HomeMy WebLinkAbout670023_30 day POA_20180123PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number. 67-23
Facility Name: Green Meadows Sow Farm
Certified Operator Name: Sid Lanier
County. Onslow
Operator Number, 22046
1. Current liquid level(s) in Inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon NameAD:
Spillway(Y or N):
Level(Inches).
2. Check all applicable items
Liquid level Is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges
X Liquid level Is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
'Attach a complete schedule with corresponding animal units and dates fro depopulation
if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 1/26/2018
I hereby certify that I have reviewed the Information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information Is
accurate and correct.
Le rande Lanier Phone, 910-346-9131
Facility Owner/Manager (print)
Date: 1/23/2018
Facility Owner/Man a (signature)
--( 0 il� • 5" (4-
r
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD ANDIOR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Green Meadows line m = 1299.1 lb PAN
2. Structure ID:
3. Structure ID:
4. Structure ID:
5. Structure ID:
line m = lb PAN
line m = lb PAN
line m = lb PAN
line m = lb PAN
6. Structure ID: Ilne m = lb PAN
n.lines I+2+3+4+5+0= 1299.1 to PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
rGnllvv. vV Nu I Lw 1 r1CLUA I U YYKII.K rAIV UAKIVU I tlt AYYLILLI UIIKINU I 1-112S 3U WAY Pt:KIUU.
I
o. tract # field # . I crop I
r. acres I
a remaining IRR{L TOTAL PAN
p� q• p u.eppllcatlonwindow'
2 PAN balance BALANCE FOR
(Iblam) FIELD (lbe.)
column r x s
vww YUJ. Wl It UI VFI OIIUII IFf OFIFIIIUODUI I uaw UI n6AL UI Up appliWUuu Yaanu III RJ Udm IUI aValnfulu
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 1407.0 lb. PAN
IV. FACILITY'S PDA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section 11) = 1299.1 lb. PAN
PoA (30 Day) 2/21100
x. Crop's remaining PAN balance (line v from section III) = 1407 0 Ib. PAN
y. Overall PAN balance (w - x) _ -108 Ib. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump 8 haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to he Included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide Information regarding the herd population and lagoon freeboard levels at the
receiving facility.
onto_eAsting spray fields will continue as weather and field conditions permit Additional land is
for pumping if needed. Can begin applying on Cam Feb 15.
PoA (30 Day) 2/21/00
PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/ldenhfier (ID): JGreen Meadows
2. Current liquid volume In 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yrJ24 hr. storm & structural freeboard
c. line b - line a (Inches In red zone) =
d top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft'
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
18.5 Inches
20.0 inches
1.5 inches
280000 ft
261600 gallons
180 days
g. volume of waste produced according to structural design 359521 fe
h. current herd # 4000 certified herd # 4900
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j excess rainfall over evaporation according to design
k. (lines h + i +j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 10/30/2017
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21100
293487 ft3
Oft3
280000 113
714947 gallons
1.33 Ibs/1000 gal.
1299.1 Ibs. PAN