Loading...
HomeMy WebLinkAbout20081698 Ver 1_Compliance Inspection Letter_20090814aA ? NCQENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary August 14, 2009 Mr. Isaac Hinson City of Charlotte, Stormwater Svc. 600 East Fourth St. Charlotte, NC 28202 Subject: 401 Certification Compliance Burtonwood Circle DWQ #: 08-1698 Mecklenburg County, NC Dear Mr. Hinson: On August 4, 2009, this office conducted a 401 Certification compliance inspection at the subject site to determine if the project was constructed as submitted to the Division of Water Quality (DWQ). Based on our inspection, the construction appeared to be, in general, compliant. However sediment that has accumulated in the stream and the coir fiber logs needs to be removed. It was noted that this office was not informed upon initiation of construction as required by "additional condition #1" of the 401 Certification. It is also suggested that shady vegetation be planted along the channel. If there are any questions please feel free to contact me. Sincerely, fJohnsoxt. cAlan Surface Water Protection Environmental Specialist cc: John Hennessy - Compliance/Enforcement Ian McMillan -Wetlands, Unit Mooresville Regional Office Location: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Phone: (704) 663-1699\Fax: (704) 663-6040\ Customer Service: 1-877-623-6748 Internet: www.ncwateraualitY.orc7 NorthCarolina Naturally An Fniml Onnortunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper