HomeMy WebLinkAbout310854_Inspection_20181220Facility, Number
CJ Division of Water Resources
- SYf O Division of Soil and Water Conservation
O Other Agency
of Visit: C_o/mpliance Inspection
m t�J for Visit: Routine O Comol
Referral O Emergency O Other O Denied Access
Date of Visit: 12-20'-l/ Arrival Time: (�-'1 O Departure Time: 1 ! County:
Farm Name: Lrdd( Ni 6g(,e� r brM V_ Owner Email:
Owner Name:
Mailing Address:
Physical Address:
Facility Contact: Title:
Phone:
Onsite Representative: Ili Integrator:
Certified Operator:
Back-up Operator:
Location of Farm:
Swine
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feede.
Farrow to Finish
Other
Other
Latitude:
Phone:
Certification Number:
Certification Number:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
Non -Layer
Design Current
Discharges and Stream Impacts
Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
Longitude:
Region:
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
❑ Yes 19 No ❑ NA ❑ NE
[—]Yes [—]No
❑ Yes [:]No
[—]Yes [—]No
❑ Yes [g No
❑ Yes [N No
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
❑NA ❑NE
❑ NA ❑ NE
Page 1 of 21412015 Confirmed
Facility Number: 3 j- Date of Inspection: -Zp-
8
Waste G`dllection & Treatment
�,�{
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
❑ Yes
lL� No
❑ NA
❑ NE
a. If yes, is waste level into the structural freeboard?
❑ Yes
❑ No
❑ NA
❑ NE
Structure 1 Structure 2 Structure 3 Structure 4
Structure 5
Structure 6
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in): 2-t7
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes
No
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes
No
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat,
notify DWR
7. Do any of the structures need maintenance or improvement?
❑ Yes
1� No
❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes
[P No
❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes
No
❑ NA
❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes
[� No
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes
LEI No
❑ NA
❑ NE
❑ Excessive Pending ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN> 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge
into
Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application
Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes
M No
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes
19 No
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes
W No
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
[�j No
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
[�T No
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ® No ❑ NA ❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ® No ❑ NA ❑ NE
the appropriate box
❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other.
21. Does record keeping need improvement? If yes, check the appropriate box below. Z Yes ❑ No ❑ NA ❑ NE
Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge?
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
❑ Yes ® No ❑ NA ❑ NE
[—]Yes ❑ No ❑ NA � NE
Page 2 of 3 21412015 Continued
Facifi Number: Date of Inspection:
2,4. Did ilie facility fail to calibrate waste application equipment as required by the pennit? ❑ Yes No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes Vg No ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge?
27. Did the facility fail to secure a phosphorus loss assessments (PLA1) certification?
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
❑ Yes
[�fNo
❑ NA
❑ NE
❑ Yes
❑ No
RNA
❑ NE
❑ Yes ® No ❑ NA ❑ NE
❑ Yes Vj No ❑ NA ❑ NE
❑ Yes [0 No ❑ NA ❑ NE
❑ Yes ❑ No [:]NA ONE
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes �No ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes [� No ❑ NA ❑ NE
Reviewer/Inspector Name:
1/0 -7YG =7,y3x-
Reviewer/Inspector Signatw
12 .La-c 5