Loading...
HomeMy WebLinkAboutDan River Ash Removal Completion Letter_20190524/' DUKE ENERGY, May 24, 2019 VIA UPS OVERNIGHT DELIVERY AND ELECTRONIC MAIL Mr. Michael S. Regan Secretary North Carolina Department of Environmental Quality 217 W Jones St Raleigh, NC 27603 George T. Hamrick Senor Vice President Coal Combustion Products 400 south Tryon Street, ST06A Charlotte, NC 28202 Phone: 980373-8113 Email. george.hamnck@duke-energy.com RE: Dan River Steam Station, Rockingham County, Notification of CornMetion of Part II, Section 3.(b)(1) of the Coal Ash Management Act of 2014 (Session Law 2014-122) (CAMA) Dear Secretary Regan: Please accept this letter as Duke Energy's notification to the North Carolina Department of Environmental Quality (NCDEQ) that Duke Energy has completed closure of the coal combustion residuals (CCR) surface impoundments at its Dan River Steam Station in accordance with CAMA. Section 3.(b)(1) of CAMA deemed the CCR surface impoundments at Dan River Steam Station as "high -priority" and required that they be closed no later than August 1, 2019 in accordance with Section 3.(c), which directs that the impoundments be closed by dewatering and that the CCR be removed to a permitted landfill or structural fill. The dewatering and removal of CCR from the Dan River Steam Station surface impoundments was completed on May 20, 2019. CCR removal was completed in accordance with the Dan River Steam Station Coal Ash Excavation Plan. As requested by NCDEQ's letter to Duke Energy dated January 22, 2019,' Duke Energy will submit a report describing (i) where the CCR was taken and in what amounts, and (li) the results of the actions taken in accordance with Duke Energy's Excavation Soil Sampling Plan. Duke Energy expects to submit the report by July 31, 2019. Duke Energy will continue to comply with all other requirements and deadlines established under CAMA, including annual inspections, annual reporting, groundwater monitoring, and groundwater corrective action. ' Although NCDEQ specifically drafted this letter to addresses closure of the high -priority impoundments at the Riverbend Steam Station, the letter generally establishes NCDEQ's position regarding how Duke Energy should "demonstrate compliance with Session Law 2014-122's closure requirements." Page 2 of 2 May 24, 2019 If you have any questions or need clarification regarding the information provided, feel free to contact Randy Hart at Randy.Hart@duke-eneray.com or 980-373-5630 at your convenience. Respectfully submitted, ,1, ', S / i George T. Hamrick Senior Vice President NCDEQ cc: dam safety @ncdenr.gov, deq.coalash@ncdenr.qov, Shelia Holman, Ed Mussler, Jon Risgaard, Toby Vinson, George Eller, Zahid Khan, Jordan Pappas Duke Energy cc: Jessica Bednarcik, Dave Renner, Dan Mc Rainey, Jim Wells, Michael Kafka, Steve Struble, Mark Patrick, Randy Hart