HomeMy WebLinkAbout20051310 Ver 1_Complete File_20050711t pF WATFR .f August 8, 2005 David E. Nicholson, County Manager Henderson County Government 205 College Street Asheville, NC 28801 Subject Property: Green River - EWP Alan W. Klimek, P.E. Director Division of Water Quality DWQ Project # 05-1310 Henderson County Q?@ ?oe[N 0 AUG 1 9 2005 WETLAN S AND STOrZ AW TEER BRANCH WETLADNEApproval of 401 Water Quality Certification with Additional Conditions Dear Mr. Nicholson: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 1,370 feet of streams for the purpose- of streambank stabilization at the subject properties, as described within your application received by the N.C. Division of Water Quality (DWQ) on August 1, 2005. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3376 (3376). The Certification(s) allows you to use Nationwide Permit(s) 37 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge, and stormwater regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose that you described in your application. As "stable" and "pre-storm" are not interchangeable terms, all work must be to ensure stability, regardless of channel location. Additionally, channels cannot be returned to it's pre- storm location unless there is documented instability is submitted and approved as part of the application package. If you change your project beyond the activities authorized below, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 401 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-6893 / Internet: http://h2o.enr.state.nc.us/ncvvetlands Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources N"sor?e httCarolina Aafurally An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Henderson County: i( Page 2 of 6 August 8, 2005 R 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Approved (Units) Plan Location or Reference Stream 1,370 feet Joe Creek & Green River 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. i r Henderson County: Page 3 of 6 August 8, 2005 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 5. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 6. Sediment and erosion control measures must be implemented prior to construction and maintained on the sites to minimize sediment in downstream areas. Seeding for a temporary cover of wheat, millet, or similar annual grain or permanent herbaceous cover should occur on all bare soil within five (5) days of ground disturbing activities to provide long-term erosion control. The projects should be accomplished in stages instead of leaving large tracts exposed to further storm events. Erosion control matting should be used in conjunction with appropriate seeding on disturbed soils in steep slope and riparian areas, unless authorized under Division of Land Resources Erosion and Sediment Control approval. Matting should be secured in place with staples, stakes, or, wherever possible, live stakes of native trees. Straw mulch and tall fescue should not be used in riparian areas. In addition, because of an anticipated difficulty in establishing ground cover during the winter, reseeding should be conducted, as necessary, in the spring-time with a native annual and perennial seed mix with a temporary nursery crop of wheat, millet or other grain. 7. Only clean, large, angular rock, large woody material, or other natural stream design materials and techniques should be used for bank stabilization. Rock should not be placed in the stream channel in a manner that constricts stream flow or that will impede aquatic life movements during low flow conditions. Filter cloth should be placed behind large rock that is used for bank stabilization. Properly designed rock vanes should be constructed wherever appropriate on bank stabilization and channel realignment stream reaches to improve channel stability and to improve aquatic habitat. Root wads should be installed low enough in the bank so that a significant portion (at least one-third) the root wad is inundated during normal flows. 8. The channel must be restored to a more stable condition. However, under no circumstances should river rock, sand or other materials be dredged (excavated) from the stream channel under authorization of this permit except, if necessary, in the immediate vicinity of the eroding banks for the explicit purpose of anchoring stabilizing or flow/grade control structures or for re-establishing the natural and more stable stream channel dimensions. Streambed materials are unstable in flowing- Henderson County: Page 4 of 6 August 8, 2005 water situations and are unsuitable for bank stabilization. Stream dredging has catastrophic effects on aquatic life and disturbance of the natural form of the stream channel can cause downstream erosion problems. The natural dimension, pattern, and profile of the stream upstream and downstream of the permitted area should not be modified by widening the stream channel or changing its depth. 9. Stabilization measures should only be applied on or near existing erosion sites, leaving other stable stream bank areas in a natural condition. Grading and backfilling should be minimized and tree and shrub growth should be retained where possible to ensure long term availability of stream bank cover for aquatic life and wildlife. Backfill materials should be obtained from upland sites except in cases where excess stream bed materials are available. Berms are not permitted because they block the floodplain, constrict and accelerate flood flows, and often fail or impede drainage during large flood events. 10. Repairs to eroded banks should be conducted in a dry work area where possible. Sandbags or other clean diversion structures should be used where possible to minimize excavation in flowing water. -Channel realignments should be constructed by excavating the new channel from downstream to upstream before connecting it to the old channel. F 11. Heavy equipment should be operated from the bank whenever possible. All mechanized equipment operated near surface waters should be inspected and. maintained regularly to prevent contamination of stream waters from -fuels, lubricants, hydraulic fluids or other toxic materials. Equipment used in stream channel must be clean, new or low hour equipment. 12. Riparian Zone Replanting Replanting of vegetation within disturbed areas located within 25 feet of the streambank associated with any land disturbing activity, repair, replacement and/or maintenance must be done in a manner consistant with the Guidelines for Riparian Buffer Restoration immediately following construction. (Please see attached.)Guidelines for Riparian Buffer Restoration. (http://h2o.enr.state.nc.us/wrn/ndf/huffers_ndf 1 13. Monitoring The Permittee shall examine the stabilization work done under this Certification on an annual basis for three (3) years following the completion of the restoration efforts. This field evaluation should note the condition and stability of the measures installed and how well the repair is holding up. A written report must be provided to DWQ's Asheville Regional Office by June 1St of each year. The report must describe inspection results, include digital photographs, list the date of inspection, and describe any needed repairs or corrections. 13.The permittee will provide on-site supervision of stability work including, but not limited to bank re-sloping, in-stream structure placement, and riparian zone re- establishment, by an appropriately trained individual. 14. If pasture along the stream is to be used for grazing, the permittee must inform the appropriate landowners that cattle should be prohibited from damaging riparian areas and from de-stabilizing the stream banks and channel. Z Henderson County: Page 5 of 6 August 8, 2005 15. Diffuse Flow All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at non-erosive velocities through the protected riparian zones such that it will not re-concentrate before discharging into a stream. 16. Water Quality Certification Notifications The permittee must provide a copy of this issued Water Quality Certification and attached cover letter to each property owner where the approved work will be performed. 18. Turbidity Standard The turbidity standard of 10 NTUs (Nephelometric Turbidity Units) shall not be exceeded as described in 15 A NCAC 2B..0200. Appropriate sediment and erosion control practices must be used to meet this standard. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the_ 404 or_ CAMA - Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. Henderson County: Page 6 of 6 August 8, 2005 This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Cyndi Karoly in the Central Office in Raleigh at 919-733-9721 or Mr. Kevin Barnett in the DWQ Asheville Regional Office at 828-296-4657. Sincerely, 1 /Z G -c?< i. L B c? 11 Alan W. Klimek, P.E., Director Division of Water Quality AW K/khb Enclosures: GC 3376 Certificate of Completion Guidelines for Riparian Buffer Restoration cc: Bradley, H. Bucy, P.E. Hobbs Upchurch & Assoc. 1300 Baxter Street Suite 108 Charlotte, NC 28204 USACE Asheville Regulatory Field Office DWQ 401/Wetlands Central Office DLR Asheville Regional Office File Copy Central Files r Filename: 05-1310.EWP.GreenRiver.Approval Re: Tracking and Tardy Notice for all Regional Offices, 8/22/05 Subject: Re: Tracking and Tardy Notice for all Regional Offices, 8/22/05 From: Kevin Barnett <Kevin.Barnett@ncmail.net> Date: Mon, 22 Aug 2005 15:39:04 -0400 To: Ian McMillan <ian.mcmiIlan@ncmail.net> CC: Roger Edwards <Roger.Edwards@ncmail.net> Ian: FYI **Asheville *_Tracking: _ *05-1310*, Henderson Co. EWP Green River Sites, Henderson Co, NW37 7/11/05 9/9/05 *05-1367*, Harold Medford, Rutherford Co, NW39 7/20/05 9/18/05 Issued -Tardy: _ *05-1072*, Waterstone c/o Westside Land & Timber Co., Henderson Co, NW39 7/6/05 9/3/05 Issued Kevin Barnett - Kevin.Barnett@ncmail.net North Carolina Dept. of Environment and Natural Resources Asheville Regional Office Division of Water Quality - Water Quality Section 2090 U.S. 70 Highway Swannanoa, NC 28778 Tel: 828-296-4500 Fax: 828-299-7043 Kevin Barnett <Kevin.Barnett@ncmail.net> NC DENR - Asheville Regional Office Division of Water Quality - Water Quality Section 1 of 1 8/22/2005 3:42 PM Triage Check List FILE COPY Date: 07/18/05 Project Name: Henderson County EWP-Green River Sites DWQ #:05-1310 County: Henderson Kevin Barnett, Asheville Regional Office To: 60-day Processing Time: 7/11/05 to 9/9/05 From: Cyndi Karoly Telephone : (919) 733-9721 The file attached is being forwarded to your for your evaluation. Please call if you need assistance. ? Stream length impacted ? Stream determination Wetland determination and distance to blue-line surface waters on USFW topo maps ? Minimization/avoidance issues ? Buffer Rules (Neuse, Tar-Pamlico, Catawba, Randleman) ? Pond fill Mitigation Ratios ? Ditching ? Are the stream and or wetland mitigation sites available and viable? ? Check drawings for accuracy Is the application consistent with pre-application meetings? ? Cumulative impact concern Comments: As per our discussion regarding revision of the triage and delegation processes, please review the attached file. Note that you are the first reviewer, so this file will need to be reviewed for administrative as well as technical details. If you elect to place this project on hold, please ask the applicant to provide your requested information to both the Central Office in Raleigh as well as the Asheville Regional Office. As we discussed, this is an experimental, interim procedure as we slowly transition to electronic applications. Please apprise me of any complications you encounter, whether related to workload, processing times, or lack of a "second reviewer" as the triage process in Central had previously provided. Also, if you think of ways to improve this process, especially so that we can plan for the electronic applications, let me know. Thanks! ENVIRONMENTAL SERVICES, INC. 1456 Patton Avenue, Suite C Asheville, North Carolina 28806 828-254-0811 / Facsimile 828-254-0812 www.esinc.cc MEMORANDUM rUl" L ?? TO: Cyndi Karoly 20051310 FROM: Jan Gay DATE: 11 July 2005 RE: Green River Permits, Henderson County EWP Attached are five (5) copies of the Nationwide Permit #37 for the Emergency Watershed Protection project in Henderson County, North Carolina. A courtesy copy has been forwarded to Kevin Barnett (DWQ Asheville). One copy has been provided to Ms. Rebekah Newton (COE Asheville) and one (1) copy is being provided to Dave McHenry (WRC) for review. Land use for each of these sites is considered commercial agriculture. No Trout buffer waivers are required for these projects. Office Use Only: Form Version March 05 USACE Action ID No. DWQ No. 2 0 0 5# 3 1 0 (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification ? Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: NWP 37 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details),check here II. Applicant Information ,! R 1. Owner/Applicant Information 4 Name: Henderson County Government Mailing Address: 100 North King Street Hendersonville NC 28792 Telephone Number: 828-694-7974 Fax Number: 828-698-6162 E-mail Address: jhembree hendersoncountync org 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: Paue 5 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Henderson County Emergency Watershed Protection 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): See Attachment A 4. Location County: Henderson Nearest Town: East Flat Rock Subdivision name (include phase/lot number): Directions to site (include road numbers/names, landmarks, etc.): 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): See Attachment A 6. Property size (acres): 7. Name of nearest receiving body of water: Green River 8. River Basin: Broad River (Note - this must be one of North Carolina's seventeen designated major river basins. The .) River Basin map is available at btLtp://I-L?-o.enr.state.nc.us/admin/map-/ 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: See Attachment B Pnue 6 of 12 10. Describe the overall project in detail, including the type of equipment to be used: The project will require the use of hand tools and heave equipment, including front end loaders and backhoes with hydraulic thumbs All equipment will be maintained to ensure no h draulic fluid will enter the stream channels. 11. Explain the purpose of the proposed work: To protect property and restore damaged stream channels to the stable pre storm condition utilizing natural channel design to the best extent practical. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. N/A V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. N/A VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: See Attachment B for each separate project description Page 7 nf 12 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, _t-. 1:-. : ..+. A- +n ot,-„ttnrP anrj flnndinu_ $fi CLL [L LGl U .3L 1111 CLL LD u"W w vv?a. v•s »...-»- ----- ----- - - Located within Distance to Area of Wetland Impact T e of Wetland yp 100-year r 100 Nearest Impact Site Number Type of Impact (e.g., forested, marsh, la Floodpin Stream (acres) (indicate on map) herbaceous, bog, etc.) (es/no (lineaz feet Total Wetland Impact (acres) 0 3. List the total acreage (estimated) of all existing wetlands on the property: 0 acres 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams Tn eatn„tarp acreage_ multinly length X width. then divide by 43,560. Average Impact Area of Stream Impact Number Stream Name Type of Impact Perennial or Intermittent? Stream Width Length Impact (indicate on ma) Before Impact linear feet) (acres 1 Joe Creek Root wad, debris P 35 135 0.11 removal 2 Joe Creek J-hook, debris P 30 125 0.09 removal 3 Green River Debris removal P 40 500 0.46 4 Green River Debris removal P 40 250 0.23 6 Green River J-hook, stone P 40 450 0.41 deflectors 10 Green River Debris removal P 40 50 0.05 12 Green River Debris removal P 60 350 0.48 13 Green River Debris removal P 60 100 0.13 14 Green River Debris removal P 60 150 0.20 15 Green River Debris removal P 60 70 0.10 Total Stream Impact (by length and acreage) 1,370 3.16 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill a,reavatinn dredginu_ flnoding_ drainage- bulkheads. etc. Open Water Impact Site Number Name of Waterbody Type of Impact Type of Waterbody (lake, pond, estuary, sound, bay, Area of Impact (indicate on ma (if applicable) ocean, etc. acres Total Open Water Impact (acres) 0 Page 8 of 12 6. List tll e+;.rA ;.,,,,alt to all Waters of the U.S. resulting from the project: G t.LUI11.11u&1,v - - ... - ---- -- - - Stream Impact (acres): 0 Wetland Impact (acres): 0 Open Water Impact (acres): 0 Total Impact to Waters of the U.S. (acres) 0 Total Stream Impact (linear feet): 1,370 7. Isolated Waters Do any isolated waters exist on the property? ? Yes ® No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. 8. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Current land use in the vicinity of the pond: Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. The proposed projects will take place within areas impacted by hurricanes during 2004. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Page 9 of 12 USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at httl2://li2o.enr.state.nc.us/ncwetlaiids/stn-n2ide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. No mitigation is proposed for this project 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): Page 10 of 12 IX. Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ® No ? 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No N 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No N 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. * Zone I extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. Zone* Impact (square feet) Multiplier Required Mitigation 1 3 (2 for Catawba) 2 1.5 Total If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0244, or.0260. Page 11 of 12 M. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. No impervious surfaces will be constructed for this project. MI. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ? No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). See Attached Narrative. plicant/Agent's Signature 'Date (Agent's ignature is valid only if an authorization letter from the applicant is provided.) Page 12 of 12 W A W N O W A W N z 33 v m m m m m c o 3 3 3 3 m < m = o m < ; a O x m a 0 G) m G) G ) G) m w o m 0 w W n w a P w P m N S. 3 7 7 ( b 7 n CD m w C D O C O m D C D O r r , r r r C D C 3 a r n v = D a v v -0 C m W N CAC°nc > C CL W j D N CL N m NW - CO o rA W n 0 m 0 m X W X m X P T D_ r CD P 47 CC CD @ C G) C) w N W W N W W W W W W -{ 3 O .' < m 3 O 0 C w 0 - n 3 67 m 7 Q s W m c W ? c c m m T 17 m rao % = m =L Sgr L n AQ AQ 96 X Z< 0 yDN m CD zm Zm N? N 0 0 O C) m 'D -C41 W C O 4 D O Z Z Z v c A CD N V 0 C7 0 ° co CD to ca n n O O O O CD O° O O O O m CD CO Ln CO CA CD CO CA CO m 0, C" CO En co M ro C" CD m CA 0, cn ~ A A A A A A A CA CA w m cn V CO U N w v W N A ° A m z j a a j N Gj m w m C> W C? CA W ° W co v m m m ? m [NT CA (T CC" Cn Enn W ° W ° Cn W Ca CA U N CJ cn 41 U i Cv U o CA' U O w Ul N 5A IV O r C0 71 r O m V N N N W A W CO r m Z Z Z Z Z AW m 2 Z Z Z N N N N N co 00 C3 N co N co N O A CAA W W CD ? W W A N O CA CO CA WW G -C4 G W CD Z G cys V CCp G 0 C) G) G) G) G) G) G) a G) m f CD 1D (D CD D j 7 7 7 > > > n 0 _ ."0 i7 ?1 .Z-7 Z1 .Z7 < < @ CD CD C G m m m N N (D (D m A CD w m P m w m w m w m w m w CD P m w m P 1 m? ' CD { w z O z O z O z? O O O O W w ?a co 9 = O 3 CA A N o CA iA K o c i? 0 o W W r 3 sn ? m N j 2 M Z Z Z Z Z m O O W w C w 0 0 O 0 0 w co 3 M W m m m CD m m m m m m M w w w w P w w w w w ' x X O m (D 0 m m m m 0C7 co w w w P O w co w w v 0 T 0 N O S 2 CD d N O 0 O 0 f7 N 7 A 7 'S7 N m 3 m f° 2 m m m a v 0 m 0 a CD CD x ;a tD ?? ¦ C Q. N CD 0 0 ?O v 0 CL ?a tQ ?D O VJ 0 D Cn (D 0) o O ca O C7 C) B CD N O -i O) CD CIO Ir" ??a •? ) ?`:? ? {? -. 'F, .F ``? ? e'er, '1, ' f 1 it-a•'!` ..P An O :1{?` ! _ ,a'•; _;i. 04. ati ? : ?, 1, `- ? .._ ? _ .--•_-, ?. Y ? . 3a (r ?3 ? S ??q•C • ? ?? ?a ' - ?' - - ? 3 ?`?^? - 1. ?? . ? e? N v ?. Nz. t •? ,.Fyn S •I. °',.4t Z?r Joe Creek and Green River Project Descriptions Ten stream reaches on Joe Creek and the Green River in Henderson County, North Carolina, are proposed for repair under the Emergency Watershed Protection program. Site numbers 1, 2, 3, 4, 12, 13, 14, and 15 (see attached map) each have a Best Usage Classification of B;Tr and are Designated Trout waters. Sites 6 and 10 each have a Best Usage Classification of B;Tr;HQW and are designated Trout Waters as well as High Quality Waters. The U.S. Fish and Wildlife Service reviewed location maps for these sites and did not request any Threatened or Endangered species reviews or surveys for any of the proposed repair areas. Each Project is described below. Site 1 is on Joe Creek and is approximately 135 linear feet in length. Proposed work for this site includes debris removal and installation of root wads for bank protection. Adjacent land use is agricultural in nature. Site 2 is on Joe Creek and is approximately 125 linear feet in length. Proposed work for this site includes debris removal, bank stabilization and revegetation, and installation of an in-stream structure (one J-hook). Adjacent land use is agricultural in nature. Site 3 is on the Green River and is approximately 500 linear feet in length. Proposed work for this site includes debris removal and bank stabilization and revegetation on scattered areas along this reach. Adjacent land use is agricultural on the repair side and forested on the opposite bank. Site 4 is on the Green River and is approximately 240 linear feet in length. Proposed work includes debris removal throughout this reach and bank stabilization and revegetation on one approximately 20 foot long bank failure. Adjacent land use is agricultural in nature. Site 6 is on the Green River and is approximately 450 linear feet in length. Work on this reach is concentrated in two areas (6a and 6b on attachments). Proposed work includes the installation of an in-stream structure (one J-hook at 6a) and bank stabilization and revegetation. This reach of the Green River is considered a High Quality Water. Adjacent land use for site 6a is a horse pasture for a commercial venture (Falling Creek Camp for Boys). Adjacent land use for site 6b is agricultural in nature. Site 10 is on the Green River and is approximately 50 linear feet in length. Proposed work includes debris removal, as well as bank stabilization and revegetation. This reach of the Green River is considered a High Quality Water. Adjacent land use is agricultural in nature. Sites 12, 13, 14, and 15 are on same property along the Green River. Site 12 is approximately 350 linear feet in length, Site 13 is approximately 11 linear feet in length, Site 14 is approximately 150 linear feet in length, and Site 15 is approximately 70 linear feet in length. Proposed work includes debris removal for each of these sites is debris removal, as well as bank stabilization and revegetation. Adjacent land use is agricultural in nature, consisting of a commercial horse pasture. `k4 All CD {L r '. I? . f Y '4 5?? hi lrY,f h#,y (" 'a-? Yn 4 fig" IT . + P .i` M'` ? Y ,? i '+? ?"' ?3 t\ ?i yn r' `. ' i.? t r ?. ''?' 1 d ? t ? , ;+? `.. `.'''r+' '. t y a ? ??? ?'t? ? ? ?'.`, r?•?, 9 r r+. } *??" M s tr ~,ti a s '+C ?'?yY?. y,+ "?r?. K _?s?? ??I k .E r ?. ?'?? 4-?r?,'t?'A: .r ? V? ?' ..? ,•^ ?/?Y .^?, ?` ?1J J'.I.?r?N ?+ ,.r??aai y ?*k ,rte ??? ?; {rf ? ??, y` r ?, -. ? k ?, ???r!,???;•,? ?? i? _., - -4; a z - Ln W , ray orn f 1 1 Q O. 4 t r 5/ M ?wK• C) Z' C L Q f R 4 ?* * (y, Y-«i' k. ? A R•- # ? '?.?? ?'"? ,.:? ?• :tip g???c,'. ?i ? t fie ??.? ? ?i?} ^Y• 4,5'"H >4 - ? n?'r?.? 4 Vy ?f", _- . 4T' '..•i d ' ?1 t'?Y. ? .•!R .- \ ?r'4A ?e s ?? .?nr _ ?+« y ,41 kr;3+ ??T,-ss'(? ?F r -Y i ? ?r '' ? «??•."v _ ? w f ?. r/? s.,a ?? ?: 11 fT r'.: '? "l°? «.r i, rar` ,,,s-?7'.•?.t{?.".r p`19:^ ??a 41 "alk . - d +? - - s +esi t" g` : r ' ,i' fr,9.n• *"+°1;: c e ' r t 1 . J Y? S t -t[ _- Mi Yt ?? t L S .,?I a y? J ?' +t rX.t ? •SYa ? -y ?n v? 'v ':,-y'?? = ?' . >» ` its ?- ti ?? ?i.?_ ?? ??g ?. R .t .: ?'"#.:. ? `lfa?e'?L?'i'! `f.c _ _ .c°?SS. ? t i' , ."?+ ??. a• ? ^` ?.• . rf 3 .. , _ , k?fV, - T. pit, a ,,'- r ems, , _ - e . t .3 dr t a? r r. ? ? ?? _ '" _ Sj ,.. • .. . o ? _. _ i,t' ? •+? 't• ail ? - e.: . i t1" ? - - _ - -- J h. ? ? • ? 1. 5 e,`? t?. t EE Ln L, zm? 0 U) 4-7 CD.: !J1 U3 ca 0- < ?'?' - ',^ ??? # ? ? T n w , ? tip,, ''•;, - ,, r 1 r ?f ? f t i •?. ? t. 'A3 ? t ? L rift sr?- i` y,?r t y +? 4 r'a ," ar ar r r ? ? 's ^?A ,• ? .?? ? '"ti `n' ?. - _._'se • - r ? +? r•- 'dry _?;OT' `?o. -? _ ' ?])M IF ?'4 i _- ??i ?' 3.? rt _. ? _? 1` 3 ? ', ? ??? , i t..-. ? n? '? '.a,?'"j*?, 1 h4.. t,fi e• ?'? 42 j .1 `or 41' ?y"?a '??z' X5+'4 1 t t ; ,« y,r ,•+' Sy"';:? , ?.,`Ft c "? X?a ?,?d ? _? *t? E ? yf 1? ''?•- tr +L? •? , ?w ??' a aar'j.:, ?.- '?^ y\ x- f4;+'?.°1 ?. s' ?? s?J? ??'? ?_t 3T,,.•y ^,+• r ? A-1 "7 t 'e 4 e'?•?+A"s' r? •?./E ?+?r???:''?? ?.• ?`b;'- „' ? af, x i;.. y ?',9 itd ????. air kl`. ?r ? .1, 5?•??,1? b!'S ,k °?"? ?? ?t x???? ^+??x t„? +?a% 4_ r "P Y t ryLy? ^tRjJ ?+`' x t tip.. ter ' .??ri4- ?y+` ? .. ? r •?,, T , ?, , ? ? r ? ? T 'Y T. 3r'" } ?1? :;' ? ? t it "? a.F ',`t-. ? o 'Y^{...?3?• A?t 'i'r•?? y.. r ?'?f?t } Y ?'' ?: ?S. l ??. } ? t 1" / ` . ?_tY?_ ,J_'?'?(,a ? ?'! ? ? ?+"f ?, ,y1Jsf ?( ? -t'a. .y N ? ` y •f•4 . r ?/ Y ?. '?'A`? ? ??T' ?r ? ? ?) ??' ?- ?Y? ?i ? LL ;•^?,;. (COO . ? .??? K r,??j tiylc,?i? • ? ° ?.., } ? ? ?' CO COV 'IT CR, P / o_ _ • ? t ? ?. V i • O to - ' t ? ?'°, +, ? " ,?" 'ti a O' Al- .. T r ° '.?? d ? , ?? `{ `"t ? ?s ??.e f"t,s ?.? 'ti'x. '??? ? t ?`'±T tY ; i'? r t .=aa.?t'? ,W? {a ? '• y ??, `w` r •?}? ?.. 5 d ,,. ,3,.. ?"` A' s '+?t4 •` '°'3n r• w `'?''' 1 .a+. R.r ,?+! ? ^•.^i W `i;, 4 ?"? ,1 * i r' , (.y ,i •4 a '•? ` +q- ?T ^.{t r , i? 'loP54x `. ?. ..4?r ?` ,i ['y4C,= "r '.' y, '? ? ' • % ? t ? ,? 5 ? 14 ? ? y1 h. ?`ay ?{? y, j ?• 'V' "~r? 4 ti?( „? 6 '-fir J'.T t..1 ?C y 1 ? 1+ tl ? 1? ? ?^0 ?? P ,. , -I'w",i1:_.. -Z lit j „` '?.Ly?..1.??A • ?' k 4 1, (a ? ?A tti! ry'4 3?1 ? ??? yk Ty; ? ? t??'? ?.... , ? ": `' ? +,i . ? p•+1.4? y'??a? t j ?t'F,t ?" ?'1.K? ? :? ?.i'+'t?• ? ?'+,?''f`: ? 'r ?C•a' ? l„''"pf"1 fi ?? ??..I. a'', h ? '* 31 ; t dY;+? Sk? r a ? { 4 f'rf t. (Y_j•?'?'R°?[Z f- „?? i',? ?? ??•. ? " .. ter, .. ?,? ' '}y ?? ? • 7." T r + + ? { .l d _. ??A? ri 1`.. ' ¢ '?? ? _ r7t ? .••?T ?? ,ems ', i T -_ f L .- iGf -.. K Y}w. j dl ? ',•'? ., ? 4 ?,. '!r? ,,.tom ? /- t' ?,a '? n«F? ,'? , }-e - r-f; .. '?s?l*?sr•+ ?r.w+;s.., c F.? .in.b:..?-•._ "^ 3::.. ?- . ^? rSn.?.xa.A$'".?sa??a+k?,?s??aeL;.siF?le??£+A:'....7'' ?f6 . >e,.e.??.s a U_ rX. ?y r Lo, lo. y C t 4 SW LO 4 Lo! C) W" !fir ?,,r `?f? ?'. )f ..b. _r. l [ Y` ? .? 7'?? 3 ',C r ? ;'??•?a MXI? LLJ, LLJ. I ?.'t+t s 7 fl . t '«i v ({tT 7Y Y{t .$fti ii t yft ytx? r `??` ' :R ''i:,.d„y t , • >, ,-"?yr r *"t A•e a.w"`' to , °'?. `"`?'4. 'i' ' ??H s+ a,> ? .:? r? ?w ? t f S` ? .. r,?S`?ja l M1 ?•l r _. ? ? / ?1? w j ` F ,?<'. +?'t'.x?._.? f t ????.• +l?xs ? y- .!s i ?? ti? ? t?^+ 3t '. ? ,? Fr t'{ ?, r s ,.*'? ?' dX/ ? r ?' °•ay?C"' - '? ,a?? it ??r? ?'J?. '{? 4 'tom 'C s ?- f F ? b [? _ ? ` • ., ,Ir Z "%t U) Lo LU Lo. LO CO 5. ' Q U) A CY) Z 0:w ? ?? '1. .. ? .: fit, 3? Z ' %ja Y '. ?',//?'" r , it •r Lij orf a. . M / `??' . v. • ..ice ? 1 . r 'r ?? ` ?? ? i. •. t ? v 'f '_.V?f"r?"?*' -14??.d ?1.?,-•r?yjt.?. ,?M,,l? ?, F'? Xf 41 Ilk, w ? ?;'1?4+ '?` 'r?.n °h o , ? M MMMMMrrrrr ? - ? lL. , Yn?-?Y?i?`_ ? h 1,3p t?"!M?'?'g"k?' f rt ?`'?t+ y ? -? ?.J??• _ i° +? ?.? C) co y CO U in .ems ,? 1 t ^ d" }t^t{, ; ,°, `?'` ?•, - z O U) 'y k, s ? .?` r ?s t J''Z W' k ,"i4 ?. ,4? .Mle R?.? ?? ? 1, _ ?? '?t U LL 0 -4 Ewa ? F i•? > ,_ t is r-' ? ° ? ,ks t? 1 ,? ? l ;, l? F, i Yy° # r ' 4 W,. wcy.. . F n: ?t :1P ? i,t} /? Z } - - - - .. mow.} l? ? {?'; ? ?M? - .. - ? `? .1rA•rr? 1f±, ?.•? r ? D. ? +IC ? ? •? O `JON ,. ?'??P???•'?e•.Q?ll rr. ?.,' r . ??_ ? ? ?..?? ??????r ?,? ?, ? ?.,,•E? EO ?? •?? "1 oll ... 'PTA ?•A???• ',A1!.?.. ?i -j R ?Lo» ?i#..rr3'r??,, w ??'i" y V -a UT t*. Z. CD W, Cnt 'X" AO 11, ot 4 1.,, i . Q w', ? p? g N 4' .aft e N ?` ? t t yG X12) '? 0 ?. ,ri.a? p? 1? - vii { t?" 3? r ? `? M ? i,?:°?:, ` '?!4 ,?? + ? ? '?'?? ?; t~-•?" " A"I #.. e? s alt ?_? ?,? iJ. -4 ? '1; `.?. ?''zl f .` ? •?? J d -" ? `?? p R.. w? ? a # n r -qr?*„..` .T S,_ ,.._,.,_„ rrx .•r+-°+-- »ri,-y'+.t r,+-^r•- 4K a -..,??•,?,,.. ;? ? ? war r ?F.'?;t`!ff ??} ?#"?'{YE?„?.£ ?:."y?l'?s-. _ v? ? tyq`?{?;?'n ',.? 4Rt t+ "? ?? .Y ? .? •- $;+ k '?t't r '' } ; -' ? ? ?.`' ? <"'t .?;, V R 7 r -, • / t F' rti ?G.•T ? 'fi't J p?\ t i''???'?'} d ' ?M . a ! ,t $ vJ."_ a "o ,, 'i, s T ", n.` ,r^'?' ?-•.. .r ? ?? ?"''` ?,d ??$' y?i ?"?. ;r t ,*v, +' :• • ?.d, F ? 3r r a„-.'?. v r,r '^ ' ,,r ? ".?.. ? ; `??- .j . ? Y ` .. ? S• 0. .,?`?' f f' , ??. ? ITS, 'it1R' ?r y r • "+? t.: ti x ,; ? ?'' ? ?,• F ? 6g, t v? l 'A U) 04 A Lu LO elf Lr) C) CT) `k,. `- 1 i o CO QZU ?/ '??? tr 4 - r 'AA •? ;th ? ?. t.; ?1J. //' _ ?? ?? M'7., ^. I' ?' •,?? "''fit 1 14 6K . ,'z Q .f i` ?f^'` 'N?7fJ? ice' ? =?' 1 ryr ,? ?'{??•, •. 41 .}, ?. `? ?` - ?(/ ?."k 3,;t_ 'y,t?? '^ it .?, Y[ ?f ? '*•,?? ? ,._ ` S • Y z' 3 r t, ?Y 1 . ? 1 ? fir' .? • fr Ss l- jww x '`t 7 4 mE ti •', w?? ?%vt `?a.'1 : rS r?S" Y 4 7 7-7 a ? -.(ACf:.iy8.na.wn,,..•aa.Y•.? a?ff.•'?r' +?.+•.?YE -?w+?+?* ?^+?'?'a..,: '- #'r''S:?,w?iai?y1? ' ? r?.•w',r?rYF1??ir@3i'??S } -tit L..switl b{Y1Fa.?c+_..a..? r.-..w??. ....i. -... - ? .. _...?.? Wrw.rvx .'k ii •w.i.L'A.AC S.W6r.1.... ?. H ND RSON COUNTY EMERGENCY WATERSHED PROTECTION PROJECT HENDERSON COUNTY, NORTH CAROLINA GREEN RIVER. DSR NO. 04-05 HENDERS( n _ Z t -7/b S HOBBS, UPCHURCH & ASSOCIATES, P.A. 141 CONSULTING ENGINEERS CHARLOTTE, NORTH CAROLINA 28204 STATE LOCATION MAP N.T.S. SHEET DESCRIPTION C-1 COVER SHEET L-1 OVERALL LAYOUT AND TABLE OF CONTENTS GR1 GREEN RIVER SITE 1 - VIEWS, PROFILE, AND X-SECTIONS GR2 GREEN RIVER SITE 2 - VIEWS, PROFILE, AND X-SECTIONS GR3 GREEN RIVER SITE 3 - VIEWS, PROFILE, AND X-SECTIONS GR4 GREEN RIVER SITE 4 - VIEWS, PROFILE, AND X-SECTIONS GR6-A GREEN RIVER SITE 6 - VIEWS, PROFILE. AND X-SECTIONS GR6-B GREEN RIVER SITE 6 - VIEWS, PROFILE, AND X-SECTIONS GR10 GREEN RIVER SITE 1 - VIEWS, PROFILE, AND X-SECTIONS CR12-13 GREEN RIVER SITE 1 - VIEWS, PROFILE, AND X-SECTIONS GR14-15 GREEN RIVER SITE 1 - VIEWS, PROFILE, AND X-SECTIONS D-1 DETAILS D-2 DETAILS D-3 DETAILS L E-1 DETAILS AND EROSION CONTROL DETAILS 'SITES 5, 7, 8, 9, & 11 ARE NO LONGER INCLUDED IN THIS EWP PROJECT. VICINITY MAP N. T. S. CONSTRUCTION NOTES: 1. MOBILIZATION & DEMOBIUZAITON: . 1.1. It is the Contractors responsibility to familiarize themselves with the project location, access requirements and any limitations. 1.2. The Contractor shall contact the Engineer or Henderson County Soil & Water Conservation District, 72 hours in advance in order to notify the a "? o 2 w a Z aMi14`oA P property owners. 2. POLLUTION CONTROL: Q a= 2.1 The crossing of live streams with equipment is prohibited. o ^? yar, 2.2 The Contractor shall provide for stabilized construction entrances, which must be maintained so as to prevent tracking or flowing of < ? ? sediments onto public roadways. All sediment spilled, dropped, washed or tracked onto public roadways shall be removed immediately. a p N CJJ O?m 2.3 The project site is located in the Broad River Watershed. All sediment and erosion controls as well as other pollution control activities are y'id •? ;^ :m subject to inspection by North Carolina Department of Environment and Natural Resources (NCDENR) personnel. y ` o 4 Th 2 t t h ll Q OU o° N., S e con rac . or s a be prepared to construct temporary siltation basins using geo-textiles and hay bales. Upon completion of the work, all temporary sedimentation ponds shall be dismantled and removed from the site for disposal. c .?' V1 2 5 3. PROJECT DE-WATERING: L h y zl; `m m 3.1 It is the recommendation of the Engineer to construct any J-Hooks or Cross Vanes without completely de-watering the project area. This x- c N,. will allow the Contractor and/or Inspector to observer the effects the structure has on natural channel flow. G Ei m 3.2 Depending on the nature of the site, passive de-watering of the mainstream channel maybe possible. Passive de-watering of secondary a a channels may also be used if appropriate. y 5 v° h 8 3.3 Excavation of a natural pool downstream may be used as a form of sediment control during in-stream construction work. Excavation should be no deeper than three (3) vertical feet at the thclweg. Borrow material should be placed in the deposition bar where any structures tie = V into the stream bank. 4. ROCK VANE / J-HOOK / CROSS VANE E 4.1 Placement of Footing Rocks is critical to the success of Rock Vanes. To insure proper placement, the Contractor shall provide a portable M M pump to de-water excessive ground water from the excavation. 4.2 The construction of Rock Vanes requires equipment which can place rock in precise locations. An excavator of a suitable size and containing a thumb is recommended. 4.3 Surface rocks shall be offset 1/3 to % boulder width back from downstream face of footing rock. Typical installation begins with the footing rocks anchored into the center of the stream, then constructed downstream into the bank at a 20'-30• angle. Q U3 4.4 A geotextile fabric shall be anchored into the upstream face of the rock vane to minimize sedimentation. Stream stone or surge stone may Z Q be placed on the fabric when available. Loose rock rubble from each load may also be used to fill in behind the upstream face of the rock Z vane. W Z 5. ROOT WADS: Z 5.1 Placement of the footer log and large rocks is critical to the success of >- 0 rootwads. To insure proper placement, the Contractor shall provide a portable pump to de-water excessive ground water from the excavation. Q C J LL 5.2 The construction of rootwads requires equipment which can place rock in 0 precise locations. An excavator of a suitable size, and containing a thumb is recommended. J 5.3 The Engineer and/or Inspector will identify for the Contractor which rootwads on site may be used for construction. < ? 6. DEBRIS REMOVAL: LIJ IGO 6.1 If a tree is removed from the stream with its root mass intact, the Contractor shall stockpile the tree separately for passible installation as O a rootwad. 6.2 The preferred method of debris disposal is chipping on-site. The mulch shall be left on-site with approval of the Engineer and property owner. 7. LIVE STAKES/POSTS: 7.1 The following plant species are authorized for use in this project; Cornus amomum (Silky Dogwood) UJ I,- Solix Nigro (Black Willow) } = O Solix Sericea (Silky Willow) Z (n W Lindera Benzoin (Spice Bush) ---) O W 7.2 All construction of Live Stakes/Posts shall be completed in the presence of the Engineer, Inspector or their designated representatives. 0 Q a 8. SEEDING & MULCHING: In addition to the conditions set forth in Section 12 the Contractor shall meet all of the following requirements. > > Z 8.1 Seed Specifications: The Contractor shall apply seed at the mixture and application rate shown on Detail D2. A conservation seed mix of 0 comparable formulation may be used only if the label is provided to the Engineer for approval prior to seeding. 0 C = 1 Z C) LLI 0(D F_ UJ W ? w 6/05 BP u. GB Sn! r; .'. - - srw?. AS SHOWN zrur vo L-1 1 OF 14 cr GREEN RIVER SITE 1 (JOE CREEK) REMOVE DEBRIS AL : =20' AE`:11. 1"4' CROSS-SECTION POOL "VERTICAMSC SITE 1 - SCOPE OF WORK 1 EA ROOT WAD / BOULDERS 2 CY DEBRIS REMOVAL 70 NOTE: ALL CROSS-SECTION VIEWS ARE FACING DOWNSTREAM, WITH AN ASSUMED ELEVATION. ROOT WAD t' ?s V T3?? ? 70L L } ?' I _jpaY?l +'rj?j by yMA,K? '? .4 _ • .. ? i'1??'`? ?' .?'d. A Y, ' .aid' ?kt . ? ?' S5 - ' Sri' T.S. Q a to a O c i O ` N ? n Q.[ O? ^F1 W V V I C ? 00 t o ? ? U U ? c ?A "Q 8 .Q 2 U c c O- E rn cm O U L '- W (A 0 Z=w 0R Q Z?Z 0?0 ?ZU Zw0 =wOrf 5; n. W wre e/u? me a CBP mun CAB oi[atn - w+c: AS SHOWN HORCZONfAL SCALE: 1'=20' VERTICAL SCALE: 1" = 4' GREEN RIVER 1 LONGITUDINAL PROFILE -50 9fFR x0. GR1 15 a: GREEN RIVER SITE 2 (JOE CREEK) Q 0 10 20 30 40 50 GREEN RIVER 2 CROSS-SECTION POOL GREEN RIVER 2 CROSS-SECTION BLOWOUT HOROZONTAL SCALE: 1"=20' VERTICAL SCALE: 1" = 4' 101 -i = =? : __ __ = -- 100 9s 7E .. 98 _ 97 96 _x_ 95 94 _ a 93 92 - - NOTE: ALL CROSS-SECTION VIEWS ARE FACING DOWNSTREAM, WITH AN ASSUMED ELEVATION. SITE 2 - SCOPE OF WORK LS "J-HOOK" 40 LF BANK STABILIZATION REVEGETATION 5 CY DEBRIS REMOVAL 60 CY FILL AND SLOPE 2H:lV REMOVE DEBRIS () 1 U 20 SO 4fl 5U GREEN RIVER 2 HOROZONTAL SCALE: 1"=20' CROSS-SECTION RIFFLE VERTICAL SCALE: 1" = 4' w 0 O 3 0 0 0 0 m a. -0- I ? 97 1 - i ? 0 : nm t 96 I _ _ ?? o j l ove - aC, NU I no 95 --- 93 92 - - - - - -- - ---- -- 91 = 00+00 00+25 00+50 00+ 75 "W oLA vl u 1+00 1 HOROZONTAL SCALE: 1"=20' VERTICAL SCALE: 1" = 4' GREEN RIVER 2 LONGITUDINAL PROFILE 0 PROPOSED "J-HOQK"L SEVbETAiL" I a '? FILL AND 2H:1V REVS VIEW: UPSTREAM N A S o eR V m ?n N h m ??E °2SWU?V •? o?4x q 2 "3 tJ U p ,; ?4 ? Nc U y ?r ? 86 o - 2 ? U cc E u? O U C N W (A FLU W Z cr ^NLL-3 O LL Z z 0}0 fy ZU ZE0 =W0_ G a W mm. 6/O, ocmcu Cap CAB pYCQit - Sr - AS SHOM GR2 15 ! a GREEN RIVER 3 Q a GREEN RIVER 3 y ,R o g7 C `NLn ?) o z° o y ? ,c d c ?`o Uo t C ? o R L H 2 i Z. ?JV o: 2. i" H S y a s a o - VIEW: UPSTREAM SITE 3 - SCOPE OF WORK 50 LF BANK STABILIZATION REVEGETATION 5 CY DEBRIS REMOVAL NOTE: ALL CROSS-SECTION VIEWS ARE FACING DOWNSTREAM, WITH AN ASSUMED ELEVATION. CROSS-SECTION RIFFLE VHOROZONTAL SC 1 "=' ERTICAL SCALER tE ' 4'20 3 0 co N.T.S. 96 I °a f f 0 - I i s 95 + 95 Ln 94 _ 94 93 _ . s. - - - --- _-- - - - 93 92 - - - --- - - - -- - 1 92 91 91 90 - - -- -- _ -- - _ I 190 2+75 3+00 3+25 3+50 3+75 4+00 4+25 4+50 4+75 5+00 4+25 HOROZONTAL SCALE: 1"=20' VERTICAL SCALE: 1- = 4' GREEN RIVER 3 LONGITUDINAL PROFILE Y MT ? U cc m- E vi O U_ C W (!J 0 Zcznw 0< z?z 0?0 ?z zof 0 LuWc? _:E E. W -x E,Uo CBP r EW e AS SHOWN SHF[t X0. GR3 w: 15 a 98 Q a y o°e N u C `N5°n Iq m o z° o Q p, o u? +? o 3 " _ u?od Z5 U 00+00 00+25 HOROZONTAL SCALE: 1'=20' VERTICAL SCALE: 1- = 4' W 0 ? U C C O- E N C N O U_ L ' cm w U) 0 ?=U z (n W 0 0- z?Z 00 zofo =wry g0- w aM 6/05 -D: CBP mar: CAB CKC- - AS SHOWN 70 80 HOROZONTAL SCALE: 1"=20' VERTICAL SCALE: I' = 4' GREEN RIVER 4 NOTE.- ALL CROSS-SECTION VIEWS ARE FACING DOWNSTREAM, WITH AN ASSUMED ELEVATION. SITE 4 - SCOPE OF WORK LS REMOVAL OF 6-10 TREES (< 10" DIAMETER) 20 LF BANK STABILIZATION REVEGETATION GREEN RIVER 4 LONGITUDINAL PROFILE 2+25 2+50 2+75 s¢n w GR4 15 VIEW: UPSTREAM GREEN RIVER 6 A Q a PROPOSED "J- SEE SLOPE 2H:1 MATTING AN SEEDIA O Uw ? 0 ,Q v?s yj S `a Q g Z M U C C a) - E c/c a) 0 U C N ?-- FLOW NOTE: ALL CROSS-SECTION VIEW, ARE - FACING DOWNSTREAM, WITH AN AS-SUME.D ELEVATION. 0 3 O m W (A =U ZofW OQa Z Z 0 O Z WWW (D F- ZW "' 27>- CL W are 6/Oo ocwm CBP oww GB o[ut¢ - rne IS SHOWN vucr-- GR6-A 15 VIEW: DOWNSTREAM r GREEN RIVER 6 B 0 10 20 30 40 50 60 70 GREEN RIVER 6 CROSS-SECTION RIFFLE 100 -- -- 98 96 -? t - 195 ' = I f = I - - 94 - I _ - - 93 92 91 0 10 20 30 40 .9 GREEN RIVER 6 CROSS-SECTION BLOWOUT-2 NOTE: ALL CROSS-SECTION VIEWS ARE FACING DOWNSTREAM, WITH AN ASSUMED ELEVATION. HOROZONTAL SCALE: 1"=20' VERTICAL SCALE: 1" = 4' SITE 6 - SCOPE OF WORK LS "J-HOOK"-6A 50 LF MATTING AND SEEDING-6A 50 LF SLOPE 2H:1V-6A 10 EA 1.5 TON DEFLECTOR STONE (TYP. OF 10)-6B 60 LF BANK STABILIZATION REVEGETATION-613 75 CY BACKFILL AND SLOPE 2H:1V-6B FILL AND SLOPE 2H:1V REVEGETATE, USE GEOTEXTILE FABRIC BEHIND STONE 0 HOROZONTAL SCALE: 1"=20' VERTICAL SCALE: 1" = 4' rte- I VIEW: DOWNSTREAM t q# 4 i 1x s! V ?r. N.T.S. N.T.S. " VIEW: DOWNSTREAM o ANCHOR UPSTREAM 1.5 TON DEFLECTOR 3 STONE (TYP OF 10) o- END INTO BANK 97 I I an +I N V) 96 _ L Ln o ' 95 - - --- -- -- -- 94 - - - -- 93 -- - -- 92 - - ---- - 91 .-_::- 2+75 3+00 HOROZONfAL SCALE: 1"=20' VERTICAL SCALE: i" = 4' 3+25 Q g V Un a3 s o=a a ? ? L2 ^ mU? V C .o oa o y -" ?QUU? 41 ? g6 .Q O - WT -Foci C c: a? - E v; cm 0 U c: m w (A ?u co Lu 0ui 0 C) Qa Z?Z 0}0 U) ?zU cl (D Zof 0 W Ill of ?a w o 6/05 oar fm CBP owx CAB CnfCnFO - srxe AS SHOWN ?EU G R6-13 a. 15 GREEN RIVER SITE 10 Q a BRIS ANY AREAS y y -007 .O?Nrn y ? o z °o y ? .c i 'C 45 ? o L 5 2°O " 7 jU a m ,Q S O - Z N.T.S. VIEW: UPSTREAM SITE 0 - SCOPE OF WORK 50 CY DEBRIS REMOVAL 50 LF BANK STABILIZATION REVEGETATION ? U C C E ui C ? O U C N w U) REMOVE REVEGETAI DISTURBED 0 U Z(f) w 7) 0 OWry O Q Z3Z 0}0 ?ZU Z?0 =?d w 6/05 xsc ¢ CBP CAB suac AS SHOWN GR10 ?. 15 VIEW: DOWNSTREAM GREEN RIVER SITE 12 GREEN RIVER SITE 13 h 14 Q y Y 7 ?n O N c to O i o ? .c to Q o,o? .Ccto ?- o l ? Z e Z o CI ?' o v .yo m o s o - mmnr REIN USE ? U C ? N- E C 0 0 U L •? W (n ?2U W Zn- ) C Z?Z 0 >- 0 [If ?U?z W U WZ W CD ?- WW 0 2 r> a W N.T.S. SITE 12 - SCOPE OF WORK 350 LF BANK STABILIZATION REVEGETATION LS REMOVAL OF 5-10 TREES(<8" DIA/TREE) 350 LF SLOPE 2H:1 V N.T.S. SITE 13 - SCOPE OF WORK 100 LF BANK STABILIZATION REVEGETATION LS REMOVAL OF 1-2 TREES (<8" DIA/TREE) 100 LF SLOPE 2H-.1V wh 6/05 CBP ox CAB w+e AS SHOWN sKu - GR12 -13 at 15 GREEN RIVER SITE 14 N.T.S. SITE 14 - SCOPE OF WORK 150 LF BANK STABILIZATION REVEGETATION LS REMOVAL OF 3-4 TREES (<8" DIA/TREE) 150 LF SLOPE 2H:1 V GREEN RIVER SITE 15 2H:1V SLOPE AN BANK STABILIZATIC REVEGETATIC SITE 15 - SCOPE OF WORK 70 LF BANK STABILIZATION REVEGETATION LS REMOVAL OF 1-2 TREES (<8" DIA/TREE) 20 LF SLOPE 2H-1V Q a ui R O V m u° a N ,c ?WV°y i Z .c ? u ,. 2 0 8 L H t o U U ? m`n .Q 0 ^ ? U C C O- E N C a) O U L C N w C/) D =U Zw OQCL Z3; Z 0 www uii LU = g o. w vs 6/05 xsa m CBP wan CAB OffOSD.' - AS SHOWN v W. GR14 -15 5 BANKFULL WIDTH (WIKF) W-I APPROX. 1/2 BOULDER WIDTH POINT BAR xp, - \JI \- H H X29, MAX. BANKFULL i H Hd aH H DEPTH i a a ? ?- I a H H OUTSIDE VANE LENGTH HOOK 1/3 WIDTH INSIDE SILL LENGTH VARIES SILL J-HOOK TYPICAL CROSS-SECTION NOTE: UNDER LIMITED RESOURCES OR FUNDING CIRCUMSTANCES THE "HOOK PORTION" MAY BE OPTIONAL, RESULTING IN A TYPICAL ROCK VANE. 0 BACKFILL 6 ELEVATION_\ f? f?0? \ e? J OPTIONAL: GAPS BETWEEN BOULDERS IN STONE FROM EXISTING STREAM IF 'HOOK PORTION" APPROX. 1/2 / AVAILABLE E OR SURGE STONE / BOULDER WIDTH WOODY RIPARIAN VEGETATION 1 ' ANE ANGLE 2K0\ -/ 'i . l: / POINT BAR PRIES I SILL SCOUR / 12' lyp / HOLE PLANT A MINIMUM OF 3 LIVE STAKES PER SOUARE \ YARD WHERE J-HOOK TIES INTO BANKFULL ELEVATION. OVER AN AREA DEFINED BY APPROXIMATELY 25 FEET UPSTREAM AND DOWNSTREAM OF TIE-IN POINT AND THE SILL i LENGTH. 11 1\ J-HOOK PLAN VIEW J-HOOK - DETAIL N.T.S. SURFACE BOULDERS FOOTING BOULDER (IF BEDROCK PRESENT DIRECTLY BELOW SURFACE BOULDERS, FOOTING BOULDER WILL NOT BE NECESSARY.) GRAVEL BED '-BANKFULL ELEVATION NOTE: BACKFILL AROUND FOOTING STONES WITH APPROVED GRAVEL BED MATERIAL. 0 FOOTING BOULDER .. BANKFULL CROSS VANE LONGITUDINAL PROFILE ELEVATION SURFACE O (BOULDER A VANE SLOPE (3%-77.) O \?? /, r? ri r? i / r T Q BANKFULL WIDTH (WBK, SILL STONE MAIL, Illhh Lt ?•• A (BANKFULL DEPTH D .? H ? _ . - Hair H O © 4? / H a - -? _ H H/ i as a aH a H ? r4 ' -! SURFACEI BOULDER FOOTING 1BOULDER CROSS VANE TYPICAL CROSS-SECTION BANKFULL WIDTH (WBKF) 1/3 1 1/3 1 1/3 I I I I I I I OPTIONAL: STONE FROM EXISTING STREAN IF AVAILABLE OR SURGE STONE SILL ! SILL " TYPE (NON-WOVEN` FOOTING BOULDERS 7t / Q w SURFACE i ?-SURGE STONE BOULDER SURFACE BOULDERS 1 GEOTEXTILE FABRIC 3 0 ELEVATION; (2) AND (D MARK ? 1 r ! ?e scouR PDO I SILL STONE NOT AND OD DENOTE BANKFULL VANE ELEVATION AT HEAD OF VANE OFFSET SURFACE BOULDERS 7/3 TO 1/2 180ULDER WIDTH BACK FROM DOWNSTREAM (FACE OF FOOTING BOULDER. _ ??????ffffff TYPE I NON-WOVEN _GEOTEXTILE FABRIC SILL 72' 1YP. I I ?- zo•-3 J / q / p u ?Hrly z (SILL O ? ,? (STONE FOOTING BOULDER (IF BEDROCK PRESENT \ DIRECTLY BELOW SURFACE BOULDER, FOOTING BOULDER WILL NOT BE NECESSARY.) PLANT A MINIMUM OF 3 LIVE STAKES PER SQUARE Y WHERE CROSS-VANE TIES INTO BANKFULL ELEVA (BOTH SIDES OF VANE), OVER AN AREA DEFINED APPROXIMATELY 25 FEET UPSTREAM AND DOWNSTRI OF TIE-IN POINT AND THE SILL LEN6 CROSS-VANE PLAN VIEW CL: 9 al CROSS-VANE -DETAIL N.T.S. !? Obi O y ?c? H 4b .c ,c 51 t.c?oo 'QUt U ; N .Q 0 ? U C ? O U W ?=U Z (A W OQd Z > Z ?ZU ?tt 0 W W O? W wrz fi/OS oesmEU CBP ovrrc MJM C1fUfR - saF AS SHOWN D-1 ? 15 h 1 DOUBLE NET STRAW BLANK SECURE W/TURF STAPLES t PER SO. YARD LIVE STAKES ON 2 ft. CENTERS SPACING BLACK WILLOW (Salix nigra) BANKFULL L SILKY DOGWOOD (Corpus amomum) DEPTH / SILKY WILLOW (Salix Sericea) L/ SPICEBUSH (Lindera benzoin) 3 FT. LIVE STAKES MATTING SHALL BE OVERSEEDED WITH SPECIFIED SEEDBED STABILIZATION CHANNEL BEDJ TYPICAL BANK STABILIZATION REVEGETATION N.T.S. Perennials-Common or Commercial N. Seedsllb (1000) Seeding Rate Ibfac w/o teen cover %of mix W/o temp cover Seedsrsq ft w/o temp cover 'Tia 'Dk rtongue ?1-5 ] - 12 5 Atlantic' Coastal Pamcgmss ' 265 1 12.5 6 Koran Lcspcdcta f 225 2 25.0 10 'Niagara' Big Bluestem @ 191 2 25.0 9 'Blacknvell' SwitchSrass 380 1 12.5 9 Purple Top Grass 465 .4 3.0 14 Timothvgrass 1.230 2 2.3 6 Orchard°rass 654 4 5.o 1 6 Total excluding Temporary Cover B 100 55 TENVORARY COVER Japanese Millet' - Foxtail Millet 220 -- 30 Oats' 32 Rve' (Grass or Grain) 30 Fescue ) 25 There could be dif icuhy in spreading Big Bluestein seed with a hand held centrifugal seeder because of a rough seed coat, light density and the presence of awns. This species could be dropped from the mixture or spread separately by hand. • These are to be used as temporary cover and the following is provided as a guide to assist in making the decision where to use each and when to use them. • Japanese and Foxtail Millet are to be used as temporary cover after June I. Either may be used or they may be used together at hall the normal rate when used singularly. Choose Japanese Millet on wet sites and Foxtail Millet on dry sites. If the site is characterized by both moisture regimes and separating the plant selection proves to be impractical, then use the mix. • Objections may be raised to using either plant due to non-nativitg. Japanese millet does have the potential to be a weed. If there is an objection to Japanese Millet drop it from the specifications and select Foxtail Nfillet as a substitute. Foxtail Millen does not have the potential to become a weed and is in the same category of usefulness as a cool season small grain. • Select Oats or Rye as the temporary cover after August I. Oats have a slightly better chance at providing useful cover on wetter sites than does Rye. These may be selected singularly or in a mix combined at half the singular rote for each to make a full seeding application rate. • All seeding applications shall include temporary cover mixtures. SEEDBED STABILIZATION 7DO gm. COIR MAT (OR APPROVED EQUAL) SECURE WITH OAK DEAD-STAKES 1 PER SO. YARD ANCHORING PINS TO BE FABRICATED OF NO. 4 REINFORCING STEEL OR EQUIVALENT MATERIAL ANCHORING PIN DETAIL N.T.S. LIVE STAKES LIVE Z 0 w J W LIVE STAKES A / L / to )_ x r ?_ \ POOLS 1 j ?J?J RIFFLE \ \\ BANKS ???? 3 LIVE STAKES 3 S- LEGEND ?THALWEG I BANKFULL B 7 LOW FLOW PLAN CROSS-SECTIONS A DISTANCE ALONG CHANNEL PROFILE LIVE STAKING PLACEMENT N.TS. INSTALL 3 LIVE STAKES PERT SO. YD. IN A RANDOM PATTERN OR ON 2 FT. CENTERS EXTEND TO TOP OF BANK OR AS DIRECTED BY ENGINEER LIVE CUTTING (1/2'1 TO I- IN DIAMETER) 0 w BUDS (FACING UPWARD) I > M \` Z d BASAL END CUT)- U_L AT AN ANGLE EROSION CC BI DORMANT LIVE STAKE 3' 0 w m a w V) TYPICAL PLAN DORMANT LIVE STAKE DETAIL N.T.S. -re N '" a a y ? ,C ,C a°a ? L2 '3 3 •C •?t o° ?UrY v° y O ME %a U C: a) O U W (A LLI =U Zcf) W 7 C)Qa Z?Z 0?0 Of ZU Z E 0 WWry =fin. W art 6/05 orswxr¢ CBP oa xx MJM srxc AS SHOWN ?Eg D-2 15 a<: q, h ROOT WAD SCALE: NTS INSTALLATION OF ROOT WAD STRUCTURES ROOT WADS SHALL BE INSTALLED ACCORDING TO DETAILED SPECIFICATION SECTION B. STONE USED IN ROOT WAD CONSTRUCTION SHALL BE IN ACCORDANCE WITH DETAILED SPECIFICATION SECTION S. THE PREFERRED METHOD OF INSTALLATION OF A ROOT WAD IS TO DRIVE THE POINT-CUT BUTT END OF THE TRUNK OF THE ROOT WAD TREE MATERIAL INTO THE STREAM BANK USING AN EXCAVATOR EQUIPPED WITH A HYDRAULIC THUMB. IF THE ROOT WAD STRUCTURE CANNOT BE DRIVEN INTO THE STREAM BANK, THE TRENCH ALTERNATIVE METHOD MAY BE USED WITH THE APPROVAL OF THE ENGINEER. A TRENCH SHALL BE DUG ALONG THE TOE OF THE STREAM BANK TO A DEPTH EQUAL TO THE DIAMETER OF THE FOOTER LOG. THE FOOTER LOG SHALL BE PLACED IN THE TRENCH. THE ROOT WAD SHALL BE PLACED IN A PREVIOUSLY DUG TRENCH SUCH THAT THE ENTIRE LENGTH OF THE TRUNK IS EMBEDDED INTO THE STREAM BANK. THERE SHALL BE NO VOIDS BETWEEN THE ROOT MASS AND THE STREAM BANK ON THE UPSTREAM SIDE OF THE ROOT WAD STRUCTURE. THE ROOT MASS SHALL BE ORIENTED TOWARD THE UPSTREAM DIRECTION IN SUCH A MANNER THAT THE VELOCITY BANKFULL ELEVATION PROPOSED CHANNEL BOTTOM FOOTER LOG PLACE TOP OF FOOTER LOG EVEN WITH INVERT ELEVATION OF CHANNEL VECTORS OF THE FLOWING WATER ARE ALIGNED WITH THE TRUNK'S LONGITUDINAL AXIS. THE TRUNK SHALL BE INSTALLED SUCH THAT THE TRUNK IS INSTALLED AT APPROXIMATELY A 1-2% DOWNWARD ANGLE INTO THE STREAM BANK AS SHOWN ON THE DETAIL- * BOULDER SHALL BE PLACED ON THE DOWNSTREAM AND UPSTREAM SIDE OF THE ROOT WAD BETWEEN THE ROOT MASS AND THE STREAM BANK TO PROVIDE EROSION CONTROL. ALL DISTURBED OR FILL MATERIAL SHALL BE COMPACTED TO A DENSITY COMPARABLE TO THE ADJACENT UNDISTURBED MATERIAL UNLESS OTHERWISE APPROVED BY THE ENGINEER. ALL MATERIALS FOR THIS STRUCTURE SHALL BE APPROVED BY THE ENGINEER AND/OR THE INSPECTOR PRIOR TO INSTALLATION. THESE STRUCTURES ARE ONLY TO BE INSTALLED IN THE LOCATIONS SHOWN IN THE PLANS AND IN ADDITIONAL LOCATIONS AS DIRECTED BY THE ENGINEER. BOULDERS TO REST ON TOP OF ROOT WAD BEHIND THE ANCHOR LOG AND ON TOP OF THE ANCHOR LOG FOOTING BOULDERS J -LIMITS OF EXCAVATION -ROOT WAD BOULDERS TO BE PLACED ON TOP OF FOOTER LOG & ON BOTH SIDES OF ROOT WAD TRUNK (REST ROOT WAD ON ANCHOR LOG) TYPICAL CROSS SECTION VIEW ROOT MASSES SHALL LAP ' OVER A MINIMUM 2.0 (2-4 MASSES PER ROOT WAD STRUCTURE) /SHINGLE ANCHOR LOGS FdFLUSH WITH ONE / I (ANOTHER \ \ ANGLE ROOT WADS 30•-60- UPSTREAM ? FOOTER LOGS TOWARDS FLOW OF STREAM ? FOOTING BOULDERS STREAM BANK OPTIONALI / Zt_ ROOT WAD TRUNKS ANCHOR LOGS VWHEN BACKFILLING OVER AND AROUND BOTTOM FOOTER LOGS, PACK BOULDERS AND LOGS IN BETWEEN ALL VOIDS TO FIRMLY SECURE ALL COMPONENTS INCLUDING JOINTS, CONNECTIONS TYPICAL PLAN VIEW AND GAPS ROOT WADS - DETAIL N.T.S. LOG VANE - DETAIL N.T.S. V Q a H m oo? U) Quo= a V ? too L j 2 o O y U U .Q ?Q R O - Z z M Q) C ? 0 U C 0 W (n 0 =U Z?w O Q CL Z > z 0?-0 U) 0 of z 0 0 ?_ Wwcr_ 2E a. W wn: a/UD CF-- CBP oa x: IUM r„EOCEV - wue AS SHOWN 9 ER 10. D-3 15 oF: ROOT WAD LOG VANE PLANT A MINIMU STAKES WHERE LO INTO BANKFUL v?` LOG VANE 1A2 MAXIMUM BANKFULL DEPTH - TREE WITH INTACT ROOT MASS CABLE TIE 15? POINT BAR GROUNDUNE BANKFULL WIDTH (W81F) \ MAXIMUM BANKFULL DEPTH / SURFACE BOULDER = FOOTING BOULDER 3-79, 12' MINIMUM DIAMETER MEASURED 5' FROM LOG VANE TYPICAL CROSS-SECTION ROOT FAN IWOODY RIPARIAN /-'VEGETATION 5 ' \ fVONL i S ? N5 MIR ANE ANGLE M OF 3 LIVE G VANE TIES L ELEVATION. CABLE TIE 20=30' i l r F? ? i j V/ "lz BANKFULL ELEVATION SURFACE BOULDER GSA I FOOTING BOULDER l 'IP???µF6 GRAVEL BED i SCOUR HOLE i Y POINT BAR BANKFULL ELEVATION 1\ LOG VANE PLAN 4' CONSTRUCTION SPECIFICATIONS 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL AND PROPERLY GRADE IT. 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN OF THE PLANS, AND SMOOTH IT OUT 3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUITABLE OUTLET. 4. USE GEOTEXILE FABRICS BECAUSE THEY IMPROVE THE STABIUTY OF THE FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. MAINTENANCE MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2 INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN R OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTINABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. PJ? \? MAN 5 Rio e5 J G?1 ? 0 5 i tip. ti?GR6 a"'?` e FILTER FABRIC TO BE INSTALLED UNDER AGGREGATE TEMPORARY GRAVEL CONSTRUCTION ENTRANCE N.T.S. 3'-0" NSF: CONTRACTOR SHALL DISPLAY A MINIMUM OF 2 SPONSOR SIGNS AT EACH SITE. ONE SIGN SHALL BE LOCATED ALONGSIDE OF THE NEAREST PUBLIC ROAD. SEDIMENT FENCE CONSTRUCTION SPECIFICATIONS: 1. USE A SYNTHETIC FILTER FABRIC OR A PERVIOUS SHEET OF POLYPROPYLENE, NYLON, POLYESTER OR POLYETHYLENE YARN WHICH IS CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS SHOWN IN TABLE BELOW. SYNTHETIC FILTER FABRIC SHOULD CONTAIN ULTRAVIOLET RAY INHIBITORS AND STABILIZERS TO PROVIDE A MINIMUM OF 6 MONTHS OF EXPECTED USEABLE CONSTRUCTION LIFE AT A TEMPERATURE RANGE OF 0 TO 120 DEGREES FAHRENHEIT. 2. FOR REINFORCEMENT OF STANDARD STRENGTH FILTER FABRIC, USE WIRE FENCE WITH A MINIMUM 14 GAUGE AND A MAXIMUM MESH SPACING OF 6 INCEHES. FENCE FABRIC SPECIFICATIONS PHYSICAL PROPERTY REQUIREMENTS FILTERING EFFICIENCY 85% MINIMUM TENSILE STRENGTH AT 20% EXTRA STRENGTH 50LB/LIN IN. MINIMUM MAXIMUM ELONGATION STANDARD STRENGTH 30LB/LIN IN. MIN. SLURRY FLOW RATE 0.30 GAL/SQ. FT./MINUTE MINIMUM MAINTENANCE: INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE OT PROMPTLY. REPLACE BURLAP EVERY 60 DAYS. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE OF THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. WIRE FENCING AND FILTER FABRIC 1.33 LB FT, 4" DIA. METAL EE POSTS 6'-8' O.C. WITH WIRE I REINFORCEMENT z a ? COMPACTED BACKFILL IEXTEND FABRIC AND WIRE INTO TRENCH SILT FENCE DETAIL N.T.S. STREAMBANK SANDBAGS CII SECTION B-B I SANDBAGS ILA (:iIF Tl-TFIIPI iirl i1E3RIF3 E1F? SECTION A-` . PUMP AROUND WORK AREA " - T, _ p -SANDBAGS PUMP AI II I ATRMFLOW DOWNSTREAM POOL II II UPSTREAM POOL PUMP DISCHARGE TO SILT I m TRAPPING DEVICE PLAN PUMP-AROUND FLOW DIVERSION DETAIL N. T. S. FOR DIMENSIONS OF W,L,D AND R SEE TEMPORARY SEDIMENT TRAP #57 WASHED STONE 5'-0" MIN. SCHEDULES ON EC2 AND EC3 TO 12" THICKNESS SIZE AS INDICATED 1 (WXL) I m4 3 I21 X 2'W X 9"THK -{RIPRAP VELOCITY g DISSIPATOR (CLASSA) n CROSS SECTION DESIGN SETTLED TOP II 2:1 SIDE SLOPE MAX. - 21" MIN. SIZE AS INDICATED (R Z m -v N I FILTER FABRIC THICKNESS AND CLASS OVERFILL 6" FOR SETTLEMENT EMERGENCY BY-PASS 6' BELOW SETTLED TOP OF DAM NATURAL GROUND FILTER FABRIC 3' MIN 1:1 SIDE SLOPE CLASS B RIPRAP STONE SECTION TEMPORARY SEDIMENT TRAP N.T.S. Q a N wOi - o ? O o V m ?? U) q C, Q .c ° o Q1 p?LU C?c° •C .c ? o ? c Z o ? ? V U o 0 ? ? we Chi ° co) O Z ? U C C E Tn O U L •? C a) W (n 0 ?=U Z(AW ?Qa?. Z?Z 0?-0 Ir- ZU WWW Zlo? a- W n.>E 6/05 o uwm CBP down MJM C ECxM. - suic AS SHOWN E-1 15 CONSTRUCTION SIGNAGE N.T.S.