HomeMy WebLinkAbout710002_Plan of Action_20180125G
PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 71-2 Humphrey
2. Current liquid volume In 25 yrJ24 hr. storm storage & structural freeboard
a. current liquid level according to marker 17.0 Inches
b. designed 25 yrJ24 hr. storm & structural freeboard 19.5 Inches
c. line b - line a (Inches in red zone) = 2.5 Inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 1,583,812 fe
e. line c112 x line d x 7.48 gallons/ft' 2468107 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 1 175 400 ft3
h. current herd # 4598 certified herd # 7255
actual waste produced = current herd # x line g = 744609 ft'
certified herd #
I. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + I +j) x 7.48 x 30 daysfiine f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1/25/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2121/00
0ft3
165,188 ft'
1121747 gallons
1.09 ibs/1000 gal.
3912.9 lbs. PAN
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: 71-2 Humphrey
2. Structure ID:
3. Structure ID:
4. Structure ID:
5. Structure ID:
6. Structure ID:
n.lines 1+2+3+4+5+6=
line m =
3912.9 lb PAN
line m =
lb PAN
line m =
lb PAN
line m =
lb PAN
line m =
lb PAN
line m =
lb PAN
3912.9 lb PAN
Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNnT RF APPI wn nI wimp- Tute in nev n=ninn
O. tract #
p. field #
q. Crop
r. acres
s. remaining IRR
2 PAN balance
Qb/acre)
L TOTAL PAN
BALANCE FOR
FIELD Qbs.)
column r x s
u. appllcallon window'
6789
F1
Small Grain
3.32
60.00
166.0
Sept -March
F2
"
4.02
222.00
892.4
"
F3
"
10.02
222.00
2224.4
"
F4A
Fescue
7.44
110.00
818.4
Aug -Jun
F4B
Overseeded Rye
7.21
25.00
180.3
Sept -March
F5
"
9.61
50.00
475.5
"
F6
Fescue
22.99
120.00
2758.8
Aug -Jun
F7A
Fescue
11.08
120.00
1329.6
"
F7B
Fescue
8.97
182.00
1632.5
F7C
Fescue
6.23
182.00
1133.9
"
C
state current crop enoing application pate or next crop application beginning date for available
recelving crops during 30 day draw dawn perlod.
v. Total PAN available for all fields (sum of column t) _
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line in from section II) =
PoA (30 Day) 2/21100
11611.8 lb. PAN
3912.9 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 11611.8 lb. PAN
y. Overall PAN balance (w - x) _ -7889 lb. PAN
Line y must show as a deficit. If line y does.not show as a deficit, list course of action here Including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be Included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste Is to be hauled to
another permitted facility, provide information -regarding the herd population and lagoon freeboard levels at the
receiving facility.
Received waste lagoon Information on 3-23-18 to complete 30 day POA. POA was completed on 3123/18 by
Jason Turner, Pender SWCD Techn.
IF FREEBOARD CAN NOT BE LOWERED BY NORMAL IRRIGATION METHODS, DEPOPULATION OF
ANIMALS OR PUMP & HAUL METHOD MAYBE NEEDED ON THIS FARM.
PoA (30 Day) 2121/00