HomeMy WebLinkAbout20090773 Ver 1_Triage Comments_20090814J DWQ#
Triaged By:
Reviewer 1
Reviewer 2
Reviewer 3
Use this form instead of writing inside the folder
Triage Comment Sheet
?. Date:'
. ? Date: 2v o
Date:
? Issue Project (Reviewer 1) ? Issue Project (Reviewer 2)
't,;M Issue ith conditions (R ewer 1)
Issue with conditions (Reviewer 2)
? More Information (Reviewer 1) ? More Information (Reviewer 2)
? Return Application (Reviewer 1) ? Return Application (Reviewer 2)
? Send to Regions (Reviewer 1)
? Send to Regions (Reviewer 2)
SATriage FormsUriage Issue Sheet.doc
PLEASE PRINT CLEARLY
09-0773 The Woodlands @ Green Level Crossing
AML comments
August 14, 2009
1. Please provide documentation of the Town of Cary's approval of the stormwater
management plan for this project by providing EITHER:
• A valid approval letter from the Town of Cary indicating that the proposed
activity has an approved SMP and one copy of the approved SMP, including
full sized plan details and calculations, OR
• A set of stormwater full sized plan details and calculations stamped as
"Approved" by the Town of Cary.