Loading...
HomeMy WebLinkAbout670053_Plan of Action_20181008IV& omw �T-53 c� Lafayette Farms, LLC PO BOX 1391 CLINTON, NC 28329 October 8, 2018 North Carolina Division of Aquifer Protection Mrs Kasten Miguez Mr Bill Dunlap Dear Kristin & Bill, Please find enclosed Plans of Action for the farms listed below All farms were pumped down prior to Hurricane Florence but due to 25-30" of rain, these lagoons got in the red. Pre -and post - storm levels were as follow L-11: 54" pre, 24" post '1�67-53 82-325 L-3 38" pre, 14" post 82-363 L-6: 42" pre; 8" post We have had an extremely wet 2018 and lagoons have been more difficult to manage than usual. If you need further information regarding this please call "me at 910-385-1000. Thank you for your attention to this matter. Sincerely, Curtis Barwick e� u� � 'r W PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number 67-53 County Onslow Facility Name. Lafayette Farms L-11 Certified Operator Name Curtis Barwick Operator Number 18437 1 Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways, and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID Spillway(Y or N) Level(inches). 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures A 30 day Plan of Action is attached Agronomic balance is within acceptable range Waste is to be pumped and hauled to off site locations Volume and PAN content of waste to be pumped and hauled is reflected in section III tables Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP Operation will be partially or fully depopulated `Attach a complete schedule with corresponding animal units and dates for depopulation `if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3 Earliest possible date to begin land application of waste: 912612018 1 hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Coharie Hog Farm Facility Owner/Manager (print) Phone: 910-592-3593 Date 9/27/2018 Facility Owner/Manager (signature) II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1 Structure ID 1 line m = 2539 3 lb PAN 2. Structure ID line m = lb PAN 3 Structure ID line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID. line m = lb PAN 6 Structure ID: - line m = lb PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 25393lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD" o. tract # p field # q crop r?acres s remaining IRR 2 PAN balance (lb/acre) t TOTAL PAN BALANCE FOR FIELD (lbs.) column rx s u application mridow' 4171 10 small grain overseed 6.02 50.00 301.0 Sep -April 4171 11 small grain overseed 4.28 5000 214.0 Sep -April 4171 12 small grain overseed 3.80 5000 1900 Sep -April 4171 13 small grain overseed 5.59 5000 2795 Sep -April 4171 1N wheat 21.53 115.23 2480.9 Sep -April 4171 14 small grain overseed 5.28 5000 2640 Se Aril 4171 9 small grain overseed 597 5000 2985 Sep -A nl 4171 2N wheat 6.00 115.23 691.4 Sep -April 4171 1 small grain overseed 7"84 50.00 392.0 Sep -April 4171 2 small grain overseed 7.67 50.00 3835 Se A nl 4171 4 small grain overseed 7.391 5000 369.5 Sep -April 4171 5 small grain overseed 7.53 50.00 376.5 Sep -April 4171 6 small grain overseed 7.90 5000 3950 Sep -April 4171 7 small grain overseed 7.35 5000 367.5 Se -A nl 4171 8 small grain overseed 9.16 5000 458.0 Sep -April 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 7461.3 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 2539 3 lb. PAN PoA (30 Day) 2/21/00 x. Crop's remaining PAN balance (line v from section III) = 7461 3 lb. PAN y. Overall PAN balance (w - x) _ -4922 lb. PAN Line y must show as a deficit If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit PoA (30 Day) 2/21100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1 Structure Name/Identifier (ID) 11 2 Current liquid volume in 25 yr./24 hr storm storage & structural freeboard a current liquid level according to marker b designed 25 yr /24 hr storm & structural freeboard c line b - line a (inches in red zone) _ d top of dike surface area according to design (area at below structural freeboard elevation) e line c/12 x line d x 7 48 gallons/ft' 3 Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 24 0 inches 28.0 inches 4.0 inches 291951 ft 727931 gallons 180 days g volume of waste produced according to structural design 415035 ft3 h current herd # 12589 certified herd # 12589 actual waste produced = current herd # x line g = certified herd # i volume of wash water according to structural design j -excess rainfall over evaporation according to design k (lines h + i + j) x 7 48 x 30 days/line f= 4 Total PAN to be land applied during draw down period I current waste analysis dated 6/15/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 415035 ft' 0 ft3 178460 ft3 739890 gallons 1 73 Ibs/1000 gal 2539.3 Ibs PAN PoA (30 Day) 2/21/00