Loading...
HomeMy WebLinkAbout710002_Plan of Action_20180701A 7AT6, -9 2o16612fg PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 71-2 Humph 2. Current liquid volume in 25 yrJ24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yrJ24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d top of dike surface area according to design (area at below structural freeboard elevation) e.-line c/12 x line d x 7.48 gallons/ft'' 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 17.0 Inches 19.8 inches 2.8 inches 201,601 ftz 351861 gallons 180 days g. volume of waste produced according to structural design 1,175 400 ft3 h. current herd # 2000 certified herd # 7255 actual waste produced = current herd # x line g = certified herd # I. volume of wash water according to structural design I. excess rainfall over evaporation according to design k. (lines h + I +j) x 7.48 x 30 daysAine f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 711/2018 m. ((lines e + ku1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 324025 ft L�ft, 155 188 ft3 597419 gallons 1.09 Ibs/1000 gal. 1034.7 Ibs. PAN 11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 71-2 Humphrey line m = 1034.7 lb PAN 2. Structure ID: line m = Ib P 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: AN line m = lb PAN line in = lb PAN line m = lb PAN line m = lb PAN n. lines 1+2+3+4+5+6= 1034.7lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT I IRT FIFI MR Tf] WWI(-N PAN raKlmnT no Aool ion n..ol..n �..1.. o. tract # p. field # q. crop r acres a. remaining IRR 2 PAN balance Qb/acre) •....v ....v vv L TOTAL PAN BALANCE FOR FIELD (lb&) column r x s vlll • LI\IVV. U. appllcagon window' 6789 F1 Berm 3.321 222.00 737.0 Mar -Sept F2 " 4.021 222.00 892.4 " F3 " 10.021 171.00 1713.4 " F4A Fes 7.44 146.00 1086.2 Aug -Jun F4B Berm 7.21 200.00 1442.0 Mar -Sept F5 " 9.51 41.00 389.9 " F6 Fes 22.99 180.00 4138.2 Aug -Jun F7A " 11.08 180.00 1994.4 " F7B " 8.97 182.00 1632.5 " F7C " 6.32 182.00 1150.2 " cilaie wi iC, it ui up ul lull iy dppti auun uare ur nex[ crop appllcauon beginning date for available receiving crops during 30 day draw down'period. v. Total PAN available for all fields (sum of column t) = 15176.4 lb. PAN IV. FACILITY'S POA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 1034.7 lb. PAN PDA (30 Day) 2121/00 x. Crop's remaining PAN balance (line v from section III) = 15176.4 Ib. PAN y. Overall PAN balance (w - x) _ -14142 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here Including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be Included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Contracted this office on 7/3112018 about high freeboard. Received waste lagoon information on 8/6/2018 POA was completed on 8/6/2018 by Jason Turner, Fender SWCD Techn. - PoA (30 Day) 2/21100