Loading...
HomeMy WebLinkAboutNC0049867_NOD-2019-PC-0124_20190509ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director The Honorable Danny Gabriel, Mayor Town of Cleveland Post Office Box 429 Cleveland, North Carolina 27013 Dear Mayor Gabriel: NORTH CAROLINA Environmental Quality 9 May 2019 Subject: Notice of Deficiency Pretreatment Compliance Inspection Town of Cleveland NPDES Permit No. NCO049867 Rowan County Tracking No. NOD-2019-PC-0124 Enclosed is a copy of the Pretreatment Compliance Inspection Report for the inspection of the Town of Cleveland's approved Industrial Pretreatment Program on May 3, 2019, by Mr. Wes Bell of this Office. This report is being issued as a Notice of Deficiency (NOD) due to the Town's failure to collect all samples according to the Industrial User Permit #0001 (Daimler Trucks NA) during the second half of 2018. Specifically, the Town failed to monitor for aluminum, COD and MBAS during the second semi-annual sampling event in 2018. It is requested that a written response be submitted to this Office by May 31, 2019, addressing the actions taken to prevent the recurrence of these violations. In responding, please address your comments to Mr. Bell. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact Mr. Bell at (704) 235-2192 or at wes.bell@ncdenr.gov. Sincerely, aDocuSignedd by: �PiY ��GG A61696D90CC3437... for W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ Enclosure: Inspection Report cC: PERCS Unit (Laserfiche) D Q � North Carolina Department of Environmental Quality I Division of Water Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 NORTH CAROLINA Da"MoM a enWmn�bl mwnq 704,663.1699 NORTH CAROLINA DIVISION OF WATER RESOURCES PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT BACKGROUND INFORMATION: 1. Control Authority (POTW) Name: Town of Cleveland 2. Control Authority Representative(s):Barbara Sifford 3. Title(s): Pretreatment Consultant 4. Last Inspection Date: 6/12/18 Inspection Type: ❑ PCI ® Audit 5. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? ® YES ❑ NO 6. Is POTW under an Order That Includes Pretreatment Conditions? ❑ YES ® NO Order Type, Number, Parameters: Are Milestone Dates Being Met? ❑ YES ❑ NO ® NA Main Program Permit Number MM/DD/YY NCO049867 05/03/19 7. Current Number Of Significant Industrial Users SIUs ? 1 8. Number of SIUs With No IUP, or With an Expired IUP? 0 9. Number of SIUs Not Inspected By POTW in the Last Calendar Year? 0 10. Number of SIUs Not Sampled By POTW in the Last Calendar Year? 0 11. Number of SIUs In SNC For Limits Violations During Either of the Last 2 Semi -Annual Periods? 0 12. Number of SIUs in SNC For Reporting During Either of the Last 2 Semi -Annual Periods? 0 13. Number of SIUs in SNC with Pretreatment Schedule? 0 14. Number of SIUs on Schedules? 0 15. Current Number Of Categorical Industrial Users (CIUs)? 1 16. Number of CIUs in SNC? 0 POTW INTERVIEW 17. Since the Last PCI, has the POTW had any NPDES Limits Violations? If Yes, What are the Parameters and How are these Problems Being Addressed? 18. Since the Last PCI, has the POTW had any Problems Related to an Industrial Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production, Etc.)? If Yes, How are these Problems Being Addressed? 19. Which Industries have been in SNC for Limits or Reporting during SNC foi either of the Last 2 Semi -Annual Periods? Not Been Published for SNC foi Public Notice?(May refer to PAR if Excessive SIUs in SNC) Not Pu 20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an Order, Has a Signed Copy of the Order been sent to the Division? 21. Are Any Permits Or Civil Penalties Currently Under Adjudication? If Yes, Which Ones? ® YES ❑ NO See Comments [—]YES ®NO Limits: None Reporting: None )lished: N/A N/A ❑ YES ® NO LTMP/STMP FILE REVIEW: 22. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® YES ❑ NO 23. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? ® YES ❑ NO 24. Is LTMP/STMP Data Maintained in a Table or Equivalent? ® YES ❑ NO Is Table Adequate? ® YES ❑ NO 25. All LTMP/STMP effluent data reported on Discharge Monitoring Report? ® YES ❑ NO 26. If NO to 23 - 26, list violations: 27. Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? ❑ YES ® NO NC DWR Pretreatment Compliance Inspection (PCI) Form Updated 7/25/07 Page 1 28. PRETREATMENT PROGRAM ELEMENTS REVIEW: Program Element Last Submittal Received Date In file? Last Approval Date In file Date Next Due, If Applicable Headworks Analysis (HWA) 10/8/18 ® Yes ❑ No 1/28/19 ® Yes ❑ No 9/1/23 Industrial Waste Survey (IWS) 7/14/16 ® Yes ❑ No 10/3/16 ® Yes ❑ No 6/1/21 Sewer Use Ordinance (SUO) 1/18/13 ® Yes ❑ No 1/23/13 ® Yes ❑ No Enforcement Response Plan (ERP) 7/15/09 ® Yes ❑ No 8/13/09 ® Yes ❑ No Long Term Monitoring Plan (LTMP) 3/31/17 ® Yes ❑ No 7/13/17 ® Yes ❑ No INDUSTRIAL USER PERMIT (IUP) FILE REVIEW: 29. User Name 1. Daimler Trucks NA, LLC I 2. 3. 30. IUP Number 0001 31. Does File Contain Current Permit? ® Yes ❑ No ❑ Yes ❑ I ❑ Yes ❑ No 32. Permit Expiration Date 6/30/20 33. Categorical Standard Applied (I.E. 40 CFR, Etc.) Or N/A 433.17 34. Does File Contain Permit Application Completed Within One Year Prior ® Yes ❑ No ❑ Yes ElNo ElYes ❑ No to Permit Issue Date? 35. Does File Contain an Inspection Completed Within Last Calendar Year? I ® Yes ❑ No ❑ Yes ❑ No 11 ❑ Yes ❑ No 36. a. Does the File Contain aSlug/Spill Control Plan? a. ®Yes ❑No a. ❑Yes ❑No a. ❑Yes ❑No b. If No, is One Needed? (See Inspection Form from POTW) b. ❑Yes ❑No b. ❑Yes ONO 11 b. ❑Yes ❑No 37. For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic ®Yes❑No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A Organic Management Plan TOMP ? 38. a. Does File Contain Original Permit Review Letter from the Division? a. ®Yes ❑No a. ❑Yes ❑No a. ❑Yes ❑No b. All Issues Resolved? b.❑Yes❑NoEN/A b.❑Yes❑No❑N/A b.❑Yes❑No❑N/A 39. During the Most Recent Semi -Annual Period, Did the POTW Complete ❑Yes ® fl❑ Yes ❑ No ❑ Yes ❑ No its Sampling as Required b IUP, includingflow? 40. Does File Contain POTW Sampling Chain -Of -Custody Forms? ® Yes ❑ No 11 ❑ Yes ❑ No ❑ Yes ❑ No 41 a. During the Most Recent Semi -Annual Period, Did the SIU Complete its ®Yes❑No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A Sampling as Required by IUP, including flow? 41b. During the Most Recent Semi -Annual Period, Did SIU submit all reports EYes❑No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A on time? 42a. For categorical IUs with Combined Wastestream Formula (CWF), does EYes❑No❑N/A ❑Ycs❑No❑N/A ❑Yes❑No❑N/A file include process/dilution flows as Required by IUP? 42b. For categorical IUs with Production based limits, does file include ❑Yes❑NoEN/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A production rates and/or flows as Required b IUP? 43a. During the Most Recent Semi -Annual Period, Did the POTW Identify OYes❑NoENA ❑Yes❑No❑N/A ❑Yes❑No❑N/A All Limits Non -Compliance from Both POTW and SIU Sampling? 43b. During the Most Recent Semi -Annual Period, Did the POTW Identify ❑Yes❑NoEN/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A All Reporting Non -Compliance from SIU Sampling? 44. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self- a.❑Yes❑NoEN/A a.❑Yes❑No❑N/A a.❑Yes❑No❑N/A Monitoring Violations? b. Did Industry Resample and submit results to POTW Within 30 Days? b.❑Yes❑No®N/A b.❑Yes❑No❑N/A b.❑Yes❑No❑N/A c. Did POTW resample within 30 days of knowledge of SIU limit c.oyes❑NoEN/A c.❑Yes❑No❑N/A c.❑Yes❑No❑N/A violations from the POTW sample event? 45. During the Most Recent Semi -Annual Period, Was the SIU in SNC? ❑ Yes ® No ❑ Yes ❑ No ❑ Yes ❑ No 46. During the Most Recent Semi -Annual Period, Was Enforcement Taken ❑Yes❑NoEN/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A as Specified in the POTW's ERP (NOVs, Penalties, timing, etc.)? 47. Does the File Contain Penalty Assessment Notices? ❑Yes❑NoEN/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 48. Does The File Contain Proof Of Penalty Collection? ❑Yes❑NoEN/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 49. a. Does the File Contain Any Current Enforcement Orders? a.❑Yes❑NoEN/A a.❑Yes❑No❑N/A a.❑Yes❑No❑N/A b. Is SIU in Compliance with Order? b.❑Yes❑No®N/A b.❑Yes❑No❑N/A b.❑Yes❑No❑N/A 50. Did the POTW Representative Have Difficulty in Obtaining Any of This ❑ Yes ® ❑ Yes ❑ No ❑ Yes ❑ Requested Information For You? !11 ni NC DWR Pretreatment Compliance Inspection (PCI) Form Updated 7/25/07 Page 2 FILE REVIEW COMMENTS: 17. The POTW's WWTP exceeded the BOD weekly average limit in April 2018 (1 violation), January 2019 (3 violations), February 2019 (2 violations) and March 2019 (1 violation). The BOD monthly average limit was also exceeded in January 2019, February 2019, and March 2019. A weekly average effluent fecal coliform violation was reported in September 2018. The POTW staff are currently evaluating WWTP operations and performing additional sampling throughout the collection system to determine the source of the influent BOD loadings. 35. The POTW performed the inspection at Daimler on 6/12/18. 37. Daimler performs semi-annual TTO sampling and analyses. 39. The POTW contracts R&A Laboratories to perform LTMP and SIU analyses. The POTW failed to collect the semi-annual MBAS, aluminum, and COD samples (per IUP) during the last half of 2018. 41a. Daimler contracts Pace Analytical Services to perform sample analyses. SUMMARY AND COMMENTS: Daimler's contracted lab (Pace Analytical Services) uses a higher detection level (10 ug/L) for arsenic than the required IUP detection level (5 ug/L). The POTW must ensure Daimler adheres to all required IUP detection levels. The records reviewed during the inspection were organized and well maintained. The POTW staff must collect additional MBAS, aluminum, and COD samples during 2019 to make up for the missed samples during the last half of 2018. Overall, the POTW's Industrial Pretreatment Program was being properly implemented. NOD: ® YES ❑ NO NOV: [—]YES ® NO QNCR: ❑ YES ® NO POTW Rating: Satisfactory ❑ Marginal ❑ Unsatisfactory_ ❑ [�:'.DgOCC3437 ocuSignedd by: PCI COMPLETED BY:... DATE: 5/9/2019 Wes Bell, Env. Specialist II, Mooresville Regional Office NC DWR Pretreatment Compliance Inspection (PCI) Form Updated 7/25/07 Page 3