Loading...
HomeMy WebLinkAbout670038_Plan of Action_20180529PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 67-38 County. Onslow Facility Name: AJ Huffman Farm Certified Operator Name: Danny Huffman Operator Number 16247 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: Lag 1 Spillway(Y or N): N Level(inches): 17 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges X Liquid level is within the 25 year 24 hour storm elevations for one or more structures A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III_ tables. Included wthin this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ pnor to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. 'Attach a complete schedule with corresponding animal units and dates fro depopulation 9f animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the Information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information Is accurate and correct. Danny Huffman Phone FacilityOwner/Manager (print) \ \ ��o. 1� d Date: Facility Owner/Man ger (signature) 910-389-9020 5/29/2018 �•r �,��v�,nv� 1h--�T�vv`oh Ii. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID Huffman line m = 2596.2 lb PAN 2. Structure ID line m = lb PAN 3 Structure ID line m = lb PAN 4. Structure ID. line m = lb PAN 5 Structure ID, line m = lb PAN 6. Structure ID line m = lb PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 2596 2 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o tract # p. field # G crop r, acres s. remaining IRR 2 PAN balance (Iblacre) L TOTAL PAN BALANCE FOR FIELD Qbs.) column r x s u. application wndow' T598 1 Corn 455 100.00 455.0 Feb15-June T598 -2 Corn 1.82 100.00 1820 Feb15-June T598 3 Corn 1.75 10000 1750 Feb15-June T582 4 Corn 369 10000 3690 ne T598 5 Corn 3001 10000 300.0 ne T598 6 Corn 239 100.00 239.0 ne T598 24 Soybeans 110 143.19 157 5 tl5 We t598 25 Soybeans 3.32 143.19 475.4 t15 t598 26 Soybeans 270 143.19 386.6 1527 So beans 1.75 14319 250.6 t1528 So beans 2.23 14319 319.3 t15 State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 3309 4 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 2596 2 lb. PAN PoA (30 Day) 221/00 x. Crop's remaining PAN balance (line v from section III) = 330g.4 Ib. PAN y. Overall PAN balance (w - x) _ -713 Ib. PAN Line y must show as a deficit If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be Included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the lif-RWARTA4 Land is available for application if needed PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): lHuffman 2. Current liquid volume in 25 yr./24 hr storm storage & structural freeboard a current liquid level according to marker 1-7.-01 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c. line b - line a (inches in red zone) = 2.5 Inches d. top of dike surface area according to design (area at below structural freeboard elevation) 137550 ft2 e. line c/12 x line d x 7.48 gallons/ft' 214349 gallons 3 Projected volume of waste liquid produced during draw down penod I. temporary storage period according to structural design 180 days g volume of waste produced according to structural design 660960 ft' h. current herd # 4000 certified herd # 4896 actual waste produced = current herd # x line g = 540000 ft' certified herd # I. volume of wash water according to structural design t excess rainfall over evaporation according to design k. (lines h + I+j) x 7.48 x 30 days/line f= 4 Total PAN to be land applied during draw down period I. current waste analysis dated 5/10/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21100 �W 85969 ft' 780375 gallons 2.61 Ibs11000 gal. 2596.2 lbs. PAN