HomeMy WebLinkAbout670053_Plan of Action_20181008IV& omw �T-53 c�
Lafayette Farms, LLC
PO BOX 1391
CLINTON, NC 28329
October 8, 2018
North Carolina Division of Aquifer Protection
Mrs Kasten Miguez
Mr Bill Dunlap
Dear Kristin & Bill,
Please find enclosed Plans of Action for the farms listed below All farms were pumped down
prior to Hurricane Florence but due to 25-30" of rain, these lagoons got in the red. Pre -and post -
storm levels were as follow
L-11:
54"
pre, 24"
post
'1�67-53
82-325 L-3
38"
pre, 14"
post
82-363 L-6:
42"
pre; 8"
post
We have had an extremely wet 2018 and lagoons have been more difficult to manage than
usual.
If you need further information regarding this please call "me at 910-385-1000. Thank you for
your attention to this matter.
Sincerely,
Curtis Barwick
e� u� �
'r W
PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number 67-53
County
Onslow
Facility Name. Lafayette Farms L-11
Certified Operator Name Curtis Barwick Operator Number
18437
1 Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways, and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID
Spillway(Y or N)
Level(inches).
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures A
30 day Plan of Action is attached Agronomic balance is within acceptable range
Waste is to be pumped and hauled to off site locations Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP
Operation will be partially or fully depopulated
`Attach a complete schedule with corresponding animal units and dates for depopulation
`if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3 Earliest possible date to begin land application of waste: 912612018
1 hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Coharie Hog Farm
Facility Owner/Manager (print)
Phone: 910-592-3593
Date 9/27/2018
Facility Owner/Manager (signature)
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM
STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1
Structure ID 1
line m = 2539 3 lb PAN
2.
Structure ID
line m =
lb PAN
3
Structure ID
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID.
line m =
lb PAN
6
Structure ID: -
line m =
lb PAN
n. lines 1 + 2 + 3 + 4 + 5 + 6 = 25393lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD"
o. tract #
p field #
q crop
r?acres
s remaining IRR
2 PAN balance
(lb/acre)
t TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column rx s
u application mridow'
4171
10
small grain overseed
6.02
50.00
301.0
Sep -April
4171
11
small grain overseed
4.28
5000
214.0
Sep -April
4171
12
small grain overseed
3.80
5000
1900
Sep -April
4171
13
small grain overseed
5.59
5000
2795
Sep -April
4171
1N
wheat
21.53
115.23
2480.9
Sep -April
4171
14
small grain overseed
5.28
5000
2640
Se Aril
4171
9
small grain overseed
597
5000
2985
Sep -A nl
4171
2N
wheat
6.00
115.23
691.4
Sep -April
4171
1
small grain overseed
7"84
50.00
392.0
Sep -April
4171
2
small grain overseed
7.67
50.00
3835
Se A nl
4171
4
small grain overseed
7.391
5000
369.5
Sep -April
4171
5
small grain overseed
7.53
50.00
376.5
Sep -April
4171
6
small grain overseed
7.90
5000
3950
Sep -April
4171
7
small grain overseed
7.35
5000
367.5
Se -A nl
4171
8
small grain overseed
9.16
5000
458.0
Sep -April
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 7461.3 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 2539 3 lb. PAN
PoA (30 Day) 2/21/00
x. Crop's remaining PAN balance (line v from section III) = 7461 3 lb. PAN
y. Overall PAN balance (w - x) _ -4922 lb. PAN
Line y must show as a deficit If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Irrigation onto existing spray fields will continue as weather and field conditions permit
PoA (30 Day) 2/21100
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1 Structure Name/Identifier (ID) 11
2 Current liquid volume in 25 yr./24 hr storm storage & structural freeboard
a current liquid level according to marker
b designed 25 yr /24 hr storm & structural freeboard
c line b - line a (inches in red zone) _
d top of dike surface area according to design
(area at below structural freeboard elevation)
e line c/12 x line d x 7 48 gallons/ft'
3 Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
24 0 inches
28.0 inches
4.0 inches
291951 ft
727931 gallons
180 days
g volume of waste produced according to structural design 415035 ft3
h current herd # 12589 certified herd # 12589
actual waste produced = current herd # x line g =
certified herd #
i volume of wash water according to structural design
j -excess rainfall over evaporation according to design
k (lines h + i + j) x 7 48 x 30 days/line f=
4 Total PAN to be land applied during draw down period
I current waste analysis dated 6/15/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
415035 ft'
0 ft3
178460 ft3
739890 gallons
1 73 Ibs/1000 gal
2539.3 Ibs PAN
PoA (30 Day) 2/21/00