HomeMy WebLinkAbout20151229 Ver 1_Certificate of Completion_20190417Pat McCrory Donald R. van der Vaart
Governor Secretary
DWR Project No: 45-1229 County: Guilford
Applicant: Piedmont Triad Airport Authority
Project Name: HAECO Facility Improvements
401 Water Quality Certification Issued Date: 4/8/2016
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality: Certification or applicable Buffer
'Rules, and any subsequent modifications, the applicant is required to return this certificate to the DWR
401 & Buffer Permitting Unit; 1650 MailrService Center, Raleigh, NC;'27699-1650. This form may be
returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It riot
necessary to send certificates from all of these.
Applicant's Certification
I, hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the, construction was observed to be
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature:
Agent's Certification
Date:
I, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be
built within substantial compliance and intent,of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature:
Date:
if this, project wds designed by a Certified Professional
TA
I, -fon Zee Adfii� las,a duly registeredProfessional M. (i.e., )Vv • OVd 916
h ine Landsca a Architect; Surveyor, etc.) in the State of North Carolina, having bee n. authorized to
eri
observe odicall weekly, full time) the construction of the project, for the Permitee hereby state that,
to the best of my abilities, due care and diligence was used in the observation of the construction such
that the construction was observed to be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting
materials. (BRPH, 03292019) This cefcation is Am@ed to the potions of permitted activities associated with the HAECO
Hangar improvements and Parking Lot project as described in the documents enclosed herein. Additional certification from the -
Engineer of Record responsible for the initial permit application on behalf of PTIA will be necessary to complete permit closeout.
Signature: Date: x%/3//9 .
Division of Water Reiources -401 & Buffer Permitting Unit
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Localion: 512 N Salisbury St Raleigh, North Carolina 27604
Phone: 919-807-63001 FAX: 919-807-6492
Internet:w rcwaterqualily.mg
Pn Equsl OpppWnM4ffi. .M. EmpbM—M . h panbywy.W Paper
N C Department of
Environmental Quality
f
Received
APR 17 2019
NCDENR
Winston-Salem
North Carolina Department of Environment and Natural RePloes Regional Office
I=�_
Pat McCrory Donald R. van der Vaart
Governor Secretary
DWR Project No: 45-1229 County: Guilford
Applicant: Piedmont Triad Airport Authority
Project Name: HAECO Facility Improvements
401 Water Quality Certification Issued Date: 4/8/2016
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality: Certification or applicable Buffer
'Rules, and any subsequent modifications, the applicant is required to return this certificate to the DWR
401 & Buffer Permitting Unit; 1650 MailrService Center, Raleigh, NC;'27699-1650. This form may be
returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It riot
necessary to send certificates from all of these.
Applicant's Certification
I, hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the, construction was observed to be
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature:
Agent's Certification
Date:
I, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be
built within substantial compliance and intent,of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature:
Date:
if this, project wds designed by a Certified Professional
TA
I, -fon Zee Adfii� las,a duly registeredProfessional M. (i.e., )Vv • OVd 916
h ine Landsca a Architect; Surveyor, etc.) in the State of North Carolina, having bee n. authorized to
eri
observe odicall weekly, full time) the construction of the project, for the Permitee hereby state that,
to the best of my abilities, due care and diligence was used in the observation of the construction such
that the construction was observed to be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting
materials. (BRPH, 03292019) This cefcation is Am@ed to the potions of permitted activities associated with the HAECO
Hangar improvements and Parking Lot project as described in the documents enclosed herein. Additional certification from the -
Engineer of Record responsible for the initial permit application on behalf of PTIA will be necessary to complete permit closeout.
Signature: Date: x%/3//9 .
Division of Water Reiources -401 & Buffer Permitting Unit
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Localion: 512 N Salisbury St Raleigh, North Carolina 27604
Phone: 919-807-63001 FAX: 919-807-6492
Internet:w rcwaterqualily.mg
Pn Equsl OpppWnM4ffi. .M. EmpbM—M . h panbywy.W Paper