PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Namelidentifier (ID): 71-2 Humphrey
2. Current liquid volume In 25 yrJ24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yrJ24 hr. storm & structural freeboard
c. line b - line a (Inches In red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons&
3. Projected volume of waste liquid produced during draw doom period
f. temporary storage period according to structural design
15.0 Inches
19.5 Inches
4.5 inches
1,583 612 ft
4442593 gallons
180 days
g. volume of waste produced according to structural design 1,175,400 ft3
h. current herd # 5300 certified herd # 7255
actual waste produced = current herd # x line g =
certified herd #
I. volume of wash water according to structural design
J. excess rainfall over evaporation according to design
k. (lines h + i +)) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 3/23/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
868666 ft3
�Ift3
�- 155,188 ft3
1263938 gallons
1.31 Ibs/1000 gal.
7476.6 Ibs. PAN
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: 71-2 Humphrey
line m =
7475.6 lb PAN
2. Structure ID:
line m =
lb PAN
3. Structure ID:
line m =
lb PAN
4. Structure ID:
line m =
lb PAN
5. Structure ID:
line In =
lb PAN
6. Structure ID:
line m =
lb PAN
n.lines 1+2+3+4+5+6= 7475.6lbPAN
Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD_ DO NOT LIST FIELDS Tn WNIM4 Peru CAIJIJnT we ADDI yen ni 101ac TUIO In nwv
o. tract #
p. field #
q. Crop
r. acres
9. remaining IRR
2 PAN balance
(Ib/acre)
L TOTAL PAN
BALANCE FOR
FIELD (lb&)
column rx s
u. epplicallon window'
6789
F1
Bermuda
3.321
222.00
737.0
March -Sept
F2
"
4.021
222.00
892.4
"
F3
"
10.021
222.00
2224.4
"
F4A
Fescue
7.441
110.00
818.4
Au Jun
F4B
Bermuda
7.21
222.00
1600.6
March -Sept
F5
"
9.51
202.00
1921.0
"
F6
Fescue
22.99
100.00
2299.0
AugJun
F7A
Fescue
11.08
99.00
1096.9
"
F7B
Fescue
8.97
177.00
1587.7
"
F7C
Fescue
6.23
182.00
1133.9
"
C
orate currenr crop enaing appncauon care or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 14311.4 lb. PAN
IV. FACILITY'S PDA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section 11) = 7475.6 lb. PAN
PDA (30 Day) 2/21/00
x. Crop's remaining PAN balance (line v from section III) = 14311.4 lb. PAN
y. Overall PAN balance (w - x) = -6836 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here Including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be Included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste Is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Received animal waste lagoon Information on 5-1-18 to complete 30 day POA. POA completed on March 23,
2018 had expired without a 30 day renewal. POA was completed on 511/18 by Jason Turner, Pander SW CD
Techn. with Information provided by Gina Marasco
FREEBOARD CAN NOT BE LOWERED BY NORMAL IRRIGATION METHODS, DEPOPULATION OF
IIMALS OR PUMP & HAUL METHOD MAYBE NEEDED ON THIS FARM.
POA (30 Day) 2/21100