\ `\. /!,// % / / // , ,' // ♦ _ , PARKING LOT CAUTION: OVERHEAD POWER LINE ' \ /•�--_ ,// /� / / I \ / \ I —/ \ / ' Imo./' /// _� \\ •�••---____—�, —^\\ \\ \ �\\ \\ —> _ _�' _—''-' // r— `\ \ \ ----------------- x.2340 �\ — —\ \ ,\ `\ /• ,/ / , / I \ / / / /�— / %/// _ `_ /------------�• `�__ �� `--^ \ \ ----- / ! t' \ 1 / / / ' �� .' ,\ _ '� _ —ate-_ —tr .'L• \ `\ �__` _—__— '' _��♦/—+/—�`r—/ ii_—/-- i —� \ —�4%41* \ \\ \ 1 / \ / i �/ r'• �_ \ _ -- — _''wig ' —--- .�� '♦ , \ - 2350_ -_.._.._. _.. ,�'''• —------_— — \ ;` \`II ~\` TEMPORARY GRAVEL—• 1 /•� ` --------------------\\ ____ \ _.._.._. \\ �.• — INSTALL PUMP—AROUND MEASURES 5 — T—\ — `\ �• _ _ --- ------ CONSTRUCTION ENTRANCE 1 — °� �` '/' ^��I \ 0 05 005.•' -FOR DITCH CONSTRUCTION ONLY \ _ - 0105-008 r _ ,- / I / / -- -- - ---__ ----�- _-- _ - \ ,� , 370• _ \ �\_� ✓�'' -- - / ,;/' \ COORDINATE WITH OWNER BEFORE REMOVING TREES ,''//' r- - - _ _--`---___-__- - -- \'��/ `\ /.,i•i/ •.,�..�-��r..�-�Tv��=_ \ ONLY CLEAR TREES NECESSARY TO INSTALL PUMP/ ,♦ , ______________`_- •\----__ _---__ ---------- - --- ��-; AROUND MEASURES �,' r r,i !' --- ---_- ___�\ \ ---__ _______\- /------------ ---- ` TITLE GENERAL NOTES: REV. B 1. FOR ADDITIONAL GENERAL NOTES SEE CCL -0100-004. FOR DRAWING INDEX SEE CCL -0100-001. FOR ABBREVIATIONS SEE CCL -0100-002. FOR LEGEND AND SYMBOLS SEE CCL -0100-003. 2. SEE CCL -0104-020 AND CCL -0104-021 FOR GRADING PLAN AND BOAT RAMP CONSTRUCTION SEQUENCE, 3. TEMPORARY IMPACTS BELOW ELEVATION 2330.0 = 1.5 ACRES, 30 0 30 0009 SCALE: FEET PLAN SCALE: 1 "=30' PRELIMINARY ,\.`���� CARo�''�' � NOT FOR FEss/009��ti9 ;- �o °Qo SEAL oo CONSTRUCTION = 03791 = ORFN° �,AF, G.\-\\\"\\ B ISSUED FOR BIDS. JTTD MGL HDR Engineering, Inc. of the Carolinas License Number: F-0116 RECORDING /fill"""``` A 3/13/2019 ISSUED FOR BIDS. JTTD MGL — — 440 S Church Street, Suite 1000 Charlotte, NC 28202-2075 PE SEAL NO. DATE REVISION DFTR DES CHKD APP INCHES 1 2 3 TENTHS 10 20 30 4 5 6 7 8 9 I I 1 1 1 1 FOR DUKE SCALE: AS NOTED DWG TYPE: DGN ENE RGYF DATE:JOB 10060948 FILENAME: CCL-0103-012.DGN DWG SIZE DRAWING NO. ANSI 22.0"x34.0" CCL -0103-012 10 DES: MGL DFTR: JTTD CHKD: APPD: REVISION IV •' \ '' '—^ ' ' -- --- _ __ ---------� -- \' AUXILIARY SPILLWAY — ` —' --- '� CEDAR CLIFF ACCESS AREA —F EROSION AND SEDIMENT CONTROL PLAN PLAN SCALE: 1 "=30' PRELIMINARY ,\.`���� CARo�''�' � NOT FOR FEss/009��ti9 ;- �o °Qo SEAL oo CONSTRUCTION = 03791 = ORFN° �,AF, G.\-\\\"\\ B ISSUED FOR BIDS. JTTD MGL HDR Engineering, Inc. of the Carolinas License Number: F-0116 RECORDING /fill"""``` A 3/13/2019 ISSUED FOR BIDS. JTTD MGL — — 440 S Church Street, Suite 1000 Charlotte, NC 28202-2075 PE SEAL NO. DATE REVISION DFTR DES CHKD APP INCHES 1 2 3 TENTHS 10 20 30 4 5 6 7 8 9 I I 1 1 1 1 FOR DUKE SCALE: AS NOTED DWG TYPE: DGN ENE RGYF DATE:JOB 10060948 FILENAME: CCL-0103-012.DGN DWG SIZE DRAWING NO. ANSI 22.0"x34.0" CCL -0103-012 10 DES: MGL DFTR: JTTD CHKD: APPD: REVISION IV = i 2 3 4 5 6 7 8t3 I CCL -0104-020 If 1 / , / / / r / / / / / / ♦ / / / / ,,/ / _rel ,' / / / / / / / �i / // ' // ' / /iii' ♦' 1 : ♦ ♦ ' ♦ / / / ' / / / / / , / / ♦ ♦// / / / / I I 1 / \ \ \ -^� \, CEDAR CLIFF RESERVOIR ,'///,/ ,' /'r / / / ,' D�,//♦/ /O// ,/// ,,�, If/, \ ! /' ,_ �♦ / / / / / ,' / ,'// / / , , ,,/ , / , . /.' ��,', ' / /,' .' I I I ' DRAWDOWN EL 2300.00 ♦ . , / r , � / , , /// / \ ,// _ , ' ,PROPERTY LINE (TYP)' / /r ,'.. . ,// // y ♦ / ' / / �- \ I I '�. `\ I ` \ \ /It/ / //// /,,, CEDAR CLIFF RESERVOIR It It FULL POND EL 2330.00 \ \ If If TERMINATE PERMANENTry Q) \ \ \ DITCH AT ELEVATION T`\ FERC LICENSE/ / , 1^___ /, /',' ; I/' i_-- I \ \ \ \ \ , , / , ,� PROJECT BOUNDARY, I , / / / / �, - _ _ - I \ ''•� 2300.00 \ \ \ \ �O If I // // / / / l / / ♦ ♦ / / / - \ \ \ it . /l, / / / / , / , / / , , I I- , / , , l ♦ / , , , , , ,/, I / / / / / / , / / / 1 / \ I N?l 7NV/00, 0000�REMOVE SEDIMENT ///� // / , / r / / .' ' ' ♦' l / /” / l l - DEPOSITS. GRADE O \ \ \ \ / / / r , / / , ♦ , ♦ / / l 1 \ \ �n / / TO ELEVATION 2322.00 p.41 \ \ \ \ \ \ /I, / / / , , III / it I - _' / , / \ 2322,\ I / 1 III/ / /,/ , / I , , > l / J / l , l , / /',- / I , - N \ \ \ \ \ \ \ l / / I l Il/ / I / / / / / //-I// / / / / / / / / / , , , I 1 1 1 / / ' ' / ' FILL CHANNEL AND \ \ \ \ \ \ \ \ \ GRADE AREA TOWARDS \\ \ \ \ \ \ \ I / � 2322.0 CONTOUR M \ \ \ REV. B GENERAL NOTES: 1. FOR GENERAL NOTES SEE CCL -0100-004. FOR DRAWING INDEX SEE CCL -0100-001. FOR ABBREVIATIONS SEE CCL -0100-002. FOR LEGEND AND SYMBOLS SEE CCL -0100-003. 2. BOAT LAUNCH GRADING CONSTRUCTION SEQUENCE: 2.1 VERIFY BOAT DOCKS HAVE BEEN REMOVED BY OTHERS, COORDINATE WITH OWNER. 2.2 INSTALL EROSION AND SEDIMENT CONTROL MEASURES AND TURBIDITY CURTAIN AS SHOWN ON CCL -0103-012. 2.3 REMOVE SEDIMENT DEPOSITS AND GRADE TO ELEVATION 2322.00 AS SHOWN ON PLAN, 2.4 INSTALL PUMP AROUND MEASURES TO CONSTRUCT DITCH 6. 2.5 INSTALL DITCH 6 AS SHOWN ON CCL -0104-021; IMMEDIATELY STABALIZE WITH RIPRAP. 2.6 INSTALL ROCK VANE. 2.7 AFTER DITCH 6 IS INSTALLED REMOVE PUMP AROUND MEASURES. 2.8 GRADE BOAT RAMP AND FILL EXISTING CHANNEL AS SHOWN ON PLAN. 2.9 INSTALL TEMPORARY STONE CONSTRUCTION ACCESS ROAD AS SHOWN ON CCL -0104-021. 2.10 AFTER PROJECT IS COMPLETE, REMOVE ACCESS ROAD AND RESTORE GRADES AS SHOWN. 1 •� \ \ \ BOAT RAMP /, I/ /,/�,',///; •� ,, , ,/ ,' ice♦ / , I , \ \ , 1 I � / '\ 2330.0 0.70 ACRES. CA \ // __/ ♦ / ' / I I \ \ \ , / I J C, \\ `\\ \\ \ \\ \ \\ \\ \-`- KEYNOTES: If DOCKS TO BE REMOVED BY OTHERS PRIOR TO CONSTRUCTION. tI // / 1/ / 1: III \ 1 / / I I / / / I / I 1 \` /,- \ \ I \ \ \ `\\ ``\ \` \` ''`,•. 1 I ' , I I / I \ \ 1 \ \\ AGGREGATE BASE ON PARKING LOT IN DITCH 6 1 I — 2 NACTOR HALL MAINTAIN GOOD CONDITION. \ \ - RIPRAP LINED 0105-012 , /„I / I 1 \ I / / ' - •`• CONTINUATION OF DITCH DURING I '1 1\ ', / ; I \\ `\ `\ 1 ' \ •� O3 SEE CCL -0104-021 FOR I \ It I I \ - If sI \ -� \ \� \� \� CONSTRUCTION PHASE. If \ 1 I \ \ \ \ \ \ \ \ \ \ \ \ \ \ (DBOAT DOCK + '� / r•~-� \ + 1 1 \ ,/ ��/ I / , / ,/ ,' //,' , // ♦/,/, !_-__ O PARKING LOT 1 /f •, --- `� \ `I I /♦ \ / _----_- ``\\ `\ TOP OF ROCK VANE = 2332.0 x / , / / / •/ rte, \ \\ -\\ \ \ \\ `�` _ i' / �__ __�_ `\ \\ `\ If / I // / , , , / 1 \ \ ROCK VANE / \I ••��• r \ \ ♦ _ _ _ - 0105-012 11 oe -_\_ •x,2340 r/- /ice/, _ ��_ I --------- _ __----- —_ \ — ` —\ \ `� � �i \ _ __'_—�-- _— .fes• �. \ � \ — _—— — — — — ——— _ _�...... . —'� lis'-!—'_�-- .fes •�, �\ \ ��\\ �\\ / j -�\ \ \\ \\\ \ / /�/ / / /' //// / moi' i—'�/ // /i' _ \_ — I •� ----\ _ `-- _ _y�wia ����91----- f,.�• •�`• \\\\\ � \\� ---� _----2350------- ��• \ `— ' .....- _....._.... 1 •�• •I• _ i \ \ •� \\ \ \'a\\ / /' / / / :f•I ' / ' \-� \\- ' ,yam'\``\�__ ,' ♦ \- -i - - __ - - _ -_ _ _- _- \ '- . 30 0 30 --------------- ���. ' 1 :��✓�'� --- _ - /� /' \\ /'/' ` _ -- 2370 _- ---_-----_----` - ----------=�-`------__\ ; \ SCALE: FEET TITLE ____ __ AUXILIARY SPILLWAY \— —'` CEDAR CLIFF ACCESS AREA —F GRADING PLAN HDR Engineering, Inc. of the Carolinas License Number: F-0116 440 S Church Street, Suite 1000 Charlotte, NC 28202-2075 PLAN SCALE: 1 "=30' PRELIMINARY NOT FOR SEAL oo o CONSTRUCTION = 03791 = O R *o* ...l RECORDING ,,'ygFl G.°v \\ ''fill,I II" w\ PE SEAL INCHES 1 2 3 TENTHS 10 20 30 4 5 6 I I I FOR ---- SCALE: AS NOTED DES: MGL DWG TYPE: DGN DFTR: JTTD JOB NO:10060948 CHKD: DATE: DWG SIZE DRAWING NO. B ISSUED FOR BIDS. JTTD MGL A 3/13/2019 ISSUED FOR BIDS. JTTD MGL — — ANSI D 22.0"x34.0" CCL -0 Cv NO. DATE REVISION DFTR DES CHKD APPD 7 8 9 10 I I I I APPD: REVISION B DUKE ENERGY FILENAME: CCL-0104-02O.DGN SCALE: AS NOTED DES: MGL DWG TYPE: DGN DFTR: JTTD JOB NO:10060948 CHKD: DATE: DWG SIZE DRAWING NO. B ISSUED FOR BIDS. JTTD MGL A 3/13/2019 ISSUED FOR BIDS. JTTD MGL — — ANSI D 22.0"x34.0" CCL -0 Cv NO. DATE REVISION DFTR DES CHKD APPD 7 8 9 10 I I I I APPD: REVISION B 2 2 4 5 6 7 8 \ \ \ \ 1 1 1 1 / / ''r; / / / / / , / / / / / , , / / 1, / / / ' ' ' / / / / / / / , / / / / / ♦ ' //'/ ---- -'''' '� "/ _-_ � �/ / , / / \ \ \ \ \ \ I I \ \ I / / \ � / / / / / ,ice/ / , , ♦ ,� / , /// / / / / / ' / , / / / , / ' / / / / / / / / /� // / �'/ ,' / / ___-- / / / ,/ , / , / \ \ \ \ \ \ I I / I O // // // // , ♦/ / //,// � / // // //n � iii _ \ ,/ '/ / ♦/ / / ,/ //,/ / / / // / // / // / //' , , // \ \ \ \ \ 1 I /41P / / . / , r / �/ ' , / O ♦ / / / , / /,/,, . / _„ / . , / , / , / / / ♦ , / / ♦ , ' /: =�' , /, / ♦ / / -/ I I I / CEDAR CLIFF RESERVOIR Ir . / , , I ......... DRAWDOWN EL 2300.00 \ \ \ \ / / / ♦ , , / / / / ' / �/ / / /,// '/ `\ ,+/. / ;PROPERTY LINE (TYPj' / / / / ,.,;/. /,:/ y'/.//, , , ♦ /� /- \\ 1 I '-�,,`• I \ \ \ \ '/�/ / / / / ♦� \ I \ I \ \ \ .41 CCL -0104-021 REV. B GENERAL NOTES: 1. FOR GENERAL NOTES SEE CCL -0100-004. FOR DRAWING INDEX SEE CCL -0100-001. FOR ABBREVIATIONS SEE CCL -0100-002. FOR LEGEND AND SYMBOLS SEE CCL -0100-003. 2. SEE CCL -0104-020 FOR GRADING SEQUENCE. 3. TEMPORARY IMPACTS BELOW ELEVATION 2330.0 = 1.5 ACRES. / / I I // / . n � // // / / / '/'/ LO / / �/ / / .' /'/,' / ,/ / \_ -. `\ \-- '.` \\ 11 \ \\ \ KEYNOTES: CEDAR CLIFF RESERVOIR 1 •,� \ I \ \ \ \ 1O DOCKS TO BE REMOVED BY OTHERS J'' _, , / / l , /i, , ; /'i' // / /' J/ �0 , / ♦ , / / J FULL POND EL 2330.00 \ 43 / O / / , / J / / / \\ \ \ ` 2� $ 1 \ \ \ \ PRIOR TO CONSTRUCTION. /' , ,/♦/ + i �,',I `: / / ' J / "' / _ ' ' '`1/~,il/ /� i /� /� O /\\ \ ZrjO '�� k \\ \\ \\\ \\ O INSTALL TEMPORARY STONE ACCESS 'FERC LICENSE /� /� ' ' 1 5 \ 1 CONSTRUCTION ROAD AFTER GRADING ,PROJECT BOUNDARYI SHOWN ON CCL -0104-020 IS __ - , , , ,,, , ,' , I , I / , , \ I •�• / \\ \ �, \\ \\ `\ \\ o COMPLETE. SEE GENERAL NOTE 2. -' -'- -' /�/ /l/// ,, 11', // � , /' / ' /, 1 I^ __/' / , , l \ -___, `\ \ '•� \ \ o \ \ \ \ O3 SEE CCL -0104-020 FOR FINAL DITCH ' /i . • / r / - / / \ \ \ \ \\ ` `\ `\ \\ GRADES. ,- � � , . , ♦, � / ,, �/ „ , , , , � / , / / , I / / \ I/ / / , `\ \ \ o. � \ \ \ \ \ \ O CONFIRM PAD DIMENSIONS WITH OWNER PRIOR TO CONSTRUCTION. PAD SIZE /, /„/ • ,/ // / / / / / / , , , , , ', /, \ / 1 / , SHALL ACCOMMODATE CRANE USED FOR i /// / �� / / / / I / \ �i I 4 BARGE ASSEMBLY. 5 ♦ / / ,' ,' ,� ,' ,, , / ,, , , // , , , , / , ,' , , , � /' / ,' // � ,` /' i � I \ \\\\ / � ��0 +4 62 TERMINATE TEMPORARY DITCH AT DRAWDOWN ELEVATION 2300.00 L--\ TEMPORARY STONE�QD 0105-012 CONSTRUCTION ACCESS ROAD0(3 41 1 I I I I// l / /I/ -'I ! `� /' '/ / , / / / /// / , /♦�/ _ / , ,/ l , \ \ 1 2305 \ \ \ \ \ I I 1 I1 / 1 /- ,' I j /J ' /I/' /' / If 11l /--' /'/ /' ' l \ \ 1 , f i /,� �;/ ,�/ ,', /' /' /// i i l i i i ,' v ,' / i �/ 2310 BOAT RAMP / ' ,l +1 /,'/ 11 / %• / 1, / r /' /' / ,' / / 1 I I I \ 1 I ` � I I \ / \\ `\ `\ `\ ''` `\ `\ \ \ It /1"', /, /. I / , / f , 1 \ \ I I 1 /\ 0 BOAT DOCK + ,//„ � , r/ �,,� ,✓/, �/ ,/ __. /// , � 1 I t, I 1 \ / / I I ; , , I I 1 �� 2k / DITCH #6 CLO ---\ Ill If� 1\ \\\ I\ IJ �•_\ \ \ // i /,/, ♦' /',' /' +' _ , PARKING LOT ALIGNMENT CURVE TABLE Al CURVE NO. PI STATION DELTA RADIUS TANGENT LENGTH CHORD DIRECTION CHORD LENGTH C1 0+68.70 036°45'21.93" 100.00' 33.22' 64.15' N39°39'44.47"E 63.06' C2 1+43.53 043°37' 14.61 " 50.00' 20.01' 38.07' N43°05'40.81 "E 37.15' /// / � ♦/ ��/, / \ � �'` --�/�! / /_��_-____-__ / '_--�� `\ - ---- ' '--' ' �-/��`- _ ' _ � `-_-'% - `._ \\ - -� - ____-__---- ---- _-_'-'_-- -'' --- __ -��' - \ tom- •♦ 30 0 30 ....... 360 \ _ I -2360 _ _------___- '� / , • /.`tom+ -r ► -- �/ , \ / / \ \ ---/' , _/ / / / J - __ - --_ `� �\\ ���\ ___ --- ---------- PLAN SCALE: 1 "=30' SCALE: FEET TITLE AUXILIARY SPILLWAY CEDAR CLIFF ACCESS AREA CONSTRUCTION ACCESS ROAD GRADING PLAN FOR HDR Engineering, Inc. of the Carolinas License Number: F-0116 440 S Church Street, Suite 1000 Charlotte, NC 28202-2075 ALIGNMENT LINE TABLE PRELIMINARY NOT FOR CONSTRUCTION ORFNGINE;;R°°' RECORDING \�`��\�H CARO��'% ......... ESS/ ` �O•Q� �N9`ti9 ' o SEAL - =o °37911 ' �.y'4F( °°G. 00� �\\ 00\ PE SEAL LINE NO. LENGTH DIRECTION DES: MGL START POINT DWG TYPE: DGN END POINT L1 549.89 N65° 21' 18"E N 779427.4419 N 779927.2402 FILENAME: CCL -0104-021 .DGN APPD: DWG SIZE E 569436.4247 E 569665.7248 L2 14.45 N61° 42' 35"E N 779464.5016 N ♦ ' 1 _ I -------- •,2340- �_•,�. `--� \`\ -J E /ice - , _ \___--� \"�� 21.02 N58° 02' 25"E N 779477.2297 N 79495.0632 E 569357.6491 E 569368.7752 14 23.89 N21* 17' 04"E N 779535.3102 N 779543.9837 E 569417.3177 E 569439.5822 L5 388.24 Nb4° 54' 18"E N 779569.3672 1 N 779920.9632 E 569466.7127 E 569631.3746 - 1�"-••-.. ---- _-------.2350----_��---_-__\ \ /// / � ♦/ ��/, / \ � �'` --�/�! / /_��_-____-__ / '_--�� `\ - ---- ' '--' ' �-/��`- _ ' _ � `-_-'% - `._ \\ - -� - ____-__---- ---- _-_'-'_-- -'' --- __ -��' - \ tom- •♦ 30 0 30 ....... 360 \ _ I -2360 _ _------___- '� / , • /.`tom+ -r ► -- �/ , \ / / \ \ ---/' , _/ / / / J - __ - --_ `� �\\ ���\ ___ --- ---------- PLAN SCALE: 1 "=30' SCALE: FEET TITLE AUXILIARY SPILLWAY CEDAR CLIFF ACCESS AREA CONSTRUCTION ACCESS ROAD GRADING PLAN FOR HDR Engineering, Inc. of the Carolinas License Number: F-0116 440 S Church Street, Suite 1000 Charlotte, NC 28202-2075 ALIGNMENT LINE TABLE PRELIMINARY NOT FOR CONSTRUCTION ORFNGINE;;R°°' RECORDING \�`��\�H CARO��'% ......... ESS/ ` �O•Q� �N9`ti9 ' o SEAL - =o °37911 ' �.y'4F( °°G. 00� �\\ 00\ PE SEAL LINE NO. LENGTH DIRECTION DES: MGL START POINT DWG TYPE: DGN END POINT L1 549.89 N65° 21' 18"E N 779427.4419 N 779927.2402 FILENAME: CCL -0104-021 .DGN APPD: DWG SIZE E 569436.4247 E 569665.7248 L2 14.45 N61° 42' 35"E N 779464.5016 N 779477.2297 E 569350.7985 E 569357.6491 L3 21.02 N58° 02' 25"E N 779477.2297 N 79495.0632 E 569357.6491 E 569368.7752 14 23.89 N21* 17' 04"E N 779535.3102 N 779543.9837 E 569417.3177 E 569439.5822 L5 388.24 Nb4° 54' 18"E N 779569.3672 1 N 779920.9632 E 569466.7127 E 569631.3746 /// / � ♦/ ��/, / \ � �'` --�/�! / /_��_-____-__ / '_--�� `\ - ---- ' '--' ' �-/��`- _ ' _ � `-_-'% - `._ \\ - -� - ____-__---- ---- _-_'-'_-- -'' --- __ -��' - \ tom- •♦ 30 0 30 ....... 360 \ _ I -2360 _ _------___- '� / , • /.`tom+ -r ► -- �/ , \ / / \ \ ---/' , _/ / / / J - __ - --_ `� �\\ ���\ ___ --- ---------- PLAN SCALE: 1 "=30' SCALE: FEET TITLE AUXILIARY SPILLWAY CEDAR CLIFF ACCESS AREA CONSTRUCTION ACCESS ROAD GRADING PLAN FOR HDR Engineering, Inc. of the Carolinas License Number: F-0116 440 S Church Street, Suite 1000 Charlotte, NC 28202-2075 PRELIMINARY NOT FOR CONSTRUCTION ORFNGINE;;R°°' RECORDING \�`��\�H CARO��'% ......... ESS/ ` �O•Q� �N9`ti9 ' o SEAL - =o °37911 ' �.y'4F( °°G. 00� �\\ 00\ PE SEAL DUKE E N E RGYF SCALE: AS NOTED DES: MGL DWG TYPE: DGN DFTR: JTTD JOB NO: 10060948 CHKD: DATE: FILENAME: CCL -0104-021 .DGN APPD: DWG SIZE DRAWING NO. REVISION B ISSUED FOR BIDS. JTTD MGL ANSI D 22.0"x34.0" r CCL -0 B A 3/13/2019 ISSUED FOR BIDS. JTTD MGL - - N0. DATE REVISION DFTR DES CHKD APPD INCHES 1 2 3 TENTHS 10 20 30 4 5 6 7 8 9 10 1 I 1 1 1 1 1 -E -F PIPE AS REQUIRED PROVIDE TYPE 1 GEOTEXTILE UNDER STONE 6" MIN MAINTENANCE: MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH SEDIMENT, CLEAN OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE DETAIL 1 SCALE: NOT TO SCALE 0103-003 0103-009 0103-010 0103-012 0103-023 SILT FENCE FABRIC INSTALLED TO SECOND WIRE FRON GALVANIZED WOVEN WIRE FIELD FENCE, 14 GAUGE WITH 6" M VERTICAL STAY SPAM 6"X6" MAX MESH SPACII GRADE SPACING: 8' OC MAX W/WIRE FENCE 6' OC MAX EXTRA STRENGTH EXTRA STRENGTH FILTER FABRIC NEEDED WITHOUT WIRE MESH FABRIC- HARDWARE ABRIC-HARDWARE CLOTH 19 GAUGE WITH 1/4" SPACING MSN STEEL POST �, MP (1.25 LB/LIN FT STEEL-51FT MIN LENGTH) 3' MIN STEEL POST 4' MAX (1.25 LB/LIN FT STEEL - 5FT MIN HARDWARE CLOTH LENGTH) MEDIAN 8" DIA RIPRAP MAX: 1'-6" HIGH FLO\N 6" MAX SPACING GENERAL NOTES: 1. SEDIMENT FILTER OUTLET AND HARDWARE CLOTH SHALL BE 16 INCHES HIGH BUT NO TALLER THAN 18 INCHES. 2. HARDWARE CLOTH SHALL BE ANCHORED TO THE STEEL POSTS SECURELY USING APPROPRIATE ANCHORS. HARDWARE CLOTH SHALL BE KEYED A MINIMUM OF 12 INCHES IN LENGTH AND BACKFILLED PROPERLY AS SHOWN IN ABOVE DETAIL. 3. POST SHALL BE NO MORE THAN 4 FEET APART. 4. SITE OUTLETS AT ANY POINT WHERE SMALL CONCENTRATED FLOW IS ANTICIPATED AND AT THE DIRECTION OF THE INSPECTOR. MAINTENANCE NOTES: 1. WASHED STONE (#57) TO BE REMOVED AND REPLACED ONCE IT BECOMES CLOGGED WITH SEDIMENT. 2. SEDIMENT TO BE REMOVED WHEN ACCUMULATIONS REACH 113 HEIGHT OF SILT FENCE. 3. THE KEY TO FUNCTIONAL ROCK OUTLETS IS WEEKLY INSPECTIONS, ROUTINE MAINTENANCE, AND REGULAR SEDIMENT REMOVAL. SILT FENCE (MAX) 1 L<� A 1 (MAX) 1.5 1.5 0 J LL. ROCK PLAN 0'-9" MIN PONDING HEIGHT STEEL POST 3' ABOVE GRADE (MAX) V7RUNOFF ��� 6" MIN THICK WASHED STONE (NCDOT #5 OR #57) FACE ON UPSTREAM SIDE SILT FENCE ROCK OUTLET DETAIL SCALE. NOT TO SCALE C7 `1 POST (1.25 LB/FT) ✓EN WIRE FABRIC FENCE FABRIC FILL SLOPE GRADE EXCAVATE TRENCH 8" DEEP X 4" WIDE BURY FABRIC 8" ALONG SIDE AND 4" ACCROSS THE BOTTOM =11 III r muiN I VIr-VV 1111 SIDE VIEW II II :III I- II II -III I- =11 1= I I I I III�I_I=„II �III�liil NOTES: 1. FABRIC, PER NCDEQ 6.62, TO BE ANCHORED IN THE TRENCH 8" DOWN AND 4" HORIZONTAL AND THEN BACKFILLED WITH EARTH AND COMPACTED. 2. POSTS TO BE MIN. OF 2'-0"IN GROUND. 3. BRACE POSTS WHERE NECESSARY. 4. ATTACH FABRIC WIRE AND POSTS WITH METAL RINGS ON PLASTIC ZIP TIES (50 LB MIN. TENSILE). 5. POST SHALL BE 5' (MIN.) STEEL "T" POST WEIGHING A MIN. 1.25 LB PER LF, MANUFACTURED WITH CLIPS. 6. WATER SHALL NOT BE IMPOUNDED TO A DEPTH GREATER THAN 1.5 FT AT ANY POINT ALONG FENCE, CONTRACTOR SHALL INSTALL A FENCE IMPOUNDMENT OUTLET, SEE DETAIL 3. MAINTENANCE NOTES: 1. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 2. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN EVENT AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. 3. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. SILT FENCE DETAIL K SCALE: NOT TO SCALE 0103-003 0103-007 0103-011 0103-025 1/4 0103-004 0103-008 0103-022 0103-027 0103-022 0103-005 0103-009 0103-023 0103-028 0103-023 0103-010 0103-024 0105-005 0103-025 4" ROCK SECTION TRENCH WITH GRAVEL DESIGN TYPE DRAINAGE AREA APPROX WEIR LENGTH (L) MIN 1/4 1/2 ACRE 3.0 FT 0103-002 0103-002 0103-011 0 0103-004 0103-003 0103-024 0103-022 0103-005 0103-005 0103-025 0103-023 0103-006 0103-007 0103-026 0103-025 0103-007 0103-008 0103-027 0103-027 0103-010 0103-028 LOCATE FENCE OUTSIDE OF TREE BRANCH SPREAD IN PLAN 3'-0" HT ORANGE WARNING FENCE 2"X2" PT STAKE @ 8'-0" OC NOTE: TREE PROTECTION SHALL BE ORANGE SAFETY FENCE, 3FT MINIMUM HEIGHT. TREE PROTECTION FENCE DETAIL r SCALE: NOT TO SCALE 0103-002 0 0 0 0103-004 0103-024 0103-005 0103-025 0 0 0103-006 0 0 0103-026 (n 0103-007 N 111 0103-027 SF 0103-008 0103-028 0103-022 2' MIN SIDE VIEW PLAN CCL -0105-005 STRAW 10' MIN BALE (TYP) STAKE (2 PER BALE) Cn w dE 0 0 0 0 0 0 0 FLOW 0 0 0 0 0 0 0 0 1/8" DIA STEEL WIRE STAPLES (2 PER BALE) PLAN 10 MIL PLASTIC {} �� LINER a '--10 MIL PLASTIC LINER BINDING WIRE EXISTING GRADE GENERAL NOTES: w_1 1. FOR GENERAL NOTES SEE CCL -0100-004. FOR DRAWING INDEX SEE CCL -0100-001, FOR ABBREVIATIONS SEE CCL -0100-002 FOR LEGEND AND SYMBOLS SEE CCL -0100-003. WOOD OR V u METAL STAKESJ STRAW (2 PER BALE) NATIVE MATERIAL BALE (OPTIONAL) SECTION A NOTE: INSTALL CONCRETE WASHOUT A MINIMUM OF 50' FROM DRAINAGE FEATURES. IF 50' MINIMUM DISTANCE CANNONT BE MAINTAINED, INSTALL SECONDARY PERIMETER CONTAINMENT. CONCRETE WASHOUT DETAIL SCALE: NOT TO SCALE 0103-022 C K `TrrL POST (1.25 LB/FT) SEN WIRE FABRIC F FENCE FABRIC STEEL POST (1.25 LB/FT)- -SF- B/FT)--SF- -SF- -SF- SF - TITLE AUXILIARY SPILLWAY EROSION AND SEDIMENT CONTROL DETAILS FOR CEDAR CLIFF IDF &SPILLWAY UPGRADE SCALE: AS NOTED DES: MGL PRELIMINARY DUKE DWG TYPE: DGN DFTR: JTTD NOT FOR ENERGY JOB N0: 10060948 CHKD: CONSTRUCTION DATE: FILENAME: CCL -0105-005. DGN APPD: OR DWG SIZE DRAWING NO. REVISION HDR Engineering, Inc. of the Carolinas License Number: F-0116 RECORDING A ISSUED FOR BIDS. CL MGL - - ANSI D CCL_p 105-005 A 440 S Church Street, Suite 1000 Charlotte, NC 28202-2075 22.0"x34.0" v PE SEAL N0. DATE REVISION DFTR DES CHKD APPD INCHES 1 2 3 TENTHS 10 20 30 4 5 6 7 8 9 1 0 I I I I I I I M -A N GRADE SEE NOTE 1 FLOW `� _ _ p III -1 1=1 ill - =1 1II` III=III-111- -I I I I I T -I 1I- -1 _I I-1 I- (n N 111 - 1IT1111- 1 SII EXCAVATE TRENCH 8" DEEP X 4" WIDE SF III�IBURY FABRIC 8" ALONG SIDE AND 4" �== III�IIi ACCROSS THE BOTTOM III=III=III= 2' MIN SIDE VIEW PLAN NOTE: 1. J -HOOKS TO BE CONSTRUCTED WITH ONE CONTINUOUS LENGTH OF SILT FENCE FABRIC. MAINTENANCE NOTES: 1. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 2. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN EVENT AND TO REDUCE PRESSURE ON THE FENCE, TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT, 3. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED, SILT FENCE J -HOOK DETAIL SCALE: NOT TO SCALE 0103-003 0103-005 0103-023 0103-007 0103-025 0103-010 0103-027 0103-011 TITLE AUXILIARY SPILLWAY EROSION AND SEDIMENT CONTROL DETAILS FOR CEDAR CLIFF IDF &SPILLWAY UPGRADE SCALE: AS NOTED DES: MGL PRELIMINARY DUKE DWG TYPE: DGN DFTR: JTTD NOT FOR ENERGY JOB N0: 10060948 CHKD: CONSTRUCTION DATE: FILENAME: CCL -0105-005. DGN APPD: OR DWG SIZE DRAWING NO. REVISION HDR Engineering, Inc. of the Carolinas License Number: F-0116 RECORDING A ISSUED FOR BIDS. CL MGL - - ANSI D CCL_p 105-005 A 440 S Church Street, Suite 1000 Charlotte, NC 28202-2075 22.0"x34.0" v PE SEAL N0. DATE REVISION DFTR DES CHKD APPD INCHES 1 2 3 TENTHS 10 20 30 4 5 6 7 8 9 1 0 I I I I I I I M -A i -E -F 2" X 2" WOOD STAKES OR 1.25 #/FT STEEL POST 2' SPACING (TYPICAL) CONTINUOUS ALONG TUBE 2 3 4 5 6 7 8 0 3�1 J ILL. SEDIMENT TUBE INSTALLATION SEDIMENT TUBE SPACING SLOPE MAX. SEDIMENT TUBE SPACING LESS THAN 2% 150 -FEET 2% 100 -FEET 3% 75 -FEET 4% 50 -FEET 5% 40 -FEET 6% 30 -FEET GREATER THAN 6% 25 -FEET SEDIMENT TUBES - GENERAL NOTES: 1. SEDIMENT TUBES MAY BE INSTALLED ALONG CONTOURS, IN DRAINAGE CONVEYANCE CHANNELS, AND AROUND INLETS TO HELP PREVENT OFF-SITE DISCHARGE OF SEDIMENT -LADEN STORMWATER RUNOFF. 2. SEDIMENT TUBES ARE ELONGATED TUBES OF COMPACTED GEOTEXTILES, CURLED EXCELSIOR WOOD, NATURAL COCONUT FIBER, OR HARDWOOD MULCH. STRAW, PINE NEEDLE, AND LEAF MULCH -FILLED SEDIMENT TUBES ARE NOT PERMITTED, 3. THE OUTER NETTING OF THE SEDIMENT TUBE SHOULD CONSIST OF SEAMLESS, HIGH-DENSITY POLYETHYLENE PHOTODEGRADABLE MATERIALS TREATED WITH ULTRAVIOLET STABILIZERS OR A SEAMLESS, HIGH-DENSITY POLYETHYLENE NON -DEGRADABLE MATERIAL. 4. SEDIMENT TUBES, WHEN USED AS CHECKS WITHIN CHANNELS, SHOULD RANGE BETWEEN 18 INCHES AND 24 INCHES DEPENDING ON CHANNEL DIMENSIONS. DIAMETERS OUTSIDE THIS RANGE MAY BE ALLOWED WHERE NECESSARY WHEN APPROVED. 5. CURLED EXCELSIOR WOOD, OR NATURAL COCONUT PRODUCTS THAT ARE ROLLED UP TO CREATE A SEDIMENT TUBE ARE NOT ALLOWED. 6. SEDIMENT TUBES SHOULD BE STAKED USING WOODEN STAKES (2 -INCH X 2 -INCH) OR STEEL POSTS (STANDARD "U" OR "T" SECTIONS WITH A MINIMUM WEIGHT OF 1.25 POUNDS PER FOOT) AT A MINIMUM OF 48 INCHES IN LENGTH PLACED ON 2 -FOOT CENTERS. 7. INSTALL ALL SEDIMENT TUBES TO ENSURE THAT NO GAPS EXIST BETWEEN THE SOIL AND THE BOTTOM OF THE TUBE. MANUFACTURER'S RECOMMENDATIONS SHOULD ALWAYS BE CONSULTED BEFORE INSTALLATION. 8. THE ENDS OF ADJACENT SEDIMENT TUBES SHOULD BE OVERLAPPED 6 INCHES TO PREVENT FLOW AND SEDIMENT FROM PASSING THROUGH THE FIELD JOINT. 9. SEDIMENT TUBES SHOULD NOT BE STACKED ON TOP OF ONE ANOTHER, UNLESS RECOMMENDED BY MANUFACTURER. 10. EACH SEDIMENT TUBE SHOULD BE INSTALLED IN A TRENCH WITH A DEPTH EQUAL TO 1/5 THE DIAMETER OF THE SEDIMENT TUBE. 11, SEDIMENT TUBES SHOULD CONTINUE UP THE SIDE SLOPES A MINIMUM OF 1 FOOT ABOVE THE DESIGN FLOW DEPTH OF THE CHANNEL. 12, INSTALL STAKES AT A DIAGONAL FACING INCOMING RUNOFF. NOTES: 1. CHECK DAMS MAY BE USED IN SLOPING DITCHES OR CHANNELS TO SLOW VELOCITY OR TO CREATE SEDIMENT TRAPS. 2. ENSURE THAT MAXIMUM SPACING BETWEEN DAMS STAKES PLACED PLACES THE TOE OF THE UPSTREAM DAM AT THE AT 2' MINIMUM SAME ELEVATION AS THE DOWNSTREAM DAM (SEE SPACING PROFILE BELOW). 3. A AND B ARE AT EQUAL ELEVATIONS. NCDOT CLASS B RIPRA "ill:_ PLAN SYMBOL SEDIMENT TUBES - INSPECTION & MAINTENANCE: 1. THE KEY TO FUNCTIONAL SEDIMENT TUBES IS WEEKLY INSPECTIONS, ROUTINE MAINTENANCE, AND REGULAR SEDIMENT REMOVAL, 2. REGULAR INSPECTIONS OF SEDIMENT TUBES SHALL BE CONDUCTED ONCE EVERY CALENDAR WEEK AND, AS RECOMMENDED, WITHIN 24 HOURS AFTER EACH RAINFALL EVEN THAT PRODUCES 1/2 INCH OR MORE OF PRECIPITATION. 3. ATTENTION TO SEDIMENT ACCUMULATIONS IN FRONT OF THE SEDIMENT TUBE IS EXTREMELY IMPORTANT. ACCUMULATED SEDIMENT SHOULD BE CONTINUALLY MONITORED AND REMOVED WHEN NECESSARY. 4. REMOVE ACCUMULATED SEDIMENT WHEN IT REACHES 113 THE HEIGHT OF THE SEDIMENT TUBE. 5. REMOVED SEDIMENT SHALL BE PLACED IN STOCKPILE STORAGE AREAS OR SPREAD THINLY ACROSS DISTURBED AREA. STABILIZE THE REMOVED SEDIMENT AFTER IT IS RELOCATED. 6. LARGE DEBRIS, TRASH, AND LEAVES SHOULD BE REMOVED FROM IN FRONT OF TUBES WHEN FOUND. 7. IF EROSION CAUSES THE EDGES TO FALL TO A HEIGHT EQUAL TO OR BELOW THE HEIGHT OF THE SEDIMENT TUBE, REPAIRS SHOULD BE MADE IMMEDIATELY TO PREVENT RUNOFF FROM BYPASSING TUBE. 8. SEDIMENT TUBES SHOULD BE REMOVED AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN COMPLETELY STABILIZED. PERMANENT VEGETATION SHOULD REPLACE AREAS FROM WHICH SEDIMENT TUBES HAVE BEEN REMOVED. SEDIMENT TUBE DETAIL SCALE. NOT TO SCALE q MAXIMUM SPACING B =III=III_ =III=III_III_111_111=111_111=11=111=111=111_ 111_111=III= PROFILE ul-ul=ul -� p1_I11-1N- 12" OF #57 Alnnn_r 1n1ncul7'n cTnnlC I ILI LI\ VLVIII SECTION A ill ��� r; ���r���•�1 ��+ � mWI ail-� �.►�+� SIT 'v/t'�r�► FILTER CLO I11�_III-111II I1I I,I1 1111=111-111= A ELEVATION (LOOKING UPSTREAM) MAINTENANCE: 1. INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2" OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. CLEAN OUT SEDIMENT, STRAW, LIMBS, OR OTHER DEBRIS THAT COULD CLOG THE CHANNEL WHEN NEEDED. 2. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DAMAGE IMMEDIATELY. 3. REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE CHECK DAM, AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. ADD STONES TO DAMS AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION. ROCK CHECK DAM DETAIL r SCALE: NOT TO SCALE 0103-007 0103-012 0103-022 0103-025 0103-026 0103-027 NCDOT CLASS B RIPRAP - 12" OF #57 NCDOT WASHED STONE FLOW NON -WOVEN GEOTEXTILE FABRIC MAINTENANCE NOTES: 1. INSPECT AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT RAINFALL EVENT (AS DEFINED BY NCDEQ) AND REPAIR IMMEDIATELY, 2, SEDIMENT TO BE REMOVED WHEN ACCUMULATIONS REACH 1/3 OF HEIGHT OF BERM. 3. REMOVE AND REPLACE NCDOT #5 OR #57 WASHED STONE WHEN IT BECOMES CLOGGED WITH SEDIMENT. GRAVEL FITLER BERM DETAIL SCALE: NOT TO SCALE 0103-008 0103-028 COMPACTED SOIL --,- 2' MIN CCL -0105-007 NOTES: 1. CONSTRUCT TEMPORARY DIVERSION AS SPECIFIED IN THE DIVERSION DITCH TABLE ON CCL -0105-012 WHERE DEPTH, SIDE SLOPE, BASE WIDTH AND PROPOSED LINING ARE PROVIDED, USE THE ABOVE DETAIL FOR DESIGN SPECIFICATIONS NOT NOTED IN THE TABLE OR WHERE ADDITIONAL TEMPORARY DIVERSION DITCHES MAY BE NEEDED BUT NOT IDENTIFIED. SEED AND MULCH BERM. 2. SIDE SLOPES SHALL NOT EXCEED A 5:1 (H:V) SLOPE IN AREAS WHERE VEHICLES MUST CROSS, 2:1 SLOPE (MAX) IN ALL OTHER AREAS. 3. ALL DIVERSION DITCHES SHALL BE VEGETATED AND MAINTAINED TO HAVE A FULL STAND OF TALL FESCUE GRASS COVER. WHERE GRASS COVER IS NOT PROVIDED, THE AREAS SHALL BE RESEEDED OR REPAIRED TO MAINTAIN FULL COVER OR PROVIDE OTHER COMPARABLY PERFORMING DITCH LINING, TEMPORARY DIVERSION DITCH DETAIL SCALE: NOT TO SCALE COMPOST SOCK 3" FLOW- AREA TO BE - - - PROTECTED "�I i 1=I I EI 11-1I EI 11=1 I EI 11=1I --'Mi!�II -' JAI=111=i - =III III-III=III=11- - '_ •_ _ 2,> X 2$' STAKES SECTION B WOOD MULCH OR COMPOST TO ' 1/2 HEIGHT OF LOG F /I I_, I I ITIS -1 � IITI-11 _ WI "P3117i 1=1 = I UNTRENCHED INSTALLATION 31' COMPOST SOCK FLOW AREA TO BE =1ir�TEIT1-1�1-I�,,,_„_ • PROTECTED _-�IIII�gi1=11gIL=11L=11 L= • ' -"-"'-III=111=IIITIII-III I 2" X 2" STAKES SECTION G TRENCH INTO GROUND 4" MIN GENERAL NOTES: M_1 1. FOR GENERAL NOTES SEE CCL -0100-004. FOR DRAWING INDEX SEE CCL -0100-001. FOR ABBREVIATIONS SEE CCL -0100-002 FOR LEGEND AND SYMBOLS SEE CCL -0100-003, NOTE: THIS APPLICATION MAY NOT BE USED WITH COMPOST SOCKS SMALLER THAN 12", ENTRENCHED INSTALLATION 0 _J MULCH OR COMPOST LL WORK FOR UNTRENCHED SOCKS w AREA w COMPOST SOCK AREA TO BE PROTECTED PLAN NOTES: 1. INSTALL COMPOST SOCKS ALONG LEVEL CONTOUR PERPENDICULAR TO STORMWATER FLOW TO ASSIST IN DISSIPATING LOW CONCENTRATED FLOW INTO SHEET FLOW AND REDUCING RUNOFF VELOCITY. 2. COMPOST SOCKS SHALL BE A MINIMUM OF 12" DIAMETER UNLESS OTHERWISE NOTED. 3. STAKES SHALL BE MADE OF OAK OR OTHER DURABLE HARDWOOD. 4. PLACE COMPOST SOCKS END TO END AND JOIN ENDS SLEEVING ONE SOCK END INTO ANOTHER. 5. IN ORDER TO PREVENT WATER FLOWING AROUND THE ENDS OF THE COMPOST SOCK, THE ENDS OF THE SOCK MUST BE CONSTRUCTED POINTING UPSLOPE SO THE ENDS ARE AT A HIGHER ELEVATION. A MINIMUM OF 10 LINEAR FEET AT EACH END PLACED AT AN ANGLE OF 30° IS RECOMMENDED. MAINTENANCE: INSPECT COMPOST SOCKS WEEKLY AND AFTER EACH SIGNIFICANT RAINFALL EVENT (AS DEFINED BY NCDEQ). REMOVE ACCUMULATED SEDIMENT AND ANY DEBRIS. THE COMPOST SOCK MUST BE REPLACED IF CLOGGED OR TORN. IF PONDING BECOMES EXCESSIVE THE SOCK MAY NEED TO BE REPLACED WITH A LARGER DIAMETER OR A DIFFERENT MEASURE. THE SOCK NEEDS TO BE REINSTALLED IF UNDERMINED OR DISLODGED. THE COMPOST SOCK SHALL BE INSPECTED UNTIL LAND DISTURBANCE IS COMPLETE AND THE AREA ABOVE THE MEASURE HAS BEEN PERMANENTLY STABILIZED. COMPOST SOCK DETAIL r5 SCALE: NOT TO SCALE 0103-002 0103-004 0103-024 0103-005 0103-025 0103-007 0103-027 0103-022 PRELIMINARY NOT FOR F)l CONSTRUCTION OR HDR Engineering, Inc. of the Carolinas License Number: F-0116 RECORDING I A I ISSUEFD FOR BIDS. 440 S Church Street, Suite 1000 Charlotte, NC 28202-2075 PE SEAL N0. DATE INCHES 1 2 3 TENTHS 10 20 30 4 5 6 7 I 1 1 1 TITLE AUXILIARY SPILLWAY EROSION AND SEDIMENT CONTROL DETAILS FOR CEDAR CLIFF IDF & SPILLWAY UPGRADE DUKE SCALE: AS NOTED DES: MGL DWG TYPE: DGN DFTR: JTTD ENERGYP' JOBNO:10060948 CHKD: FILENAME: CCL-0105-007.DGN APPD: DWG SIZE DRAWING NO. REVISION JTTD MGL - - ANSI D 22.0"x34.0" CCL -0105-007 A REVISION DFTR DES CHKD APPD 8 9 10 I I I M -A D'1 -E -F 2 3 La (FT) 4 5 6 7 8 D50 RIPRAP SIZE (IN) ' W2 - 11.5 - - NOTES: 1. CLASS OR MEDIAN SIZE OF RIPRAP AND LENGTH, WIDTH AND DEPTH OF APRON TO BE SHOWN ON PLANS. 2. RIPRAP SHOULD EXTEND UP BOTH SIDES OF THE APRON AND AROUND THE END OF THE PIPE OR CULVERT AT THE DISCHARGE OUTLET AT A MAXIMUM SLOPE OF :1 AND A HEIGHT NOT LESS THAN TWO THIRDS THE PIPE DIAMETER OR CULVERT HEIGHT. 3. THERE SHALL BE NO OVERFLOW FROM THE END OF THE APRON TO THE SURFACE OF THE RECEIVING CHANNEL. THE AREA TO BE PAVED OR RIPRAPPED SHALL BE UNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE AT THE SAME GRADE (FLUSH) WITH THE SURFACE OF THE RECEIVING CHANNEL. THE APRON SHALL HAVE A CUTOFF OR TOE WALL AT THE DOWNSTREAM END. 4. THE WIDTH OF THE END OF THE APRON SHALL BE EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING CHANNEL. MAXIMUM TAPER TO RECEIVING CHANNEL 5:1. 5. ALL SUBGRADE FILL FOR STRUCTURE TO BE COMPACTED TO 95% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY OR TO THE DENSITY OF THE SURROUNDING UNDISTURBED MATERIAL. 6. THE PLACING OF FILL, EITHER LOOSE OR COMPACTED, IN THE RECEIVING CHANNEL SHALL NOT BE ALLOWED. 7. NO BENDS OR CURVES IN THE HORIZONTAL ALIGNMENT OF THE APRON UNLESS OTHERWISE SHOWN. 8. TYPE 1 GEOTEXTYLE FILTER FABRIC SHALL BE INSTALLED ON COMPACTED SUBGRADE PRIOR TO PLACEMENT OF RIPRAP. 9. ANY DISTURBED AREA FROM END OF APRON TO RECEIVING CHANNEL MUST BE STABILIZED. END OF FLARED SECTION NATURAL GRADE 0 % SLOPE IN 1'-6" MIN � \ TYPE 1 GEOTEXTILE FILTER FABRIC LAP (IFN ELEVATION % NOTE: MINIMUM H=2/3 PIPE DIAMETER T (THICKNESS) T = 1. X DMAX GEOTEXTILE FILTER FABRIC SECTION B NOTE: USE USDA NOMOGRAPH FROM NC SEDIMENT AND EROSION CONTROL MANUAL. OUTLET La (FT) W1 (FT) W2 (FT) *T (IN) H (IN) D50 RIPRAP SIZE (IN) HW Al 10.0 11.5 4.5 13.5 12 6 HW A2 16.0 18.0 6.0 13.5 16 6 *D50 (SEE FIG 8.06 A&B "NC SEDIMENT AND EROSION CONTROL MANUAL" DMAX = 1.5 * D50 T = 1.5 * DMAX T(MIN) = 10" RIPRAP APRON AT PIPE OUTFALL DETAIL SCALE: NOT TO SCALE 0103-022 SILT FENCE AS NEEDED FILTER MEDIA (SEE NOTE 2) /--- PUMP FLOW VEGETATIVE BUFFER I NOTES: 1, PRIOR TO INSTALLATION, MANUFACTURER SPECIFICATIONS OF FILTER MEDIA SHALL BE PROVIDED TO THE EROSION CONTROL INSPECTOR FOR APPROVAL AND USE. DISCHARGE FROM FILTER MEDIA SHALL MEET OR EXCEED THE PROVISIONS OF THE CLEAN WATER ACT. 2, ENSURE THAT PUMP PRESSURE DOES NOT EXCEED FILTER MEDIA PRESSURE RATING. 3, FILTER MEDIA MAY BE, BUT NOT LIMITED TO, SAND MEDIA FILTRATION DEVICES, RATED FILTER FABRIC BAGS OR POLYMER BASED DEWATERING PRACTICES. 4, PUMP STRAINER SHALL NOT BE IN CONTACT WITH BOTTOM OF POND. EROSION CONTROL DEWATERING DETAIL 3 SCALE: NOT TO SCALE 0105-001 TEMPORARY FLEXIBLE HOSE SEDIMENT BAG TOP OF BANK (TIE TO TEMPORARY (SEE NOTE 2) CTA SII 17Cn nl ITI CTN FILTER FABRIC TYPE 2 SEDIMENT REMOVAL DEVICE APPROXIMATE BASE FIOW WATER TOP OF BANK TrLAnnnnnv OSE �T BAG TEMPORARY STABILIZED OUTLET SECTION FLOW IMPERVIOUS DIKE (SEE nInTU Q\ 0 APPROXIMATE BASE '7 - FLOW WATER LEVEL 0 (6") BASE FLOW + 1' (2' MIN) SANDBAG/STONE _ (CLASS A) (SEE NOTE 8) F W WORKING AREA I/R`IMPERVIOUS MEMBRANE TYPE 2 IMPERVIOUS DIKE DETAIL NOTES: 1. SEDIMENT FILTER BAG FABRIC SHALL BE GEOTEXTILE MANUFACTURED FROM WOVEN POLYPROPYLENE OR POLYMER MATERIAL. SEDIMENT FILTER BAG FABRIC MAY BE MADE FROM RECYCLED POLYMER MATERIALS. POLYMER MATERIALS SHALL NOT CONTAIN BIODEGRADABLE FILLER MATERIALS AND SHALL CONFORM TO THE REQUIREMENTS IN ASTM DESIGNATION: E 204 3. THE SEDIMENT FILTER BAG SHALL BE 10'X12'X1.5' (MIN) AND SHALL BE COMPLETE WITH LIFTING LOOPS AND DUMP STRAPS ATTACHED AT THE BOTTOM TO FACILITATE EMPTYING OF THE SEDIMENT FILTER BAG. 4. LIFTING STRAPS SHOULD BE PLACED UNDER THE DEWATERING SEDIMENT FILTER BAG TO FACILITATE REMOVAL AFTER USE. 5. PLACE THE DEWATERING SEDIMENT FILTER BAG ON A LEVEL STABILIZED AREA OVER DENSE VEGETATION/STRAW, OR GRAVEL (IF INCREASED DRAINAGE SURFACE AREA IS NEEDED). 6. INSERT DISCHARGE HOSE FROM PUMP INTO THE DEWATERING SEDIMENT FILTER BAG A MINIMUM OF 6 INCHES AND TIGHTLY SECURE WITH ATTACHED STRAP TO PREVENT WATER FROM FLOWING OUT OF THE UNIT WITHOUT BEING FILTERED. 7. REPLACE THE UNIT WHEN 1/2 FULL OF SEDIMENT OR WHEN SEDIMENT HAS REDUCED THE FLOW RATE OF THE PUMP DISCHARGE TO AN IMPRACTICAL RATE. 8. REMOVE THE UNIT AND SEDIMENT FROM ENVIRONMENTALLY SENSITIVE AREA AND WATERWAYS. AT THE APPROVED DISPOSAL SITE, OPEN OR SLIT THE UNIT, REMOVE SEDIMENT AND GRADE SMOOTHLY INTO EXISTING TOPOGRAPHY. DISPOSE OF THE DEWATERING SEDIMENT FILTER BAG, AT AN APPROPRIATE RECYCLING OR SOLID WASTE FACILITY. DEWATERING SEDIMENT FILTER BAC DETAIL SCALE: NOT TO SCALE 0105-001 i -iii -iii -iii -iii -iii -iii -iii -iii SILT FENCE ill=III-III_ III -III =III=III-III-III-III=III SEE DETAIL TIN I -llllllilll�ll'-�Ilill11_ 2\CCL-0105-005 -1111111 .I' d)1111= . 10" (TYP)3 =111111; SOIL/SEDIMENT 3 '' X 1 P F STOCKPILE AREA z '11 �I-�I11¢ 11iQ :2 '.rc111- 1 -i1 -i WATER LEVEL - - f� - -11-111-111- ORIGINAL GROUND SURFACE / 1' NOTES: 1. SILT FENCE TO EXTEND AROUND ENTIRE PERIMETER OF STOCKPILE, OR IF STOCKPILE AREA IS LOCATED ON/NEAR A SLOPE, THE SILT FENCE IS TO EXTEND ALONG CONTOURS OF THE DOWN -GRADIENT AREA, 2. IF STOCKPILE IS TO REMAIN FOR MORE THAN 14 DAYS, TEMPORARY STABILIZATION LOW POINT MEASURES MUST BE IMPLEMENTED. 3. SILT FENCE SHALL BE MAINTAINED UNTIL STOCKPILE AREA HAS EITHER BEEN REMOVED OR PERMANENTLY STABILIZED. 4. THE KEY TO FUNCTIONAL TEMPORARY STOCKPILE AREAS IS WEEKLY INSPECTIONS, ROUTINE MAINTENANCE, AND REGULAR SEDIMENT REMOVAL. 5. TEMPORARY STOCKPILE TO HAVE A MAXIMUM HEIGHT OF 15' TEMPORARY STOCKPILE E&SC DETAIL 4 SCALE: NOT TO SCALE 0105-001 PRELIMINARY NOT FOR CONSTRUCTION F)l OR B ISSUED FOR BIDS. HDR Engineering, Inc. of the Carolinas License Number: F-0116 RECORDING A 3/13/2019 ISSUED FOR BIDS. 440 S Church Street, Suite 1000 Charlotte, NC 28202-2075 PE SEAL NO. DATE INCHES 1 2 3 TENTHS 10 20 30 4 5 6 7 1 1 1 1 TEMPORARY ` FLEXIBLE HOSE DEWATERING PUMP 1 I I J� I CCL -0105-008 IREv. B GENERAL NOTES: DES: MGL 1. FOR GENERAL NOTES SEE CCL -0100-004. DFTR: JTTD FOR DRAWING INDEX SEE CCL -0100-001. JOB N0:10060948 FOR ABBREVIATIONS SEE CCL -0100-002. DATE: FOR CCL LEGEND AND SYMBOLS SEE -0100-003. V CLEAN WATER B PUMP -AROUND PUMP /-- TEMPORARY FLEXIBLE HOSE EXISTING CHANNEL IMPERVIOUS DIKE (SEE DETAIL, THIS DRAWING) SEDIMENT REMOVAL DEVICE 6TEMPORARY STABILIZED OUTLET SEE DETAIL 2 ON THIS DRAWING SEE DETAIL 2 ON THIS DRAWIN i PLAN VIEW NOTES: 1. ALL CHANNEL WORK INVOLVING EXCAVATION SHALL BE PERFORMED IN DRY CONDITIONS OR IN CHANNEL SECTIONS ISOLATED BY IMPERVIOUS DIKES AND KEPT DE -WATERED. 2. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED THE SAME WORKING DAY. 3. PUMP -AROUND PUMP AND HOSE SHALL ADEQUATELY CONVEY BASEFLOW (CONTRACTOR TO VERIFY). DE -WATERING PUMP SHALL ADEQUATELY DE -WATER THE WORKING AREA AT THE DOWNSTREAM IMPERVIOUS DIKE. 4. GRAVITY -BASED GEOTEXTILE BAG FILTERS SHALL BE USED TO COLLECT SILT AND SEDIMENT FROM WORK AREA DE -WATERING. THE DESIGNER MAY SPECIFY A SEDIMENT BASIN OR OTHER SEDIMENT CONTROL MEASURE IN LIEU OF A SEDIMENT BAG IF SITE CONDITIONS ARE FAVORABLE (I.E. - TREES WILL NOT BE IMPACTED FOR BASIN EXCAVATION, ETC.). 5. EFFLUENT FROM CLEAN WATER PUMP AROUND MAY BE DISCHARGED DIRECTLY INTO STABILIZED OUTLET (NO SEDIMENT REMOVAL DEVICE REQUIRED). 6. A STABILIZED OUTLET SHALL BE USED TO CONTROL THE EFFLUENT FROM ALL PUMPING OPERATIONS, THE DESIGNER SHALL SPECIFY ALL MATERIALS AND DIMENSIONS ASSOCIATED WITH STABILIZED OUTLETS, 7. FILTER FABRIC AS SPECIFIED BY THE DESIGNER SHALL BE USED UNDERNEATH ALL STONE/RIP RAP PLACED FOR SEDIMENT BAGS, STABILIZED OUTLETS, SPLASH PADS. 8. IMPERVIOUS DIKES SHALL BE CONSTRUCTED TO ISOLATE THE IN -STREAM WORKING AREA, AN IMPERVIOUS FABRIC MEMBRANE AND SAND BAGS OR STONE, AS SPECIFIED BY THE DESIGNER, SHALL BE USED TO CREATE THE DIKES, 9. THE WORK SEQUENCE IN PUMP -AROUND OPERATIONS PROCEEDS TYPICALLY AS FOLLOWS: A. INSTALL SEDIMENT REMOVAL DEVICE AND TEMPORARY STABILIZED OUTLETS AT THE DOWNSTREAM END OF WORKING AREA. B. INSTALL PUMP -AROUND PUMP AND FLEXIBLE HOSE, C. INSTALL UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING (CLEAN WATER) DOWNSTREAM TO STABILIZED OUTLET. D. INSTALL DOWNSTREAM IMPERVIOUS DIKE AND DE -WATERING PUMP. E. PERFORM CHANNEL WORK IN ACCORDANCE WITH THE PLANS IN THE WORKING AREA. F. DE -WATER THE WORKING AREA (AS NEEDED) INTO THE SEDIMENT REMOVAL DEVICE AND TEMPORARY STABILIZED OUTLET. G. UPON COMPLETION OF WORK, REMOVE ANY SEDIMENT ACCUMULATION BEHIND IMPERVIOUS DIKES. H. REMOVE DOWNSTREAM AND THEN UPSTREAM DIKES AND ALL PUMPS AND HOSE. I. SEED AND MULCH ALL DISTURBED AREAS PER THE PLANTING PLAN. PUMP -AROUND DETAIL 1� SCALE: NOT TO SCALE 0103-012 TITLE AUXILIARY SPILLWAY EROSION AND SEDIMENT CONTROL DETAILS FOR CEDAR CLIFF IDF & SPILLWAY UPGRADE DUKE E N E RGY�' SCALE: AS NOTED DES: MGL DWG TYPE: DGN DFTR: JTTD JOB N0:10060948 CHKD: DATE: FILENAME: CCL-0105-008.DGN APPD: DWG SIZE DRAWING NO. REVISION JTTD MGL ANSI D 22.0"x34.0" CCL -0105-008 B JTTD MGL - - REVISION DFTR DES CHKD APPD 8 9 10 I I I