Loading...
HomeMy WebLinkAbout710002_Plan of Action_20180323PLAN OF ACTION (PON FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1 Structure Name/ldentifler (ID); 71-2 Humphrey 2. Current liquid volume in 25 yr124 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr /24 hr. storm & structural freeboard c. line b - line a (Inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line C/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 13.0 Inches 19.5 inches 6.5 inches 1,583,812 ftz 6417078 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 1,175,400 ft3 h. current herd # 3100 certified herd #� 7255 actual waste produced = current herd # x line g = 502238 ft3 certified herd # I. volume of wash water according to structural design ft3 J. excess rainfall over evaporation according to design 165,188 ft3 k. (lines h + i +J) x 7.48 x 30 daysAine f= 819592 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 3/23/2018 1.31 Ibs/100D gal. m. ((lines e + k)/1000) x line I = 9480.0 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) POA (30 Day) Z21/00 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID. 71-2 Humphrey 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: line m = 9480.0 lb PAN line m = lb PAN line m = lb PAN line m = lb PAN line m = lb PAN line m = lb PAN n.lines 1+2+3+4+5+6= 9480.0lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT I IST FIFI nc Tn ❑vurPU Ma\I PA\ILI1T MAM-..�...-.._..._ o. Vact # p. field # q, crop r. acres y`5. remammg IRR 2 PAN balance (lb/acre) L TOTAL PAN,u BALANCE FOR FIELD (lbs.) column r x s ap icaUonU d ' u. applipUon window 6789 F1 F2 Bermuda 3.32 4.02 222.00 222.00 737.0 892.4 March -Se t " F3 10.02 222.00 2224.4 " F4A Fescue Bermuda " 7.44 7.21 9.51 145.00 190.00 165.00 1078.8 1369.9 1569.2 Au Jun March -Sept " MIF7C Fescue Fescue 22.99 11.08 90.00 99.00 2069.1 1096.9 Au -Jun " Fescue 8.97 177.00 1587.7 " Fescue 6.23 182.00 1133.9 " c �Sta}a ci vronf rvnn n..alnn ......u....u.... �_._ _ ,,, �N aNNuwuuu ueyuinrny vale Tor available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) _ IV. FACILITY'S PoA OVERALL PAN BALANCE W. Total PAN to be land applied (line n from section II) = PoA (30 Day) 2121/00 13759.3 lb. PAN 9480.0 lb. PAN x. Crop's remaining PAN balance (line v from section III) = Y. Overall PAN balance (w -x) _ 13759.3 lb. PAN -4279 lb. PAN Line y must show as a deficit If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these 5elds to the PAN balance table and recalculate the overall PAN balance. If animal waste Is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the 'eceiving facility. Received animal waste lagoon information on 6/26/18 to complete 30 day POA POA completed on 6/26, 20 88. POA was completed by Jason Turner, Fender SWCD_Techn. with information provided by Gina Marasco IF FREEBOARD CAN NOT BE LOWERED BY NORMAL IRRIGATION METHODS, DEPOPULATION OF ANIMALS OR PUMP & HAUL METHOD MAYBE NEEDED ON THIS FARM. PoA (30 Day) 2121/00