HomeMy WebLinkAbout310877_Plan of Action_20180806r
r PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1 Structure Name/ldentifier (ID) Sholar Enterprises Inc 31-877
2 Current liquid volume in 25 yr /24 hr. storm storage & structural freeboard
a. current liquid level according to marker 17 0 inches
b. designed 25 yr /24 hr storm & structural freeboard 19 0 inches
c line b - line a (inches in red zone) = 2.0 inches
d top of dike surface area according to design
(area at below structural freeboard elevation) 90,736 ftz
e line ctl2 x line d x 7 48 gallons/ft' 113,118 gallons
3 Projected volume of waste liquid produced during draw down period
f temporary storage period according to structural design
180 days
g. volume of waste produced according to structural design
105,497 ft'
h current herd # 3,200 certified herd # 3,200
actual waste produced = current herd # x line g =
105,497 fit'
certified herd #
i volume of wash water according to structural design
Oft3
I excess rainfall over evaporation according to design
55,183 ft3
k (lines h + i +j) x 7.48 x 30 days/Ime f=
200,315 gallons
4. Total PAN to be land applied during draw down period
I current waste analysis dated 7/5/2018 1.41 Ibs/1000 gal
m ((lines e + k)/1000) x line I = 441.9 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
Structure 1 Sholar Enterprises (31-877) PoA30day (8-6-18) Page 1 of 1
t
Line y must show as a deficit If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc For pump & haul and herd reduction options, recalculate new PAN
based on new information If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Waste will be applied as soon as weather permits.
Summary Sholar Enterprises (31-877) PoA30day (8-6-18) Page 2 of 2
III TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Sholar Enterprises Inc. (31-877)
2. Structure ID
3 Structure ID.
4. Structure ID:
5 Structure ID:
6. Structure ID:
n.lines 1+2+3+4+5+6=
line m = 441 9 lb PAN
line m = lb PAN
line m = lb PAN
line m = lb PAN
line m = lb PAN
line m = lb PAN
441.9 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT RF APPI IFn niIRINr; THIS an nAV PFRInn
o. tract #
p. field #
4 crop
r acres
s remaining IRR
2 PAN balance
Qb/acre)
L TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u application wndoW
72142
1
Bermuda Pasture
3.57
100.00
357.0
3/1 -10/31
72142
2
Bermuda Pasture
3.30
10000
330.0
3/1 -10/31
72142
3
Bermuda Pasture
3.26
10000
3260
3/1 -10/31
72142
4
Bermuda Pasture
1.88
10000
1880
3/1 -10/31
72142
5
Bermuda Pasture
1.20
100.00
120.0
3/1 -10/31
72142
6
Bermuda Pasture
1.70
10000
170.0
3/1 -10/31
72142
7
Bermuda Pasture
1.53
10000
153.0
3/1 - 10131
72142
8
Bermuda Pasture
1.57
10000
157.0
3/1 -10/31
72142
9
Bermuda Pasture
2.73
10000
2730
3/1 -10/31
72142
10
Bermuda Pasture
2.23
100 00
223.0
3/1 -10/31
72142
11
Bermuda Pasture
3.12
10000
312.0
3/1 -10/31
72142
12
Bermuda Pasture
3.12
1 100.00
312.0
3/1 -10/31
72142
13
Bermuda Pasture
1.80
10000
180.0
3/1 -10/31
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period
v. Total PAN available for all fields (sum of column t) _
IV. FACILITY'S PDA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) =
x. Crop's remaining PAN balance (line v from section III) _
y. Overall PAN balance (w - x) =
3101.0 lb. PAN
441.9 lb. PAN
3101 0 lb. PAN
-2659 lb. PAN
Summary Sholar Enterprises (31-877) PoA30day (8-6-18) Page 1 of 2
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 31-877
County: Dupl i n
Facility Name: Shol ar Enterprises Inc.
Certified Operator Name: Mike Shol ar Operator #: 990542
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in
the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2
Lagoon Name (ID) 1
Spillway (Yes or No): No
Level (inches)- 17"
Check all applicable items
Structure 3 Structure 4
Liquid level is within the designed structural freeboard elevations of one or more structures Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges
X_ Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality prior to transfer of waste
to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3 Earliest possible date to begin land application of waste: 8/6/2018
I hereby certify that I have reviewed the information listed above and included within the attached
Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct.
Mike sholar Phone: (910) 271-5126
Facility Owner/Manager (print)
Date: 8/6/2018
Facility Owner/Manager (signature)
Cover Page Sholar Enterprises (31-877) PoA30day (8-6-18) Page 1 of 1