HomeMy WebLinkAbout670038_Plan of Action_20180730,) (�1 3 e- �e f A118 bi PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number 67-38 Facility Name: Certified Operator Name, Huffman Farm County. Onslow Danny Huffman Operator Number. 16247 1 Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons mth spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: Lag 1 Spillway(Y or N). N Level(inches)- 15 2 Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWO prior to transfer of waste to a site not covered in the facility's CAWMP Operation will be partially or fully depopulated. `Attach a complete schedule with corresponding animal units and dates fro depopulation `d animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste as conditions permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct Danny Huffman Phone: 910-389-9020 Facility Owner/Manager (print) —_ Date, 7/31/2018 Facility OwnerlManager (siglo Lure) -�(3a( ti�, IL TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID Huffman line m = 1737.6 lb PAN 2. Structure ID line m = lb PAN 3 Structure ID line m = lb PAN 4. Structure ID. line m = lb PAN 5. Structure ID line m = lb PAN 6 Structure ID line m = lb PAN n.lines 1+2+3+4+5+6= 17376lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p field # G crop r acres s. remaining IRR 2 PAN balance Qb/acre) L TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u application vwndow' T598 7 Soybeans 2.36 143.19 337.9 April -Set 15 T598 8 Soybeans 2.29 143.19 327.9 April - Set 15 T598 9 Soybeans 2.30 14319 329 3 April - Set 15 T582 10 Soybeans 346 137.39 475 4 April - Sept 15 T598 11 So beans 316 13739 4342 A riI -Set 15 T598 12 Soybeans 314 137.39 4314 A riI - Set 15 T598 13 Soybeans 303 13739 416 3 April - Set 15 t598 14 Soybeans 2071 13739 284 4 April - Sept 15 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 3036.8 lb. PAN IV. FACILITY S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = 1737 6 lb. PAN PDA (30 Day) 2/21/00 .} x. Crop's remaining PAN balance (line v from section III) = 3036 8 lb. PAN y. Overall PAN balance (w - x) _ -1299 lb. PAN Line y must show as a deficit If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new Information If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility NAKKAI Ivt: Additional Land is available for application if needed PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1 Structure Name/Identifier (ID). lHuffman 2. Current liquid volume in 25 yr./24 hr storm storage & structural freeboard a current liquid level according to marker b designed 25 yr 124 hr. storm & structural freeboard c line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e, line c/12 x line d x 7 48 gallons/ft' 3 Projected volume of waste liquid produced during draw down period f. temporary storage penod according to structural design 15 0 inches 19.5inches 4 5 inches 137550 ftz 385828 gallons 180 days g volume of waste produced according to structural design 660960 ft3 h current herd # 4000 certified herd #F 4896 actual waste produced = current herd # x line g = 540000 It' certified herd # i volume of wash water according to structural design j excess rainfall over evaporation according to design k (lines h + i + j) x 7 48 x 30 days/line f= 4 Total PAN to be land applied during draw down period I. current waste analysis dated 7/26/2018 m ((Imes e + k)/1000) x line I = REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 221100 ft3 ft3 85969 ft3 780375 gallons 1.49 Ibs/1000 gal. 1737.6 lbs. PAN