HomeMy WebLinkAboutWQ0020409_RCW Inspection Report_20190523Compliance Inspection Report
Permit: WQ0020409 Effective: 07/19/17 Expiration: 06/30/22 owner: City of Raleigh
SOC: Effective: Expiration: Facility: Little Creek WWTP
County: Wake 1419 NC Hwy 39
Region: Raleigh
Zebulon NC 27597
Contact Person: Kelvin T Brown Title: Supervisor Phone: 919-269-4082
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Certification: Phone:
Related Permits:
WQ0020410 City of Raleigh - Town of Zebulon Reclaimed Water Distribution
System/Program
NC0079316 City of Raleigh - Little Creek WWTP
Inspection Date: 05/23/2019 Entry Time: 09:OOAM Exit Time: 09:45AM
Primary Inspector: Rick V Trone Phone: 919-791-4200
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Reclaimed Water
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Treatment Flow Measurement -Effluent Treatment Flow Measurement -Influent Miscellaneous Questions
Treatment Flow Measurement -Water Treatment Treatment Disinfection
Use Records
Treatment Flow Measurement End Use -Reuse
(See attachment summary)
Page 1 of 5
Permit: WQ0020409 Owner - Facility: City of Raleigh
Inspection Date: 05/23/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
On May 23, 2019 Rick Trone of the Raleigh Regional Office conducted a compliance evaluation inspection of the reclaimed
water bulk distribution system located at the Little Creek WWTP. Reclaimed water is generated by the Treatment Plant
(Permit NC0079316). The purpose of this inspection was to ensure compliance with the subject permit. During the
inspection, the cooperation of Ms. Marla Dalton, ORC, was helpful and appreciated.
This compliance evaluation inspection consisted of the following:
-Review of the permit;
-Review of the owner/facility information;
-Review of ORC logbooks, calibration documentation, Non -discharge wastewater monitoring reports (NDMR), employee
education program, distribution records and;
-On-site inspection of treatment and storage components
The current permit was issued July 19, 2017 and expires on June 30, 2022.
At the facility reclaimed water is generated and blended with potable water. Zebulon is at the end of the potable water
system and this process helps maintain fresh potable water in this area of the system. The Reuse flowmeter was last
verified/calibrated in April 2019. Turbidity is monitored prior to the fill station at the plant and the turbidimeter was last
calibrated August 2018 and indicated 0.44 NTU at the time of inspection. The Chlorine Analyzer was also calibrated at this
time.
The bulk fill station located at the plant sees little use. The portable flowmeter at this location was last calibrated/verified in
April 2019. A customer used the bulk fill station on May 22, 2019 but the previous use was many months prior. Despite the
low usage, the system and all components appeared to be well maintained.
Reclaimed water is also sent through the distribution system to multiple users in the area. These users include
GlaxoSmithKline, Mudcats Stadium, US Foods, Sunrock, and Town of Zebulon. The plant also uses the reclaimed water for
various needs. The elevated reclaimed water storage tank located offsite near the baseball stadium appeared to be well
maintained. Access was restricted by a fence and signage was in place.
NDMR reports were reviewed and indicate compliance. Effluent sampling is aligned with the facilities NPDES permit and all
monitoring is conducted as required by the onsite lab and the certified lab at the Neuse River Resource Recovery Facility.
Residual chlorine and fecal coliform monitoring are conducted at the WWTP Entry, Mudcats stadium, and at a location on
Industrial Drive. These sampling locations can be adjusted as needed. No exceedances were noted for sampling
parameters.
Educational training provided for plant staff was last conducted in May 2019 and is conducted annually. No spills in the
system have been recorded. The facility maintains a reclaimed water log book and a bulk reclaimed water log.
Overall, the Reclaimed Water Distribution System appears to be well maintained and compliant with permit requirements.
Page 2 of 5
Permit: WQ0020409 Owner - Facility: City of Raleigh
Inspection Date: 05/23/2019 Inspection Type : Compliance Evaluation
Reason for Visit: Routine
Type
Yes No NA NE
Infiltration System
❑
Lagoon Spray, LR
❑
Single Family Spray, LR
❑
Reuse (Quality)
❑
Activated Sludge Spray, HR
❑
Activated Sludge Drip, LR
❑
Recycle/Reuse
❑
Activated Sludge Spray, LR
❑
Single Family Drip
❑
Treatment Yes No NA NE
Are Treatment facilities consistent with those outlined in the current permit? 0 ❑ ❑ ❑
Do all treatment units appear to be operational? (if no, note below.) 0 ❑ ❑ ❑
Comment:
Treatment Flow Measurement -Influent
Yes No NA NE
Is flowmeter calibrated annually?
0
❑ ❑ ❑
Is flowmeter operating properly?
0
❑ ❑ ❑
Does flowmeter monitor continuously?
❑ ❑ ❑
Does flowmeter record flow?
❑ ❑ ❑
Does flowmeter appear to monitor accurately?
❑ ❑ ❑
Comment:
Treatment Flow Measurement -Water Use Records Yes No NA NE
Is water use metered? ❑ 1:10 ❑
Are the daily average values properly calculated? ❑ ❑ 0 ❑
Comment:
Treatment Flow Measurement -Effluent
Yes No NA NE
Is flowmeter calibrated annually?
0
❑ ❑ ❑
Is flowmeter operating properly?
0
❑ ❑ ❑
Does flowmeter monitor continuously?
❑ ❑ ❑
Does flowmeter record flow?
❑ ❑ ❑
Does flowmeter appear to monitor accurately?
❑ ❑ ❑
Comment:
Treatment Disinfection Yes No NA NE
Is the system working? 0 ❑ ❑ ❑
Page 3 of 5
Permit: WQ0020409 Owner - Facility: City of Raleigh
Inspection Date: 05/23/2019 Inspection Type : Compliance Evaluation
Reason for Visit: Routine
Do the fecal coliform results indicate proper disinfection?
❑ ❑ ❑
Is there adequate detention time (-30 minutes)?
❑ ❑ ❑
Is the system properly maintained?
❑ ❑ ❑
If gas, does the cylinder storage appear safe?
❑
❑ ❑
Is the fan in the chlorine feed room and storage area operable?
❑
❑ ❑
Is the chlorinator accessible?
❑
❑ ❑
If tablets, are tablets present?
❑
❑ ❑
Are the tablets the proper size and type?
❑
❑ ❑
Is contact chamber free of sludge, solids, and growth?
❑ ❑ ❑
If UV, are extra UV bulbs available?
❑ ❑ ❑
If UV, is the UV intensity adequate?
❑ ❑ ❑
# Is it a dual feed system?
❑ ❑ ❑
Does the Stationary Source have more than 2500 Ibs of Chlorine (CAS No. 7782-50-5)?
❑
❑ ❑
If yes, then is there a Risk Management Plan on site?
❑
❑ ❑
If yes, then what is the EPA twelve digit ID Number? (1000-
If yes, then when was the RMP last updated?
Comment:
End Use -Reuse
Yes No NA NE
Is the acreage in the permit being utilized?
❑
❑ ❑
Does the acreage specified in the permit correspond to the measured acreage at the site?
❑
❑ ❑
Are all essential units provided in duplicate?
❑
❑ ❑
Is an automatically activated standby power source available?
❑ ❑ ❑
Is the equalization capacity adequate?
❑
❑ ❑
Is aerated flow equalization present?
❑
❑ 0 ❑
Has the turbidity meter been calibrated in the last 12 months?
❑ ❑ ❑
Does the turbidity meter have recording capabilities?
❑ ❑ ❑
Is all flow diverted at the appropriate times?
❑ ❑ ❑
Is all upset wastewater diverted from reuse storage unit?
❑ ❑ ❑
Is all upset wastewater treated, retreated, or disposed of acceptably?
❑ ❑ ❑
Is upset wastewater treated prior to discharge to irrigation storage?
❑ ❑ ❑
Is public access restricted from irrigation area during active site use?
❑
❑ ❑
If golf course, is a sign posted in plain sight on the club house?
❑
❑ ❑
Is the cover crop acceptable?
❑
❑ ❑
Are buffers adequate?
❑
❑ ❑
Is the site free of ponding/runoff?
❑
❑ ❑
Is the acreage in the permit being utilized?
❑
❑ ❑
Page 4 of 5
Permit: WQ0020409 Owner - Facility: City of Raleigh
Inspection Date: 05/23/2019 Inspection Type : Compliance Evaluation
Is the application equipment acceptable?
Is the application area free of limiting slopes?
How close is the closest water supply well?
Are any supply wells within the CB?
Are any supply wells within 250' of the CB?
Is municipal water available in the area?
Are GW monitoring wells required?
Are GW monitoring wells located properly w/ respect to RIB and CB?
Are GW monitoring wells properly constructed, including screened interval?
Comment:
Reason for Visit: Routine
Page 5 of 5