HomeMy WebLinkAbout710002_Plan of Action_20180125G PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 71-2 Humphrey 2. Current liquid volume In 25 yrJ24 hr. storm storage & structural freeboard a. current liquid level according to marker 17.0 Inches b. designed 25 yrJ24 hr. storm & structural freeboard 19.5 Inches c. line b - line a (Inches in red zone) = 2.5 Inches d. top of dike surface area according to design (area at below structural freeboard elevation) 1,583,812 fe e. line c112 x line d x 7.48 gallons/ft' 2468107 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 1 175 400 ft3 h. current herd # 4598 certified herd # 7255 actual waste produced = current herd # x line g = 744609 ft' certified herd # I. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + I +j) x 7.48 x 30 daysfiine f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1/25/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2121/00 0ft3 165,188 ft' 1121747 gallons 1.09 ibs/1000 gal. 3912.9 lbs. PAN II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 71-2 Humphrey 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: n.lines 1+2+3+4+5+6= line m = 3912.9 lb PAN line m = lb PAN line m = lb PAN line m = lb PAN line m = lb PAN line m = lb PAN 3912.9 lb PAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNnT RF APPI wn nI wimp- Tute in nev n=ninn O. tract # p. field # q. Crop r. acres s. remaining IRR 2 PAN balance Qb/acre) L TOTAL PAN BALANCE FOR FIELD Qbs.) column r x s u. appllcallon window' 6789 F1 Small Grain 3.32 60.00 166.0 Sept -March F2 " 4.02 222.00 892.4 " F3 " 10.02 222.00 2224.4 " F4A Fescue 7.44 110.00 818.4 Aug -Jun F4B Overseeded Rye 7.21 25.00 180.3 Sept -March F5 " 9.61 50.00 475.5 " F6 Fescue 22.99 120.00 2758.8 Aug -Jun F7A Fescue 11.08 120.00 1329.6 " F7B Fescue 8.97 182.00 1632.5 F7C Fescue 6.23 182.00 1133.9 " C state current crop enoing application pate or next crop application beginning date for available recelving crops during 30 day draw dawn perlod. v. Total PAN available for all fields (sum of column t) _ IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line in from section II) = PoA (30 Day) 2/21100 11611.8 lb. PAN 3912.9 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 11611.8 lb. PAN y. Overall PAN balance (w - x) _ -7889 lb. PAN Line y must show as a deficit. If line y does.not show as a deficit, list course of action here Including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be Included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste Is to be hauled to another permitted facility, provide information -regarding the herd population and lagoon freeboard levels at the receiving facility. Received waste lagoon Information on 3-23-18 to complete 30 day POA. POA was completed on 3123/18 by Jason Turner, Pender SWCD Techn. IF FREEBOARD CAN NOT BE LOWERED BY NORMAL IRRIGATION METHODS, DEPOPULATION OF ANIMALS OR PUMP & HAUL METHOD MAYBE NEEDED ON THIS FARM. PoA (30 Day) 2121/00