Loading...
HomeMy WebLinkAbout20090427 Ver 1_Notice of Withdrawal_20090812NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary August 12, 2009 DWQ Project # 09-0427 Tyrrell County CERTIFIED MAIL #7007 3020 0001 8861 0913 Carl Spruill 161 Wellman Street Norfolk, VA 23502 Subject Property: 73 Waterfront Road, Albemarle Sound RETURN OF APPLICATION Dear Mr. Spriull: On April 15, 2009, the Division of Water Quality (DWQ) received your application dated March 19, 2009 to impact 0.10 acres of waters and 0.02 acres of wetlands for the purpose of replacing an existing bulkhead and adding additional slippage to an existing pier. On May 19, June 30 and July 9, 2009 you were issued "Request for More Information" letters. On May 22, July 6, and August 7, 2009 your consultant, Hood Richardson, submitted partial responses to the requested information. The DWQ has determined that your application was still incomplete and/or provided inaccurate information. The DWQ will require additional information in order to process your application to impact protected wetlands and waters on the subject property. Since this project was put on hold for additional information and your response did not address our questions, we are returning your application. If you want to carry out this proposed impact, you will need to reapply and pay the 401 Certification fee again. If you want to reapply, please provide the following information so that we may review your project. Additional Information Requested: Avoidance and Minimization The DWQ will require you to provide an engineered model or situational North Carolina Division of Water Quality Internet: www.ncwaterquality.org 943 Washington Square Mall Phone: 252-946-6481 Washington, NC 27889 FAX 252-946-9215 An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper NorthCarolina ;Vattaullff Page 2 of 2 calculations to be reviewed that verify the conditions on the Spruill property warrant the proposed shoreline configuration. Please also provide engineering calculations that demonstrate that the size and amount of rip rap placed in front of the bulkhead and the proposed groin are calculated to provide for the minimum amount of fill and still provide structural integrity of the vertical structure. No justification is required by the DWQ if impacts are minimized to the following specifications; new bulkhead installed no more than 2ft waterward of the existing bulkhead structure and the rip rap is installed at a 2:1 slope and the groin is installed with a base width no greater than eight (8) feet and not to exceed one (1) foot above normal water level. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Kyle Barnes of the Washington Regional Office at 252-948-3917or Ian McMillan of the DWQ Central Office at 919-733-1786 if you have any questions regarding or would like to set up a meeting to discuss this matter. S'ncerely Coleen H. Su 4bZ-4 cc: 4010versight/Express Permitting Unit USACE Washington Regulatory Field Office File Copy CAMA: Doug Hugget/Morehead CAMA: WaRO Hood Richardson, 110 west Second Street, Washington, NC 27889 Filename: 09-0427