Loading...
HomeMy WebLinkAbout710002_Plan of Action_20180323 (3)Co�1 n JX(, #' ,*18C0 5z1 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Namelidentifier (ID): 71-2 Humphrey 2. Current liquid volume In 25 yrJ24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yrJ24 hr. storm & structural freeboard c. line b - line a (Inches In red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons& 3. Projected volume of waste liquid produced during draw doom period f. temporary storage period according to structural design 15.0 Inches 19.5 Inches 4.5 inches 1,583 612 ft 4442593 gallons 180 days g. volume of waste produced according to structural design 1,175,400 ft3 h. current herd # 5300 certified herd # 7255 actual waste produced = current herd # x line g = certified herd # I. volume of wash water according to structural design J. excess rainfall over evaporation according to design k. (lines h + i +)) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 3/23/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 868666 ft3 �Ift3 �- 155,188 ft3 1263938 gallons 1.31 Ibs/1000 gal. 7476.6 Ibs. PAN II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 71-2 Humphrey line m = 7475.6 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line In = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 7475.6lbPAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD_ DO NOT LIST FIELDS Tn WNIM4 Peru CAIJIJnT we ADDI yen ni 101ac TUIO In nwv o. tract # p. field # q. Crop r. acres 9. remaining IRR 2 PAN balance (Ib/acre) L TOTAL PAN BALANCE FOR FIELD (lb&) column rx s u. epplicallon window' 6789 F1 Bermuda 3.321 222.00 737.0 March -Sept F2 " 4.021 222.00 892.4 " F3 " 10.021 222.00 2224.4 " F4A Fescue 7.441 110.00 818.4 Au Jun F4B Bermuda 7.21 222.00 1600.6 March -Sept F5 " 9.51 202.00 1921.0 " F6 Fescue 22.99 100.00 2299.0 AugJun F7A Fescue 11.08 99.00 1096.9 " F7B Fescue 8.97 177.00 1587.7 " F7C Fescue 6.23 182.00 1133.9 " C orate currenr crop enaing appncauon care or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 14311.4 lb. PAN IV. FACILITY'S PDA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = 7475.6 lb. PAN PDA (30 Day) 2/21/00 x. Crop's remaining PAN balance (line v from section III) = 14311.4 lb. PAN y. Overall PAN balance (w - x) = -6836 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here Including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be Included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste Is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Received animal waste lagoon Information on 5-1-18 to complete 30 day POA. POA completed on March 23, 2018 had expired without a 30 day renewal. POA was completed on 511/18 by Jason Turner, Pander SW CD Techn. with Information provided by Gina Marasco FREEBOARD CAN NOT BE LOWERED BY NORMAL IRRIGATION METHODS, DEPOPULATION OF IIMALS OR PUMP & HAUL METHOD MAYBE NEEDED ON THIS FARM. POA (30 Day) 2/21100