Loading...
HomeMy WebLinkAbout20190668 Ver 1_Polk County - B 29 - Detour Hydro Report_20190522DocuSign Envelope ID: C1AF8EF7-EOFO-4BA2-9B20-092019FOB193 DETOUR STRUCTURE SURVEY & HYDRAULIC DESIGN REPORT N.C. DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS HYDRAULICS UNIT RALEIGH, N.C. I.D. NO. 41665.3D Project No. 41665.3D Proj. Station DET 21+01 County P01k Stream Z5ee auunwnai nuies Str. No. On Highway NC9 Between SR 1550 Recommended 2 @ 84" CMP w/ temp. sandbag HW Structure and 29 SR 1525 Recommended Roadway Width22' (26' EOP to EOP) Skew 75 Recommended Location is (Up, At, Down) Stream from Existing Crossing Upstream Benchmark isControl Point BM #2 @ BL Sta. 14+10.26 32.96' LT Elev. 884.01 ft. Datum NAVD 88ft. Superstructure Depth (3' assumed unless otherwise noted) N/A ft. Recommended Grade Point at Structure 884.14 ft. DESIGN DATA Frequency Discharge Elevation (U/S) Velocity (D/S) 10 yr. 890 c.f.s. 883.1 ft. 3.1 ft/s SITE DATA Drainage Area3.7 square miles Normal Water Surface Elev. 874.2 t, Allowable HW Elev.883.2 (SAG at -DET- 21+50) ft. ADDITIONAL INFORMATION Stream is South Branch of Little White Oak Creek 2 @ 84" CMP not buried Note: See attached drawing for any additional notes Designed by: P. H. Cameron, P. E. Assisted by:V. Wang, E.I. Project Engineer: P.H. Cameron, P.E. Reviewed by:`- CARo , �0�..•�SSI •'129 =, SEAL _ 40801 S nli �'•••........ Docusi9ti0rb/Y :/H. C �'\V` �\o\ Zols EP8382D9B58C3240F �C,� ve(nN �Y ...