HomeMy WebLinkAbout710002_Plan of Action_20180613a01 e Do was p U�►1N
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
FIVE (5) DAY DRAW DOWN PERIOD
I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/ldentifler(ID): 1 71-2
2. Current liquid volume In structural freeboard
a. current liquid level according to marker
b. designed structural freeboard zone
(Normally 12Inches or greater)
c. line b - line a (inches within structural freeboard) _
d, top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g: volume of waste produced according to structural design
h. current herd # 3824 certified herd # 7255
actual waste produced = current herd # x line g =
certified herd #
I. volume of wash water according to structural design
J. excess rainfall over evaporation according to design
k. (lines h+ I +j) x 7.48 x 5 days/line f=
4. Total volume of waste to be land applied during 5 day draw dawn
1. total volume to be land applied line e + line k =
9.0 inches
19.8 inches
10.8 Inches
201,601 ft2
1357178 gallons
160 days
1,175,400 ft3
619535 W
Oft3
155,188 fe
160970 gallons
1518148 gallons
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN
THE STRUCTURAL, FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below)
PoA (5 Day) 2/21/00
♦, N
II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS
FOR ALL WASTE STRUCTURES FOR FACILITY
1. structure ID: 71-2
2.
structure ID:
3.
structure ID:
4.
structure ID:
5.
structure ID:
6.
structure ID:
n.lines 1+2+3+4+5+6=
o. line n
127164 =
line I = 1518148 gallons
line I =
gallons
line I =
gallons
line I =
gallons
line I =
gallons
line I =
gallons
1518148 gallons
55.91 acre -Inches
III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD'a
'While this section deals with hydraulic loading capacities, applications cannot exceed
agronomic rate for receiving crop according to its certified waste plan.
2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are
not considered available to receive waste.
p. tract #
q. field #
r. soil type
s. crop
t. acres
u. remaining
IRR-2 PAN
balance
QWacre)
v. maximum
eppllc don rate
(irdhr)
W. maximum
application
amount onches)
6789
1
C Bermuda
3.23
222
0.5
1
2
4.02
222
0.5
1
3
10.20
200
0.5
1
4A
Fescue
6.89
145
0.5
1
4131
C Bermuda
7.21
2221
0.5
1
5
9.51
185
0.5
1
6
Fescue
22.99
90
0.5
1
7A
11:08
99
0.6
1
7B
8.97
177
0.5
1
7C
6.23
182
0.6
1
x. total acres available during 5 day draw down (sum of column t) = 90.33 acres
IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE
PoA l Day) 2/ Ii2'{7S17o- 0.62 Inches per acre to be applied within 5 days
line x
If unable to land apply hydraulic load listed in line y, list course of action here including pump
and haul, depopulation, herd reduction, etc. For pump $ haul and herd reduction options,
1. Describe moisture conditions of flelds? (e.g. Is there water standing in field; does
2. Date and amount of last rainfall event?
DATE:=-65129118t� AMOUNT: F 3.50 Inches
3. Dates of last waste application event per field:
June-0 20.1137,-::l
4. Given optimum soil and weather conditions, Is irrigation equipment capable of applying the volume In
It Is capable
per irrigation event; cnanges made In gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to
r=rai
Shorter pumping time and lower application rates will be used. Smaller o rings and faster travel speeds will be
used. Aeroway system will be•used when soil conditions improve.
Robert Marasco called on 5-28-18 to report freeboard. Determined on 5-30-18 that the freeboard was at 11"
and needed a 5 day POA. Revised 30 dayPOA to 5 day POA on 6-1-18. This information was provided by
Robert Marasco on 6-1-18. Completed by Jason Turner PSWCD on 6-1-18.
Requested update by noon on 6-5-18, but got it. Received call from Robert 6-6-18 about revising 5 day POA.
Received updated Information this morning 6-6-18'and revised on 6-6-18. New information provided on 6-11-18.
PoA (5 Day) 2/21/00