Loading...
HomeMy WebLinkAbout20060229 Ver 2_401 Application_20090814C) LP -? as 9 V 2- 'I r-1 nlr LETTER OF TRANSMITTAL ?5C's1Do OVIL, MUNICIPAL & S'YttUCIL)P L E?YGr£'#EER- CC?A4PRF;c MN SV F rNVIRnN?-;f Nr-\1 P.O. Box 7966 Rocky Mount, North Carolina 27804 252.972.7703 Fax 252.972.7638 admin@appianengineers.com www.AppianEngineers.com APPIAN JOB NO. 08-063 TO: NCDENR DWQ 4011 Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699 919.721.4200 . ....................... Waterstone Subdivision Boat Ramp Tar River Reservoir, Nash County GENTLEMEN: We are sending you ( X ) herewith ( ) under separate cover: SUBMITTAL FOR: CODE FOR APPROVAL 1 FOR YOUR USE 2 AS REQUESTED 3 BID TAB DISTRIBUTION 4 APPROVED PERMITS 5 REVIEW AND COMMENT 6 PLEASE SIGN AND RETURN 7 ACTION CODE APPROVED A APPROVED AS NOTED B NOT APPROVED C REVISE AND RESUBMIT D PLEASE SKIN AND RETURN E PRINT COPIES DRAWING NUMBER (REVISION NO. OR DATE) DESCRIPTION CODE 5 - PCN/Plans 1 1 - Cover Letter 1 1 - Agent Authorization Form 1 AUG 14 2009 DENR . WATER QUALITY WETL W 15 AND STORMNATER BRANCH Remarks: PCN for Buffer Rule Approval for Boat Ramp for your review. H enclosures not list above, klndty notify at once. Thank you B Date: ? O David C. Revoir, PE, LEED AP dre voinlpa ppianengineers. com Received Bv: August 13, 2009 NCDENR DWQ 401/ Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699-1650 RE: Pre-Construction Notification (PCN) Form Waterstone Subdivision - Boat Ramp Tar River Reservoir, Nash County, NC NW 36 and Riparian Buffer Authorization Dear Sir or Madam: 0 0 ona1 CONSULG NGINEERS, PA CIVIL, MUNICIPAL & STRUCTURAL ENGINEERS COMPREHENSIVE ENVIRONMENTAL SERVICES J[R@Rflre[# n U AUG 14 2oog KTLWSAND ST WATERQUALITYMWAij @?iA O We are enclosing five (5) complete copies of the PCN and plans for NW36 and Riparian Buffer Authorization for the Waterstone Subdivision boat ramp by Waterstone Subdivision HOA of Rocky Mount, Nash County, NC. The proposed concrete boat ramp will provide boating access to the Waterstone Community. No grading is proposed, as the boat will match existing grade. The site was in previous violation of impacts to the buffer due to clearing in Zone 1 (NOV-2008-WQ-0089). A restoration plan was submitted and approved. All required plantings were planted and approved by Martin Richmond. A 3-year monitoring plan to ensure survivability of new plantings is in place. We are now requesting authorization to build a boat ramp adjacent to the plantings to serve an existing community boat dock. Thank you for expediting this process as much as possible because the HOA is eager to construct the boat ramp in August, while the water in the reservoir is still low. Please let us know if you have any questions regarding the attached PCN. Respectfully, Appian Consulting Engineers, P.A. bi- C&4?0 David C. Revoir, PE P.O. Box 7966 • Rocky Mount, NC 27804 • 252.972.7703, v • 252.972.7638, f www.AppianEngineers.com • admin@appianengineers.com 0?, \N AT z:9 pG O liii? -c OLD - oaaq u a Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre-Construction Notification (PCN) Form A. Applicant Information PA I 1. Processing 1a. Type(s) of approval sought from the Corps: ?X Section 404 Permit ? Section ID-Permit, 1b. Specify Nationwide Permit (NWP) number: NW 36 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? 0 Yes ? No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ? No For the record only for Corps Permit: ? Yes ?X No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes 0 No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ? Yes X? No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes Q No 2. Project Information 2a. Name of project: Waterstone Subdivision Boat Ramp 2b. County: Nash 2c. Nearest municipality / town: Rocky Mount, NC 27804 2d. Subdivision name: Waterstone Subdivision 2e. NCDOT only, T.I.P. or state project no: n/a 3. Owner Information I) ` 3a. Name(s) on Recorded Deed: Waterstone HOA IM U 3b. Deed Book and Page No. DB 36 PG 274 AUG 14 20nq 3c. Responsible Party (for LLC if applicable): Waterstone HOA DENR. WATER QUALITY MAN DS AND M 3d. Street address: - ap 844 Country Club Road 3e. City, state, zip: Rocky Mount, NC 27804 3f. Telephone no.: 252.443.0277 3g. Fax no.: 252.443.1535 3h. Email address: dsmith@thedavidsmithgroup.com Page 1 of 10 PCN Form - Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ?X Agent ? Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: David C. Revoir, PE 5b. Business name (if applicable): Appian Consulting Engineers, PA 5c. Street address: PO Box 7966 5d. City, state, zip: Rocky Mount, NC 27804 5e. Telephone no.: 252.972.7703 5f. Fax no.: 252.972.7638 5g. Email address: drevoir@appianengineers.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 3727.0027.9650 1 b. Site coordinates (in decimal degrees): Latitude: 35.88047 Longitude: -77.91115 1 c. Property size: 0.92 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Tar River Reservoir 2b. Water Quality Classification of nearest receiving water: WS-IV, NSW, CA 2c. River basin: Tar-Pamlico 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Single-family residential communities on the Tar-River Reservoir. The boat ramp will serve the Waterstone Subdivision and an existing community 12- boat dock. 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 0 3d. Explain the purpose of the proposed project: Construction of a 16' wide concrete boat ramp into the Tar River Reservoir to serve the Waterstone Community and existing boat dock. 3e. Describe the overall project in detail, including the type of equipment to be used: Construction of a 16' wide concrete boat ramp into the Tar River Reservoir using backhoes and by hand. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ? Yes ? No ?X Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? ? Preliminary ? Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ? Yes ? No ?X Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ? Yes ?X No 6b. If yes, explain. Page 3 of 10 PCN Form - Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ? Wetlands ? Streams - tributaries ?X Buffers X? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes/No - W2 - Choose one Choose one Yes/No - W3 - Choose one Choose one Yes/No - W4 - Choose one Choose one Yes/No - W5 - Choose one Choose one Yes/No - W6 - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S11 - Choose one S2 - Choose one S3 - Choose one S4 - Choose one S5 - Choose one S6 - Choose one 3h. Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form - Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individual) list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 P Tar River Reservoir Other - Boat Ramp Lake 0.014 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 0.014 4g. Comments: rox 600 sf of concrete boat ramp to be laced below the normal App p p pool lake level 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? E] Yes No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? E] Neuse x Tar-Pamlico ? Catawba ? Randleman ? Other: 6b. Buffer Impact number- Permanent (P) or Temporary T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet 6g. Zone 2 impact (square feet B1 P Boat Ramp Tar River Reservoir No 600 1,000 B2 - Yes/No B3 - Yes/No B4 - Yes/No B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 600 1,000 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The area for the boat ramp is currently seeded with grass. A few trees will be need to be cleared within the buffer for sufficient width for the ramp. Total disturbance of trees to be approximately 250 sf. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. The boat ramp will be constructed with back-hoes and by hand. Construction traffic to access the site by the existing paved cul-de-sac and stone parking area. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ?X No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Makin a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form - Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires Yes OX No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ?X Yes ? No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. Proposed concrete boat ramp to match existing grade. Runoff will flow through the riparian buffer since th i t l ?X Yes ? No e ramp s a a cross-s ope. 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 3.9% 2b. Does this project require a Stormwater Management Plan? ? Yes ?X No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Less than 0.5 ac will be disturbed. Approximately 1,600 sf (0.04 ac) will be disturbed by this project. Approximately 1,600 sf (0.036 ac) to be impervious, or 3.9% of the tract. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? Nash County ? Phase II ? NSW 3b. Which of the following locally-implemented stormwater management programs ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ?Yes ? No attached? 4. DWQ Stormwater Program Review ?Coastal counties ?HQW 4a. Which of the following state-implemented stormwater management programs apply ?ORW (check all that apply): ?Session Law 2006-246 ?Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 8 of 10 PCN Form - Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ? Yes ?X No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ? No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ? Yes ? No letter.) Comments: i 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ?X Yes ? No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ?Yes Q No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): NCDENR DWQ issued a Notice of Violation (NOV-2008-WQ-0089) due to clearing of trees in both Zone 1 and Zone 2. A restoration plan was submitted and approved. All required plantings were submitted and approved by Martin Richmond. A 3-year monitoring plan to ensure survivability of new plantings is in place. We are now requesting authorization to build a boat ramp adjacent to the plantings to serve the existing community boat dock. 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ?Yes Q No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. No wastewater will be generated by this project. Page 9 of 10 PCN Form - Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes ? No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ? No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ? No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ? No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ?X Yes ? No 8b. If yes, explain how project meets FEMA requirements: No placement of fill is proposed for this project. Boat ramp to match existing contours. 8c. What source(s) did you use to make the floodplain determination? FEMA Flood Panel 3720.3737.OOJ, dated Nov. 3, 2004 David C. Revoir, PE • Appian Consulting Engineers, PA 08-13-2009 Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided. Page 10 of 10 AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: LOT NO. 65 PLAN NO. STREET ADDRESS: Annabella Road Rocky Mount. NC 27804 Property Owner: Waterstone HOA PARCEL ID: 372700279650 The undersigned, registered property owners of the above noted property, do hereby authorize David C. Revoir. PE , of Appian Consulting Engineers PA to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than property above): Waterstone HOA 844 Country Club Road Rocky Mount, NC 27804 (252) 443-0277 (252) 443-1535, fax dsmith@thedavidsmithgroup.com We hereby certify the a e information submitted in this application is true and accurate to the best o knowledg Authorized Signature 7-0? Date ...b.. ..,. . SA' Proposed Boat Ramp r l 'J `il C x. Ilk -lq fix n? . :am 1:2500 feet Tar River Reservoir Nash County, NC Lat: 35.88047 Long: -77.91115 Copyright 2001Appian Consulting Engineers, P. A. These drawings have been prepored as 'instruments of service fora particular site or building improvement and remains the property of the Engineer for use under his supervision, No reproduction or other use is allowed without his permission, his permission, ~ ~ O 2 J SITE "'V O OF THE RIVER R0, OWNER/DEVELOPE ~ ~ ~ Y .a m v eEta WATERSTONE HOA 0 0 p J h CIO DAVID SMITH / ^p 844 COUNTRY CLUB ROAD ~ ~ ° ~ ROCKY MOUNT, NC 27804 ~ a 252.443.0277 a 20' MIN. o ~ ~ _ - f o ~ ° NORMAL HIGH WATER Z o ~ c o ~ 9e I ~ ~ F ~ - m - ~ ~ ~9 r„ 'A / _ - d+ Y U Z NOTE 4 _ NORMAL LOW WATER a ~ w Z ~ ~ o ~ 0 , d D i~ 3' MIN. ; W m ~ w - ~ ~ z rn O o , J NOTES: W ~ 1. The minimum slab width is to be 12' min., ~ ~ o o w 16 feet is recommended. > ~ ' ~ ~ n i n contraction and Ion itudinal 'oints 0 2. Expa s o, g i ELEVATION ~ may be eliminated unless required by the Engineer. NOTE 10 ~ ; ` N ~ o Q j 3. Steel fabric slab reinforcement shall be 6x6 ~ REINFORCING ~ z ~ I ~ MESH ~ ~ a I x W .9 WWF unless a roved otherwise SCHEDULE OF REINFORCING STEEL W2.9 2 pp I r J j by Engineer. ~ i BARS "C" ~ a o 4. Slab is to be constructed on either a straight c~o~ NORTH '~O'~~` grade or with vertical curves with a rate of o o 0 0 0 o v o v o 0 0 0 0 / U '10'~`~l(~c~` ~ c~`C~' 1 . C~~ ~~o~1Q~~ 1 1 Ur ?"i Q n 2%. Recommended BEND TO FIT GRADE w change per foot of less tha I w i rr I ~ i BARS "A" 1 o w o a awl I ? 1 1 = > z MAP slope 13%. Transverse slope to be 0%. BARS "g" ~ VICINITY ~ 3 i 3' , ~ i BARS "B" i I ~1 N , 1 NOT TO SCALE 5. The maximum gradient of slab is to be 10%. 6. All reinforcing steel members are to have a ING O.C. 21 RIP RAI r : 3: , 1 3" CLR. i " con rete cover at ed es of MARK SIZE N0. LENGTH SPAC minimum of 3 c g J PROVIDi r~ RIP RAP ON FILTER FABRIC TO BE I ~ I n r J i PROVIDED ON BOTH SIDES OF RAMP, a' ~ ~ 3" CLR.- ~ „ , „ , „ a ~ WHEN ~ BEFORE YOU DIG, slab. Mesh reinforcement is to be placed 2 from A #4 * 2 -0 1 -0 STRAIGHT ~ AREAS ~ . WHEN SHOWN ON SITE PLAN, IN gI ~ ~ i 1'r 1' CALL to of slab. p B #4 * 4'-6" 1'-0" BENT (SEE ABOVE) Z; o' AREAS SUBJECT TO WAVE ACTION. of I ~ BARS "C" ~ a z t z i ~ ®9" O.C. d i ~ 7. Final finish of slab is to obtained by the use ~ f I 1 i ~ 1 ~ ~ of a steel rake drawn transversl to axis of slab C 4 g 9 AND STRAIGHT 1 y # AS SHOWN I (parallel to water line). I ? - ~ r X ~ ' I ' ' I • ~ " E ~ I' I 8. Portions of slab which will ultimately be below * N0. OF BARS EQUALS SLAB WIDTH IN FEET. I I ,,~~`...a...AO~ water level are to be protected during pouring, SLAB WIDTH MINUS 6" CONTROL JOINTS ®12' o.c.~ CONSULTING ENGINEERS, P.A. I ~ j (NOTE 2) CIVIL, MUNICIPAL & NORTH CAROLINA BNE-CALL CENTER finishing, and curing by the use of cofferdams, j ~ ~ STRUCTURAL ENGINEERS cribs or other methods meetin the a royal of www.ncocc.org ~ g pp COMPREHENSIVE the Engineer. for vehicles and trailers fir- ,r-~ ~ ENVIRONMENTAL SERVICES 9. Suitable parking areas I are to be provided off of ramp. I ~ 1 ~ 6a~?~;~ ROCKY I~flt?ISNT: BOUNDARY DESCRIPTION SHOWN 10. Concrete tanks w/ connecting straps may be used SLAB REINFORCEMENT IN P 2CEMENT IN L~ ~ i$ 841 SOUTH WESLEYAN BLVD. WITH NOTE 3 f~ ROCKY MOUNT, N.C. 27804 to extend ram - owners o Lion. ACCORDANCE WITH NOTE 3 IS NOT FOR RECORDATION. p p AJG Z ~ ~7!J~t~ PHONE: (252) 972-7703 PLAN VIEW FAX: (252} 912-7638 RECORD DRAWINC~S~ - '~1®RLJ VdiDE V~E13e - ~~°.i1A e'DSHND 5~741ZPi~j 9Rr;^~Chi These drawings are believed to be a correct www.appianengineers,com representation of actual field conditions but are not warranted as such. admin(~appianengineers.com By; Date: CONSTRUCTION SAFETY These drawings do not contain the requirements for ALL BOAT .L r ~},1l~ Pp~pd job safety. All provisions for safety shall be the sole ~U aoooo responsibility of the contractor. ~a w IC LANDINGS EXISTING COI~ITIONS~ ~~°e s REV. 8-6-09 0 ~ The contractor shall be res onsible for reviewing all NOT TO SCALE P SEAL ~ 8 existing job conditions, Any adverse existing conditions affecting work shown on these drawings shall be ~ ~ 26959, 8 ~ o brought to the attention of the engineer for possible ~,8 Y ~-0~° ~GINE~,o° clarification or reconciliation. °°oae,ea>oaooo°eeep°D ~ ~ ~4 ® ~ e 1 ~ ~ • ` ~ \ i /1 ` e e ` ~ ~ • Final Drawings ` ~ ~ e ` o ~ e ` ~ ~ e el Review ur®ses O LY ` ~ ~ e ` ~ ~ ~ ~ ~ e 1 T ~ ` ` e ` ~ ~ ~ ~ 1 ~ 1 N ~ ~ ~ ` e ~ ` e / ~ W' 1 O U 1 ~ ~ ~ e ~ ~ e ~ ~ e / / ~ ~ ` ry ;e ~ ` 1 ,0~ ,1. 1 1~v , P~ . ti~ i 247, I 1 ~ ~Q ` ~ ~ 1 1 ~ i ~ qP ~ I / ~ 0 ~a a~ e 1 1 ~i 1 r / do ~ e. r~ ~ ~ e ® ` e h~ i ~ 1 PRO. CLEAR`NG LIMITS ~ r -ex. woods- ANNABELLA ROAD e , e ~ a_~~~ ~ -ex. woods- ~ ~ _ ~~.,.~_i~_~~ ~ i~ ~ ^ . i~~ ,i~_ _ ~~_i~..~_ - . ~ - ._i~_ ~ _ r` ~ i ~ ~ a ` , p y~L. 1/ l.r i i ~ ~ ~ r \ f / ~^c r~in~~' 1 i i ~ ~ i ~ i ~ ~ P ~ ~Of~ ~ , ~ ) ~ ~s~ d - l , N ",~,5 d ' ~eL~~N~ t ~ 1 X09 d, ~ ~ , t Z~c n~1~~~ee ; i rn ~ ( ~ ~ ee I ~ ~ ~ I I o I >v , eey i D ~ ~ ~ 'ee -EX. GRAVEL- ~ ~ p ~ eee I I i ~ ~ i e r PRO. CONC. BOAT RAMP ~ r' ~ ~ •~a ' i I I I O o i SEE DETAIL. ~ ~ ~ ~i ~ x,-. eee ~ i - x. trees- \ ~ 1 1 I i 158' i i i ~ o ~ ° ; i -ex. woods-` eee ~ T i ~ ~ ~ / / I'~ i I T F NC~~ AS NECESSARY ` eeo ` SL E .1 / ~ ~ ' PER NCDENR`REQUIREMENTS e'`e ' / ~i ~ e I I 0 v I ' I ~ ~ ~ ~ ~ ~ ~ ~ ~ % ~e ~ 3 ~1 ~ i , ~ o ~ ; ~ k~ - ~ N 1~~~ ~ ~ , ~ / r j / ~ ~ ~ ~ e . / _ y ~ ~ e,; ~ ~ i , ~ o TAR RIVER RESERVOIR- / , •e~~-~~ . ~ ~ i r ~ M ~ ~ /°W / . ~ x 1e ,>e, - i I O ~ ee i , ; I ~ o z(n P ~ ae I / k ~ 60 ~ ~ ee ~ / ~ \ ~ e g ~ I , o 9' . I w I ~L. / / ~ ~ s. \ ee I+I ~ ~ ~ rag \ ` ee I ~ ~ e ~ 65 - - I II II~ a o I I ~ ~ ~'4 / / / ~ ~ eee / / ~ ~ ee 40,002 sq,ft. 40,002 sq,ft. ~ J l ~ e 0.92 acres ~ / / ~ °e / / / ~ e°e 0.92 acres ? I ~ ~ I ~ ~ ~ / / ~ ~ ? ` / ` 1 Y I ~ I 0 / / ~ ~ 0 I ~ / / / ~ / ~ e e ~ / / / \ / / I N o o T I ~ / ~ / / / ~ i ii I ~ ~ / / / / ~ e Il 6 I,, ~ S , ~ Y ~ o , / 1 ~ / ~ ` a ~ / ~ ~ o ' WSZ a i ~ N C / / \ 0 SCALE: 1" = 20' 08-063 0) E D-0000 0 0 20 40 50 60 70 80 ° CE-1