HomeMy WebLinkAbout310871_Plan of Action_20180604PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES M4
Facility Number: _31_ - _871 County:_Duplin
Facility Name:_Earth Right Farms, Inc. — Sow Farm
Certified Operator Name: _Stephen M Williamson Operator #_19128
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/Identifier (ID): _1
Spillway (Yes or No): _No_
Level (inches) _17
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached Hydraulic and agronomic balances are within
acceptable ranges
_X_ Liquid level is within the 25 year 24 hour storm elevations for one or more structures A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality prior to transfer of waste
to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 6-06-2018
I hereby certify that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
Stephen M Williamson Phone: _(910)296-1
Facility Owner/Manager (print)
Sfwkew M W v Date: _6-3-201
Facility Owner/Manager (signature)
PoA Cover Page 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
1-871
2 Current liquid volume in 25 yr /24 hr storm storage & structural freeboard
a.
current liquid level according to marker
17
inches
b.
designed 25 yr /24 hr. storm & structural freeboard
19
inches
c.
line b - line a (inches in red zone) =
2
inches
d.
top of dike surface area according to design
ftz
(area at below structural freeboard elevation)
_254021
e. line c x line d x 7.48 gallons = _316680 gallons
12 ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 326784_ ft3
h. actual waste produced = current herd # x line g =
certified herd #
I. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i +i) x 7.48 x 30 days =
line f
4. Total PAN to be land applied during draw down period
I. current waste analysis dated _4/17/2018_
m. (lines e + k) x line I =
1000
307680 ft3
ft3
_148179_ ft3
_568304_ gallons
1.80 Ib/1000 gal.
1592_ lb PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
PoA (30 Day) 2/21/00 1
1. structure ID: 1
line m =
1592 lb PAN V
2. structure ID:
line m =
lb PAN
3. structure ID:
line m =
lb PAN
4. structure ID:
line m =
lb PAN
5 structure ID:
line m =
lb PAN
6 structure ID- line m = lb PAN
n. lines 1+2+3+4+5+6 = 1592 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIES DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining
IRR-2 PAN
balance
(lb/acre)
t. TOTAL PAN
BALANCE
FOR FIELD
(Ibs.)
column r x s
u.
application
window'
2403
1A
BP
278
210
5838
March -Sept
2403
113
Millet
3615
88
3181
April -Sept
'State current crop ending application date or next crop application beginning date for available receiving
crops during 30 day drawn down period
v. Total PAN available for all fields (sum of column t) = 9019 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
PoA (30 Day) 2/21100 2
w.
Total PAN to be land applied (line n from section II) =
1592
lb. PAN
x.
Crop's remaining PAN balance (line v from section III) =
9019
lb. PAN
y.
Overall PAN balance (w - x) _
<7427>
lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here
including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd
reduction options, recalculate new PAN based on new information. If new fields are to be
included as an option for lowering lagoon level, add these fields to the PAN balance table and
recalculate the overall PAN balance. If animal waste is to be hauled to another permitted
facility provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
We have received 26.4" of rain since January 1, 2018 with 16.2" coming since April 7 which
combined with changing from winter crops to summer crops and soil condition has made it
difficult to manage the lagoon level. We are working diligently as crops and soil conditions
allow to get the lagoon freeboard back above 19". David Powell with DWR was notified of the
freeboard level being below 19" on June 1, 2018.