HomeMy WebLinkAbout670003_Plan of Action_20181011PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 67 3
County: Onslow
Facility Name: Brandon Howard Farm #2
Certified Operator Name: Brandon Howard Operator # 17382
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/Identifier (ID): Lagoon
Spillway (Yes or No). No
Level (inches)- 3
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached Hydraulic and agronomic balances are within
acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Resources prior to transfer of
waste to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste
9/19/18
I hereby certify that 1 have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
Brandon Howard
Facility Owner/Manager (print)
Phone: 910-934-2521
W6164r Date:
Facility Owner/Manager (signature)
PoA Cover Page 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE,
1 Structure Name/Identifier (ID) 67-3 Lagoon
2 Current liquid volume in 25 yr /24 hr. storm storage & structural freeboard
a current liquid level according to marker F 3.0 inches
b. designed 25 yr/24 hr storm & structural freeboard 20.0 inches
c. line b - line a (inches in red zone) _
d top of dike surface area according to design
(area at below structural freeboard elevation)
e line c/12 x lined x 7.48 gallons/ft'
3 Protected volume of waste liquid produced during draw down penod
17 0 inches
167466 ft2
1774581 gallons
f temporary storage period according to structural design 180 days
g volume of waste produced according to structural design 1021477 ft3
h current herd # 3050 certified herd # 3271
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j excess rainfall over evaporation according to design
k (lines h + i +j) x 7.48 x 30 days/line f=
4 Total PAN to be land applied during draw down period
I current waste analysis dated 9/26/2018
m ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
952463 it'
0 ft3
100625 ft3
1312849 gallons
0.04 Ibs/1000 gal.
123.5 Ibs PAN
II TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1
Structure ID 67-3 Lagoon
line m = 123 5 lb PAN
2
Structure ID
line m =
lb PAN
3
Structure ID:
line m =
lb PAN
4
Structure ID
line m =
lb PAN
5.
Structure ID.
line m =
lb PAN
6
Structure ID,
line m =
lb PAN
n.lines 1+2+3+4+5+6= 1235lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o tract #
p field #
q crop
r. acres
s remaining IRR
2 PAN balance
Qb/acre)
t TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u application wndow'
1341
Z1
Bermuda Hay
560
14395
806 1
1341
Z2
Bermuda Hay
540
13932
7523
1341
Z3
Bermuda Hay
484
14920
722.1
1341
Z4
Bermuda Hay
3.53
148.36
5237
1341
Z5
Bermuda Hay
2.78
149.11
4145
1341
Z6
Bermuda Hay
4.22
163.70
6908
1341
Z7
Bermuda Hay
4.22
16370
690.8
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period
v. Total PAN available for all fields (sum of column t) = 4600.4 lb. PAN
IV. FACILITY S PDA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 123 5 lb. PAN
PoA (30 Day) 2/21/00
x. Crop's remaining PAN balance (line v from section III) = 4600 4 lb. PAN
y. Overall PAN balance (w - x) _ -4477 lb. PAN
Line y must show as a deficit If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc For pump & haul and herd reduction options, recalculate new PAN
based on new information If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility
This Lagoon was inundated during Hurricane Florence
PoA (30 Day) 2/21/00