July 18, 2005
DWQ Project # 05-1196
Burke County
Una C. Holz
12 Maple Place
Hopewell Junction, NY 12533
Subject Property: South Point I Phase VII Lot #10 (D) {g@ (g nW~ lID
5218 Kalmia Drive, Morganton, NC 28655 ~ SEP 2 6 2005
DENR. WATE~ 1\~~te~rRANCH
\'.;nN103 mo 6TOI""..
Approval of 401 Water Quality Certification with Additional Conditions
Dear Mrs. Holz:
You have our approval, in accordance with the attached conditions and those listed
below, to place fill within or otherwise impact 120 square feet of shoreline for the
purpose of stabilization at the subject property, as described within your application
received by the N.C. Division of Water Quality (DWQ) on June 29, 2005. After
reviewing your application, we have decided that the impacts are covered by General
Water Quality Certification Number(s) 3373 (GC3373). The Certification(s) allows you
to use Regional Permit(s) 198200079 when issued by the US Army Corps of Engineers
(USACE). In addition, you should obtain or otherwise comply with any other required
federal, state or local permits before you go ahead with your project including (but not
limited to) Erosion and Sediment Control, Non-discharge, Stormwater and Buffer
regulations. Also, this approval to proceed with your proposed impacts or to
conduct impacts to waters as depicted in your application shall expire upon
expiration of the 404 or CAMA Permit.
This approval is for the purpose of shoreline stabilization. Nothing in this
authorization allows for the use of "river rock." If you change your project beyond
what is approved in this authorization, you must notify us and you may be required to
send us a new application. If the property is sold, the new owner must be given a copy
of this Certification and approval letter and is thereby responsible for complying with all
conditions. If total fills for this project (now or in the future) exceed one acre of wetland
or 150 linear feet of stream, compensatory mitigation may be required as described in
15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in
the attached certification and any additional conditions listed below.
The Additional Conditions of the Certification are:
N~rhcarOlina
;\'fltllra//!/
't\J1 Wetlands Certification Unit
1650 Mail Sel\'ice Center, Raleigh, North Carolina 27699.1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919.733.1786/ FAX 919-733-6893/lntemet: hllp:ffh2oenr,slate. nc,usfncwetlands
4.n Equal Opportunity/Affirmative Action Employer - 50% Rec'jcled/10% Post Consumer Paper
Page 2 of 6 . r
July 18,2005
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific
and general conditions of this Certification (or Isolated Wetland Permit) are met.
No other impacts are approved including incidental impacts:
Shoreline
Plan Location or Reference
A
2. Erosion & Sediment Control Practices
Erosion and sediment control practices must be in full compliance with all
specifications governing the proper design, installation and operation and
maintenance of such Best Management Practices in order to protect surface
waters standards:
a. The erosion and sediment control measures for the project must be
designed, installed, operated, and maintained in accordance with the most
recent version of the North Carolina Sediment and Erosion Control Planning
and Design Manual,
b. The design, installation, operation, and maintenance of the sediment and
erosion control measures must be such that they equal, or exceed, the
requirements specified in the most recent version of the North Carolina
Sediment and Erosion Control Manual. The devices shall be maintained on
all construction sites, borrow sites, and waste pile (spoil) projects, including
contractor-owned or leased borrow pits associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be
designed, installed, operated, and maintained in accordance with the most
recent version of the North Carolina Surface Mining Manual.
d. The reclamation measures and implementation must comply with the
reclamation in accordance with the requirements of the Sedimentation
Pollution Control Act.
3. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian
areas beyond the footprint of the impacts depicted in the Pre-Construction
Notification. All construction activities, including the design, installation, operation,
and maintenance of sediment and erosion control Best Management Practices,
shall be performed so that no violations of state water quality standards, statutes,
or rules occur.
, .
Page 3 of6
July 18, 2005
4. No Sediment & Erosion Control Measures win Wetlands or Waters
Sediment and erosion control measures shall not be placed in wetlands or waters
to the maximum extent practicable. If placement of sediment and erosion control
devices in wetlands and waters is unavoidable, they shall be removed and the
natural grade restored within six months of the date that the Division of Land
Resources has released the project.
5. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification
or applicable Buffer Rules, and any subsequent modifications, the applicant is
required to return the attached certificate of completion to the 401/VVetlands Unit,
North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC,
27699-1650.
6, Riprap Installation
All banks shall be laid back at a 2: 1 slope and riprap applied at the water I land
interface (at full pool). Riprap shall be placed as a linear protective measure
upon the regarded slopes. Stone used in stabilization shall be a random size,
varying from Class B riprap up to 6 feet in diameter to provide additional wildlife
habitat. All exposed soils above the Riprap stabilized area shall be replanted in
accordance with the attached Guidelines for Riparian Buffer Restoration.
This authorization shall in no way be construed as allowing the installation of a
bulkhead or seawall. In no way does this Certification allow for the use of
"river rock."
7. Equipment
Heavy equipment should be operated from the bank whenever possible. All
mechanized equipment operated near surface waters should be inspected and
maintained regularly to prevent contamination of waters from fuels, lubricants,
hydraulic fluids or other toxic materials. Equipment used in waters must be
clean, new or low hour equipment.
8. Diffuse Flow
All constructed stormwater conveyance outlets shall be directed and maintained
as diffuse flow at non-erosive velocities through the protected stream buffers
such that it will not re-concentrate before being discharged. If this is not possible,
it may be necessary to provide stormwater facilities that are considered to
remove nitrogen. This may require additional approval from this Office.
Page 4 of 6 . ,
July 13, 2005
9. Catawba Buffer Tree Protection
No trees shall be removed from Zone 1 of the Catawba Buffer unless they are
directly within the construction access corridor. If trees are removed, forested
vegetation shall be re-established within the construction access or other
temporary impact area occurring in the protected buffer zone within the next
growing season following construction of the project;
Additionally, should a dense woody buffer not exist along the shoreline, one must
be planted at the completion of the construction activity which complies with the
Catawba Buffer Rules.
10. Turbidity Standard
The turbidity standard of 25 NTUs (Nephelometric Turbidity Units) shall not be
exceeded as described in 15 A NCAC 2B. .0200. Appropriate sediment and
erosion control practices must be used to meet this standard.
11. No Impacts Beyond those in Application
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or
riparian areas beyond the footprint of the impacts depicted in the Pre-
construction Notification. All construction activities, including the design,
installation, operation, and maintenance of sediment and erosion control Best
Management Practices, shall be performed so that no violations of state water
quality standards, statutes, or rules occur.
12. No Sediment and Erosion Control Measures in Wetlands
Sediment and erosion control measures shall not be placed in wetlands or waters
to the maximum extent practicable. If placement of sediment and erosion control
devices in wetlands and waters is unavoidable, they shall be removed and the
natural grade restored within six months of the date that the Division of Land
Resources or locally delegated program has released the project.
13. Deed Restriction
Deed Restriction or similar mechanisms shall be placed on all retained
jurisdictional wetlands, waters and protective buffers in order to protect these
resources from future impacts to wetland, water and buffers located on the
property. These mechanisms shall be put in place prior to impacting any
wetlands, waters and/or buffers approved for impact under this Certification
Approval and Authorization Certificate. A sample deed notification can be
downloaded from the 401M1etlands Unit web site at
http://h20.enr.state. nC.us/ncwetlands.
Page 5 of6
July 13, 2005
14. Property Access
As Duke Power Company owns part, or all, of the property on which this
stabilization activity will be taking place, or it is within the Federal Energy
Regulatory Commission Project Boundary, this Water Quality Certification is only
valid after the written authorization of Duke Power Company has been obtained
through their permitting process, granting access to perform these stabilization
activities on their property or within the Federal Energy Regulatory Commission
Project Boundary. Failure to obtain the above written authorization from Duke
Power Company, any stabilization / fill / dredging which takes place on Duke
Power Company property will be considered a violation of the issue Water
Quality Certification.
Violations of any condition herein set forth may result in revocation of this Certification
and may result in criminal and/or civil penalties. The authorization to proceed with your
proposed impacts or to conduct impacts to waters as depicted in your application and
as authorized by this Certification, shall expire upon expiration of the 404 or CAMA
Permit.
If you do not accept any of the conditions of this Certification (associated with the
approved wetland or stream impacts), you may ask for an adjudicatory hearing. You
must act within 60 days of the date that you receive this letter. To ask for a hearing.
send a written petition, which conforms to Chapter 150B of the North Carolina General
Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh,
N.C. 27699-6714. This certification and its conditions are final and binding unless you
ask for a hearing.
Page 6 of6
July 18, 2005
This letter completes the review of the Division of Water Quality under Section 401 of
the Clean Water Act. If you have any questions, please telephone Cyndi Karoly in the
Central Office in Raleigh at 919-733-9721 or Kevin Barnett in the DWQ Asheville
Regional Office at 828-296-4657.
Sincerely,
1J L -
~_/ _ l
"1fr,'-'Y'/1 ., L:: c.,Lr..ra.<..Cl4 !b-i
Alan W. Klimek, P.E., Director
Division of Water Quality
AWKlkhb
Enclosures: GC 3373
Certificate of Completion
Guidelines to Riparian Buffer Restoration
cc: Sue Harmon
Permits Etc.
Post Office Box 234
Boiling Springs, NC 28017
USACE Asheville Regulatory Field Office
DWQ Asheville Regional Office
DLR Asheville Regional Office
File Copy
Central Files
Filename: Holz.Burke.GC3373.Approval
.1
~j'
1
t
f ".
----- fSio:wpol ----..
I I
I
I
Triage Check List
Date: 07/07/05
;1-;2 ~~ n r;-T"J (~
,> ~~ \_~ ;-~
:t :. ,1 \
~; \1 io-_ T"': i ':.J
r- -:-, ~, :.
'.. -.1. ",
I _ ',I
~_>1 " i
Project Name: Lisa C. Holz
DWQ#: 05-1196
County: Burke
To:
Kevin Barnett, Asheville Regional Office
60-day Processing Time: 6/2.9/05 to 8/27/05
From: Cyndi Karoly Telephone: (919) 733-9721
The file attached is being forwarded to your for your evaluation.
Please call if you need assistance.
D Stream length impacted
D Stream determination
D Wetland determination and distance to blue-line surface waters on USFW topo maps
Minimization/avoidance issues
D Buffer Rules (Neuse, Tar-Pamlico, Catawba, Randleman)
D Pond fill
D Mitigation Ratios
Ditching
D Are the stream and or wetland mitigation sites available and viable?
D Check drawings for accuracy
D Is the application consistent with pre-application meetings?
Cumulative impact concern
D
D
D
Comments: As per our discussion regarding revision of the triage and delegation processes,
please review the attached file. Note that you are the first reviewer, so this file will need to be
reviewed for administrati ve as well as technical details. If you elect to place this project on hold,
please ask the applicant to provide your requested information to both the Central Office in
Raleigh as well as the Asheville Regional Office. As we discussed, this is an experimental, interim
procedure as we slowly transition to electronic applications. Please apprise me of any
complications you encounter, whether related to workload, processing times, or lack of a "second
reviewer" as the triage process in Central had previously provided. Also, if you think of ways to
improve this process, especially so that we can plan for the electronic applications, let me know.
Thanks!
i~D 0 :J' " n l:'
J0Q
The following is an abbreviated application form for those applying for a 401 'Vater Quality
Certification to impact FERC (Federal Energy Regulatory Commission) regulated lake shore or
bottom under the U.S. Army Corps of Engineers Permit GP30. This Application cannot be used
for wetland or stream impacts. Please provide seven (7) copies of this application and supporting
information as well as a non-refundable application fee to the Division of Water Quality of $200.00
for impacts of to lake bottom of less than 1 acre and $475.00 for impacts to lake bottom of greater
or equal to 1 acre.
(') ,\ I , ~ t-. I-'~
r- ',' ",;.- t, I
Ii j 1 ~ ! L.l ,
:---'-~l[-!\ ,'rn
" -C" t "..,
\L_ 'Li f L~-'
Applications should be sent to:
Division of Water Quality Wetlands Unit
1650 Mail Service Center
Raleigh, NC 27699-1650
~~@~ow~@
JUN 2 9 2005
L Applicant Information
I.
Owner/Applicant Information
. D7NR - WATEH QUil.urT'
\iETlAI,DS A.',m STCRM\'iATER BRANCH
Name:
Mailing Address:
MRS. LISA C. HOLZ
12 MAPLE PLACE
_HOPEWELL JUNCTION, NY 12533
845-226-3501 Fax Number:
Telephone Number:
E-mail Address:
2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached
if the Agent has signatory authority for the owner/applicant.)
Name:
MRS. SUE HARMON
Company Affiliation: _PERMITS, ETC.
Mailing Address: _POST OFFICE BOX 234
_BOILING SPRINGS, NC 28017
704-434-0706 Fax Number: 704-434-7100
Telephone Number:
E-mail Address:
.JJermitsetc@carolina.IT.com
n. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local landmarks such
as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and
development plans in relation to surrounding properties. You may use the diagram below to make a
hand sketch of your project. Also, see the example below for guidance. Both the vicinity map and site
plan must include a scale and north arrow. The footprints of all buildings, impervious surfaces, or other
facilities must be included.
LISA C. HOLZ
1. Location
County: _BURKE Nearest Town:
Subdivision name or site address (include phase/lot number):
(5218 KALMIA DRIVE, MORGANTON, NC 28655)
Directions to site please include road numbers, landmarks, etc. (This is not necessary if an adequate
MORGANTON
SOUTHPOINTE / PH. 6 / LOT 10
vicinity map is included): FROM MORGANTON TAKE HWY 126 W / TL ON SOUTH-
POINTE DR. / TR ON OLD DRY CREEK RD. / TL ON KALMIA DR. / PROPERTY ON RIGHT
2. Describe the existing land use or condition of the site at the time of this application:
THIS IS A VACANT, WOODED LAKE LOT.
3. Property size (acres): _3.23 ACRES
4. Nearest body of water (streamlriver/sound/oceanllake): LAKE JAMES
5. Describe the purpose of the proposed work: _TO STABILIZE THE ERODING BANK ALONG
APPROXIMATELY 60 FEET OF SHORELINE ON TillS LOT BY APPLYING RIPRAP. THE RIP-
RAP WILL BE 2-3 FEET IN HEIGHT.
6. List the type of equipment to be used to construct the project:
AND HAND TOOLS
_A BARGE, A BACKHOE
7. Amount of impact (including all excavation, backfill, rip rap, retaining walls, etc.) below the
normal pool lake level in square feet or acres: 2 FT. X 60 FT. = 120 SQUARE FEET
8.a. Amount of impact (including all clearing, back fill, excavation, rip rap, retaining walls, etc.)
above the normal pool lake level and 50 feet land-ward in square feet or acres:
_1 FT. X 60 FT. = 60 SQUARE FEET (A CONSTRUCTION PATHWAY WILL NOT BE
_NEEDED SINCE A BARGE WILL BE USED.)
8.b. Please describe vegetation above the normal pool lake level and 50 feet landward to be impacted
(number of trees for instance): TWO TO FOUR TREES WILL BE REMOVED. THEY
WILL BE REPLACED USING THE GUIDELINES SET FORTH IN BURKE COUNTY'S
SHORELINE PROTECTION ORDINANCE. ANY REMAINING DISTURBED AREA WILL
HAVE MULCH APPLIED TO IT.
~ dGftm1(ry., I Qg'n/-lP-fl~,tllJ SiLo (. f:J...1/0$
Applicant/Agent's Signature I Date I
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
ID
Lake (Full Pond)
Full Pond
Shoreline
)
Proposed .f?:oot Ooc.J<..
Lakeward
~I X G;O{ R.i ("ll.)
, I K &;0 CleltfW-
A boye- Fu.l \ POf)d
Li~u ~ \"2
LD+ ft 10
5,uJhPoinre /Ph.G
(No COrci'ft.tcJi on patluiXl1 ne-ecled")
Please approximately sketch the following infonnation on this plan
(please provide dimensions for each item, such as 10 ft. x 100 ft.):
1) All proposed vegetation clearing (provide dimensions)
2) Location of rip rap or fill to be placed above the "Nonnal Pool"
elevation
3) Location of rip rap or fill to be placed below the "Normal Pool"
elevation
4) The location of any proposed structures such as buildings,
retaining walls, docks, etc.
5) The location of any excavation or dredging below the "Normal
Pool" elevation
6) Location of construction access corridors
~ I I
Jnl'- rirrrlp L,IJILLbL foo f~eJ In lenfJi-11 find ;),~3 in hei~ht.
. ,31 8 ^ il5~ ---
lo.~ /J>/'~----fY\'P. f( ---- 1
~ ::t 1.71llcro9 <J~ I":"~ \'1r /.' (;) ~O ~61 U!, ~ ~-'Y
_ . 1\) R= 8 \ /'_ ,,0 .~,/ e - - - ~ - I
~ nl~ ~') pe;- IV roro. . "fl " I'~
Z ~,6')" 'f':) /~. ,." ".f).'\. ,/~, jW~
!o-011~9~""'E8' ,-...l~' "\~;':',~~ c,~'" /;~,)' >1'"
""';) (;.,'t:J),<,) .......<)) ........;~, gR8E-9 .JI:';
"-Ii? "}......e... . .e"'",)' .......Ji.1' '''':
~/,,- .I1'.....'\\q.~q .. I "J' I'
':\G<1' '()J'~/~r) 'Ioe'" c..,")':< 2.19 acres _.tl
"/<;'5....G..."\~.?:.-... \\q..\<),~, ....-~ ~,.
CJ,f'ft'" '1.1 ~, ,';1', \ \" .1. ~..
';\.\()~1. <,1.' r-:,\-;'. >~,""\'~
"~ \ .. ~.. ~ ><' T .
!-J('} - - B ..
c-l \04 16U4'''' R5J
o . \.\0l,.4. NOO'OO'2 5'W
. 0\';)' ~____----n '
"'~''0'...;.~(\,cl'\. a;'To' Sl~::)gi-
I '..'J ~,D()';";'l"I' 3a-:-......
I . .".' .....
,/ ' ... 0 11 V') If
. '\ ':lJ ..\, '"? I
Q ,':('f< \..
..... ~. (II \
:t>'\ RBE-lO \~)
, r, , ca- .. Jd. '
~, , .,," ,. <..':l I A iZ>
. '..> , ..>. '-. \J... . ~ ' " .....
, '01... ,., \ Cl" "..
0,' ... ",'\. I , 10' ,:'......
., ' \ .. \ " . J
~ ".,; :" 0. t~:\,1., ~'... ;/..../<J~"){,' ...'-
\..A.J \ o,,'h'\
\ ".....h
1 0 \ , ' ,,',
M'
I
I
<-:6 ~
~..........,,:( ....
/....~l.'l .:!?
,'l'l ~I
) ~
~I
a;-6 lr I
q>
I
,
I
~\;;\ "1J VI
'61P,%. C 0>
d't 01 C1 ~ \JI
IJ' I . \JI _...... tJ
;, tJ -,):> I\l
" I\l () I .
I \~ ~ >: ~\
\ _ I ,-' j; -i
\ &~ 1!> ~ r<1..o
_--"'~~) ~ 0 ~
~~7"~ ~ ~....::o ~ -
(]I b' ~~LD DRY CREEK RD ,
"'. i . (6~gin Tronsi\i()l'l to 45
~ Puhl'c Riqht-ol-WOY)
o .
'::S //
<0
v~ C.7
lIlt ,",,"'076'.]('[
Ceo '95i
:: /' 'A_R!~~
'{(. ,op "'~""~
,r l' -:...'1' ell'
r "~ ,. tJ>'
\ 1/-5 ,,;)~ .. ,..J\
~----e c, ~,'-;',\
'6 \~.
;\
'i\.~'\ ~ ~
Q. ~ 2.89 BerOG u ' .. :;
I ' fJ ~) v
~l j; , ... ... 'Ii> ~/ ~ <::J
j'05~~ :,,", ~~ v
19010 Q: /
11), ;... ..tl "
~,I" <f;'
:~ ~..r;J ~
G/>f'~ I
,<r I
~
.K/ \"
0;, ,+1
~~
RSE-7
7
3.23 acros
"
_/
qf\ 1f
~_______--G "
'" <,()(.'19'7'''' ;:... 805....
Vl/ .' )J. ... .,g'
~, 0)8':'
~-~~ ~~,~
~~ nc'lC=-25 .,,' '"
._\ n= ~\ a''':>
.' 1;" ",
l1l_f~S6
--R
, -9/
',!s ,~..)
... r./.P
25
t82 ClcrOG
~~
;'-6~"J. fb~
. , \J' -
'4 ' ..; ..,.
'/. \ V.
~. '- <^
,;>, ,
~~
" '
"J, "
~, \
,
~i~~
,
,~\ \
~\~\
..;\\,..
....,
~\
\
~
\
\
200 BI'
N06'OJ' )13"(
':0
26
4.65aerot
"Y"
~
I.~ ~
l/1 ,."
vi'"
No
- ~
Z
LiSCL C. r\ol1..
5oLlrhPolote./ Ph.~1 Ltrt-IO
Mor~n+O[) I Me.. ~~G,5S
5 I( I
coJe.: I ; ICO
/
.
. ^' 'J
. :)','( \ \,':
" \
r' ,.. ,'~l" ('
, \
; 1'1'"
'-, :
,,~
2.05 acres
'Il
~\
" \
, \
tJ
".\
"'.\
~
\
l\C.~'.:R - './'v'tJt,r:'. OlJ~:'"UT(
WE1LJ.::;';;5fJm S'IC:f,;;'\'iAlf:H i;it;:;CH
:Jr
/8 .~
. 01
- ..,.
1111-,
I
~:z-<
I
_ '^ 's - show rip ('llf, {q(J linea.rfe.ef,
J... 3 feet 'In hei9Jt+
'Proje.c..t wi II be. done. b~ bar9-V i
Morganton area, NC
....
Plllgllh National
Forest .
l-'. ,.7~/
~~ ,
t"' '..,j
~~
."~-
'a
p;l
...........'.
;.-LJ..
.,;
---.....
~ .....-......~- /~..... ....~ j
126 QO~;;..... ' J '
~gll~ ,.. .. . '
_...../...~~. [I ~t. Laka Jamos
~ --,'l. J'" 'I 7~~(
..... I :~ 1234;=../ I .....IJ_~'.,
-...,..~. . ' \ '-' ~~cl.L~~} >'
. , ,. ,. ,....~'
I
Lisa Holz SouthPointe / Ph. 6 / Lot 10
\r J~ )) --~0 ~
1-1 ) I /.
~1' ~/ / --" -.,'."'____....------
V' (1243) J~) ~//j ;-e::=-...=.
(126) '=(Q/ ---J (f
-"" '9 \\
.t Usa C. !-bIZ-.. M. ,~,,,,"'" ' H'" ''5, . n .1...248
: / . SOJthPoiltEtph. f/ Lot 10 .;,~ ;::-~.. l( I) -r'
"~ McrgJ1tm, l\C 28555 ~ rf-2~~L.....'l
LatJb.Joo 3S. 7625 ~ ~
'" Lorgitu:Je -81,83::04 ~ \ \
'\'1' .. /.-~r~! ~ \ '.
.~)' '('iff7~()._~ ~~ ~~;~ .'.\'L' :i
'F <',~..~ II 11' :' 126'1
~ <~ ~-. .<~f(~'~.. :'--", (,\/\ // "7(--,(<\
'.'~( .. .'~ '=-'="~", .J
..~;d~ ~':12ii)!1 '~ /.
;S/jrV~~"-a( )/ '\
t ~ J )',~ C4,.~~ \,,-,,-,,
r..~..)~ " f I?~..,
~\'Qf-e /~z. -';i!:o,~ '\
(IS" ,. (r,2301 ~ ~\) :,.'1.~221~5~~:"'.'=:,
'.......~ l( I ( ,<~/hr
~~~~!/ '
~_J oJ":,,} ....'
;.J
.,~
Oml 0.5
1.5
2
2.5
/DJ&@/'[JrJ". -,..
li1f.~_] I; I VI/I/, ".-;, ,,,
... \ ~AM
JU '-" ,.,
N C' iJ/
2 .J Z005 ..~
I.~ DENt::> .
't;Tl.AN ". fVA-'"
'Os AND s~,t:_;: qU':"l.i"
11'.;r""Jr~/t'
" ui?,~"''Cli
Copyright C lB83-2001 Microsoft Corp. andlor Its suppliers. All nQhts reserved. http://www.microsoftcomlstreets
C Copyright 2aXl by Geographic Data Technole>;lY. Inc. All r1Qhts reserved. C 2aXl NaVlQation Technole>;lies. All riQhts reserved. This data includes information taken wrth permiSSion from
Canadian authorities C Her Majesty the Queen In RiQhl of Canada. C CopyriQhl2aXl by Compusearch Micromar1<etinQ Data and Systems Ltd. '
Li% C. HoI'~
5outhPolnr~ /Ph.(, I Lof * If)
To: North Carolina Division of Water Quality
I give Sue Harmon, of Permits, Etc., permission to sign as my agent on my
application for shoreline stabilization.
Signature (s)
Date (P/do/0~
DUKE POWER LAKE MANAGEMENT, EC12-Q
POBOX 1006
CHARLOTTE, NC 28201-1006
704-382-1567 or TOLL FREE 1-800-443-5193
APPLICATION FOR PERMIT TO STABILIZE THE SHORELINE IN NORTH CAROLINA
Please type or print and fill in all blanks. If infonnation is not applicable, so indicate by placing N./ A in blank. PLEASE
SUBMIT APPLICATION AND APPROPRIATE DUKE POWER FILING FEE, PAYABLE TO DUKE POWER,
TO ABOVE ADDRESS.
L Applicant Information
A. Name LISA C. HOLZ
B. Mailing Address_12 MAPLE PLACE, HOPEWELL JUNCTION, NY 12533
C. Tclephone:_845-226-3501
II. Location or Proposed Project
A. Lake LAKE JAMES
B. Street Address _5218 KALMIA DRIVE, MORGANTON, NC 28655
C. County BURKE
D. City, town, community or landmark MORGANTON
E. Section ]HASE 6_ Lot # _10_ Subdivision SOUTIIPOINTE
F. Directions to property by road ]ROM MORGANTON TAKE HWY 126 WEST / TL ON SOUTIIPOINTE
DRIVE / TR ON OLD DRY CREEK RD. / TL ON KALMIA DRIVE I PROPERTY ON RIGIIT_
G. Latitude and longitude for the project site _LATITUDE 35.76526 LONGITUDE -81.83964
H. Please submit a map showing the coordinates or a detailed map (USGS quad map, city map, etc.) showing the
exact location of the project site. (NOTE: LatitudcJ longitude coordinates can be found on internet site,
www.maIlsonus.com.
DL Description of Project
A. Length of wall_APPROXIMATELY 60 LINEAR FEET
B. Material_RIPRAP
C. Distance from property lincJshoreline_ WILL FOLLOW EXISTING SHORELINE
IV. Intended Use of Project Area
A. Private_YES
B. Commercial ~
Applican.t Signature (J - ~
Agent Signature h hY1
Tm ii5 Etc...
PLEASE NOTE mE FOLLOWING: )
. A COPY OF THE COMPLETED APPLICATION WITH A ROAD MAP SHOWING LOCATION OF THE PROPERTY
MUST BE SUBMITTED TO: US ARMY CORPS OF ENGINEERS, 151 PATTON AVE. -ROOM 208,
ASHEVILLE, NC 28801-5006
v.
Date
Phone1IJ!f-'fM- D'1 DC?
(P/cQO!D <;
Fax 1Dlf-lf?Jlf-7/00
. A COpy OF THE "DUKE POWER APPLICATION FOR PERMIT TO ST ABn...IZE THE SHORELINE IN NORTH
CAROLINA" AND SEVEN (7) COPIES OF THE COMPLETED "NC DIVISION OF WATER QUALITY PRE-
CONSTRUCTION NOTIFICATION APPLICATION" MUST BE SUBMITIED WITH THE DMSION OF WATER
QUALITY APPLICATION FEE TO:
NC DIVISION OF WATER QUALITY
ATTENTION: JOHN DORNEY
PARKVIEW BLDG., 2321 CRABTREE BLVD.
RALEIGH, NC 27604
919-733-1786
06/03/05ssb
Lisa Holz
SouthPointe
Ph. 6 / Lot 1 0
I i
I I I I
f)!'; \1 i. 1 :~ i" ~ "j 4
I i \ I I 1 '_; . I
05'1196
.- ~ i"""" r- ! \ ; ~ ;-1
I \ ~_ ~..J ~ I L I i
The following is an abbreviated application form for those applying for a 401 Water Quality
Certification to impact FERC (Federal Energy Regulatory Commission) regulated lake shore or
bottom under the U.S. Army Corps of Engineers Permit GP30. This Application cannot be used
for wetland or stream impacts. Please provide seven (7) copies of this application and supporting
information as well as a non-refundable application fee to the Division of Water Quality of $200.00
for impacts of to lake bottom of less than 1 acre and $475.00 for impacts to lake bottom of greater
or equal to 1 acre.
Applications should be sent to:
Division of Water Quality Wetlands Unit
1650 Mail Service Center
Rnleigh, NC 27699-1650
1. Owner/Applicant Infonnation
m~@~Q\Yl~@
JUN 2 9 2005
L Applicant Information
Name:
. D~NR - WATER QU:'.un
\,'ETW,DSAJ"D S-C/-l ". 'T-
i\ I \oIiIl';\ tf/ 6f~;\rICH
Mailing Address:
MRS. LISA C. HOLZ
12 MAPLE PLACE
_HOPEWELL JUNCTION, NY 12533
Telephone Number: _845-226-3501 Fax Number:
E-mail Address:
2. Agent Infonnation (A signed and dated copy of the Agent Authorization letter must be attached
if the Agent has signatory authority for the owner/applicant.)
Name:
MRS. SUE HARMON
Company Affiliation: _PERMITS, ETC.
Mailing Address: POST OFFICE BOX 234
_BOILING SPRINGS, NC 28017
704-434-0706 Fax Number: 704-434-7100
Telephone Number:
E-mail Address:
jJermitsetc@carolina.IT.com
IT. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local landmarks such
as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and
development plans in relation to surrounding properties. You may use the diagram below to make a
hand sketch of your project. Also, see the example below for guidance. Both the vicinity map and site
plan must include a scale and north arrow. The footprints of all buildings, impervious surfaces, or other
facilities must be included.
LISA C. HOLZ
1. Location
County: _BURKE Nearest Town:
Subdivision name or site address (include phase/lot number):
(5218 KALMIA DRIVE, MORGANTON, NC 28655)
Directions to site please include road numbers, landmarks, etc. (This is not necessary if an adequate
MORGANTON
SOUTHPOINTE / PH. 6 / LOT 10
vicinity map is included): _FROM MORGANTON TAKE HWY 126 W / TL ON SOUTH-
POINTE DR. / TR ON OLD DRY CREEK RD./ TL ON KALMIA DR./ PROPERTY ON RIGHT_
2. Describe the existing land use or condition of the site at the time of this application:
TIllS IS A VACANT, WOODED LAKE LOT.
3. Property size (acres): _3.23 ACRES
4. Nearest body of water (streamlriver/sound/ocean/lake): LAKE JAMES
5. Describe the purpose of the proposed work: _TO STABILIZE THE ERODING BANK ALONG
APPROXIMATELY 60 FEET OF SHORELINE ON TIllS LOT BY APPLYING RIPRAP. THE RIP-
RAP WILL BE 2-3 FEET IN HEIGHT.
6. List the type of equipment to be used to construct the project:
AND HAND TOOLS
_A BARGE, A BACKHOE
7. Amount of impact (including all excavation, backfill, rip rap, retaining walls, etc.) below the
nonnal pool lake level in square feet or acres: 2 FT. X 60 FT. = 120 SQUARE FEET
8.a. Amount of impact (including all clearing, back fill, excavation, rip rap, retaining walls, etc.)
above the normal pool lake level and 50 feet land-ward in square feet or acres:
_1 FT. X 60 FT. = 60 SQUARE FEET (A CONSTRUCTION PATHWAY WILL NOT BE
_NEEDED SINCE A BARGE WILL BE USED.)
8.b. Please describe vegetation above the normal pool lake level and 50 feet landward to be impacted
(number of trees for instance): TWO TO FOUR TREES WILL BE REMOVED. THEY
WILL BE REPLACED USING THE GUIDELINES SET FORTH IN BURKE COUNTY'S
SHORELINE PROTECTION ORDINANCE. ANY REMAINING DISTURBED AREA WILL
HAVE MULCH APPLIED TO IT.
~ dGftJ>'YIITX / I ~e nt-tAft;', tAli [Ie. (; I J.. '/IOS
Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
<::
ID
Lake (Full Pond)
Full Pond
Shoreline
)
f>ropo~ed lZ:oaJ OocJ<-
Lakeward
j..' X G;OI Ri fCL)
t' K &;0 CIElLred-
Above, FuJ\ POf)cl
Li ~a. l-\o l-z
LDt tt 10
$oath Poi nre /Ph. (P
(No co~tfl.tcliD1) pliHuVQJj ntedd")
Please approximately sketch the following information on this plan
(please provide dimensions for each item, such as 10ft. x 100 ft.):
1) All proposed vegetation clearing (provide dimensions)
2) Location of rip rap or fill to be placed above the "Normal Pool"
elevation
3) Location of rip rap or fill to be placed below the "Nonnal Pool"
elevation
4) The location of any proposed structures such as buildings,
retaining walls, docks, etc.
5) The location of any excavation or dredging below the "Nonnal
Pool" elevation
6) Location of construction access corridors
r I I
Jnf1~ ripr(lp Ldlll_DL ~O fee,} In lmgi-h nnd ;),'3 in hei9ht.
~ QS1 - - ---
----fY
\~. r;:}~O ~51 ~Q5'~ ~-'tJ
\ ~o .~ /' 8---8" ,~
~ '0'0' .')0,,'. ,.
/" ,," ... .,,'\. " ~... j',:)I~
~ ").... .~ ~ . ,,~ "" .;'> Ii..,
"\ ".,'0 c.,'" ",' " .', f'
... ".()) """'l:"~' 9 R8E-9 '0 I ~
,",~ ,.'
'IQ@" c..,~" 2,19 acre" ~ rtl
\ .- ~
~,\"1\ 0"'~~"
"'J \ '!,. . ' - ',' '" -ll
',P.\ ~ ' , , ,,\ T ') .
_ ~('7 - - B ' ,
~ \04 16134'<<' ~6j
o \.\oj,4 NOO'OO'25"W
. '<.\ ".l\' B - - - - - - - - n .
" v.,....-; -:-, .........').........
C.."J 9~~r.,;.'Jc)lq \. <0(8)::. ~'~"{ S.l.,,'.~~'
I .' ~. l' oJ ..J(f (' ..
I f~'~
~, 0 ~~
/;':?:'c.,. 'f.'
b ..-:(~ \~ \
((,~\.,~ RBE-lO \~)
1'1'. , ~ '. . '. .G \
lJ'"...... ,'~" /: Q)
,..), \ .".' ~"IQ ".,~ " /.I:l'\.,""l-
0.' ,,"''\,\1 , 10' , :'l"
;.' ...".\-"\. \ ,/ //,"
e ,I. t:-l~hf\ 'Z, /. /'" /.J~'l'Q' ,,"
\ :C^"X ......"....."....
LA.Ju. ';'\ ;~.;~.~
10 \~..',,"
I
I
/'
8
"
...~
....<. \'13
l.7111cr01l
RaE-7
~'-. I
}J' I ''Ii)
j'05~~ :1-'
a:-6
3.23 acr08
Cll
~.
>:<F\ 7f
(p____ -.-;:,- - A, 8,.'....
~I :,OC197., "..i.....~S9'
;rl 0)6''''
~-~~ ~~'~
" ~~ r=lt::-25 .,~\
..\ n= \
""Il_ :~56 . 0
- "~-9 ~Oj~... ~
../s. ";"":")-
.....J ....-'\.
'0~hl:l
25
~
I.~ ~
111 ....
iii'"
N r-
~ ~
z
~~
;'6~ OJ.;. fb\
. \ \J -
'4 \ ~ ..,.
...... \ V.
'~, \ ('
'1>. ,\
~ ~\
"', \
~,J) \
,&. \
\
~i~~
\
I~\
<.1'.\'&\
<6.\f,.\
;\ .
....,
# \
\
~
,
,
t82 o.cros
20081'
N06'OJ' Hn
':0
26
4.&5 Beret
"il",
-
'A' 'J
_: ),,'r \ \ \":
, "
r' ", " ~l" t'
. ,
; 1'("
'-0 :
~
...
--
_/
2.05 acres
~\
,\'\
, \
tJ
\
...,\
~,
\
...11,
r.,r:.
Li5CL C. MOiL. /D)
:So II tl1 Po I nh I Ph 10 Iltsl- 10 fA[ 'I1J@&:7\'---,
Mor9Jn-IDn I l\le.. ~<3~5S JU/V " '. ;:<'':''t
2....
I C l . III I~iz.. Dt!...", " (U!:
~:Z-< wco.. e,. :: \.A.J ;'..~'i::,~- .,
t l"D~;.;-tl.;,;:..'
_ 'f,. 's - show rip rap I ~D Iin;i:fat,
~.. ~ .feet in he;9h.t
'Proje.c..t wi II be, done. bLj- lxtrq-v
Lis.ov C. Hvl.l.-
5outhPoinr~/Ph.~ (Lof1f/V
To' North Carolina Division of Water Quality
Lisa Holz SouthPointe / Ph. 6/ Lot 10
\~ Jj )) --<'i./r)
/1 ) I .,
-L~/ ~-' '.
/ 'J\,\' 7~'J'/f/ J='" ,~.-----
, (~~ Lisa c.I:-b~... H.. . .~.. "'. (\. n :;-.~~
Sc:uthPoilte/Ph. f/ Lot 10 ,;--- J"'''' ",': I Ii
McrgiJ"lta"l, t\.C 2ffi55 ./;/' f1~6~'i'!:"-.' '."/
Latltude 35. 76'52f5 .- ~. ~..~. .;:-'
LOr\lltu:Je. -81.8J::04 ,,~ )/ ~ ..>
1'1'" .,//.~ ~ ~ '
~ (~~'j~n 1 1. >~?i~l{
. '",""i .' (;~n( \~
. -..2 '.' .:;:-l~'~" '1\
<.d',( ( ..t~V~f1 ~,=",;O:==~"-". 1./
~~. 'i~)I! \ /1
/rs.~ '/)~fu:1\\ffi . '."fL. ./.
>-,\;,j ~~ /)/ . .J'<~r~~~~~~ r )! I
;::----- . , "'~ .. / V"';' i..'::'~~ .... 1~~C4r.~' ( , '----
...............~. '.._-~. . '.' .;? cr f ~'\
126) -"" ' ,'" " _,I,. <b",.,
\'\..,.0~'v \. / ,.,." '.. 'I '1 I r(,,>,.. .
~~~ '~. ,'~, l" /~~ :/ (123Q'! "'t~~\ .~f~'~:_
~ '~~J~LEk'JQm's' .,~ :Pi r ~'<./. .)1:1-5 '.
._.; ~\ '-' t~~) __>o./,~._.,..,:J(~~ /l/~ II ( . /tx,;~)
Morganton area, NC
.....,.
."....",..
..
I
Plsgah Nlltlomil
Forest .
..-,~ .
',' ./
i .~"
;'
._)f
~~
~
-\
Q)
.....
" .
.~."".
Oml 0.5
1.5
2
2.5
& &@ & nt~...., Iff:
JUN 2 9 2ui.o.1 .'!!)
1~~T1 ~~NR - ~VATE
''-'V\[)SA,VDS- ./1 Q/..; ,',
IClli~'WAI:~I: ..'
(; . t.',~i"CH
Copyright C 1003-2001 Microsoll Corp. andlor its $uppliers. All ri~hts reserved. hllp:liWww.microwftccmlstreets
C Copyright 2000 by Geographic Datil TechnolO\lY, Inc. All n~hts reserved. C 2000 Navi~ation TechnoIO\lie.. All ri~hts reserved. This datil include. information laken Wlth permiSSion from
~~lan authoritie$ C Her Majesty the Queen in Ri~hl of Canada. C Copyrl~hl2000 by Compu$Oarch Micromarketin~ Data and Systems Ltd.
L.i~ C. Hofz,
5oufhPvinfe-/Ph.~ (0Jt * IV
To: North Carolina Division of Water Quality
I give Sue Harmon, of Permits, Etc., permission to sign as my agent on my
application for shoreline stabilization.
Signature (s)
Date (Placlo')
Lisa Holz
SouthPointe
Ph. 6 / Lot 10
II