Loading...
HomeMy WebLinkAbout710002_Plan of Action_20180530PLAN OF ACTION /PoA) FO)t_HIG FREEBOARD AT ANIMAL FACILITIES FIIV 5 D' Y A` W DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifler (ID): 1 71-2 2. Current liquid volume in structural freeboard a. current liquid level according to marker b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 is line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f, temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 4604 certified herd # 7255 actual waste produced = current herd # x line g = certified herd # I. volume of wash water according to structural design j. excess rainfall over evaporation according to design k: (lines h+ i +j) x 7.48 x 5 days/llne f= 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = 4.0 inches 19.8 Inches 15.8 inches 201,601 flz 1985501 gallons 180 days 1,175,400 ft3 745905 ft3 ft3 �L--155��188 ft3 187227 gallons 2172728 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21/00 II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: 71-2 2. structure ID: 3. structure ID: 4. structure ID: 5. structure ID: 6. structure ID: n.lines 1+2+3+4+5+6= o. line n / 27154 = line I =_ 2172728 gallons line I = gallons line I = gallons line I = gallons line I = gallons line I = gallons 2172728 gallons 80.02 acre -inches III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD' 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. 2Fields with no remaining PAN balance, no reoeMng crop, and/or completely saturated are not considered available to receive waste. p. tract # q. field # r. soil type s. crop t. acres u. remaining IRR-2 PAN balance (Ib/acre) v. mabmum appllcalton rate (in/hr) w maximum appllcabon amount (Inches) 6789 1 C Bermuda 3.23 222 0.5 1 2 4.02 222 0.5 1 3 10.20 200 0.5 1 4A Fescue 6.89 145 0.5 1 4BI C Bermuda 7.21 2221 0.5 1 5 n9.51 1951 0.5 1 6 Fescue 22.99 951 0.5 1 7A 11.08 991 0.5 1 7B 8.97 177 0.5 1 7C 6.23 182 0.5 1 x. total acres available during 5 day draw down (sum of column t) = 90.33 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE PoA ( Day) 2/ line o 0.89 Inches per acre to be applied within 5 days line x If unable to land apply hydraulic load listed In line y, list course of action here Including pump and haul, depopulation, herd reduction, etc. For pump A haul and herd reduction onthrta_ 1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation eauioment mar down Infield, °trafflraHIHV nrmcc cnuc• ..au —n....1.....- Fields are very wet and irrigation system can not travel at this time. 2. Date and amount of last rainfall event? DATE: 05/29/18 AMOUNT: 3.50 inches 31, 2018 pumped for 35 mins Is it is capable IJ01 111190uU1I eve1IL, uudngetl maue In gun sizes, nozzles, "o" rings, operating time, travel speed_ eta to Shorter pumping time and -lower application rates will be used. Smaller o rings and faster travel speeds will be used. Aeroway system will be used when soil conditions improve. Robert Marasco called on 5-29-18 to report freeboard. Determined on 5-30-18 that the freeboard was at 11" and needed a 5 day POA. Revised 30 dayPOA to 5 day POA on 6-1-18. This information was provided by Robert Marasco on 5-1-18. Completed by Jason Turner PSWCD on 8-1-18. PoA (5 Day) 2121/00