HomeMy WebLinkAbout20081698 Ver 1_Compliance Inspection Letter_20090814aA ?
NCQENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins Dee Freeman
Governor Director Secretary
August 14, 2009
Mr. Isaac Hinson
City of Charlotte, Stormwater Svc.
600 East Fourth St.
Charlotte, NC 28202
Subject: 401 Certification Compliance
Burtonwood Circle
DWQ #: 08-1698
Mecklenburg County, NC
Dear Mr. Hinson:
On August 4, 2009, this office conducted a 401 Certification compliance inspection at the subject site to
determine if the project was constructed as submitted to the Division of Water Quality (DWQ). Based on our
inspection, the construction appeared to be, in general, compliant. However sediment that has accumulated in
the stream and the coir fiber logs needs to be removed. It was noted that this office was not informed upon
initiation of construction as required by "additional condition #1" of the 401 Certification. It is also suggested
that shady vegetation be planted along the channel.
If there are any questions please feel free to contact me.
Sincerely,
fJohnsoxt.
cAlan Surface Water Protection
Environmental Specialist
cc: John Hennessy - Compliance/Enforcement
Ian McMillan -Wetlands, Unit
Mooresville Regional Office
Location: 610 East Center Avenue, Suite 301, Mooresville, NC 28115
Phone: (704) 663-1699\Fax: (704) 663-6040\ Customer Service: 1-877-623-6748
Internet: www.ncwateraualitY.orc7
NorthCarolina
Naturally
An Fniml Onnortunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper