Loading...
HomeMy WebLinkAbout670003_Plan of Action_20181011PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 67 3 County: Onslow Facility Name: Brandon Howard Farm #2 Certified Operator Name: Brandon Howard Operator # 17382 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): Lagoon Spillway (Yes or No). No Level (inches)- 3 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Resources prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste 9/19/18 I hereby certify that 1 have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Brandon Howard Facility Owner/Manager (print) Phone: 910-934-2521 W6164r Date: Facility Owner/Manager (signature) PoA Cover Page 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE, 1 Structure Name/Identifier (ID) 67-3 Lagoon 2 Current liquid volume in 25 yr /24 hr. storm storage & structural freeboard a current liquid level according to marker F 3.0 inches b. designed 25 yr/24 hr storm & structural freeboard 20.0 inches c. line b - line a (inches in red zone) _ d top of dike surface area according to design (area at below structural freeboard elevation) e line c/12 x lined x 7.48 gallons/ft' 3 Protected volume of waste liquid produced during draw down penod 17 0 inches 167466 ft2 1774581 gallons f temporary storage period according to structural design 180 days g volume of waste produced according to structural design 1021477 ft3 h current herd # 3050 certified herd # 3271 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j excess rainfall over evaporation according to design k (lines h + i +j) x 7.48 x 30 days/line f= 4 Total PAN to be land applied during draw down period I current waste analysis dated 9/26/2018 m ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 952463 it' 0 ft3 100625 ft3 1312849 gallons 0.04 Ibs/1000 gal. 123.5 Ibs PAN II TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1 Structure ID 67-3 Lagoon line m = 123 5 lb PAN 2 Structure ID line m = lb PAN 3 Structure ID: line m = lb PAN 4 Structure ID line m = lb PAN 5. Structure ID. line m = lb PAN 6 Structure ID, line m = lb PAN n.lines 1+2+3+4+5+6= 1235lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o tract # p field # q crop r. acres s remaining IRR 2 PAN balance Qb/acre) t TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u application wndow' 1341 Z1 Bermuda Hay 560 14395 806 1 1341 Z2 Bermuda Hay 540 13932 7523 1341 Z3 Bermuda Hay 484 14920 722.1 1341 Z4 Bermuda Hay 3.53 148.36 5237 1341 Z5 Bermuda Hay 2.78 149.11 4145 1341 Z6 Bermuda Hay 4.22 163.70 6908 1341 Z7 Bermuda Hay 4.22 16370 690.8 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period v. Total PAN available for all fields (sum of column t) = 4600.4 lb. PAN IV. FACILITY S PDA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 123 5 lb. PAN PoA (30 Day) 2/21/00 x. Crop's remaining PAN balance (line v from section III) = 4600 4 lb. PAN y. Overall PAN balance (w - x) _ -4477 lb. PAN Line y must show as a deficit If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc For pump & haul and herd reduction options, recalculate new PAN based on new information If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility This Lagoon was inundated during Hurricane Florence PoA (30 Day) 2/21/00