Loading...
HomeMy WebLinkAbout20190667 Ver 1_W-5704F_PERMIT DRAWINGS 05-16-2019 (3)_20190521See Sheet I A For Index of Sheets 12+73.02 IN PROJECT W-5704 STATE OF NORTH CAROLINA DIVISION HIGHWAYS WA YNE CO UNTY LOCATION.- NC 581 BETWEEN SR 1324 (NOR -AM ROAD) AND SR 1317 (BUCK SWAMP ROAD). TYPE OF WORK: GRADING, DRAINAGE PA TVING PERMIT L)iRA I VING STATE STATE PROJECT REFERENCE NO. SHEET NO. TOTAL SHEETS N.C. W-5704F I STATE PROD. NO. F. A. PROJ. NO. DESCRIPTION 44850.1.6 HSIP-0581(030) PE 44850.2.6 HSIP-0581(030) R/W & UTILITY -Yl- POT 15+50.00 "" -Y2- POT 13+20.00 CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. T 30 +19.04 =5704. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED GRAPHIC SCALES 50 25 0 50 100 DESIGN DATA ADT 2017 = 8400 ADT 2040 = 10300 K = 10 % D = 60 % T = 3 % * V = 5 5 MPH * TTST =1% DUAL 2% FUNC CLASS = MAJOR COLLECTOR REGIONAL TIER'1111 PROJECT LENGTH LENGTH ROADWAY TIP PROJECT W-5704F = 0.331 MILES TOTAL LENGTH TIP PROJECT W-5704F = 0.331 MILES Prepared in the Office of: DIVISION OF HIGHWAYS Division Four DDC, 509 Ward Blvd., Wilson NC, 27895 HYDRAULICS ENGINEER P.E. SIGNATURE: �� NOR? �g a a � a 2018 STANDARD SPECIFICATIONS RONNIE KEETER, PE PLANS 50 25 0 50 100 RIGHT OF WAY DATE: AUGUST 2 0, 2 Ol 8 ROADWAY DESIGN ENGINEER P.E. SIGNATURE: PROJECT ENGINEER D.R. ETHRIDGE PROFILE (HORIZONTAL) 10 5 0 10 20 LETTING DATE: JANUARY 2020 PROJECT DESIGN ENGINEER PROFILE (VERTICAL) SITE STRUCTURE SIZE / STATION NO. TYPE (FROM/TO) BUFFER IMPACTS SUMMARY IMPACT TYPE ALLOWABLE ROAD PARALLEL ZONE 1 ZONE 2 TOTAL ZONE 1 CROSSING BRIDGE IMPACT (ft) (ft) (ft) (tt) BUFFER WETLANDS IN MITIGABLE REPLACEMENT BUFFERS ZONE 2 TOTAL ZONE 1 ZONE 2 ZONE 1 ZONE 2 (ft) (ft2) (ft2) (ft) (ft) (ft) 1 2@36" RCP -L- 15+41 X 3497 1925 5422 0 0 0 0 0 TOTAL: 3497 1925 5422 0 0 0 0 0 N.C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS WAYNE COUNTY PROJECT: W-5704F WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS SITE NO. STRUCTURE SIZE / TYPE STATION (FROM/TO) PERMANENT FILL IN WETLANDS (AC) TEMP. FILL IN WETLANDS (AC) EXCAVATION IN WETLANDS (AC) MECHANIZED CLEARING IN WETLANDS (AC) HAND CLEARING IN WETLANDS (AC) PERMANENT SW IMPACTS (AC) TEMP. SW IMPACTS (AC) EXISTING CHANNEL IMPACTS PERMANENT (FT) EXISTING CHANNELEXISTING IMPACTS PERMANENT BANK STABILIZATIO N (FT) CHANNEL IMPACTS TEMP. (FT) 1 2@36" RCP -L- 15+41 0.000 0.000 0.000 0.000 0.000 0.000 0.000 25.000 10.000 63.000 TOTALS: 25.000 10.000 63.000 N.C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS WAYNE COUNTY PROJECT: W-5704F