Loading...
HomeMy WebLinkAbout20090457 Ver 1_Compliance Inspection Letter_20090814g NCQENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Division of Water Quality Coleen H. Sullins Director Dee Freeman Secretary August 14, 2009 Mr. Isaac Hinson City of Charlotte, Stormwater Svc. 600 East Fourth St. Charlotte, NC 28202 Dear Mr. Hinson: Subject: 401 Certification Compliance Culvert Replacement, W. Rocky River Rd. DWQ #: 09-0457 Mecklenburg County, NC On August 4, 2009, this office conducted a 401 Certification compliance inspection at the subject site to determine if the project was constructed as submitted to the Division of Water Quality (DWQ). Based on our inspection, the construction appeared to be, in general, compliant. However there was concern with the rip rap velocity dissipater that was in place at the downstream end of the culvert. The stream currently flowed "through" the rip rap, instead of over the rip rap, thus the migration of aquatic biota is inhibited. It was mentioned that it is expected that over time the stream substrate will fill the voids of the rip rap returning the flow pattern to a more natural state. A follow up inspection shall be conducted at a later date to determine if the above infill occurs. At that time it will be decided if any modifications are required. Sincerely, f' Alan Johnson . Surface Water?81" ction Environmental Specialist cc: John Hennessy - Compliance/Enforcement Ian McMillan - Wetlands Unit Mooresville Regional Office Location: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Phone: (704) 663-1699\Fax: (704) 663-6040\ Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.orq NorthCarolina Natmally An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper