Loading...
HomeMy WebLinkAbout20190668 Ver 1_PCN Form Submission_20190522DWR IDIOM n of Water Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 21nitial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* C Yes r No Change only if needed. BIMS # Assigned 20190668 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Select Project Reviewer* Kevin Barnett:eads\khbarnett Information for Initial Review 1a. Name of project: Polk County - Bridge 29 1a. Who is the Primary Contact?* Patrick J. Breedlove 1b. Primary Contact Email:* pjbreedlove@ncdot.gov Date Submitted 5/22/2019 Nearest Body of Water South Branch Little White Oak Creek Basin Broad Water Classification Class C Version# * 1 Reviewing Office* Asheville Regional Office - (828) 296-4500 1c. Primary Contact Phone:* (828)631-1145 Site Coordinates Latitude: Longitude: 35.285886-82.121607 AProcessing Information U County (or Counties) where the project is located: Polk Is this project a public transportation project?* r Yes r' No Is this a NCDOT Project?* r Yes r No (NCDOT only) T.I.P. or state project number: WBS#M 41665.3D 1a. Type(s) of approval sought from the Corps: W Section 404 Permit (wetlands, streams and waters, Clean Water Act) F Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What types) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) F' Regional General Permit (RGP) F' Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? f Yes r No Nationwide Permit (NWP) Number: 03 - Maintenance NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: rJ 401 Water Quality Certification - Regular F Non-404 Jurisdictional General Permit F Individual Permit le. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: F 401 Water Quality Certification - Express F Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment Polk County - B 29 - Mitigation Acceptance Letter.pdf 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? r^ Yes r No B. Applicant Information 1d. Who is applying for the permit? W Owner F Applicant (other than owner) le. Is there an Agent/Consultant for this project? r Yes r- No 2. Owner Information 2a. Name(s) on recorded deed: NCDOT Division 14 2b. Deed book and page no.: 2c. Responsible party: 2d.Address Street Address 253 Webster Road Address Line 2 city Sylva Bbstal / Zip Code 28779 2e. Telephone Number: (828)631-1145 Sate / Province / Region North Carolina (buntry United States 2f. Fax Number: (828)586-4043 66.17KB * r Yes r No r Yes r No 2g. Email Address:* pjbreedlove@ncdot.gov C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (d appropriate) 1c. Nearest municipality/town: Mill Spring 2. Project Identification 2a. Property Identification Number: 2c. Project Address Street Address Address Line 2 oty Fbstal / Zip CDde 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* South Branch Little White Oak Creek 3b. Water Resources Classification of nearest receiving water:* Class C 3c. What river basin(s) is your project located in?* Broad 3d. Please provide the 12-digit HUC in which the project is located. 030501050202 4. Project Description and History 2b. Property size: State / ftovince / Pagion 0xuntry 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Existing land use is an existing three span pre -stressed concrete channel bridge on a two lane secondary road. Project site is located in a rural residential area with large agriculture field near Polk County School facility. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r' No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Polk County - B 29 - USGS Topo Map.pdf 399.43KB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Polk County - B 29 - NRCS Soil Survey.pdf 350.96KB 4f. List the total estimated acreage of all existing wetlands on the property: 0.0 4g. List the total estimated linear feet of all existing streams on the property: 150 4h. Explain the purpose of the proposed project:* Project is to replace an obsolete and deteriorating three span pre -stressed concrete channel bridge with a two span pre -stressed girder bridge. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* NCDOT contractor will install erosion and sediment control measures. NCDOT contractor Will install diversion and by-pass pipe. An on -site detour Will be constructed utilizing a double 84" pipe structure with sand bag headwalls. Contractor will remove existing bridge structure, drill interior bent piles and install new two span concrete girder bridge. Traffic will be placed onto new bridge and detour pipe structure will be removed. Rip -rap will be placed for bank stabilization above the normal high water mark. Rip -rap materials will be permanently installed once final grading allows. By-pass pipe structure will be removed and temporary impact areas will be restored, including Little White Oak Creek mitigation area. Bridge structure will be constructed utilizing the follow equipment: crane, excavator, dump truck, paving equipment, pump and hand tools. 4j. Please upload project drawings for the proposed project. Polk County - B 29 - Final Permit Plans.pdf 5.11 MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?* r Yes r No r Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 5d1. Jurisdictional determination upload Polk County - B 29 - JD (Final).pdf 6. Future Project Plans 243.51 KB 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? F. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): r Wetlands 9 Streams -tributaries r Open Waters r Pond Construction 3. Stream Impacts r Buffers 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. S. name* 3e. Stream Type* Type of 3gSwidth * 3h. Impact(�) F �[3f. urisdiction* length* S1 Site 1 - Bridge 29 9 Permanent Other South Branch Little White Perennial Both 15 4 Oak Creek Average (feet) (linear feet) S2 Site 2 -Bridg a 29 Tem ora p rY Culvert South Branch Little White Perennial Both 15 48 Oak Creek Average (feet) (linear feet) S3 Site 3 - Bridge 29 Temporary Dewatering ] South Branch Little White Perennial Both 1Aver�e(feet) 14near Oak Creek fed) 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 4 3i. Total stream and ditch impacts: 192 3j. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization 3i. Total temporary stream impacts: 188 la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The eAsting bridge is being replaced with a structure that is adequate for traffic needs in the same disturbed location. The pre -stressed girder bridge was designed for the minimum size to ensure conveyance of traffic on the secondary road. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: The on -site stream (South Branch Little White Oak Creek) will be diverted while the on -site detour is constructed and while the eAsting bridge is removed and replaced. Erosion and sedimentation control measures will be installed prior to ground disturbance. Both of these measures will aid in the prevention of sediment into downstream habitats. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2c. If yes, mitigation is required by (check all that apply): rJ DWR W Corps 2d. If yes, which mitigation option(s) will be used for this project? r Mitigation bank W Payment to in -lieu fee r- Permittee Responsible program Mitigation 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. f- Yes r No 4b. Stream mitigation requested: (linear feet) 23 4d. Buffer mitigation requested (DWR only): (square feet) 4f. Non -riparian wetland mitigation requested: (acres) 4h. Comments 4c. If using stream mitigation, what is the stream temperature: cool 4e. Riparian wetland mitigation requested: (acres) 4g. Coastal (tidal) wetland mitigation requested: (acres) 6. Buffer mitigation (State Regulated Riparian Buffer Rules) - required by DWR 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If yes, you must fill out this entire form - please contact DWR for more information. r Yes r No F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No If no, explain why: Project is not located within a NC riparian Buffer Protection Area. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No Comments: G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No v U 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? * r Yes r No 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House?* r Yes r No Comments: CE Completed. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15ANCAC 2B .0200)?* r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. The project is only to replace the existing subject bridge due to deterioration and does not increase the capacity of roads in the area. Project is not a road widening or improvement project. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? r Yes r' No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. Is another Federal agency involved?* r- Yes r No Se. Is this a DOT project located within Division's 1-8? r^ Yes r No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No 5g(1). If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? r Yes r No If you answered "Yes" to 5g(1), did you discover any signs of bat use? r^ Yes r No r^ Unknown 5h. Does this project involve the construction/installation of a wind turbine(s)?* r- Yes r No r- Unknown 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No If yes, please provide details to include type of percussive activity, purpose, duration, and specific location of this activity on the property. Polk County - B 29 - MVP 3 Cover Letter (Final).pdf 511.59KB 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? U.S. Fish & Wildlife - ECOS - Online Mapper Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r- Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NOAA - Essential Fish Habitat v3.0 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* NCDOT Culture Resource Specialist 7c. Historic or Prehistoric Information Upload Polk County - B 29 - Archaeological Screening.pdf Polk County - B 29 - Archictecture Screening.pdf 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* F Yes r No 8b. If yes, explain how project meets FEMA requirements: NCDOT Programmatic Agreement 8c. What source(s) did you use to make the floodplain determination?* NC Flood Maps - Flood Risk Information System. Miscellaneous Comments Miscellaneous attachments not previously requested. Polk County - B 29 - Bat Assessment Form.pdf Polk County - B 29 - Detour Hydro Report.pdf Polk County - B 29 - GIS Floodplain Map.pdf Polk County - B 29 - Hydro Report.pdf Polk County - B 29 - Impact -Restoration Proposal Plan.pdf Polk County - B 29 - NC Hertiage Program.pdf Polk County - B 29 - Site Photos.pdf Polk County - B 29 - Vicinity Map.pdf Signature * W By checking the box and signing below, I certify that: 2 53MB 2.73MB 39.49KB 46.92KB 333.22KB 2.91 MB 4.44MB 3.14MB 1.13MB 1.1MB • I have given true, accurate, and complete information on this form; . I agree that submission of this PCN form is a 'transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Patrick Jeremy Breedlove Signature Date 5/22/2019