HomeMy WebLinkAbout20051301 Ver 1_Complete File_20050708+ ± O?0? W A 7-,q r 6 y r Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality July 25, 2005 DWQ Project # 05-1301 Haywood County Jack Horton, County Manager Haywood County Courthouse 215 North Main Street Waynesville, NC 28786 Subject Property: Rogers / Hampy Site - Crawford Creek AUG 2 - zon? to DEh1R - WATtR QUA Approval of 401 Water Quality Certification with Additional Cona sloiM"46-18/?,,rte.,, Dear Mr. Horton: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 150 feet of streams for the purpose of streambank stabilization at the subject properties, as described within your application received by the N.C. Division of Water Quality (DWQ) on July 20, 2005. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3367 (3367). The Certification (s) allows you to use Nationwide Permit(s) 37 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge, and stormwater regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 401 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-6893 / Internet: http://h2o.enr.state.nc,us/ncwetlands Nose otthCarolina Naturall An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper Haywood County: K? Page 2 of 6 July 25, 2005 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Approved Units Plan Location or Reference Stream 150 feet Crawford Creek 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. v' Haywood County: Page 3 of 6 July 25, 2005 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 5. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 6. Construction in this creek and disturbance within a 25-foot trout buffer should be avoided during the January 1 to April 15 rainbow trout spawning period to avoid adverse effects of sediment on eggs and larvae. However, Wildlife Resources Commission will not object to construction of Natural Resources Conservation Service "urgent and compelling" sites during the spawning period provided these projects are, to the extent appropriate and practical, constructed by: (1) using flow diversion structures such as sand bags, (2) placing large-sized rock toes and filter cloth backing for stabilization sites before backfilling, and (3) excavating new channel alignments in dry areas. Construction at the other non-"urgent and compelling" sites should not occur during the spawning period to minimize the potential adverse effects of multiple construction activities on trout resources in this creek. 7. Sediment and erosion control measures must be implemented prior to construction and maintained on the sites to minimize sediment in downstream areas. Seeding for a temporary cover of wheat, millet, or similar annual grain or permanent herbaceous cover should occur on all bare soil within five (5) days of ground disturbing activities to provide long-term erosion control. The projects should be accomplished in stages instead of leaving large tracts exposed to further storm events. Erosion control matting should be used in conjunction with appropriate seeding on disturbed soils in steep slope and riparian areas. Matting should be secured in place with staples, stakes, or, wherever possible, live stakes of native trees. Straw mulch and tall fescue should not be used in riparian areas. In addition, because of an anticipated difficulty in establishing ground cover during the winter, reseeding should be conducted, as necessary, in the spring-time with a native annual and perennial seed mix with a temporary nursery crop of wheat, millet or other grain. Haywood County: Page 4 of 6 July 25, 2005 8. Only clean, large, angular rock, large woody material, or other natural stream design materials and techniques should be used for bank stabilization. Rock should not be placed in the stream channel in a manner that constricts stream flow or that will impede aquatic life movements during low flow conditions. Filter cloth should be placed behind large rock that is used for bank stabilization. Properly designed rock vanes should be constructed wherever appropriate on bank stabilization and channel realignment stream reaches to improve channel stability and to improve aquatic habitat. Root wads should be installed low enough in the bank so that a significant portion (at least one-third) the root wad is inundated during normal flows. 9. The channel should be restored to a more stable condition. However, under no circumstances should river rock, sand or other materials be dredged from the stream channel under authorization of this permit except, if necessary, in the immediate vicinity of the eroding banks for the explicit purpose of anchoring stabilizing or flow/grade control structures or for reestablishing the natural and more stable stream channel dimensions. Stream bed materials are unstable in flowing-water situations and are unsuitable for bank stabilization. In stream dredging has catastrophic effects on aquatic life and disturbance of the natural form of the stream channel can cause downstream erosion problems. The natural dimension, pattern, and profile of the stream upstream and downstream of the permitted area should not be modified by widening the stream channel or changing its depth. 10. Stabilization measures should only be applied on or near existing erosion sites, leaving other stable stream bank areas in a natural condition. Grading and backfilling should be minimized and tree and shrub growth should be retained where possible to ensure long term availability of stream bank cover for aquatic life and wildlife. Backfill materials should be obtained from upland sites except in cases where excess stream bed materials are available. Berms should not be permitted because they block the floodplain, constrict and accelerate flood flows, and often fail and sometimes impede drainage during large flood events. 11. Repairs to eroded banks should be conducted in a dry work area where possible. Sandbags or other clean diversion structures should be used where possible to minimize excavation in flowing water. Channel realignments should be constructed by excavating the new channel from downstream to upstream before connecting it to the old channel. 12. Heavy equipment should be operated from the bank whenever possible. All mechanized equipment operated near surface waters should be inspected and maintained regularly to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids or other toxic materials. Equipment used in stream channel must be clean, new or low hour equipment. 13. Disturbed stream banks and a 25-foot vegetated zone, or the widest width that is practical under the site conditions, should be restored where possible along the construction sites to natural riparian conditions with native trees and shrubs (e.g., silky dogwood, rhododendron, dog hobble, red maple, silky willow, tag alder, black willow, sycamore) to provide long-term bank stability and stream shading. Note, silky dogwood, silky willow and black willow can be planted as live stakes collected during the dormant growing season. Cuttings should be randomly planted on four (4) foot centers from the waters edge to the top of the bank. Trees should be planted on ten (10) to twelve (12) foot centers. Stream banks in these areas should also be Haywood County: Page 5 of 6 July 25, 2005 seeded with a native annual and perennial seed mix with a temporary nursery crop of wheat, millet or other grain. 14. If pasture along the stream is to be used for grazing, a fence must be constructed outside of the riparian zone and the stream to prevent livestock from entering these areas. 15. Diffuse Flow All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at non-erosive velocities through the protected riparian zones such that it will not re-concentrate before discharging into a stream. If this is not possible, it may be necessary to provide stormwater facilities that are considered to remove nitrogen. This may require additional approval from this Office. 16. Riparian Zone Replanting Replanting of vegetation within disturbed areas located within 25 feet of the streambank associated with any land disturbing activity, repair, replacement and/or maintenance must be done in a manner consistant with the Guidelines for Riparian Buffer Restoration immediately following construction. (Please see attached.) 17. Deed Notifications Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective woody riparian zones in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place prior to impacting any wetlands, waters and/or buffers approved for impact under this Certification Approval and Authorization Certificate. A sample deed notification can be downloaded from the 401/Wetlands Unit web site at http://h2o.enr.state.nc.us/ncwetlands. The text of the sample deed notification may be modified as appropriate to suit to this project. 18. Turbidity Standard The turbidity standard of 10 NTUs (Nephelometric Turbidity Units) shall not be exceeded as described in 15 A NCAC 2B. .0200. Appropriate sediment and erosion control practices must be used to meet this standard. 19. No Sediment and Erosion Control Measures in Wetlands Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources or locally delegated program has released the project. Haywood County: Page 6 of 6 July 25, 2005 Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Cyndi Karoly in the Central Office in Raleigh at 919-733-9721 or Mr. Kevin Barnett in the DWQ Asheville Regional Office at 828-296-4657. - -- - Sincerely, -tyl 41- . - Alan W. Klimek, P.E., Director Division of Water Quality AW K/khb Enclosures: GC 3367 Certificate of Completion Guidelines for Riparian Buffer Restoration cc: Ken Futreal, Southwestern NC R & D Council 367 Dellwood Road Building E, Suite 3 Waynesville, NC 28786 USACE Asheville Regulatory Field Office DWQ 401 Unit - Central Office DLR Asheville Regional Office File Copy Central Files Filename: 05-1301.EWP.Rogers-HampySite-CrawfordCreek.Approval Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources July 25, 2005 Alan W. Klimek, P.E. Director Division of Water Quality DWQ Project # 05-1301 Haywood County Jack Horton, County Manager Haywood County Courthouse 215 North Main Street Waynesville, NC 28786 Subject Property: Riverview Road Site - Pigeon River ????. AUG 2 - 2005 DENR - WATER QUALITY Approval of 401 Water Quality Certification with Additional Conditions ""' `?°'j'? ? '°v" Dear Mr. Horton: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 670 feet of streams for the purpose of streambank stabilization at the subject properties, as described within your application received by the N.C. Division of Water Quality (DWQ) on July 20, 2005. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3367 (3367). The Certification (s) allows you to use Nationwide Permit(s) 37 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge, and stormwater regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 101 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-6893 / Internet: http://h2o.enr.state.nc.us/ncwetiands N"pA,Carolina ?vatura!!r,/ An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper Haywood County: Page 2 of 6 July 25, 2005 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Approved Units Plan Location or Reference Stream 670 feet Pigeon River 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. r Haywood County: Page 3 of 6 July 25, 2005 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 5. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 6. Construction in this creek and disturbance within a 25-foot trout buffer should be avoided during the January 1 to April 15 rainbow trout spawning period to avoid adverse effects of sediment on eggs and larvae. However, Wildlife Resources Commission will not object to construction . of-- Natural Resources Conservation Service "urgent and compelling" sites during the spawning period provided these projects are, to the extent appropriate and practical, constructed by: (1) using flow diversion structures such as sand bags, (2) placing large-sized rock toes and filter cloth backing for stabilization sites before backfilling, and (3) excavating new channel alignments in dry areas. Construction at the other non-"urgent and compelling" sites should not occur during the spawning period to minimize the potential adverse effects of multiple construction activities on trout resources in this creek. 7. Sediment and erosion control measures must be implemented prior to construction and maintained on the sites to minimize sediment in downstream areas. Seeding for a temporary cover of wheat, millet, or similar annual grain or permanent herbaceous cover should occur on all bare soil within five (5) days of ground disturbing activities to provide long-term erosion control. The projects should be accomplished in stages instead of leaving large tracts exposed to further storm events. Erosion control matting should be used in conjunction with appropriate seeding on disturbed soils in steep slope and riparian areas. Matting should be secured in place with staples, stakes, or, wherever possible, live stakes of native trees. Straw mulch and tall fescue should not be used in riparian areas. In addition, because of an anticipated difficulty in establishing ground cover during the winter, reseeding should be conducted, as necessary, in the spring-time with a native annual and perennial seed mix with a temporary nursery crop of wheat, millet or other grain. Haywood County: Page 4 of 6 July 25, 2005 8. Only clean, large, angular rock, large woody material, or other natural stream design materials and techniques should be used for bank stabilization. Rock should not be placed in the stream channel in a manner that constricts stream flow or that will impede aquatic life movements during low flow conditions. Filter cloth should be placed behind large rock that is used for bank stabilization. Properly designed rock vanes should be constructed wherever appropriate on bank stabilization and channel realignment stream reaches to improve channel stability and to improve aquatic habitat. Root wads should be installed low enough in the bank so that a significant portion (at least one-third) the root wad is inundated during normal flows. 9. The channel should be restored to a more stable condition. However, under no circumstances should river rock, sand or other materials be dredged from the stream channel under authorization of this permit except, if necessary, in the immediate vicinity of the eroding banks for the explicit purpose of anchoring stabilizing or flow/grade control structures or for reestablishing the natural and more stable stream channel dimensions. Stream bed materials are unstable in flowing-water situations and are unsuitable for bank stabilization. In stream dredging has catastrophic effects on aquatic life and disturbance of the natural form of the stream channel can cause downstream erosion problems. The natural dimension, pattern, and profile of the stream upstream and downstream of the permitted area should not be modified by widening the stream channel or changing its depth. 10. Stabilization measures should only be applied on or near existing erosion sites, leaving other stable stream bank areas in a natural condition. Grading and backfilling should be minimized and tree and shrub growth should be retained where possible to ensure long term availability of stream bank cover for aquatic life and wildlife. Backfill materials should be obtained from upland sites except in cases where excess stream bed materials are available. Berms should not be permitted because they block the floodplain, constrict and accelerate flood flows, and often fail and sometimes impede drainage during large flood events. 11. Repairs to eroded banks should be conducted in a dry work area where possible. Sandbags or other clean diversion structures should be used where possible to minimize excavation in flowing water. Channel realignments should be constructed by excavating the new channel from downstream to upstream before connecting it to the old channel. 12. Heavy equipment should be operated from the bank whenever possible. All mechanized equipment operated near surface waters should be inspected and maintained regularly to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids or other toxic materials. Equipment used in stream channel must be clean, new or low hour equipment. 13. Disturbed stream banks and a 25-foot vegetated zone, or the widest width that is practical under the site conditions, should be restored where possible along the construction sites to natural riparian conditions with native trees and shrubs (e.g., silky dogwood, rhododendron, dog hobble, red maple, silky willow, tag alder, black willow, sycamore) to provide long-term bank stability and stream shading. Note, silky dogwood, silky willow and black willow can be planted as live stakes collected during the dormant growing season. Cuttings should be randomly planted on four (4) foot centers from the waters edge to the top of the bank. Trees should be planted on ten (10) to twelve (12) foot centers. Stream banks in these areas should also be r Haywood County: Page 5 of 6 July 25, 2005 seeded with a native annual and perennial seed mix with a temporary nursery crop of wheat, millet or other grain. 14. If pasture along the stream is to be used for grazing, a fence must be constructed outside of the riparian zone and the stream to prevent livestock from entering these areas. 15. Diffuse Flow All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at non-erosive velocities through the protected riparian zones such that it will not re-concentrate before discharging into a stream. If this is not possible, it may be necessary to provide stormwater facilities that are considered to remove nitrogen. This may require additional approval from this Office. 16. Riparian Zone Replanting Replanting of vegetation within disturbed areas located within 25 feet of the streambank associated with any land disturbing activity, repair, replacement and/or maintenance must be done in a manner consistant with the Guidelines for Riparian Buffer Restoration immediately following construction. (Please see attached.) 7. Deed Notifications Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective woody riparian zones in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place prior to impacting any wetlands, waters and/or buffers approved for impact under this Certification Approval and Authorization Certificate. A sample deed notification can be downloaded from the 401/Wetlands Unit web site at http://h2o.enr.state.nc.us/ncwetlands. The text of the sample deed notification may be modified as appropriate to suit to this project. 18. Turbidity Standard The turbidity standard of 10 NTUs (Nephelometric Turbidity Units) shall not be exceeded as described in 15 A NCAC 2B. .0200. Appropriate sediment and erosion control practices must be used to meet this standard. 19. No Sediment and Erosion Control Measures in Wetlands Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources or locally delegated program has released the project. Haywood County: Page 6 of 6 July 25, 2005 Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Cyndi Karoly in the Central Office in Raleigh at 919-733-9721 or Mr. Kevin Barnett in the DWQ Asheville Regional Office at 828-296-4657. Sincerely, Alan W. Klimek, P.E., Director Division of Water Quality AWK/khb Enclosures: GC 3367 Certificate of Completion Guidelines for Riparian Buffer Restoration cc: Ken Futreal, Southwestern NC R & D Council 367 Dellwood Road Building E, Suite 3 Waynesville, NC 28786 USACE Asheville Regulatory Field Office DWQ 401 Unit - Central Office DLR Asheville Regional Office File Copy Central Files Filename: 05-1346.EWP.RiverwiewRoadSite-PigeonRiver.Approval Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality July 25, 2005 Jack Horton, County Manager Haywood County Courthouse 215 North Main Street DWQ Project # 05-1301 Haywood County Waynesville, NC 28786 %% Subject Property: Rogers / Hampy Site - Crawford Creek V I ? TO Approval of 401 Water Quality Certification with Additional Condi 0 Dear Mr. Horton: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 150 feet of streams for the purpose of streambank stabilization at the subject properties, as described within your application received by the N.C. Division of Water Quality,,(DWQ) on July 20, 2005. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3367 (3367). The Certification(s) allows you to use Nationwide Permit(s) 37 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge, and stormwater regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose that you described in your application. If you change your project, you must notify us and you may be required .to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 401 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX 919-733-68931 Internet htto:l/h2o.enr.state.nc.us/ncwetlands N14 Carolina Naturally An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Haywood County: Page 2 of 6 July 25, 2005 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Approved Units Plan Location or Reference Stream 150 feet Crawford Creek 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. r Haywood County: Page 3 of 6 July 25, 2005 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If„ placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 5. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 6. Construction in this creek and disturbance within a 25-foot trout buffer should be avoided during the January 1 to April 15 rainbow trout spawning period to avoid adverse effects of sediment on eggs and larvae. However, Wildlife Resources Commission will not object to construction of Natural Resources Conservation Service "urgent and compelling" sites during the spawning period provided these projects are, to the extent appropriate and practical, constructed by: (1) using flow diversion structures such as sand bags, (2) placing large-sized rock toes and filter cloth backing for stabilization sites before backfilling, and (3) excavating new channel alignments in dry areas. Construction at the other non-"urgent and compelling" sites should not occur during the spawning period to minimize the potential adverse effects of multiple construction activities on trout resources in this creek. 7. Sediment and erosion control measures must be implemented prior to construction and maintained on the sites to minimize sediment in downstream areas. Seeding for a temporary cover of wheat, millet, or similar annual grain or permanent herbaceous cover should occur on all bare soil within five (5) days of ground disturbing activities to provide long-term erosion control. The projects should be accomplished in stages instead of leaving large tracts exposed to further storm events. Erosion control matting should be used in conjunction with appropriate seeding on disturbed soils in steep slope and riparian areas. Matting should be secured in place with staples, stakes, or, wherever possible, live stakes of native trees. Straw mulch and tall fescue should not be used in riparian areas. In addition, because of an anticipated difficulty in establishing ground cover during the winter, reseeding should be conducted, as necessary, in the spring-time with a native annual and perennial seed mix with a temporary nursery crop of wheat, millet or other grain. Haywood County: Page 4 of 6 July 25, 2005 8. Only clean, large, angular rock, large woody material, or other natural stream design materials and techniques should be used for bank stabilization. Rock should not be placed in the stream channel in a manner that constricts stream flow or that will impede aquatic, life movements during low flow conditions. Filter cloth should be placed behind large rock that is used for bank stabilization. Properly designed rock vanes should be constructed wherever appropriate on bank stabilization and channel realignment stream reaches to improve channel stability and to improve aquatic habitat. Root wads should be installed low enough in the bank so that a significant portion (at least one-third) the root wad is inundated during normal flows. 9. The channel should be restored to a more stable condition. However, under no circumstances should river rock, sand or other materials be dredged from the stream channel under authorization of this permit except, if necessary, in the immediate vicinity of the eroding banks for the explicit purpose of anchoring stabilizing or flow/grade control structures or for reestablishing the natural and more stable stream channel dimensions. Stream bed materials are unstable in flowing-water situations and are unsuitable for bank stabilization. In stream dredging has catastrophic effects on aquatic life and disturbance of the. natural form of the stream channel can cause downstream erosion problems. The natural dimension, pattern, and profile of the stream upstream and downstream of the permitted area should not be modified by widening the stream channel or changing its depth. 10. Stabilization measures should only be applied on or near existing erosion sites, leaving other stable stream bank areas in a natural condition. Grading and backfilling should be minimized and tree and shrub growth should be retained where possible to ensure long term availability of stream bank cover for aquatic life and wildlife. Backfill materials should be obtained from upland sites except in cases where excess stream bed materials are available. Berms should not be permitted because they block the floodplain, constrict and accelerate flood flows, and often fail and sometimes impede drainage during large flood events. 11. Repairs to eroded banks should be conducted in a dry work area where possible. Sandbags or other clean diversion structures should be used where possible to minimize excavation in flowing water. Channel realignments should be constructed by excavating the new channel from downstream to upstream before connecting it to the old channel. 12. Heavy equipment should be operated from the bank whenever possible. All mechanized equipment operated near surface waters should be inspected and maintained regularly to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids or other toxic materials. Equipment used in stream channel must be clean, new or low hour equipment. 13. Disturbed stream banks and a 25-foot vegetated zone, or the widest width that is practical under the site conditions, should be restored where possible along the construction sites to natural riparian conditions with native trees and shrubs (e.g., silky dogwood, rhododendron, dog hobble, red maple, silky willow, tag alder, black willow, sycamore) to provide long-term bank stability and stream shading. Note, silky dogwood, silky willow and black willow can be planted as live stakes collected during the dormant growing season. Cuttings should be randomly planted on four (4) foot centers from the waters edge to the top of the bank. Trees should be planted on ten (10) to twelve (12) foot centers. Stream banks in these areas should also be Haywood County: Page 5 of 6 July 25, 2005 seeded with a native annual and perennial seed mix with a temporary nursery crop of wheat, millet or other grain. 14.If pasture along the stream is to be used for grazing, a fence must be constructed outside of the riparian zone and the stream to prevent livestock from entering these areas. 15. Diffuse Flow All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at non-erosive velocities through the protected riparian zones such that it will not re-concentrate before discharging into a stream. If this is not possible, it may be necessary to provide stormwater facilities that are considered to remove nitrogen. This may require additional approval from this Office. 16. Riparian Zone Replanting Replanting of vegetation within disturbed areas located within 25 feet of the streambank associated with any land disturbing activity, repair, replacement and/or maintenance must be done in a manner consistant with the Guidelines for Riparian Buffer Restoration immediately following construction. (Please see attached.) 17. Deed Notifications Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective woody riparian zones in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place prior to impacting any wetlands, waters and/or buffers approved for impact under this Certification Approval and Authorization Certificate. A sample deed notification can be downloaded from the 401/Wetlands Unit web site at http://h2o.enr.state.nc.us/ncwetlands. The text of the sample deed notification may be modified as appropriate to suit to this project. 18. Turbidity Standard The turbidity standard of 10 NTUs (Nephelometric Turbidity Units) shall not be exceeded as described in 15 A NCAC 2B. .0200. Appropriate sediment and erosion control practices must be used to meet this standard. 19. No Sediment and Erosion Control Measures in Wetlands Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources or locally delegated program has released the project. Haywood County: Page 6 of 6 July 25, 2005 Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Cyndi Karoly in the Central Office in Raleigh at 919-733-9721 or Mr. Kevin Barnett in the DWQ Asheville Regional Office at 828-296-4657. Sincerely, Z7?° Alan W. Klimek, P.E., Director Division of Water Quality AW K/khb Enclosures: GC 3367 Certificate of Completion Guidelines for Riparian Buffer Restoration cc: Ken Futreal, Southwestern NC R & D Council 367 Dellwood Road Building E, Suite 3 Waynesville, NC 28786 USACE Asheville Regulatory Field Office DWQ 401 Unit - Central Office DLR Asheville Regional Office File Copy Central Files Filename: 05-1301. EW P. Rogers-HampySite-Crawford Creek.Approval i Detailst i Details2„ j Pe is and 6erts ; Gross Refs "Impacts j b9ltIgatlon M Fjwes, lV131ia g Eve inspecfion? Comment9,, Hi5tot '.? Project Number- 20051301 Version: 1 Status: Issued LastACtionDesr. Project issued 'Project Name: Haywood County EWP: Crawford Creek 'Project Type: !.Stream Restoration /Creation Prolert Desc: EWP 'Owner. Horton, Jack ?_ Details... *Received From: APPhcan? - ?.. _.._. COE ID:. _rfmaryCounty:Hay+f0otl ?'. Receive _ DOTTIP: 'AdminRegion: ;Asheville i dDt 07108(2005 .... ,. ;,, _ keen bamett Renewer.,- Issued Dt 0 712 512 0 0 5 _ _ = econdaryCounty J Statutory Dt 091060005 CA-MA NEPA/ SEPA Received Dt: i DOM Office: SW Plan Received Dt COE Office: nevdla Regulatory Field Office` SW Plan Approved Dt Public Notice Published Dt Last Updated Ey laune.dennison SW Plan Location: ! - -? Public Notice Received Dt: Last Updated On: 0 711 812 0 0 5 Sewage Disposal: ! P.N_ Comment Period Ends Dt <pack Close - ---- i Ready 'SID: WPD1-- Triage Check List Date: 07/18/05 Project Name: Haywood County EWP - Crawford Creek DWQ #:05-1301 County: Haywood Kevin Barnett, Asheville Regional Office .,; To: en 60-day Processing Time: 7/8/05 to 9/6/05 From: Cyndi Karoly Telephone : (919) 733-9721 The file attached is being forwarded to your for your evaluation. Please call if you need assistance. ? Stream length impacted ? Stream determination Wetland determination and distance to blue-line surface waters on USFW topo maps ? Minimization/avoidance issues ? Buffer Rules (Neuse, Tar-Pamlico, Catawba, Randleman) ? Pond fill Mitigation Ratios ? Ditching ? Are the stream and or wetland mitigation sites available and viable? ? Check drawings for accuracy Is the application consistent with pre-application meetings? ? Cumulative impact concern Comments: As per our discussion regarding revision of the triage and delegation processes, please review the attached file. Note that you are the first reviewer, so this file will need to be reviewed for administrative as well as technical details. If you elect to place this project on hold, please ask the applicant to provide your requested information to both the Central Office in Raleigh as well as the Asheville Regional Office. As we discussed, this is an experimental, interim procedure as we slowly transition to electronic applications. Please apprise me of any complications you encounter, whether related to workload, processing times, or lack of a "second reviewer" as the triage process in Central had previously provided. Also, if you think of ways to improve this process, especially so that we can plan for the electronic applications, let me know. Thanks! BOARD OF COMMISSIONERS MARK S. SWVANGER, CHAIRMAN MARY ANN ENLOE, VICE CHAIRMAN LARRY R. AUMONS L. KEVIN ENSLEY J. W. "KIRK" KIRKPATRICK, III ? O D G? 1808 2005 130 1 June 7, 2005 Mr. Scott McLendon Asheville Regulatory Field Office Chief Asheville Regulatory Field Office US Army Corps of Engineers 151 Patton Avenue Room 208 F I L Asheville, N.C. 28801-5006 Ms. Cyndi Karoly, Supervisor 401 Oversight and Express Permits Unit 2321 Crabtree Boulevard 1650 Mail Service Center Raleigh, N. C. 27699-1650 Dear Mr. McLendon and Ms. Karoly: RE: 404/401 Permit Application for Haywood County COUNTY MANAGER C. JACK NORTON COUNTY ATTORNEY LEON M. KILLIAN, III Attached please find the subject applications for EWP sites in Haywood County (Crawford Creek and East Fork of the Pigeon River @ Beauty Shop). The information included with these applications has been developed in cooperation with the Natural Resource Conservation Service (MRCS), the Haywood County Soil and Water Conservation District, and the North Carolina Department of Environment and Natural Resources. This is Haywood County's submission for critical EWP sites on the East Fork of the Pigeon River and Crawford Creek, a tributary of the East Fork of the Pigeon River. There are no Endangered Species located in the areas of the proposed works of improvement. We are looking forward to being able to proceed with this work Please let me, or our coordinator, Kenneth R Futreal (828.400.3279), know of any issues of consideration that we need to make to secure approval for this planned work. We are submitting a copy of the proposal directly to DWQ's Regional 401 Office (Mr. Kevin Barnett) in Asheville, N.C. In addition, since the State of North Carolina has "waived" fees for these EWP 401's, we have not included any permit fees. Thank you for your attention to these applications. We are looking forward to timely regulatory action and approval of these repair plans, so this work can be accomplished. Sincerely, orto Haywood County Manager CJH:bdr Enclosures cc: Kevin Barnett, w/enclosures Kenneth Futreal 215 NORTH MAIN STREET • COURTHOUSE ANNEX - WAYNESVILLE, NORTH CAROLINA 28786 PHONE: 828.452.6625 • FAX: 828.452.6715 Office Use Only: Form Version May 2002 2005 1 301 USACE Action ID No. DWQ No. ki, any panicuiar nem is not appiicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing 1. Check all of the approval (s) requested for this project: ® Section 404 Permit 0 Riparian or Watershed Buffer Rules ? Section 10 Permit Isolated Wetland Permit from DWQ ® 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide 37 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete section VIII and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of rf r? ?--i nvtromnental Concern (see the top of page 2 for further details), the t Tq? mot, - ?$,f II. Applicant Information JUL 0 8 2005 1. Owner/Applicant Information DENR-VVAfERQUALITY Name: Haywood County, Tack Horton, County Manager ??TU?fti05nt DSiCi???''?i?7??EttGS?CH Mailing Address: 215 North Main Street Waynesville, NC 28786 Telephone Number: (828) 452-6625 Fax Number: E-mail Address:_ jhorton@haywoodnc.net 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Kenneth R. Futreal Company Affiliation: Southwestern NCR &D co un it Mailing Address: 367 Dellwood Road Building E, Suite 3 PO Box 1230 Waynesville, NC 28786 Telephone Number: (828) 400-3279 Fax Number: (828) 452-0829 E-mail Address: kfutreal@yahoo.com Page 5 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Haywood County Emergency Watershed Protection Program 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): 8662328470 - Rogers, Dorothy Hooper 8662420542 - Hampy, Mary Loraine 4. Location County: Haywood Nearest Town: Canton, NC Subdivision name (include phase/lot number): Directions to site (include road numbers, landmarks, etc.): Approximately 1 mi e South of Cruso at intersection of US 276 and Crawford Creek Road. 5. Site coordinates, if available (UTM or Lat/Long): N 35024' 0.48", W 820 48' 47-9111 (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres): Approximately 1.0 Acre 7. Nearest body of water (streana/river/sound/ocean/lake):East Fork Pigeon River 8. River Basin: French Broad (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http:Hli2o.enr.state..nc.us/admiii/malis/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Streamhanks are arorling and Bondi ti one are dateri crating, The area affected is resid n ial Page 6 of 12 10. Describe the overall project in detail, including the type of equipment to be used: - - -Streambank-repair and stabilization h ft-Bank (NorthEast Side) of the stream will be shaped to 1.5:1 slope or flatter A rock rrc,Ga vanes will hp installed to redirect the stream flow. Equipment will be excavator, dozers and dump trucks. 11. Explain the purpose of the proposed work: The streambank repair and stabilization is urgent and compelling work under the Natural Resources Conservation Services (NRCS) Emergency Watershed Protection (EWP) Program to protect existing property and structures. IV. Prior Project History If jurisdictional detenninations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. None Anticipated VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forns should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 7 of 12 1.-- Provide a written description of the proposed impacts: - - - - - - - - - - 2. Individually list wetland impacts below: Wetland Impact Site Number (indicate on ma) Type of Impact* Area of Impact (acres) Located within 100-year Floodplain** (yes/no) Distance to Nearest Stream (linear feet) Type of Wetland*** * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http://www.fcma.sov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: Total area of wetland impact proposed: 3. Individually list all intermittent and perennial stream impacts below: Stream Impact Site Number (indicate on ma) Type of Impact* Length of Impact (linear feet) Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? (pleasespecify) 1 i an Excavation 150 Crawford rrppk V) * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS neaps are available through the USGS at 1-800-358-9616, or online at www.usas.gov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozome.com, www.mapquesl.coill, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 150 Page 8 of 12 -------4.--Individually-list X11-open -waterimpaet-,-{including lakes;-ponds;-estuaries, soundsAtlantic Ocean and any other water of the U.S.) below: Open Water Impact Site Number (indicate on ma) Type of Impact* Area of Impact (acres) Name Wat) (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 5. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankinent, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. The streambank on the Right Southwest of the site needs protection to prevent streambank eroding and undermining residential structure. The Left (North East) side needs protection to prevent additional streambank eroding. Access will take place from the north east side of the stream. Equipment will operate from bank when possible. All disturbed areas will be seeded within 15 days of ground disturbing activities. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Page 9 of 12 USACE In accordance with the Final Notice of Issuance- and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.eiir.state.iic.us/iiewetlajids/strmgide.htmi. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCWRP, check the NCWRP website at http://li2o.eii.state.nc.us/wrp/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): Page 10 of 12 IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No W If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No X? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233 (Neese), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 213 .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No [2 If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet) Multiplier Required Mitigation 1 3 2 1.5 Total fi Zone 1 extends out 30 feet perpendicular from near bank ol-channel: Zone 2 extends an additional 20 feet from the edge of Zone 1. Page 11 of 12 If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0260. XI. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No [? Is this an after-the-fact permit application? Yes ? No ? XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Drip t-n E deral rpgul ati nns regarriino _ rhnca of Fjg, funding r-o str-UGtion A;F X31 EWP work must be under construction by September of 2005. Page 12 of 12 (Agent's signature is valid only if an authorization letter from the applicant is provided.) Land Ownership Crawford Creek @ Highway 276 Tax PIN Owner 8662328470 Dorothy Hooper Rogers 11 Sharp Mountain Road Canton, NC 28716 8662420542 Mary Loraine Hampy 605 Lakeshore Drive Eustice, FL 32716 g"H _ - ; a, d; ? :,fir ? {' ? ' 1•? Ilk VIZ. r 10 ?IkZ `? yew ,lC µ}{?? k t a IN e? a 0 r. ? ?t _ y It f f _e.r v Na.? !Y {ts S ' b+ ,j k r mid, 1 ? ?. r o ,. y A Il?,l ?0) J,? oooo a _ ' \\ \ ??C1) \, i rY? 110"Z 1 NOMMM ?ci VV l / 11 , ?/? / ? ? j.'_ /, ? - f., ? / \ ? 1, - ?? ? ? ?•? $'?? ? \\\ ?.? < - - 3 59 ao °34 I ° m/• lv awe nwoe rgrrKwgv?t (SHINING ROCK 184-SE) 336 4454 IV SE Sr.Qi F i'9a nnn BOARD OF COMMISSIONERS Q?pOD CpG\, G 9? 1 r8V COUNTY MANAGER C. JACK HORTON MARK S. SWANGER, CHAIRMAN MARY ANN ENLOE, VICE CHAIRMAN LARRY R. AMMONS L. KEVIN ENSLEY J. W. "KIRK" KIRKPATRICK, III June 7, 2005 Mr. Scott McLendon Asheville Regulatory Field Office Chief Asheville Regulatory Field Office US Army Corps of Engineers 151 Patton Avenue Room 208 Asheville, N.C. 28801-5006 Ms. Cyndi Karoly, Supervisor 401 Oversight and Express Permits Unit 2321 Crabtree Boulevard 1650 Mail Service Center Raleigh, N. C. 27699-1650 Dear Mr. McLendon and Ms. Karoly: COUNTY ATTORNEY LEON M. KILLIAN, III 20051301 ?ry OF-NR RE: 404/401 Permit Application for Haywood County Attached please find the subject applications for EWP sites in Haywood County (Crawford Creek and East Fork of the Pigeon River @ Beauty Shop). The information included with these applications has been developed in cooperation with the Natural Resource Conservation Service (NRCS), the Haywood County Soil and Water Conservation District, and the North Carolina Department of Environment and Natural Resources. This is Haywood County's submission for critical EAT sites on the East Fork of the Pigeon River and Crawford Creek, a tributary of the East Fork of the Pigeon River. There are no Endangered Species located in the areas of the proposed works of improvement. We are looking forward to being able to proceed with this work. Please let me, or our coordinator, Kenneth R Futreal (828.400.3279), know of any issues of consideration that we need to make to secure approval for this planned work We are submitting a copy of the proposal directly to DWQ's Regional 401 Office (Mr. Kevin Barnett) in Asheville, N.C. In addition, since the State of North Carolina has "waived" fees for these EWP 401's, we have not included any permit fees. Thank you for your attention to these applications. We are looking forward to timely regulatory action and approval of these repair plans, so this work can be accomplished. Sincerely, orto Haywood County Manager CJH:bdr Enclosures cc: Kevin Barnett, w/enclosures Kenneth Futreal 215 NORTH MAIN STREET • COURTHOUSE ANNEX • WAYNESVILLE, NORTH CAROLINA 28786 PHONE: 828.452.6625 • FAX: 828.452.6715 1? - ,( Office Use Only: Form Version May 2002 2005130'1 USACE Action ID No. DWQ No. ku any panicuiar item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide 37 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete section VIII and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Enviromnental Concern (see the top of page 2 for further details), check here-D' }? _ 1 s 4 ?' f ?( ,ate pp?p II. Applicant Information fJ F'. v.. Ji.JI_ f) 200r 1. Owner/Applicant Information Name: Haywood County, Tack Horton, county, ManagerOfa LITY Mailing Address: 215 North Main Street Waynesville, NC 28786 Telephone Number: (828) 452-6625 Fax Number: E-mail Address:_ jhorton@haywoodnc.net 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Kenneth R. Futreal Company Affiliation: Southwestern NC RC&D Council Mailing Address: 367 Dellwood Road Building E, Suite 3 PO Box 1230 Waynesville, NC 28786 Telephone Number: (828) 400-3279 Fax Number: (828) 452-0829 E-mail Address: kfutreal@yahoo.com Page 5 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than l 1 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Haywood County Emergency Watershed Protection Program 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): 8662328470 - Rogers, Dorothy Hooper 86624205-4-9 - Hampy, Mary Loraine 4. Location County: Haywood Nearest Town: Canton, NC Subdivision name (include phase/lot number): Directions to site (include road numbers, landmarks, etc.): App oxim Ply t mi e south of Cruso at intersection of US 276 and Crawford Creek Road. 5. Site coordinates, if available (UTM or Lat/Long): N 35024' 0.48", W 820 48' 47.9] " (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres): Approximately 1.0 Acre 7. Nearest body of water (stream/river/sound/ocean/lake):East Fork Pigeon River 8. River Basin: French Broad (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at htti)://li2o.enr.state.ne.us/admin/niaps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Stre mbanks are Prnriing and conditions are detgrierating, The area affected is sid n ia1 Page 6 of 12 10. Describe the overall project in detail, including the type of equipment to be used: - - - - - _Streambank-repair and stabilization The L.eft_Bank (NortbEast Sire) of the stream will be shaped to 1.5:1 slope or flatter. A rock cross vane will be installed to redirect the stream flow. Equipment will be excavator, dozers and dump trucks. 11. Explain the purpose of the proposed work: The streambank repair and stabilization is urgent and compelling work under the Natural Resources Conservation Services (NRCS) Emergency Watershed Protection (EWP) Program to protect existing property and structures. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. None Anticipated VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream chamiels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 7 of 12 ----- A.- Provide a written description of the proposed impacts:- 2. Individually list wetland impacts below: Wetland Impact Site Number (indicate on ma) Type of Impact* Area of Impact (acres) Located within i00-year Fioodplain** (yes/no) Distance to Nearest Stream (linear feet) Type of Wetland*** * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at littp://www.fema.aov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: Total area of wetland impact proposed: 3. Individually list all intermittent and perennial stream impacts below: Stream Impact Site Number (indicate on ma) Type of Impact* Length of Impact (linear feet) Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? (please secify) 1 i an Excavation 150 Crawford rrppk in - * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation. ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.usr!s.t ov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozrnre.conn, www.nrrpquest_coIn, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 150 Page 8 of 12 ----4.-Individually-li st-all-open-water-in-ipacts-(inchding-lakes,-ponds,-estuaries,-pounds; Atlantic Ocean and any other water of the U.S.) below: Open Water Impact Site Number (indicate on ma) Type of Inipact* Area of Impact (acres) Name of Waterbod (if applicable) y Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 5. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., darri/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. The streambank on the Right Southwest of the site needs protection to prevent streambank eroding and undermining residential structure. The Left (North East) side needs protection to prevent additional streambank eroding. Access will take place from the north east side of the stream. Equipment will operate from bank when possible. All disturbed areas will be seeded within 15 days of ground disturbing activities. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Page 9 of 12 USACE - In accordance with the Final Notice of Issuance and Modification of -Nationwide- --- Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at llttp://h2o.eiir.state.nc.us/ncwetlands/stniiLide.himl. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCWRP, check the NCWRP website at http://li2o.enr.state.nc.us/wrp/index.htni. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Arnount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): Page 10 of 12 IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes ® No ? If yes, does the project require preparation of an enviromnental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. . Yes ? No W If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No 0 X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233 (Meuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 213 .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No 1? If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet) Multiplier Required Miti gation 3 2 1.5 Total * "Lone I extends out 30 feel perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of lone 1. Page I I of 12 IX. Environmental Documentation (required by DWQ) - Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No x? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No [J If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet) Multiplier Required Mitigation 1 3 2 1.5 Total fi Gone I extends out 30 leet perpendicular from near bank of channel: Lone Z extends an additional 20 feet from the edge of zone 1. Page I I of 12 • R If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0260. XI. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. __ 1. XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No U Is this an after-the-fact permit application? Yes ? No 0 XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Piia to Federal reRulntinnG regardina_thnca of RWP, funding constr-urtion o€ all EWP work must be under construction by September of 2005. Page 12 of 12 (Agent's signature is valid only if an authorization letter from the applicant is provided.) Land Ownership Crawford Creek @ Highway 276 Tax PIN Owner 8662328470 Dorothy Hooper Rogers 11 Sharp Mountain Road Canton, NC 28716 8662420542 Mary Loraine Hampy 605 Lakeshore Drive Eustice, FL 32716 ( fr, r Ilk, d' 6 k ? Y S . A `$vp t e WK?" P ?tNy ?• r ,• r INC ij? y ? ?! .rte"' ? i r ?l ?r T " ? -d ?•? o? ? r t r e 3: iPl ??:,n- - `_= 4 k •e-. v+ ? ?.,"kF, ?+13? .,,? „?, _ _ r "?l?v ? , F ?' .rb {h ..?'L ? ?? _• r - r a 1 T OF 'T P K ? k. or •. .-yam... ?+Tj :!GS.„w.s.wtT r ? e f` ?? ? .r a +.t ?'• ?, - _rr.,asiee+" Sa 8.. i3• - +w.. 3 Allow Ile r:° _ _ , i+ tae .t??.f,•?". - J i -ef Ilk 10 N/1,00 %, • ,111, ?? ?.? --- -? - -? ? , , , ?., ;I / ,? ?,,?? , ?) EX. Q ? 3 ? t mil- l ?? L)LL ?J4 v1, - `34 I a mr. i',' uwe 111"i, r."HmAy/ (SHINING ROCK 184-S£) 336 4454 IV St Sr.AI F 1•9annn -[Fwd: [Fwd: [Fwd. STream Clearing Activities]]] Subject: [Fwd: [Fwd: [Fwd: STream Clearing Activities]]] From: Cyndi Karoly <cyndi.karoly@ncmail.net> Date: Wed, 16 Mar 2005 15:58:57 -0500 To: Laurie J Dennison <Laurie.J.Dennison@ncmail.net> fyi - so please note that fees are waived when you create these files - perhaps a brief handwritten note in the file jacket, or we can add a copy of this message Subject: [Fwd: [Fwd: STream Clearing Activities]] From: Tom Reeder <tom.reeder@ncmail.net> Date: Wed, 16 Mar 2005 15:43:18 -0500 To: Cyndi Karoly <cyndi.karoly@ncmail.net> Cyndi - In answer to your question yesterday it appears that the fees are being waived for the EWP associated 401s. Subject: [Fwd: STream Clearing Activities] From: Alan Klimek <alan.klimek@ncmail.net> Date: Wed, 16 Mar 2005 15:37:40 -0500 To: Tom Reeder <Tom.Reeder@ncmail.net> Yes, the fees are being waived. See attachment. Alan ------- Original Message -------- Subject:STream Clearing Activities Date:Mon, 28 Feb 2005 09:40:08 -0500 From:"Robin W. Smith" <robin.w.smith(n,ncmail.net> Organization:NC DENR To:Alan Klimek <Alan.Klimek(@,,ncmail.net>, Jim Simons <Jim.Simonspncmail.net>, David Vogel <David.Vogel@ncmail.net> CC:Johanna Reese <Johanna.Reese@)ncmail.net>, Nann Guthrie <Nann. Guthrie(a),ncmail.net> x61: Attached is an electronic copy of the letter and information sheet sent to the 19 counties and one town that have contracts with NRCS for stream clearing projects. Those letters went out over the Secretary's signature on Friday. We will hand-deliver a memo containing the same basic information to the mountain area legislators tomorrow. We are also working with the Governor's office on a news release; I am not sure how soon that will go out. Give me a call if you have any questions. Thanks for working toward getting meetings set up. Robin. [Fwd: [Fwd: [Fwd: STream Clearing Activities]]] Robin W. Smith <robin.w.smith(cr,ncmail.net> Assistant Secretary of Planning & Policy Office of the Secretary NC DENR Content-Type: message/r&822 [Fwd: [Fwd: STream Clearing Activities]] Content-Encoding: 7bit Content-Type: message/r&822 [Fwd: STream Clearing Activities] Content-Encoding: 7bit Content-Type: application/msword ?EWP letter to counties.docI Content-Encoding: base64 Content-Type: application/msword Stream-Clearing Activities-3.doc i Content-Encoding: base64 2 of 2 3/17/2005 6:46 AM I February 25, 2005 Page 1 of 2 February 25, 2005 RE: Emergency Watershed Protection Stream-Clearing Projects Dear I know that County experienced stream damage as a result of the fall hurricanes. Our department would like to work closely with your county to insure that stream restoration projects receiving state and federal funds under the Emergency Watershed Protection (EWP) program move as smoothly as possible through the environmental review and permitting process. I have enclosed for your information a brief summary of the types of permits and approvals that may be required for these projects. For projects that involve work directly affecting the streambed, the United States Army Corps of Engineers will be the primary environmental permitting agency. For those projects, our staff in the Division of Water Quality and the Division of Land Resources play a supporting role and issue related state approvals. I have asked our staff to meet with all of the western counties, either individually or in small groups, to talk about each county's proposed stream restoration projects and answer your questions about permit requirements. Our staff will ask the Corps of Engineers and Soil and Water Conservation staff to join in those meetings in an effort to put together a plan of action for reviewing and approving stream restoration projects as quickly as possible. You should receive a telephone call from DENR staff soon to talk about a date and time that would be convenient to meet and talk about your projects. I have also directed our staff to waive fees for state water quality certifications (under Section 401 of the Clean Water Act) and for approval of erosion and sedimentation Ir February 25, 2005 Page 2 of 2 control plans for stream-clearing projects funded under EWP. Fees will be waived for all EWP permit s requested by September 1, 2005. I hope these efforts will ease the burden on county governments already challenged by the demands of reconstruction and recovery. If we can help you in any other way, please do not hesitate to call. I have asked Assistant Secretary Robin Smith to be a- primary contact on these projects for DENR; you can reach Ms. Smith at (919) 715-4141. The enclosed information sheet also provides contact information for DENR staff in both the Asheville and Winston-Salem Regional Offices and for the Corps of Engineers office in Asheville. Sincerely, William G. Ross, Jr.