Loading...
HomeMy WebLinkAboutWQ0039818_Pump & Haul permit_20180221TfF Water Resources ENVIRONMENTAL QUALITY February 21, 2018 Dail Ballard, Executive Director Don Lee Camp and Retreat Center 700 Waterfield Ridge Place Garner, NC 27529 Subject: Permit No. WQ0039818 Camp Don Lee Domestic Wastewater Pump & Haul Permit Pamlico County Dear Ms. Ballard: ROY COOPER Governor MICHAEL S. REGAN Secrelmy LINDA CULPEPPER Interim Dueclnr In accordance with your application received February 20, 2018 we are forwarding herewith Permit No. WQ0039818, dated February 21, 2018 to Don Lee Camp and Retreat Center forthe time -limited operation of a domestic wastewater pump and haul operation. This permit shall be effective from the date of issuance, February 21, 2018, and will expire on August 21, 2018, and shall be subject to the conditions and limitations as specified therein. This cover letter and supplement shall be considered a part of this permit and are therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: Condition 1.1: The Permittee or its representative shall inspect the permitted pump and haul facilities at least daily to prevent malfunctions and deterioration, operator errors, and discharges that may cause or lead to the release of wastes to the environment, a threat to human health, or a nuisance condition. Condition 11.1: An accurate record of the pump and haul activities must be maintained by the Permittee, indicating; Date and time wastewater is removed from the facility; Name of contract hauler; Name of facility receiving wastewater; & Volume of wastewater removed. Condition 11.14: This permit shall expire August 21, 2018. Should the pump and haul activities stop prior to the date of expiration send written notification to the Washington Regional Office, Water Quality Section notifying them of that the permit is no longer required and detailing the final disposal solution If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Slate of North Carolina I Environmental Quality I Water Resources 1617 Mail service Center I Raleigh, North Carolina 27699-1611 919 807 6300 Don Lee Camp and Retreat Centerr Permit No. WQ0039818 Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. If you need additional information concerning this matter, please contact Scott Vinson at (252) 948-3844 or via e-mail at Scott.Vinson@ncdenr.gov . Sincerely7 -1 � for Linda Culpepper Interim Director, Division of Water Resources by David May, Regional Supervisor Water Quality Regional Operations Section Washington Regional Office Division of Water Resources, NCDEQ cc: Gary MacConnell, PE (email) Tony Hawkins, ORC, City of New Bern WWTP (email) Jordan Hughes, PE, City Engineer, City of New Bern (email) Washington Regional Office Files Water Resources Central Files: Attention Diane Rodman Page 2 of 7 Water Resources ENVIRONMENTAL QUALITY DOMESTIC WASTEWATER PUMP & HAUL PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the Don Lee Camp and Retreat Center for the construction and operation of a domestic wastewater pump and haul operation to serve Camp Don Lee. The facility from which pumping will occur shall be the on -site high rate infiltration basin. The anticipated flow for this pump and haul operation is expected to be greater than 12,000 gallons per day of domestic wastewater, pursuant to the application received on February 20, 2018 and in conformity with 15A NCAC 02T and other supporting data subsequently filed and approved by the Department of Environmental Quality and considered a part of this permit. This permit shall be effective from February 21, 2018, and will expire on August 21, 2018, and shall be subject to the conditions and limitations as specified therein. foffPnda Culpepper Interim Director, Division of Water Resources By Authority of The Environmental Management Commission Permit Number: WQ0039818 Permit Issued: February 21, 2018 Page 3 of 7 Don Lee Camp and Retreat Center is hereby authorized to: Construct and operate the aforementioned domestic wastewater pump and haul operation. The wastewater collected by this system shall be pumped and hauled to the City of New Bern Wastewater Treatment Facility (Permit No. NC0025348) for final treatment and disposal. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below. SPECIAL CONDITIONS 1. The Permittee or its representative shall inspect the permitted pump and haul facilities at least daily to prevent malfunctions and deterioration, operator errors, and discharges that may cause or lead to the release of wastes to the environment, a threat to human health, or a nuisance condition. The Permittee shall maintain an inspection log or summary including at least: a. Date and time of inspection; b. Observations made; c. Any maintenance, repairs, or corrective actions taken by the Permittee. The Permittee shall maintain this log of inspections for as long as the pump and haul activities are being conducted and shall be made available to the Division or other permitting authority, upon request. Records shall be submitted quarterly to the Supervisor of the Water Quality Regional Operations of the Washington Regional Office. The records must be submitted within 30 days of the end of each quarter (quarters end on the last day of March, June, September, and December). [15A NCAC 02T .0204(d)] 2. The Washington Regional Office, must be notified at least 48 hours prior to the commencement of the pump and haul activities so that a site inspection may be performed. [15A NCAC 02T .0110] 3. This permit shall become voidable unless the agreement between Camp Don Lee, Craven Ag Services, Inc., and the City of New Bern WWTP for the collection, transportation, and final treatment of wastewater is in full force and effect. [15A NCAC 02T.0204(b)] II. STANDARD CONDITIONS 1. An accurate record of the pump and haul activities must be maintained by the Permittee, indicating: a. Date and time wastewater is removed from the facility; b. Name of contract hauler; c. Name of facility receiving wastewater; d. Volume of wastewater removed. Page 4 of 7 The Permittee shall maintain this log for as long as the pump and haul activities are being conducted and shall be made available to the Division or other permitting authority, upon request. Records shall be submitted quarterly to the Supervisor of the Water Quality Regional Operations of the REGION Regional Office. The records must be submitted within 30 days of the end of each quarter (quarters end on the last day of March, June, September, and December). [15A NCAC 02T .0108] 2. This permit shall not be transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. [15A NCAC 02T .0104; G.S. 143-215.1(d3)] 3. The Permittee shall provide for the installation and maintenance of an audible and visual high-water alarm on all storage and pumping facilities associated with this pump and haul operation. [15A NCAC 02T .0204(c)] 4. This permit shall become voidable unless the subject pump and haul activities are carried out in accordance with the conditions of this permit; 15A NCAC 2T; and other supporting materials unless specifically mentioned herein. [15A NCAC 02T.01101 5. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. No type, kind or quantity of wastewater other than the pumped and hauled wastewater from the facility shall be included in these pump and haul activities. [15A NCAC 02T .0110] 6. The wastewater collection facilities shall be properly maintained and operated at all times. Adequate inspection, maintenance, and cleaning shall be provided by the permittee to insure proper operation of the subject facilities. [15A NCAC 02T .0403] 7. The Permittee shall report by telephone to a Water Resources staff member at the Washington Water Quality Regional Operations Section, telephone number (252) 946-6481, as soon as possible, but in no case more than 24 hour, following the occurrence or first knowledge of the occurrence of either of the following: a. If the flow volume estimated above is exceeded by any amount on any day; or b. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater storage, such as failures of tanks, piping, pumps, aerators, compressors etc.; or c. Any failure of a pumping station, sewer line, etc., resulting in a spill or by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility; or d. Any SSO and/or spill over 1,000 gallons; or e. Any SSO and/or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-550 (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to Page 5 of 7 ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 143-215.1C(a1)] 8. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 02T; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina - licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T .0108(b- c)] 9. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall cease operation of all pump and haul activities and shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [15A NCAC 02T .0110; 15A NCAC 02T .0108(b)] 10. Any duly authorized officer, employee, or representative of the Division of Water Resources may, upon presentation of credentials, enter and inspect any property, premises, or place on or related to the pump and haul collection facilities at any reasonable time for the purpose of determining compliance with the Division's approval; may inspect or copy any records that must be maintained under the terms and conditions of this permit; and may obtain samples. [15A NCAC 02T .0110] 11. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which maybe required by the Division or any other Federal, State, of Local government agencies. [G.S. 143-215.1(b)] 12. Operation of this permit is based on acceptance of the certification attached to this permit, completed by the Permittee and a North Carolina licensed Professional Engineer. Note that a completed certification is only required for activities that met the definition of the Practice of Engineering in accordance with G.S. 89C-3. In some instances this certification may not be required. 13. A copy this permit, and approved plans and specifications (if applicable) shall be maintained on file by the Permittee for the life of the project. [15A NCAC 02T .0104] 14. This permit shall expire August 21, 2018. Should the pump and haul activities stop prior to the date of expiration send written notification to the Washington Regional Office, Water Quality Regional Operations Section notifying them that the permit is no longer required and detailing the final disposal solution. [15A NCAC 02T .0105(j), 15A NCAC 02T.0204(a)] Page 6 of 7 DOMESTIC WASTEWATER PUMP & HAUL ENGINEERING CERTIFICATION This certification shall be completed and submitted to the appropriate regional office for activities that result in the Practice of Engineering in accordance with G.S. 89C-3. In some instances this certification may not be required. PERMITTEE: Don Lee Camp and Retreat Center PERMIT#: WQ0039818 PROJECT: Camp Don Lee Pump and Haul ISSUE DATE: February 21, 2018 This project shall not be considered complete nor allowed to operate until the Division has received this Certification. It should be submitted in a mannerthat documents the Division's receipt. Send the required documentation to the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom. PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the pump and haul system permitted herein or portions thereof. Printed Name, Title Signature Date ENGINEERS CERTIFICATION 1, , as a duly registered Professional En Ineer in the State of North Carolina, having been authorized to observe (❑ periodically, ❑ weekly, LJ full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2T and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: ❑ Final ❑ Partial (include description) Certification Comments/Qualifiers (attach if necessary): NC Division of Water Resources — Water Quality Regional Operations Section Washington Regional Office 943 Washington Square Mall, Washington, NC 27889 Phone: (252)-946-6481