Loading...
HomeMy WebLinkAbout20070470 Ver 1_Reports_20090804 Beverly Eaves Perdue Governor Mr. Michael L. Holder, P.E. Division 12 Engineer N.C. Department of Transportation Post Office Box 47 Shelby, North Carolina 28151-0047 Division of Water Quality Coleen H. Sullins Director August 4, 2009 Subject: Inspection-US Highway 64 DWQ Project 07-0470 TIP No. B-4258 Rutherford County Dear Mr. Holder: Dee Freeman Secretary On July 28, 2009, I inspected the construction work on US Highway 64 project (Replacement of Bridge No. 7) in Rutherford County. The bridge construction and road realignment work is continuing. Please continue to ensure that all sediment and erosion control structures are maintained and that seeding and mulching are performed as needed to protect downstream waters. Please refer to the attached inspection report for any specific items noted during the inspection. If you have questions, please call me at 828-296-4500. Sincerely, QQ Michael R. Parker Environmental Senior Specialist Attachment cc: Trish Simon, Division 12, DEO Neil Trivette, Roadside Environmental Transportation Permitting Unit Niki Maher, NPS Assistance and Compliance Oversight Unit Mike Parker, Asheville Regional Office US Highway 64 Inspection Letter July 2009 SURFACE WATER PROTECTION SECTION - Asheville Regional Office 2090 U.S. 70 Highway. Swannari NC 28778-8211 Phone: 828-29645001 FAX: 828-2997043 One Customer Service: 1-877-623-6748 North Carol i n a Internet: www.ncwatemualitv.org An Equal Opporlunity 1ARumative Action Employer Naturalllf NCDENR North Carolina Department of Environment and Natural Resources DWO Site Visits for DOT Projects Field Sheet DWQ representative: Michael R. Parker Date: July 28, 2009 County: Rutherford Region: Asheville DOT Division: Division 13 Activity: X 401 Compliance Evaluation ? Complaint ?DWQ Follow Up Evaluation ? Other DWQ 401 #: 07-0470 NW Permit IP 0 Project Name: Location of Project: FUS Highway 64 Bridge Replacement Bridge No. 7 US Highway 64 at Lake Lure Project Complete: ?Yes X No Activities (DOT): X? Bridge ? Culvert ? Bottomless Culvert ? Bottomless Arch X? Riprap Inlet/Outlet Stabilization ? Spoil Pile ? Borrow Pit ? Wetland Mitigation ? Stream Restoration ? On-site Stream Relocation ? Buffer Restoration ? Bank Stabilization ? Other Fill If no, estimated date of completion: Water Ouality Concerns (DWO): ? Steam Standards Violation X? Turbidity ? Evidence of spills ? Oil/Petroleum ? Solid Waste ? Failed E & S control measures X? Sedimentation Impacts Stormwater Permit Violation ? Fill ? Buffer Impacts (see below) ? Other Additional Wetland Impacts: ? yes ? no Estimated Acres ? Zone I Est Acres ? Zone 2 Est Acres Additional Stream Impacts: ? yes ? no Est Linear feet Estimated linear feet of impact: Buffer Impacts: ?Neuse []Tar-Pam []Randleman []Catawba Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact ac Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac Buffer Designation: []Exempt []Allowable []Allowable w/mitigation []Prohibited Name of Waterway(s): DWO Site Visits for DOT Projects Background Info Broad River Basin/ Subbasin: BRD 030501 Wetland Type: ?lsolated ?Non-Isolated (Waters of US) Stream Class: ?Class B ?303d Listed ?WS-11 ?WS-V ?SB X?Class C ?ORW X?Trout ?WS-III ?NSW ?HQW ?WS-I ?WS-IV ?SA ?CA Type of Authorized Impact: ?Culvert ?Bottomless Culvert X?Bridge ?Bottomless Arch X?Riprap Inlet/Outlet Stabi lization X?Fill Authorized Wetland Impacts Authorized Stream Impacts: ?0 - 1/10'h acre ?1/11`h to 1/3`d acre ? 1 /3`d to 1.0 acre ?> 1.0 acre X?< 150 linear feet ?> 150 linear feet Work continues on Bridge No. 6 over the Broad River. The center span of beams have been set over the river. Nail wall was being constructed along new roadway alignment. Rip rap along Broad River appears to contain a lot of fine material. Clean rip rap should be used for bank stabilization. Continue to maintain erosion control devices and continue with seeding and matting as required. Project looked to be in good condition and shape. US Highway 64 July 2009 Inspection Report