PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 71-2 Humph
2. Current liquid volume in 25 yrJ24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yrJ24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d top of dike surface area according to design
(area at below structural freeboard elevation)
e.-line c/12 x line d x 7.48 gallons/ft''
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
17.0 Inches
19.8 inches
2.8 inches
201,601 ftz
351861 gallons
180 days
g. volume of waste produced according to structural design 1,175 400 ft3
h. current herd # 2000 certified herd # 7255
actual waste produced = current herd # x line g =
certified herd #
I. volume of wash water according to structural design
I. excess rainfall over evaporation according to design
k. (lines h + I +j) x 7.48 x 30 daysAine f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 711/2018
m. ((lines e + ku1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
324025 ft
L�ft,
155 188 ft3
597419 gallons
1.09 Ibs/1000 gal.
1034.7 Ibs. PAN
11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: 71-2 Humphrey line m = 1034.7 lb PAN
2. Structure ID: line m = Ib P
3. Structure ID:
4. Structure ID:
5. Structure ID:
6. Structure ID:
AN
line m = lb PAN
line in = lb PAN
line m = lb PAN
line m = lb PAN
n. lines 1+2+3+4+5+6= 1034.7lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT I IRT FIFI MR Tf] WWI(-N PAN raKlmnT no Aool ion n..ol..n �..1..
o. tract #
p. field #
q. crop
r acres
a. remaining IRR
2 PAN balance
Qb/acre)
•....v ....v vv
L TOTAL PAN
BALANCE FOR
FIELD (lb&)
column r x s
vlll • LI\IVV.
U. appllcagon window'
6789
F1
Berm
3.321
222.00
737.0
Mar -Sept
F2
"
4.021
222.00
892.4
"
F3
"
10.021
171.00
1713.4
"
F4A
Fes
7.44
146.00
1086.2
Aug -Jun
F4B
Berm
7.21
200.00
1442.0
Mar -Sept
F5
"
9.51
41.00
389.9
"
F6
Fes
22.99
180.00
4138.2
Aug -Jun
F7A
"
11.08
180.00
1994.4
"
F7B
"
8.97
182.00
1632.5
"
F7C
"
6.32
182.00
1150.2
"
cilaie wi iC, it ui up ul lull iy dppti auun uare ur nex[ crop appllcauon beginning date for available
receiving crops during 30 day draw down'period.
v. Total PAN available for all fields (sum of column t) = 15176.4 lb. PAN
IV. FACILITY'S POA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 1034.7 lb. PAN
PDA (30 Day) 2121/00
x. Crop's remaining PAN balance (line v from section III) = 15176.4 Ib. PAN
y. Overall PAN balance (w - x) _ -14142 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here Including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be Included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Contracted this office on 7/3112018 about high freeboard. Received waste lagoon information on 8/6/2018
POA was completed on 8/6/2018 by Jason Turner, Fender SWCD Techn. -
PoA (30 Day) 2/21100