HomeMy WebLinkAbout310871_Plan of Action_20180705PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 31-871 2. Current liquid volume in 25 yr /24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c x line d x 7.48 gallons = 12 ft3 17 inches 19 inches inches 254021 ft2 _316680 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g volume of waste produced according to structural design _326784_ ft3 h. actual waste produced = current herd # x line g = _307680 ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +i) x 7.48 x 30 days = line f 4. Total PAN to be land applied during draw down period I. current waste analysis dated _4/17/2018_ m. (lines e + k) x line I = 1000 ft3 148179 ft3 _568304_ gallons _1.80_ Ib/1000 gal. _1592_ lb PAN REPEAT SECTION l FOR EACH WASTE STRUCTURE ON SITE If. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PoA (30 Day) 2121/00 1 1. structure ID: 1 2. structure ID: 3. structure ID. 4. structure ID: 5. structure ID: 6. structure ID: r+ r line m = 1592 lb PAN line m = lb PAN line m = lb PAN line m = lb PAN line m = lb PAN line m = lb PAN in. lines 1 +2+3+4+5+6 = 1592 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIES DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r acres s. remaining IRR-2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 2403 1A BP 27.8 210 5838 March -Sept 2403 1 B Millet 36.15 88 3181 April -Sept 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day drawn down period v. Total PAN available for all fields (sum of column t) = 9019 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE PoA (30 Day) 2/21/00 2 w. Total PAN to be land applied (line n from section II) = _1 592 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 9019 lb. PAN y. Overall PAN balance (w - x) _ _<7427> lb. PAN Line y must show as a deficit. If line y does - not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: We have received 26.4" of rain since January 1, 2018 with 16.2" coming since April 7 which combined with changing from winter crops to summer crops and soil condition has made it difficult to manage the lagoon level. We are working diligently as crops and soil conditions allow to get the lagoon freeboard back above 19". David Powell with DWR was notified of the freeboard level being below 19" on June 1, 2018. PoA (30 Day) 2/21100 3