HomeMy WebLinkAbout20190667 Ver 1_W-5704F_PERMIT DRAWINGS 05-16-2019_20190521See Sheet I A For Index of Sheets
12+73.02
IN PROJECT W-5704
STATE OF NORTH CAROLINA
DIVISION
HIGHWAYS
WA YNE CO UNTY
LOCATION.- NC 581 BETWEEN SR 1324 (NOR -AM ROAD)
AND SR 1317 (BUCK SWAMP ROAD).
TYPE OF WORK: GRADING, DRAINAGE
PA TVING
PERMIT L)iRA I VING
STATE
STATE PROJECT REFERENCE NO.
SHEET
NO.
TOTAL
SHEETS
N.C.
W-5704F
I
STATE PROD. NO.
F. A. PROJ. NO.
DESCRIPTION
44850.1.6
HSIP-0581(030)
PE
44850.2.6
HSIP-0581(030)
R/W & UTILITY
-Yl- POT 15+50.00 "" -Y2- POT 13+20.00
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III.
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
T 30 +19.04
=5704.
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
GRAPHIC SCALES
50 25 0 50 100
DESIGN DATA
ADT 2017 = 8400
ADT 2040 = 10300
K = 10 %
D = 60 %
T = 3 % *
V = 5 5 MPH
* TTST =1% DUAL 2%
FUNC CLASS =
MAJOR COLLECTOR
REGIONAL TIER'1111
PROJECT LENGTH
LENGTH ROADWAY TIP PROJECT W-5704F = 0.331 MILES
TOTAL LENGTH TIP PROJECT W-5704F = 0.331 MILES
Prepared in the Office of:
DIVISION OF HIGHWAYS
Division Four DDC, 509 Ward Blvd., Wilson NC, 27895
HYDRAULICS ENGINEER
P.E.
SIGNATURE:
�� NOR? �g
a
a
� a
2018 STANDARD SPECIFICATIONS
RONNIE KEETER, PE
PLANS
50 25 0 50 100
RIGHT OF WAY DATE:
AUGUST 2 0, 2 Ol 8
ROADWAY DESIGN
ENGINEER
P.E.
SIGNATURE:
PROJECT ENGINEER
D.R. ETHRIDGE
PROFILE (HORIZONTAL)
10 5 0 10 20
LETTING DATE:
JANUARY 2020
PROJECT DESIGN ENGINEER
PROFILE (VERTICAL)
SITE STRUCTURE SIZE / STATION
NO. TYPE (FROM/TO)
BUFFER IMPACTS SUMMARY
IMPACT
TYPE ALLOWABLE
ROAD PARALLEL ZONE 1 ZONE 2 TOTAL ZONE 1
CROSSING BRIDGE IMPACT (ft) (ft) (ft) (tt)
BUFFER WETLANDS IN
MITIGABLE REPLACEMENT BUFFERS
ZONE 2 TOTAL ZONE 1 ZONE 2 ZONE 1 ZONE 2
(ft) (ft2) (ft2) (ft) (ft) (ft)
1
2@36" RCP
-L- 15+41
X
3497
1925
5422
0
0
0
0
0
TOTAL:
3497
1925
5422
0
0
0
0
0
N.C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
WAYNE COUNTY
PROJECT: W-5704F
WETLAND PERMIT IMPACT SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
SITE
NO.
STRUCTURE SIZE /
TYPE
STATION
(FROM/TO)
PERMANENT
FILL IN
WETLANDS
(AC)
TEMP. FILL IN
WETLANDS
(AC)
EXCAVATION
IN
WETLANDS
(AC)
MECHANIZED
CLEARING IN
WETLANDS
(AC)
HAND
CLEARING IN
WETLANDS
(AC)
PERMANENT
SW IMPACTS
(AC)
TEMP. SW
IMPACTS
(AC)
EXISTING
CHANNEL
IMPACTS
PERMANENT
(FT)
EXISTING
CHANNELEXISTING
IMPACTS
PERMANENT
BANK
STABILIZATIO
N
(FT)
CHANNEL
IMPACTS
TEMP.
(FT)
1
2@36" RCP
-L- 15+41
0.000
0.000
0.000
0.000
0.000
0.000
0.000
25.000
10.000
63.000
TOTALS:
25.000
10.000
63.000
N.C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
WAYNE COUNTY
PROJECT: W-5704F