HomeMy WebLinkAboutNCC190352_ESC Approval Submitted (2)_20190522�L
4 l _ PROTECTION z
FENCE
`LONGE30URN DRIVE
EX. (EX 15T 1 N b�
EX. PH
CB.... EX. 18" RCP '�� CB -
�` r EX _ EX. 8" DIW -- _ - - -`
�. Ex. 8'v EX,
EX. E7(.
Mil MFI 1 x. 115, RCP i MH
Mii �. EX. 8" 5AN. SEWER (TYPi _ 1 s
1
TEMrORARY
CONSTRUCTION
/ENTRANCE
1
PEMBERL�..
5U8 ASS iD
V DIVERSION �
V �.
/ITREE
3OG PROTECTION'r r
FENCE (T-1'P.)
PP�y ..... RISER BASIN # I /
_... r
i DRAINAGE AREA=23.�} AC 1 I
r. OVERHEAD
+, ! POWER LIN 5 SLOPE
- •......r r DRAIN
LIMIT OF
OURBANCE
MBIivAi1
PR F�L fIQN .FEN
SIL CE
PERMANENT 5LOPE-
EASEMENT ! EX
(BM 20.1,2; PG 245) M I
INV.=298.0
15'LXCLAS 2
EX "F _._ RIP-IZAP PAD
-- ff {1)561 24")
COIR
POND DRAINING SEQUENCE:
I . THE EXISTING ON-51TE POND SHALL BE DRAINED TO IN5TALL RISER DA51N # I .
2. POND DRAINING SHALL DE ACCOMPLISHED BY FIR5T IN5TALL[NG THE 30" RCP TO THE APPROXIMATE EXISTING
WATERS EDGE OP THE EXISTING POND.
3. POND DRAINING MAY THEN COMMENCE BY PUMPING WATER THROUGH THE INSTALLED 30" RCP. AS THE WATER
LEVEL 15 LOWERED, CONTRACTOR 5HALL AL50 LOWER GRADE OF THE E7l[5TING DAM.
4. ONCE WATER 15 SUFFICIENTLY LOWERED, CONTRACTOR SHALL INSTALL REMAINING 30" RCP, R15ER, AND 4"
5KIMMER.
4'x4'
RISER
4" SKIMMER
EROSION PERMIT NOTE5
1. A LAND DISTURBING (E&SC) PERMIT IS REQUIRED FOR PROJECTS OVER 0.50 ACRE. IF MULTIPLE LOTS WITH
LAND DISTURBANCE OVER 0.50 ACRE TOTAL ARE EITHER CONTIGUOUS OR NON-CONTIGUOUS IN THE SAME
SUBDIVISION, BEING TAKEN DOWN BY THE SAME BUILDER/OWNER, A LANE] DISTURBING PERMIT IS REQUIRED.
THE COST Of THE PLAN REVIEW AND PERMIT IS $500/ACRE ROUNDED UP. THE FEE IS DUE AT TIME OF PLAN
SUBMITTAL. DEVELOPER IS RESPONSIBLE FOR INFORMING BUILDER OF E&SC PERMIT REQUIREMENTS ON
INDIVIDUAL LOTS.
2. IF ADDITIONAL ACREAGE IS ADDED TO AN EXISTING PERMIT REVISED FORMS, PLANS, AND ANY ADDITIONAL
FEES MUST BE SUBMITTED.
3. IF OWNERSHIP OF A PROPERTY HAS CHANGED A REVISED FRO MUST BE SUBMITTED.
4. IF A PROPERTY 15 TAKEN OVER BY THE BANK, THE BANK SHALL CONTACT THE TOWN AND REPAIR ALL EROSION
CONTROL MEASURES TO TOWN/NCDENR STANDARDS. THEY SHALL ALSO SUBMITA NEW FRO FORM.
5. IF A PROJECT 15 NOT COMPLETE WITHIN TWO YEARS, THE PLANS MUST BE RENEWED AT $250/ACRE. A
REVISED SET OF PLANS MAY BE SUBMITTED IF ACREAGE HAS ALREADY BEEN DEVELOPED AND A CERTIFICATE OF
OCCUPANY HAS BEEN ISSUED.
6. AN EROSION PRECONSTRUCTION MEETING MUST BE HELD WITH THE TOWN OF WAKE FOREST PRIOR TO
START OF ANY WORK, INCLUDING INSTALLATION OF EROSION CONTROL MEASURES, DEMOLITION, CUTTING
TREES, AND GRUBBING. CALL ENGINEERING AT (919) 435-9442 TO SET UP A MEETING. ALL PLANS MUST BE
SIGNED AND COPIES RETURNED BACK TO THE TOWN 1 WEEK PRIOR TO PRECONSTRUCTION MEETING.
7. THE OWNER, GENERAL CONTRACTOR, GRADING COMPANY, AND EROSION
CONTROL INSTALLER MSUT BE PRESENT AT THE PR ECONSTR U CITO N MEETING.
8. THE E&SC PERMIT AN NPDES GENERAL STORMWATER PERMIT WILL BE GIVEN OUT AT THIS MEETING.
CONSTRUCTION SEQUENCE NOTES
1. AFTER THE PRECONSTRUCITON MEETING IS HELD, THE CONTRACTOR CAN INSTALL INITIAL EROSION
CONTROL MEASURES ONLY. THIS INCLUDES BUT IS NOT LIMITED TO CONSTRUCTION ENTRANCE, SILT
FENCE, PERIMETER DIVERSION DITCH, CHECK DAMS (ROCK OR WADDLE TYPE), TREE PROTECTION
FENCE, EXISITNG INLET PROTECTION, SKIMMER SEDIMENT BASINS, AND SEDIMENT TRAPS. CLEAR ONLY
AS NECESSARY TO INSTALL THESE MEASURES.
2. CONTRACTOR i5 RESPONSIBLE FOR E&SC WEEKLY INSTALLATION AND MAINTENANCE LOG INCLUDING
DATES OF TEMPORARY/PERMANENT GROUND COVE R,A RAIN GAGE, COPY OFTOW F 51GNED PLANS
ONSITE, REVISED SIGNED PLANS, NPDES LOG, AND CONSTRUCTION BOX MUST BE PRESENTAND EASILY
ACCESSABLE ONSITE.
3.ONCE MEASURES ARE INSTALLED, CONTRACTOR/FRO TO CALL TOWF FOR AN INITIAL INSPECTION. IF
SITE PASSES INSPECTION, A CERTIFICATE OF COMPLIANCE WILL BE ISSUED. CONTRACTOR CAN NOW
BEING CLEARING, GRUBBING, AND GRADING.
4. CONTRACTOR TO MAINTAIN ACCESS ROAD FOR EMERGENCIES AT ALL TIMES.
5. PHASE PROJECT TO LEAVE AS LITTLE GROUND OPEN AS POSSIBLE.
6. TEMPORARILY SEED, STRAW AND TACK OR HYDROSEED WITHIN 14 DAYS OF ANY PHASE OF GRADING,
INCLUDING SLOPES. SEED BASINS AND DITCHES IMMEDITEALY AFTER CONSTRUCTION.
7.PRIOR TO REMOVAL OF TEMPORARY MEASURES, TOWN MUST APPROVE REMOVAL, ALL AREAS ABOVE
TEMPORARY MEASURE MUST HAVE 85% GROUND COVER.
8-THE TOWN OF WAKE FOREST CONSTRUCTION INSPECTOR WILL EVAU LATE THE SITE ATLEAST ONCE A
MONTH. A COPY OF THE IN5PECTION FORM WILL BE EMAILED TO THE FRO. THE WEEKLY EROSION LOG AND
NPDES LOG MUST BE ONSITE AND AVAILABLE FOR REVIEW.
9. IF THE SITE IS FOUND OUT OF COMPLIANCE A NOTICE OF VIOLATION WILL BE ISSUED GIVING THE
CONTRACTOR/FRO 7 WORKING DAYS TO REMEDY THE PROBLEM. IF THE SITUATION IS NOT RESOLVED
WITHIN THE TIME PERIOD A FINE MAY BE ISSUED.
10. IF SEDIMENT LEAVES THE SITE A FINE MAYBE ISSUED UP TO $5,000 PER DAY PER VIOLATION. IF
SEDIMENT ENTERS BUFFER, STREAM, OR WETLAND NCDWQ WILL BE NOTIFIED, THEY MAY ISSUE FINES UP
TO $25,000 PER DAY PER VIOLATION.
11. CALL THE TOWN UPON COMPLETION FOR A FINAL EROSION INSPECTION. A PUNCHLIST MAYBE
GENEREATED ADDRESSING ANY REMAINING ITEMS. THERE MUST BE 85%GROUNDCOVER ON THE ENTIRE SITE
PRIOR TO CERTIFICATE OF OCCUPANCY. IF THE SITE IS FOUND TO BE IN COMPLIANCE AN EROSION
CERTIFICATE OF COMPLETION WILL BE ISSUED.
1 P/__ F A 1 I-1
DIVER5ION DITCH
TREE FROTECTION FENCE
AND 51LT FENCE
TREE PROTECTION FENCE
Q I 0=49.4 CFS {I 10=7.04 11'4/1 1R, C=o.3} t
5.A,=2 1 ,519 5E {49.4 CPS X .01 X 43.5 } ! LIMIT5 OF D15TURDANCE
VOL. =42, 120 CF (23.4 AC X 1,800 CFJAC j I
SIZE=I75LX 140WX31)
WEIR SIZE= 10,
SKIMMER 51ZE=4'; ORIFICE SIZE= 1 .6'
CUSTOM E3A51 N
1
1
1 CON5TRUCTION ENTRANCE
SOIL
STOCKPILE
AREA
_ ...
LIMIT DP
GENERAL NOTES:
I . ALL MATERIALS AND METHODS OF CONSTRUCTION 5HALL CONFORM TO TOWN OF WAKE FOREST STANDARDS AND SPECIFICATIONS.
2. BOUNDARY AND EX15TING CONDITION5 ENFORMATION FOR THE 51TE WERE TAKEN FROM A DIGITAL FILE PROVIDED BY ELINGBURG LAND
SURVEY COMPANY.
3. TOPOGRAPHIC INFORMATION POR THE 51TE WAS TAKEN FROM A DIGITAL FILE PROVIDED BY f=LING15URG LAND SURVEY COMPANY. TH15
SURVEY DATA WAS BLENDED WITH NORTH CAROLINA LIDAR TOPO AT THE PROPERTY BOUNDARY TO CREATE THE TOPOGRAPHY SHOWN
HEREON.
4, WETLAND AND NEU5E RIVER BUFFER DELINEATIONS WERE DETERMINED BY SAGE ECOLOGICAL SERVICES, INC.
5. THE FEMA MAP REFERENCE FOR TH15 SITE 15 PANEL 3720183000J DATED MAY 2, 200G.
G. ALL NECESSARY PI RM1T5 5HALL BE OBTAINED FROM NCDENK, DWR, THE ARMY CORPS OF ENGINEER5 OR OTHER AUTHORIZED AGENCIES
PRIOR TO CONSTRUCTION DRAWING APPROVAL.
7. THE AREAS SHOWN ON THE RECORDED PLAT IDENTIFIED AS NEU5E RIVER RIPARIAN BUFFER SHALL BE MAINTAINED IN PERPETUITY IN THEIR
NATURAL OR MITIGATED CONDITION. NO PERSON OR ENTITY SMALL FILL, GRADE, EXCAVATE, OR PERFORM ANY OTHER LAND -DISTURBING
ACTIVITIES; NOR CUT, REMOVE, OR HARM ANY VEGETATION; NOR CONSTRUCT ANY 5TRUCTURE5 NOR ADD ANY ADDITIONAL IMPERVIOUS
SURFACE, NOR ALLOW ANIMAL GRAZING OR WATERING OR ANY OTHER AGRICULTURAL USE ON SUCH PROTECTED AREAS WITHOUT WRITTEN
AUTHORIZATION OF THE DIVISION OF WATER QUALITY (DWQ) OR COMPLIANCE WITH T11E RIPARIAN BUFFER PROTECTION RULE5 (15A NCAC
215 .0233 OR .0259). THIS COVENANT 15 TO RUN WITH THE LAND, AND SHALL BE BINDING ON THE OWNER, AND ALL PARTIES CLAIMING
UNDER IT.
8. THE 51TE 15 PROP05ED TO BE MA55 GRADED, ALL APPLICABLE REQUIREMENT5 OF LIDO 5ECTi0N 12 SHALL APPLY.
9. THE TOTAL DISTURBED AREA 5 15.2 ACRES.
10. PHASE I SMALL CON515T OF LAND DISTURBANCE NECE55ARY TO INSTALL EROSION CONTROL MEASURES ONLY. ONCE COMPLETED, THE
CONTRACTOR 5HALL CONTACT THE TOWN Of WAKE FOREST TO COMPLETE A 51TE INSPECTION AND ISSUE A CERTIF[CATE OF COMPLIANCE
BEFORE STARTING PHASE 2.
1 1. ER051ON CONTROL MEA5URE5 SMALL BE INSTALLED IN THE BEST LOCATION BASED UPON FIELD CONDITIONS,
12. THE DEVELOPER 15 Rl 5FONSIDLE FOR INSTALLATION AND MAINTENANCE OF ER0510N CONTROL ❑EVICE5,
13. RETAINING WALL APPROVALS SHALL BE }iANDLED AS A SEPARATE SUBMITTAL.
14. 501L 5TOCKPILE5 SHALL BE NO HIGHER THAN 35 PEET AND HAVE 5LOPE5 NO STEEPER THAN 2: 1.
15. THE LIGON MILL ROAD D15TURBED LIMITS {R/W} 5HALL BE 5TABILI7E1) WITHIN 7 DAYS OF FINAL ROUGH GRADING.
i G. NO CONSTRUCTION TRAFFIC SHALL ENTER OR EXIT ONTO STONE MONUMENT DRIVE AND LONGBOURN DRIVE.
17, CONSTRUCTION VEHICLES/EQUIPMENT 5HALL NOT PARK ON STONE MONUMENT DRIVE AND LONGBOURN DRIVE. ALL CON5TRUCTiON
EQUIPMENT AND VEHICLES SHALL BE KEPT ON SITE.
Q 20 40 80
GRAPHIC SCALE
THESE PLAN 11
HAV
OVED FOR CONSTRUCTION BY THE TOWN OP WAKE FOREST
EN INEERING DEPARTMENT
DATE
E5 BI Ty
DATE
A5
2-IN
cmK_4-1.1q
PUBLIC WORKS � ENT
DATE
P NNING PARTMENT
DATE
EROSION AND SEDIMENT CONTROL
DATE
CITY OF RALEIGH PUBLIC UTILITIES
DATE
FIRE PREVENTION
DEPARTMENT
I�Ij4
DATE URBAN FORESTER DATE
U
J
.m
J
CL
I I Kej
r►
(D
(
5
z
_..i
w
W
W
Z
0
c
m
0
Z
C
Lu
3
111
u
Nv
U
221 N. SALEM ST.
SUITE Bat
PO BOX 1062
APEX, INC 275M
Office: 919-M-1174
fegidratlon: P-0151
www.jonen.com
_�ng111F111�l+fry oapr
S L
r'/�� '�NG IN
ft''�R
,,+df«Ifllfii Ll4i���� A 1 _ 1
2
--
° l.l._1
Lu Q
L.L O
Q
O L
L
LJ._.1
Z L7
L
Q 0 J
0
UJ a/
❑C
� o 0
� U
J
z
L 0
uj
U..V
O 0 w
w % ,, I
Q �
�LL_ W
O
O
I--
JULY 19, 2018
I 1/15/1-5 15t TRC COMMENT5
02101 / 19 15IGNATUKE SET
Ira
1724