HomeMy WebLinkAboutSW3190502_Application_20190516DEMLR USE ONLY
Date Received
Fee Paid
Permit Number
ar5.ttp-satol
+ Z&Z, ib * QI 5
5 -*1l
0 5 02
Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction
(select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan
❑ Other WQ M mt Plan:
State of North Carolina
Department of Environment and Natural Resources
Division of Energy, Mineral and Land Resources S�Q4 N �I ' _ .
STORMWATER MANAGEMENT PERMIT APPLICATION F� 1/,, <ez.
This form may be photocopied for use as an original
I. GENERAL INFORMATION
1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans,
specifications, letters, operation and maintenance agreements, etc.):
Project Kodiak
2. Location of Project (street address):
1215 Longferry Road'
City:Salisbury County:Rowan County Zip:28146
3. Directions to project (from nearest major intersection):
From the intersection of I-85 and Long FeriT Road travel west approximately 1000 ft and turn right
onto the undamed I-85 Service road. The site is on the Left
4. Latitude:35' 41' 32.4" N Longitude:80' 23' 55.0" W of the main entrance to the project.
II. PERMIT INFORMATION:
1. a. Specify whether project is (check one): ®New ❑Modification ❑ Renewal w/ Modificationt
tRenewals with modifications also requires SWU-102 - Renewal Application Form
b.If this application is being submitted as the result of a modification to an existing permit, list the existing
permit number , its issue date (if known) , and the status of
construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification
2. Specify the type of project (check one):
❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other
3. If this application is being submitted as the result of a previously returned application or a letter from
DEMLR requesting a state stormwater management permit application, list the stormwater project number,
if assigned, and the previous name of the project, if different than currently
proposed,
4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be
obtained by contacting the Customer Service Center at 1-877-623-6748):
❑CAMA Major ®Sedimentation/Erosion Control: 60.0 ac of Disturbed Area
❑NPDES Industrial Stormwater Z404/401 Permit: Proposed Impacts 101 FT and 0.166 AC
b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number,
issue date and the type of each permit:404 (SAW2016-02133), 401 DWR#19-0320), Erosion Control
Approval Dated 2019-0429 vrovided by Rowan Countv.
5. Is the project located within 5 miles of a public airport? ®No ❑Yes
If yes, see S.L. 2012-200, Part VI: httl2://12ortal.ncdenr.org/web/Ir/rules-and-regulations
Form SWU-101 Version Oct. 31, 2013 Page 1 of 6
III. CONTACT INFORMATION
1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee,
designated government official, individual, etc. who owns the project):
Applicant/ Organization: N P Salisbury Industrial LLC
Signing Official & Title:Caleb Moore, Project Manager
b. Contact information for person listed in item 1a above:
Street Address:2060 Reading Road, Suite 250
City:Cincinnati State:OH Zip:45202
Mailing Address (if applicable):
City: State: Zip:
Phone: (513 445-9010 Fax: ( )
Email:cmoore@northpointkc.com
c. Please check the appropriate box. The applicant listed above is:
® The property owner (Skip to Contact Information, item 3a)
❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below)
❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and
2b below)
❑ Developer* (Complete Contact Information, item 2a and 2b below.)
2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the
person who owns the property that the project is located on):
Property Owner/Organiza
Signing Official & Title:_
b. Contact information for person listed in item 2a above:
Street Address:
City:
Mailing Address (if applicable):
City:
Phone: ( )
Email:
State: Zip:
State: Zi
Fax: ( 1
3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other
person who can anstiTer questions about the project:
Other Contact Person/ Organization: Kimley-Horn R. Blake Day, P.E.,
Signing Official & Title:
b. Contact information for person listed in item 3a above:
Mailing Address:200 South Tryon St., Suite 200
City:Charlotte State:NC Zip:28202
Phone: (704 ) 319-5691 Fax: ( )
Email:blake.day@kimley-horn.com
4. Local jurisdiction for building permits: Rowan County
Point of Contact:Thomas O'Kelly Phone #: (704 ) 216-8612
Form SVIU-101 Version Oct. 31, 2013 Page 2 of 6
IV. PROJECT INFORMATION
1. In the space provided below, briefly summarize how the stormwater runoff will be treated.
All onsite stormwater will be routed via surface drainage channels, and subsurface drainage to the onsite
Sandfilter located at the southern boundary of the project. The water stormwater will be treated for water
quality prior to being released to the adjacent downstream outfall location.
2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved:
❑ Approval of a Site Specific Development Plan or PUD Approval Date:
❑ Valid Building Permit Issued Date:
❑ Other: Date:
b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with:
❑ Coastal SW -1995 ❑ Ph II - Post Construction
3. Stormwater runoff from this project drains to the Yadkin Pee -Dee River basin.
4. Total Property Area: 88.0 acres 5. Total Coastal Wetlands Area: acres
6. Total Surface Water Area: acres
7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project
Area+:88.0 acres
+ Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area
between the banks of streams and rivers, the area below the Normal High Water (NHM line or Mean High Water
(MHW) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to
calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may
be included in the total project area.
8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 38.6
9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered
stormwater BMP. For low density and other projects, use 1 for the whole property area)
10. Complete the following information for each drainage area identified in Project Information item 9. If there
are more than four drainage areas in the project, attach an additional sheet with the information for each area
provided in the same format as below.
Basin Information
Drainage Area 1
Drainage Area
Drainage Area
Drainage Area _
Receiving Stream Name
Town Creek
Stream Class *
C
Stream Index Number *
12-115-3
Total Drainage Area (so
2,117,469
On -site Drainage Area (so
2,117,469
Off -site Drainage Area (so
0.00
Proposed Impervious Area** (so
1,480,626
% Impervious Area** total
69.9
Impervious— Surface Area
Drainage Area T
Drainage Area
Drainage Area
Drainage Area
On -site Buildings/Lots (sf)
690,000
On -site Streets (so
0
On -site Parking (so
669,147
On -site Sidewalks (so
64,35
Other on -site (so
29,072
Future (so
109,000
Off -site (so
0
Existing BUA*** (so
0
Total (so:
1 1,480,626
* Stream Class and Index Number can be determined at: http. portal.ncdenr.org/weMpq[ps/csu/classi cations
�* Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas,
sidewalks, gravel areas, etc.
***Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that
is to be removed and which will be replaced by new BUA.
Form SWU-101 Version Oct. 31, 2013 Page 3 of 6
11. How was the off -site impervious area listed above determined? Provide documentation. Delineated from
the design AutoCAD files.
Projects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened &
Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15A NCAC 02B . 0600.
V. SUPPLEMENT AND O&M FORMS
The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms
must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded
from httD://Dortal.ncdenr.orLy/web/wo/ws/su/bmv-manual.
VI. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and
Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application
instruction sheet and BMP checklists are available from
http://portal.ncdenr.org/web/wq/ws/su/statesw/forms_docs. The complete application package should be
submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the
interactive online map at http://portal.ncdenr.org/web/wq/ws/su/maps.)
Please indicate that the following required information have been provided by initialing in the space provided
for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions
for each submitted application package from hiip://12ortal.ncdenr.org/web/wq/ws/su/statesw/forms does.
Initials
1. Original and one copy of the Stormwater Management Permit Application Form. as
2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants H A
Form. (if required as per Part V11 below)
3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M
agreement(s) for each BMP.
4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to
http://www.envhelp.org/pages/onestopexpress.html for information on the Express program
and the associated fees. Contact the appropriate regional office Express Permit Coordinator for
additional information and to schedule the required application meeting.)
5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor
the project. This is required in addition to the brief summary provided in the Project
Information, item 1.
6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the
receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2
mile radius on the map.
7. Sealed, signed and dated calculations (one copy).
8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including:
a. Development/Project name.
b. Engineer and firm.
c. Location map with named sLreels and NCSR numbers.
d. Legend.
e. North arrow.
f. Scale.
g. Revision number and dates.
h. Identify all surface waters on the plans by delineating the normal pool elevation of
impounded structures, the banks of streams and rivers, the MHW` or NHW line of tidal
waters, and any coastal wetlands landward of the MHW or NHW lines.
• Delineate the vegetated buffer landward from the normal pool elevation of impounded
structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters.
i. Dimensioned property/project boundary with bearings & distances.
j. Site Layout with all BUA identified and dimensioned.
k. Existing contours, proposed contours, spot elevations, finished floor elevations.
1. Details of roads, drainage features, collection systems, and stormwater control measures.
m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a
qualified person. Provide documentation of qualifications and identify the person who
made the determination on the plans.
n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations.
o. Drainage areas delineated (included in the main set of plans, not as a separate document).
0�
Form SWU-101 Version Oct. 31, 2013 Page 4 of 6
p. Vegetated buffers (where required).
9. Copy of any applicable soils report with the associated SHWT elevations (Please identify _
elevations in addition to depths) as well as a map of the boring locations with the existing
elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the
project area clearly delineated. For projects with infiltration BMPs, the report should also
include the soil type, expected infiltration rate, and the method of determining the infiltration rate.
(Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verifij the SHWT prior
to submittal, (910) 796-7378.)
10. A copy of the most current property deed. Deed book: 1326 Page No: 23/24
11. For corporations and limited liability corporations (LLC): Provide documentation from the NC _
Secretary of State or other official documentation, which supports the titles and positions held
by the persons listed in Contact Information, item 1a, 2a, and/or 3a per 15A NCAC 21-1.1003(e).
The corporation or LLC must be listed as an active corporation in good standing with the NC
Secretary of State, otherwise the application will be returned.
ht!p://www.secretary.state.nc.us/Cori2orations/`CSearch.aspx
VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective
covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed
BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided
as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and
protective covenants forms can be downloaded from httpJ/portal.ncdenr.org/web/lr/state-stormwater-
forms does. Download the latest versions for each submittal.
In the instances where the applicant is different than the property owner, it is the responsibility of the property
owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring
that the deed restrictions are recorded.
By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and
protective covenants for this project, if required, shall include all the items required in the permit and listed
on the forms available on the website, that the covenants will be binding on all parties and persons claiming
under them, that they will run with the land, that the required covenants cannot be changed or deleted
without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot.
VIII. CONSULTANT INFORMATION AND AUTHORIZATION
Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a
consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as
addressing requests for additional information).
Consulting Engineer:R. Blake Day, P.E.
Consulting Firm: Kimley-Horn and Associates, Inc.
Mailing Address:200 South Tryon Street, Suite 200
City:Charlotte State:NC Zip:28202
Plwne: (704 ) 319-5691 Fax: ( )
Email:blake.day@kimley-horn.com
IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this
section)
I, (print or type name of person listed in Contact Information, item 2a) , certify that I
own the property identified in this permit application, and thus give permission to (print or type name of person
listed in Contact Information, item 1a) with (print or type name of organization listed in
Contact Information, item 1a) to develop the project as currently proposed. A copy of
the lease agreement or pending property sales contract has been provided with the submittal, which indicates the
party responsible for the operation and maintenance of the stormwater system.
Form SWU-101 Version Oct. 31, 2013 Page 5 of 6
As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated
agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their
lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back
to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and
submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater
treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility
without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement
action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6.
Date: '5 - I- I I
nn v M
I, O 1,tf IC . ��.E r^ , a Notary Public for the
l State off f y l isw� i County of
�C , Mom. do hereby certify that _ Vy c-iAcn i e l t-6C/ C of o personally appeared
before me this " day of a1 , and acknowledge the due executi9fn of the application for
a stormwater permit. Witness my hand and official seal,
HEATHER R. PFENDER
Notary Public - Notary Seal
Clay County - State of Missouri
Commission Number 15633521
IyM
Commission Expires Feb 24, 2023
SEAL
My commission expires Z r Zg - Z5
MAY 16 2013
X. APPLICANT'S CERTIFICATION DENR-LAND QUALITY
I, (print or type name of person listed in Contact Information, item 1a) Caleb Moore STORMWATER PERMITTING
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that the project will be constructed in conformance with the approved plans, that the required deed restrictions
and protective covenants will be recorded, and that the proposed project complies with the requirements of the
applicable stormwater rules under 15A NCAC 21-1.1000 and any other applicable state stormwater requirements.
Signature:
I,
a Notary Public for the State of
. do hereby certify that
before ine tlti& _ day of
Date:
County of
personally appeared
, and acknowledge the due execution of the application for
a stormwater permit. Witness my hand and official seal,
SEAL
My commission expires
Form SWU-101 Version Oct. 31, 2013 Page 6 of 6