Loading...
HomeMy WebLinkAbout20181161 Ver 1_Table 3 - Stream Impacts_Updated_201905093. Stream Impacts: If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream Impact Number, Permanent or Temporary 3b. Type of Impact 3c. Stream Name 3d. Determination 3e. Type of Jurisdiction 3f. Average Stream Width (ft.) 3g. Impact Length (if.) S1-P Culvert Gashes Creek (Sol) Perennial Corps 6 42 S2 - P Culvert Gashes Creek (S01) Perennial Corps 6 42 S3 - P Culvert UT1 > Gashes Creek (S02) Perennial Corps 2 50 S4 - P Culvert extension Gashes Creek (S01) Perennial Corps 6 9 S5 - T Coffer dam construction Gashes Creek (S01) Perennial Corps 6 10 S6 - T Coffer dam construction Gashes Creek (S01) Perennial Corps 6 10 S7 - T Coffer dam construction UT1 > Gashes Creek (S02) Perennial Corps 2 10 S8 - T I Cofferdam construction I Gashes Creek (S01) Perennial iCorps 6 10 S9 - T ICutvert removal & bank stabilization I UT2> Gashes Creek (S03) I Perennial lCorps 2 20 (Sum All Impacts) (Temporary) Net Permanent Impacts 203 60 143