HomeMy WebLinkAbout20051153 Ver 1_Complete File_20050623\O?U. `?QG Michael F. Easley, Governor
t/ -7
t_ William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, RE. Director
Division of Water Quality
July 5, 2005
DWQ Project # 05-1153
Mitchell County
Kathy Young, Mitchell County Clerk
Mitchell County Board of Commisioners
Sdministration Building 2
26 Crimson Laurel Circle
Bakersville, NC 28705
Subject Property: Green Creek (EWP M2004-04b)
Approval of 401 Water Quality Certification with Additional Conditions
Dear Mrs. Young:
You have our approval, in accordance with the attached conditions and those listed
below, to place fill within or otherwise impact 525 feet of streams for the purpose of
streambank stabilization at the subject properties, as described within your application
received by the N.C. Division of Water Quality (DWQ) on April 19, 2005. After reviewing
your application, we have decided that the impacts are covered by General Water
Quality Certification Number(s) 3376 (3376). The Certification(s) allows you to use
Nationwide Permit(s) 37 when issued by the US Army Corps of Engineers (USACE). In
addition, you should obtain or otherwise comply with any other required federal, state or
local permits before you go ahead with your project including (but not limited to) Erosion
and Sediment Control, Non-discharge, and stormwater regulations. Also, this
approval to proceed with your proposed impacts or to conduct impacts to waters
as depicted in your application shall expire upon expiration of the 404 or CAMA
Permit.
This approval is for the purpose and design that you described in your application. If
you change your project, you must notify us and you may be required to send us a new
application. If the property is sold, the new owner must be given a copy of this
Certification and approval letter and is thereby responsible for complying with all
conditions. If total fills for this project (now or in the future) exceed one acre of wetland
or 150 linear feet of stream, compensatory mitigation may be required as described in
15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in
the attached certification and any additional conditions listed below.
The Additional Conditions of the Certification are:
,01 Wetlands Certification Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
?321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
'hone: 919-733-1786/ FAX 919-733-6893 / Internet: http://h2o.enr.statf, nc.us/ncvvetlands
One
No thCarc, ina
\n Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
MILcueu I-ounry:
Pap 2 of 6
July 5, 2005
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific
and general conditions of this Certification (or Isolated Wetland Permit) are met.
No other impacts are approved including incidental impacts:
Amount
Approved Units Plan Location or Reference
Stream 525 feet Green Creek
2. Erosion & Sediment Control Practices
Erosion and sediment control practices must be in full compliance with all
specifications governing the proper design, installation and operation and
maintenance of such Best Management Practices in order to protect surface
waters standards:
a. The erosion and sediment control measures for the project must be
designed, installed, operated, and maintained in accordance with the most
recent version of the North Carolina Sediment and Erosion Control Planning
and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and
erosion control measures must be such that they equal, or exceed, the
requirements specified in the most recent version of the North Carolina
Sediment and Erosion Control Manual. The devices shall be maintained on
all construction sites, borrow sites, and waste pile (spoil) projects, including
contractor-owned or leased borrow pits associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be
designed, installed, operated, and maintained in accordance with the most
recent version of the North Carolina Surface Mining Manual.
d. The reclamation measures and implementation must comply with the
reclamation in accordance with the requirements of the Sedimentation
Pollution Control Act.
3. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian
areas beyond the footprint of the impacts depicted in the Pre-Construction
Notification. All construction activities, including the design, installation, operation,
and maintenance of sediment and erosion control Best Management Practices,
shall be performed so that no violations of state water quality standards, statutes,
or rules occur.
Lvulcneu Uounry:
Pave 3 of 6
July 5, 2005
4. No Sediment & Erosion Control Measures w/n Wetlands or Waters
Sediment and erosion control measures shall not be placed in wetlands or waters
to the maximum extent practicable. If placement of sediment and erosion control
devices in wetlands and waters is unavoidable, they shall be removed and the
natural grade restored within six months of the date that the Division of Land
Resources has released the project.
5. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification
or applicable Buffer Rules, and any subsequent modifications, the applicant is
required to return the attached certificate of completion to the 401/Wetlands Unit,
North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC,
27699-1650.
6. Green Creek is classified C, Trout, High Quality Water. As such, the following
Administrative Codes apply: 15A NCAC 04B.0125 and 15A NCAC 02B.0211
7. Sediment and erosion control measures must be implemented prior to construction
and maintained on the sites to minimize sediment in downstream areas. Seeding for
a temporary cover of wheat, millet, or similar annual grain or permanent herbaceous
cover should occur on all bare soil within five (5) days of ground disturbing activities
to provide long-term erosion control. The projects should be accomplished in stages
instead of leaving large tracts exposed to further storm events. Erosion control
matting should be used in conjunction with appropriate seeding on disturbed soils in
steep slope and riparian areas, unless authorized under Division of Land Resources
Erosion and Sediment Control approval. Matting should be secured in place with
staples, stakes, or, wherever possible, live stakes of native trees. Straw mulch and
tall fescue should not be used in riparian areas. In addition, because of an
anticipated difficulty in establishing ground cover during the winter, reseeding should
be conducted, as necessary, in the spring-time with a native annual and perennial
seed mix with a temporary nursery crop of wheat, millet or other grain.
Only clean, large, angular rock, large woody material, or other natural stream design
materials and techniques should be used for bank stabilization. Rock should not be
placed in the stream channel in a manner that constricts stream flow or that will
impede aquatic life movements during low flow conditions. Filter cloth should be
placed behind large rock that is used for bank stabilization. Properly designed rock
vanes should be constructed wherever appropriate on bank stabilization and
channel realignment stream reaches to improve channel stability and to improve
aquatic habitat. Root wads should be installed low enough in the bank so that a
significant portion (at least one-third) the root wad is inundated during normal flows.
, Uutl<y.
Page 4 of 6
July 5, 2005
9. The channel must be restored to a more stable condition. However, under no
circumstances should river rock, sand or other materials be dredged from the stream
channel under authorization of this permit except, if necessary, in the immediate
vicinity of the eroding banks for the explicit purpose of anchoring stabilizing or
flow/grade control structures or for reestablishing the natural and more stable stream
channel dimensions. Stream bed materials are unstable in flowing-water situations
and are unsuitable for bank stabilization. Stream dredging has catastrophic effects
on aquatic life and disturbance of the natural form of the stream channel can cause
downstream erosion problems. The natural dimension, pattern, and profile of the
stream upstream and downstream of the permitted area should not be modified by
widening the stream channel or changing its depth.
10. Stabilization measures should only be applied on or near existing erosion sites,
leaving other stable stream bank areas in a natural condition. Grading and
backfilling should be minimized and tree and shrub growth should be retained where
possible to ensure long term availability of stream bank cover for aquatic life and
wildlife. Backfill materials should be obtained from upland sites except in cases
where excess stream bed materials are available. Berms are not permitted because
they block the floodplain, constrict and accelerate flood flows, and often fail or
impede drainage during large flood events.
11. Repairs to eroded banks should be conducted in a dry work area where possible.
Sandbags or other clean diversion structures should be used where possible to
minimize excavation in flowing water. Channel realignments should be constructed
by excavating the new channel from downstream to upstream before connecting it to
the old channel.
12. Heavy equipment should be operated from the bank whenever possible. All
mechanized equipment operated near surface waters should be inspected and
maintained regularly to prevent contamination of stream waters from fuels,
lubricants, hydraulic fluids or other toxic materials. Equipment used in stream
channel must be clean, new or low hour equipment.
13.As long-term stream stability is a concern with this type of work, it is strongly
recommended that woody vegetation be established along stream banks where
possible. Any riparian vegetation planting should be performed in accordance with
the Guidelines for Riparian Buffer Restoration.
(http://h2o.enr.state.nc.us/wrp/pdf/buffers.pdf )
14.Monitoring
The Permittee shall examine the stabilization work done under this Certification
on an annual basis for three (3) years following the completion of the restoration
efforts. This field evaluation should note the condition and stability of the
measures installed and how well the repair is holding up. A written report must
be provided to DWQ's Asheville Regional Office by June 1St of each year. The
report must describe inspection results, include digital photographs, list the date
of inspection, and describe any needed repairs or corrections.
15.The permittee will provide on-site supervision of stability work including, but not
limited to bank re-sloping, in-stream structure placement, and riparian zone re-
establishment, by an appropriately trained individual.
MILLAIeu uoumy:
Page 5 of 6
July 5, 2005
16-If pasture along the stream is to be used for grazing, the permittee must inform the
appropriate landowners that cattle should be prohibited from damaging riparian
areas and from de-stabilizing the stream banks and channel.
17.Diffuse Flow
All constructed stormwater conveyance outlets shall be directed and maintained
as diffuse flow at non-erosive velocities through the protected riparian zones
such that it will not re-concentrate before discharging into a stream.
18.Water Quality Certification Notifications
The permittee must provide a copy of this issued Water Quality Certification and
attached cover letter to each property owner where the approved work will be
performed.
19.Turbidity Standard
The turbidity standard of 10 NTUs (Nephelometric Turbidity Units) shall not be
exceeded as described in 15 A NCAC 2B. .0200. Appropriate sediment and
erosion control practices must be used to meet this standard.
Violations of any condition herein set forth may result in revocation of this Certification
and may result in criminal and/or civil penalties. The authorization to proceed with your
proposed impacts or to conduct impacts to waters as depicted in your application and
as authorized by this Certification, shall expire upon expiration of the 404 or CAMA
Permit.
If you do not accept any of the conditions of this Certification (associated with the
approved wetland or stream impacts), you may ask for an adjudicatory hearing. You
must act within 60 days of the date that you receive this letter. To ask for a hearing,
send a written petition, which conforms to Chapter 150B of the North Carolina General
Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh,
N.C. 27699-6714. This certification and its conditions are final and binding unless you
ask for a hearing.
Page 6 of 6
July 5, 2005
This letter completes the review of the Division of Water Quality under Section 401 of
the Clean Water Act. If you have any questions, please telephone Cyndi Karoly in the
Central Office in Raleigh at 919-733-9721 or Mr. Kevin Barnett in the DWQ Asheville
Regional Office at 828-296-4657.
2
4i
AW K/khb
Enclosures: GC 3376
Certificate of Completion
Guidelines for Riparian Buffer Restoration
cc: Stu Ryman
Altamont Environmental, Inc.
50 College Street
Asheville, NC 28801
USACE Asheville Regulatory Field Office
DWQ Asheville Regional Office
DLR Asheville Regional Office
File Copy
Central Files
Sincerely,
Alan W. Klimek, P.E.
Filename: 05-1153.EWP.MitcheliCounty.GreenCteek.Approval
1 _
ue
ds
ProjectNdmbgr; 5 511J53? 4210n ? Bt ua: lsaued?^ LootACtlonDose:1pitijoctIso
t
lpro)kctNeme: MWall C0dnty WP}idhCteil Ip&plb: "PMJsct[ypg:'IWOarn Restoration tCraoon•'.
O?v+ler' MBChall Cou.. i ?Oarrl O16otnlf! tlDheis' ?Cleai atelle.;. r '
"co"dprom' AppllceM = ,?}?dlAriheirct COEID: 46rrlaryCouht, Inchfll
Recs(Vatl qt QdJ4?f2tl06: [Jklf??o110n Req b{l? W DOTTIP; 'notAlti Reglor?s AehaHlle
Iee?atl t7? UyJOVdYJOl15- j?'Courtq?? Oaf Cl frvolves Pubtlr lAnd Rarlewar, kaHn.bameit. i
etIfth?j Dt dAIg4t2005 e•z Q NEPA f 8EPk i?slu?raa .
'8aconda Cbuh
DC1?6thee:-? r .; QSiateNear Aneiizd . ?.
GO6Olflte,:feyllbRepuiatoryPfB1ti,?Altla SaPAlieceMedDt y
laudo.tlAnhla6rtt } ` 8?yplin'ReetVad OtLaei Upd tl '
- C
v ,. --ate
Lest Updelatl Omi Oy101f2DU5`$W PI>ioApprWed Dttlblle NodcePubllahed tSk
I_ a_V
ESN Plan Location:=? PUbllc Notice Recalled Dt
CJ
j - P.14, 0 PBrfOd Ends Dt.
8ewege Disposal:
<9ack• ? eaF ^t P F?`tlyl Cl0se
Triage Check List
Date: 06/30/05 FILE COPY Project Name: Mitchell County EWP
Green Creek M2004-04B
DWQ#: 05-1153
County: Mitchell
To:
Kevin Barnett, Asheville Regional Office
60-day Processing Time: 6/23/05 to 8/21/05
From: Cyndi Karoly Telephone : (919) 733-9721
The file attached is being forwarded to your for your evaluation.
Please call if you need assistance.
? Stream length impacted
? Stream determination
Wetland determination and distance to blue-line surface waters on USFW topo maps
? Minimization/avoidance issues
? Buffer Rules (Neuse, Tar-Pamlico, Catawba, Randleman)
? Pond fill
Mitigation Ratios
? Ditching
? Are the stream and or wetland mitigation sites available and viable?
? Check drawings for accuracy
Is the application consistent with pre-application meetings?
? Cumulative impact concern
? UT to Young's Creek (TROUT WATERS)
Comments: As per our discussion regarding revision of the triage and delegation processes,
please review the attached file. Note that you are the first reviewer, so this file will need to be
reviewed for administrative as well as technical details. If you elect to place this project on hold,
please ask the applicant to provide your requested information to both the Central Office in
Raleigh as well as the Asheville Regional Office. As we discussed, this is an experimental, interim
procedure as we slowly transition to electronic applications. Please apprise me of any
complications you encounter, whether related to workload, processing times, or lack of a "second
reviewer" as the triage process in Central had previously provided. Also, if you think of ways to
improve this process, especially so that we can plan for the electronic applications, let me know.
Thanks!
r
0-d7 Q5 1153
50 COLLEGE STREET, AS11EV?LLE, NC 28801
TEL. 828.281.3350 FAC.828.281,3351
www.altamontenvironmental.co
June 20, 2005
JUN 2 ' 7005
Ms. Cyndi Karoly
Division of Water Quality i. DENR - WNfHi ?Au.aLl r
401 Wetlands Unit FILE CET WETLANDS AND 3TORMINATCR 8RAW,H
1650 Mail Service Center
Raleigh, NC 27699-1650
Subject: Mitchell County EWP Project Pre-Construction Notification Application for Green
Creek DSR M2004-04b, Big Rock Creek DSR M2004-19 and Crabtree Creek DSR
M2004-21
Dear Ms. Karoly:
Enclosed are six copies of the Green Creek DSR M2004-04b.' Big Rock Creek DSR M2004-19 and
Crabtree Creek DSR M2004-21 applications for Section 404 nationwide permit 37, and corresponding
DWQ 401 water quality certification. Recovery work applied for in this permit includes streambank
stabilization and debris removal. Mr. Ryman has signed the application as an authorized agent for
Mitchell County. A letter of authorization is included. Additionally, we have sent one copy of the
enclosed permit application directly to Mr. Kevin Barnett in the Swannanoa office, Mr. Scott McLendon
of the U.S. Army Corps of Engineers, Mr. Brian Cole in the Asheville U.S. Fish and Wildlife Service
office, and Mr. Ron Linville in the N.C. Wildlife Resources Commission office.
Altamont appreciates your assistance with this application. If you would like additional information,
please contact the undersigned.
Sincerely,
Stuart A. Ryman, P.G'
Enclosures: PCN Green Creek M2004-04b
PCN Big Rock Creek M2004-19
PCN Crabtree Creek M2004-21
i
Christo er F. ilbert, P.E.
CC: Kathy Young - Mitchell County Clerk to the Board (transmittal letter only)
Cliff Vinson - District Conservation Officer NRCS (transmittal letter only)
Kevin Barnett - NCDENR DWQ, Asheville Regional Office
P:\Mitchell\Correspondence\DWQ PCN Cover Letter-Caroly-DSR 19,2 Ldoc
.,
E N G I N E E R I N G & H Y D R O G E O L O G Y
50 COLLEGE STREET, ASIIEVILLE, NC 28801
TEL. 828.281.3350 FAC.828.281.3351
www.altamontenvironmental.com
June 20, 2005
Mr. Scott McLendon
US Army Corps of Engineers
151 Patton Avenue
Room 208
Asheville, NC 28801-5006
Subject: Mitchell County EWP Project Pre-Construction Notification Application for Green
Creek DSR M2004-04b, Big Rock Creek DSR M2004-19 and Crabtree Creek DSR
M2004-21
Dear Mr. McLendon:
Enclosed is one copy each of the Green Creek DSR M2004-04b, Big Rock Creek DSR M2004-19 and
Crabtree Creek DSR M2004-21 applications for Section 404 nationwide permit 37, and corresponding
DWQ 401 water quality certification. Recovery work applied for in this permit includes streambank
stabilization and debris removal. Mr. Ryman has signed the application as an authorized agent for
Mitchell County. A letter of authorization is included. Additionally we have sent one copy of the
enclosed permit applications directly to Mr. Kevin Barnett in the Swannanoa office, Ms. Cyndi Karoly of
the Division of Water Quality, Brian Cole in the Asheville U.S. Fish and Wildlife Service office, and Mr.
Ron Linville in the N.C. Wildlife Resources Commission office.
Altamont appreciates your assistance with this application. If you would like additional information,
please contact the undersigned.
Sincerely,
Stuart A. Ryman, P.G.
Christ er . it ert, P.E.
Enclosures: PCN Green Creek M2004-04b
PCN Big Rock Creek M2004-19
PCN Crabtree Creek M2004-21
CC: Kathy Young - Mitchell County Clerk to the Board (with attachments)
Cliff Vinson - District Conservation Officer NRCS (with attachments)
Brian Cole - U.S. Fish and Wildlife Service (with attachments)
Ron Linville - North Carolina Wildlife Resources Commission (with attachments)
Cyndi Karoly - NCDENR Division of Water Quality (with attachments)
Kevin Barnett - NCDENR DWQ, Asheville Regional Office (with attachments)
P:\Mitchell\Con•cspondence\ACOE PCN Cover Letter-DSR 19.doc
1 1
Office Use Only: Form Version May 2002
USACE Action ID No. DWQ No.
kit any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
1. Processing FILE ug"OPY
1. Check all of the a
pproval(s) requested for this project:
® Section 404 Permit ? Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
® 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide 37
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete
section VIII and check here: ?
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ?
II. Applicant Information
1. Owner/Applicant Information
Name: Kathy Young, Mitchell County Clerk to the Board of Commissioners
Mailing Address: Administration Building Suite 2
26 Crimson Laurel Circle
Bakersville, North Carolina 28705 p P
Telephone Number: (828) 688-2139 Fax Number: (828) 688-4443 JUN 2 3 2005
E-mail Address: kyoung@mtchell. main. nc. us
DENR -WATER QUALITY
V",DS? D STORMWATER BRANCH
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: Stuart A. Ryman
Company Affiliation: Altamont Environmental, Inc.
Mailing Address: 50 College Street, Asheville, NC 28801
Telephone Number: (828) 281-3350 Fax Number: (828) 281-3351
E-mail Address: sryman@altamontenvironmental.com
III. Project Information
r
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all, buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-'inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Green Creek EWP M2004-04b
2. T.I.P. Project Number or State Project Number (NCDOT Only): NIA
3. Property Identification Number (Tax PIN): See attached Table 1
4. Location
County: Mitchell County Nearest Town: Bakersville
Subdivision name (include phase/lot number): NIA
Directions to site (include road numbers, landmarks, etc.): From Burnsville, follow NC;
Highway 197 North to Red Hill. In Red Hill, turn right on NC Highway 226 South. Follow'
Highway 226 to the flashing yellow light in Bakersville. Turn left on Highway 261. Proceed
north on Highway 261 to the crossroads community of Glen Ayre. Turn right onto Green
Creek Road at Thomas' Grocery. Proceed approximately one-half mile to the bridge across
Green Creek. This bridge is the upstream end of the area covered by this PCN. The project
area consists of Green Creek downstream of this point. The stream is accessible from Green
Creek Road throughout the area.
5. Site coordinates, if available (UTM or Lat/Long): 36.0591 ° N 82.1146° W (approximate
center ofproject area) I
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Property size (acres): See attached Table I
7. Nearest body of water (stream/river/sound/ocean/lake): Green Creek
8. River Basin: French Broad
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.)
2
Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application:
Land use in the vicinity of the proposed project site consists of agricultural uses, including
Christmas tree farms and grazing lands (cattle). Portions of Green Creek were heavily
impacted during Tropical Storms Frances and Ivan. In some locations, the stream is clogged
with woody and non-native debris, reducing the hydraulic capacity of the channel. Multiple
areas of minor streambank erosion have been noted. Additionally, several areas of
streambank erosion threaten the stability of adjacent properties and structures, including
gravel roads, driveways, residences and bridges.
9. Describe the overall project in detail, including the type of equipment to be used:
The lower portion of the exigency EWP project area known as DSR No. M2004-04b is
addressed by this permit application. Specifically, this application addresses the downstream
reach of this DSR. The project area consists of Green Creek downstream of the first bridge on
Green Creek Road, approximately 525 linear feet. The upstream portion Green Creek was
addressed in a permit application submitted on April 13, 2005.
Areas 1-7 exist on two parcels of land, and are entirely located in an agricultural field
(christmas trees). Since all areas are located on agricultural land, a formal approval of the
Erosion and Sediment Control Plan elements ofthis plan is not needed. Furthermore, a trout
waiver is also not required.
Green Creek is classified as `Class C', `Trout' waters and High Quality Waters (HQW)
throughout the project area. The following activities are proposed in the project area.,
1) Seven distinct areas in need of streambank stabilization have been identified, totaling
approximately 525 linear feet. High water flow has severely eroded stream banks in these
areas. In places, riverbanks are over-steepened and very unstable, threatening roads, bridges,
residences, utilitypoles, driveways and property. Repairs in the areas will involve the
following:
• Stabilize the channel in its post flood configuration using organic and rock structures
• Stabilize the river banks by removing unstable vegetation, placing large angular stone
at the toe of the slope to an elevation just above the water level, backfilling behind and
above the stone with rocky debris removed from the floodplain or imported to the site,
topping with planting media and planting native vegetation. Additionally, in-stream
structures will be used to deflect flow from the stream bank.
2) Removal of organic, mineral, and non-native material from areas where the hydraulic
capacity of the stream channel has been reduced based upon evaluation of existing cross-
sections and regional curves
3) Softening of minor over-steepened banks and riparian planting.
Work will include: stream bank stabilization in the areas described below. Equipment used to
accomplish the above tasks includes: rubber tired skidders, 15 ton dump truck, hydraulic track
mounted excavator with thumb, and chainsaws.
The general location of the seven stream bank repair areas is provided in Figure 2.
Representative photos for areas one through seven are included as Figures 4 through 10.
Repairs for each of these areas are detailed in Figures 4a through 10a. Typical rock vane
structure details are included in Figure 11.
Streambank Stabilization
Streambank stabilization is needed on approximately 525 linear feet of banks within the project
area. Stabilization is required at the seven distinct locations shown in Figure 2.
Repair at each of the areas will generally include stabilizing the bank in its current location to
maintain the channels post-flood sinuosity. A key in trench will be excavated at the base of the
existing slope as necessary. Large (three to four foot diameter) angular rock will be used to
stabilize the toe of'the bank. A second tier of rock will be used, as needed' The area behind the
boulders will be backfilled with rocky debris material excavated from the floodplain or
imported material, and topsoil will be placed on the top of the reconstructed bank to aid in the
establishment of vegetation. Where sufficient space is available, a bankfull bench will be i
constructed in the fill area to increase hydraulic capacity and enhance.fuiure bank stability.
The area will be seeded with grasses upon completion of'heavy equipment work. With the
landowner's permission, live stakes and bare root stock native trees and shrubs will be planted
on top of the bank stabilization work.
Green Creek appears to have been straightened and channelized during the construction of the
existing paved Green Creek Road. During the increased flows of hurricanes Francis and Ivan
the project reach apparently found it's natural pattern (sinuosity > 1.2) between Green Creek
Road and Croft Way (private). The goal within the bower Green Creek reach is to maintain the
channels post flood pattern while stabilizing eroded banks adjacent to prI (vate driveways and
roads using a combination of rock vanes and root wads.
Work will be performed from the riverbank to the extent possible. In some locations, work will
occur in the dry above the normal water surface level. However, given the existing condition of
the stream bank and channel at these locations, it is likely that the stabilization of'the toe orf the
banks will occur in the wet. In such cases, sand bags, or the equivalent, will be used to de?lect
water flow away from the work area, as well as prevent water from accumulating in the work
area. Standard erosion and sedimentation control measures will be utilized throughout the
project.
The work addressed in this application is intended to improve the post-flood hydraulic capacity
of the stream reaches discussed and stabilize severely eroded streambanks that are threatening
structures. The proposed actions are not intended to enhance existing conditions or restore the
stream reaches using natural channel design techniques. Such activities) would require detailed
engineering evaluation and design, which are beyond the intent of the EWP program.
On May 5, 2005, in anticipation of upcoming work under the F,WP Program, the Board of'
Commissioners of Mitchell County passed a resolution authorizing access to private land in
order to conduct EWP repairs. For this reason, individual Access Agreements are not
4
necessary for the work proposed in this PCN. A summary of property owners is included as
Table 1.
At each work site, work shall proceed,from downstream to upstream to reduce sediment
loading. All staging areas will be less than half an acre in size. Work will proceed as follows
at each work area (as applicable):
1. Flag the work limits.
2. Mark live trees and shrubs to be protected
3. Construct temporary construction entrancelexits, where necessary.
4. Install sediment fence around staging areas.
5. At the end of each workday install erosion control matting on exposed soil using removable
stakes. Erosion control mats will be constructed offiber or a coin fiber mixture fabric for
maximum erosion protection, vegetation establishment assistance, and for minimal impact
on wildlife.
6. During construction, place large boulders at the toe of repaired streambank, where
necessary.
7. Fill and compact behind boulders. Cover with topsoil, install erosion control mat, and seed
8. Inspect and maintain repairs.
A site-specific engineering design based on a specific storm event was not completed because
the EWP program is not intended to fund stream restoration design or construction work.
Rather, the EWP program is designed to quickly stabilize eroding stream banks to prevent on-
going erosion, sedimentation and possible loss of property or life. Because natural channel
design methods are beyond the scope of'the EWP program, published literature values were
consulted in order to specify the bank stabilization and erosion control materials and methods
described in this document. For example, we have specified that filter cloth will be placed
behind large rock used for streambank stabilization or for in-stream structures to increase the
stability of the repair measures and minimize sediment loading to the stream. If root-wads are
used they will be installed so that at least 113 of the root is inundated during normal flows.
Clean, large, angular rock, large woody material, and natural fiber erosion control mats will be
used for streambank stabilization.
Once site construction has ceased, the banks of'the restored channel will be seeded with a
native floodplain seed mix and the high stress areas will be lined with erosion control (EC)
matting to ensure bank stability. Furthermore, sod matting will be grubbed on-site and used
(when available) to line the near bank regions of the constructed/stabilized channel to provide
immediate stability. Live stakes and matting staples will be used to secure the E(
in these high stress areas. Broadcast seeding rates will be as specified from the local
nursery, generally 15-20 lbs/acre depending on species. With landowner permission, native
shrub and tree species will be planted throughout the project reach at a rate of 320 stems/acre,
securing near bank areas and providing future shading to the channel. Existing woody
vegetation will be preserved to minimize project impacts. The following steps will be observed
with respect to vegetation:
IV.
1. Exposed soil will be covered with erosion control matting at the end of every workday.
Mats will be secured using removable stakes.
2. The project riparian zone and/or buffer areas will be re-vegetated with a combination of
native trees, shrubs and herbs/grasses. All disturbed areas will be seeded with a temporary
native grass mixture immediately following completion of the work in those areas. Tall
fescue will not be used in riparian areas.
3. When possible sod will be taken from adjacent areas (with landowner permission) and
placed on exposed soil to provide immediate stabilization within five days of ground
disturbing activities.
4. If sod is not available on-site temporary seeding will occur on all bare soil within five days,
of ground disturbing activities to provide long-term erosion control. If sock is used, the bare
area left after removal of sod will be planted.
5. Re-seeding will be conducted, as necessary, with a native annual and perennial seed mix
with a temporary nursery crop of wheat, millet, or other grain.
6. Woody vegetation will be planted during the dormant growing season assuming landowner
permission.
10. Explain the purpose of the proposed work:
The work being described is exigency work under the Emergency Watershed Prhotection program
to protect existing property and structures. Sireambank stabilization will also prevent further
erosion and sedimentation to the Green Creek and North Toe River resource.
Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and di to permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetla d, stream and
buffer impacts, along with associated mitigation (where applicable). If this is aINCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
N/A
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
No
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts:
Proposed impacts include stream bank stabilization. Precautions will be taken to keep heavy
equipment out of the stream channel except where absolutely necessary to install bank
stabilization measures. Work will be conducted in the dry to the extent practicable. Sediment
and erosion control measures, including sand bags, silt fences and reseeding, will be utilized to
minimize sedimentation.
2. Individually list wetland impacts below:
There will be no wetlands impacted at this site.
Wetland Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres) Located within
100-year Floodplain**
(es/no) Distance to
Nearest Stream
linear feet)
Type of Wetland***
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditch in g/drai nage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at http://www.fema.gov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only).
List the total acreage (estimated) of all existing wetlands on the property: None
Total area of wetland impact proposed: N/A
i
3. Individually list all intermittent and perennial stream impacts below:
Average Width
Stream Impact Length of Stream of Stream Perennial or
Site Number (see Type of Impact* Impact Name** Before Impact Intermittent?
Figure 2) (linear feet) O
Area 1 Streambank Stabilization 110 Green Creek 20-30 Perennial
Area 2 Streambank Stabilization 100 Green Creek 20-30 Perennial
Area 3 Streambank Stabilization 100 Green Creek 50 Perennial
Area 4 Streambank Stabilization 30 Green Creek 20-30 elen
Area 5 Streambank Stabilization 70 Green Creek 20-30 j
Area 6 Streambank Stabilization 55 Green Creek 20-30
Area 7 Streambank Stabilization 60 Green Creek 20-30 * List each impact separately an
d identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If streain relocation is
proposed, plan.s and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to fhe nearest
downstream named stream into which it flows. USGS maps are available through the 11SGS at 1-800-358-9616, or online at
www.usgs.p,ov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.coin,
www.map uest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 525 linear.fiet
4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.) below:
There will be no impacts to open waters.
Open Water Impact
Site Number
Type of Impact* Area of
Impact Name of Waterbody Type of Waterbody
(lake, pond, estuary, sound,
(indicate on ma) (acres) (if applicable) bay, ocean> etc.)
i
8
* List each impact separately and identity temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads, etc.
5. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.): N/A
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.): N/A
Size of watershed draining to pond: N/A Expected pond surface area: N/A
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
On behalf of Mitchell County, Altamont will provide contractors engaged in the implementation of
this work both written and verbal instructions of all impact avoidance statements provided below.
All heavy equipment will be kept out of the stream channel during streambank stabilization and
stream relocation work, except where absolutely necessary to install bank stabilization measures.
Disturbance of channel bottom and banks and equipment access areas shall be held to the
minimum necessary to allow for bank stabilization and debris removal sufficient to restore the
hydraulic capacity of the stream channel. Temporary grass cover shall be planted on all bare soil
within 5 days of ground disturbing activities. Provided landowners give permission, herbaceous
and woody shrub and tree vegetation will also be installed on the riverbank upon completion of
bank stabilization work. Mitchell County will provide a site manager to routinely inspect and
supervise contractor work to help ensure impact avoidance instructions are being followed.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 21I .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed. i
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
htty://h2o.enr.state.nc.us/ncwetlands/strmgide.htmi.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a'
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
N/A
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at
(919) 733-5208 to determine availability and to request written approval of mitigation prior
to submittal of a PCN. For additional information regarding the application process for the
NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of
the NCWRP is proposed, please check the appropriate box on page three and provide the
following information:
Amount of stream mitigation requested (linear feet): N/A
Amount of buffer mitigation requested (square feet): N/A
Amount of Riparian wetland mitigation requested (acres): N/A
10
Amount of Non-riparian wetland mitigation requested (acres): N/A
Amount of Coastal wetland mitigation requested (acres): VA
IX. Environmental Documentation (required by DWQ)
Does the project involve an expenditure of public (federal/state) funds or the use of public
(federal/state) land?
Yes ® No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify)?
Yes ? No ® If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
*
Zone Impact
(square feet)
Multiplier Required
Mitigation
1 3
2 1.5
Total
* Zone I extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or .0260.
XI. Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
Impervious acreage will not change. Erosion and sedimentation prevention and control will be
maintained throughout this project primarily through proper water management, construction
sequencing, proper staging and stockpiling of'materials, and the maintenance, at all times, of
suitable channel capacity./br expected flow events. Equipment, fuels, lubricants, or other
potential sources of water pollution will not be stored in areas that could be flooded during this
project.
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
Portable facilities shall be provided at the work site.
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Mules?
Yes ? No
Is this an after-the-fact permit application?
Yes ? No
XIV. Other Circumstances (Optional):
12
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
N/A
Applicant/Agent's Sig?ature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
13
Table 1
Affected Parcels
Green Creek DSR No. M2004-04b
Mitchell County, North Carolina
BANK
REPAIR
AREA PARCEL SIZE STREAMBANK
NO. PIN OWNER (ACRES) ADDRESS CITY STATE ZIP STABILIZATION
1-7 0875-9318 Jo H. Griffen 66.6 145 Old Tram LY Pawley's Island SC 29585 x
TABLE 2
REPAIR AREA COORDINATES
GREEN CREEK
DSR 2004-04b
MITCHELL COUNTY, NORTH CAROLINA
Green Creek EWP Project Area 2004-04b
Repair Area Coordinates
Area Latitude Longitude
1 36.0588091 82.1128317
2 36.0587401 82.1138901
3 36.0587746 82.1149905
4 36.0588783 82.1149909
5 36.0587747 82.1154143
6 36.0587747 82.1160070
May 03 05 09:51a
NORTH CAROLINA
AN EMERGENCY PROCLAMATION
OF THE
MITCHELL COUNTY BOARD OF COMMISSIONERS
p.2
MITCHELL COUNTY
WHEREAS, Mitchell County suffered "severe flooding" during the month of September; and
WHEREAS, severe property damage has occurred within Mitchell County, creating debris
accumulation and mud slides; and
WHEREAS, pursuant to Chapter 166A of the General Statutes and Article 36A Chapter 14 of
the General Statutes, an emergency proclamation was issued to maintain order
and protect lives or property during the state of emergency.
NOW, THEREFORE IT IS PROCLAIMED by the Chairman of the Mitchell County Board of
Commissioners that it is necessary to authorize county officials, their agents, or
assigns to enter onto private property within Mitchell County for the purpose of
removing debris accumulation and stabilizing mud slides.
IT IS FURTHER PROCLAIMED that the Mitchell County Board of Commissioners adopted an
Emergency Proclamation on September 29, 2004 to take effect upon its
execution and remain in effect for one hundred and eighty days thereafter. It has
since been determined that term needs to be extended for and additional one
hundred and eighty days for a total of three hundred and sixty days.
Proclaimed this the 2"d day of May 2005.
C46itasters, Chairman
Attest:
4L ga,
Ka n Cle to the Board
m% Feb 17 05 04:50p p.1
Isom
a
nma t
?T
MITCHELL COUNTY
26 CRIMSON LAUREL CIRCLE, Suite 1 E-mail: mitcty@mitchell.main.nc.us
BAKERSVILLE, NC 28705 t
Telephone: 828-688-2139 Fax: 828-688-4443
February 17, 2005
Altamont Environmental, Inc.
50 College Street
Asheville, NC 28801
Dear Stu:
On January 20, 2005 at the Special Session of the Mitchell County Board of
Commissioners, they executed a contract for professional services relative to
EWP Project. Pursuant to this the Mitchell County Board of Commissioners
upon approval by County Attorney Hise, hereby authorizes Altamont
Environmental, Inc. to sign and execute all necessary permits and coordinate
communications with said regulatory agencies.
If you should have any questions concerning this matter or require additional
information, please do not hesitate to contact me.
Sincerely,
Phil Castro
Acting County Manager
3
ti
I
ti
I 4
I
.5
'
f S
51
5
1
W
m
5? r
4 LLr .
1. 7T L
V-A- Arm,
r 4
f
5
1
1
rr
r
fr
I r
?r
r
= r'
I? r
r?
I
r
r
?r
1AI
r
O
O
J
O
w
tD
O
0-1
O
}
X
o6
O
z
w
w
z
z
w
0
N
0
ID
•r
ti
0
`r
a - #
y
5
x
c
w
x ;r
w
E
cn
3
E ? o
1 r ,?
.
It 14
y r ?
0
N -r
zMo
W W V
5 ? C
N y
U
? ¢ o
Q w >
Hwy
W M ?
M ?
00
V] N
w?
O ?
o?
:J
o U
1
? 0
rl
a
? U
A ?
LL
O
O
O
O
O
,IF
f?
.
k?
Ar.i
:
a
?e q
C3 ?-
r
_
PINK
r '
Area 4 _
' °s?. • 1- Area 3 h: -
66 x
AW,
R.
F Area
ry?y$' .,-i. °'^--^!?, ;; r• /? ?` !' ,a,? '?+ :?",?.,? ?1?. tom-,, ? „?'? ? .n ??
r- t Area 2 *av
Area 1"t. ,. 40 ,10_
tt " `rte x0Mr
Ila
e
? 1 . ?? ? , . ? ??: - y1 :.,, M! .?* ....•' ? ?,'?'!i .#" 'til. , ? $;?•? ak ,? ?.:?;+r `,1 - -.
s r?
w;.
A Az
.
4 1 -
r
14
ii! 10 ,
AOL.
Figure 2
Green Creek ALTAMONT ENVIRONMENTAL, INC.
DSRNo. M2004-04b ENGINEERING & HYDROGEOLOGY?
50 COLLEGE STREET, ASHEVILLE, NC 28801
TEL. 828.281.3350 PAC. 828.281.3351
200 0 200 Feet www.altamontenvironmental.com
Mitchell County, North Carolina
02-15-05
55 LF OF BANK REPAIR NEEDED
4' VERTICAL BANKS
(AREA 6)?
70 LF OF BANK REPAIR NEEDED
4' VERTICAL BANKS i
ROCK VANE +/OR RW
(AREA 5)
dv
F-il
I 3.
O?
100 LF OF WIDE/AGGRADED '' +
AREA
(AREA 3)
ICI I
tol I
<
En
Iii 1
C W QI
_ t0 /
U ? II I ?
110 LF OF BANK REPAIR NEEDEq I \
ENCROACHING ON DRIVEWAY
PROPOSE DIVERSION STRUCTURE
(AREA 1)
Al?l 11 -
0
Q
0
ry
Y
W
w
cl?
U
z
W
W
ry
U
60 LF OF BANK REPAIR NEEDED
5-6' VERTICAL BANKS
(AREA 7)
30 LF OF BANK REPAIR NEEDED
2-3' VERTICAL BANKS
(AREA 4)
100 LF OF BANK REPAIR NEEDED
6' VERTICAL BANKS
(AREA 2)
OT RIPRAP
XISTING FENCE
OT RIPRAP
LOWER GREEN CREEK FIGURE
N IN RI Y R Y BANK STABILIZATION
50 COLLEGE STREET, ASHEVILLE, NC 28801
AREAS
TEL.828.281.3350 EnC.828.281.3351
www. al tetnon to n v iron m ent al. com
EWP DSR# 2004-048
DRAWN BY: PAUL DOW
PROJECT MANAGER: STU RYMAN MITCHELL COUNTY, NORTH CAROLINA
CLIENT: MITCHELL COUNTY
DATE: 6/16/05 FILE PATH: P:\MITCHELL\DSRS\DSR 04 - GREEN CREEK\ BANK STABILIZATION AREAS.OWG
.y;
r ? t M
¦
Figure 4
Streambank Stabilization Area 1
Green Creek
DSR No. 2004-04b
Mitchell County, North Carolina
r1
ri'i'? ? ?_ '?` r ` y iAc •
i.
I ,
FE N O I N E E R I N O & H Y D R O O E O L O O Y
50 COLLEGE STREET, ASHEVILLE, NC 28801
TEL. 828.281.3350 FAC.828.281.3351
www.aItalnontenvii-onmental.coni
PrA
ie.�Avt �
_I NEER_I_NG & H YDR0GEOLOCY
50 COLLEGE STREET, ASHEVILLE, NC 28801
TEL 828.281.3350 FAC.828.281.3351
www. altamontenvironmeutal.com
DRAWN BY: PAUL DOW
PROJECT MANAGER: STU RYMAN
CLIENT: MITCHELL COUNTY
DATE: 6/15/05
GREEN CREEK FIGURE
BANK STABILIZATION
GREEN CREEK -AREA I 4A
EWP DSR No. 2004-04B
MITCHELL COUNTY, NC
FILE PATH: P:\MITCIIELL\DSRS\DSR 04 - GREEN CREEK\ CONCEPTUAL DESIGN PHOTOS.OWG
? r . ???a w h •y.
Figure 5
Streambank Stabilization Area 2
Green Creek
DSR No. 2004-04b
Mitchell County, North Carolina
[? f
f ?
lvoh
_ p; ?t??r'¦bla
.I
LEGE STREET, ASHEVILLE, NC 28801
828.281.3350 FAC.828.281.3351
,v.altamontenvironmentalxom
2i:zg
i
S ?y
1 r
1
m
I
Figure 6
Streambank Stabilization Area 3
Green Creek
DSR No. 2004-04b
Mitchell County, North Carolina
E N G I N E E R I N G & H Y D R 0 G E O l O 0 Y
50 COLLEGE STREET, AsHEVILLE, NC 28801
TEL. 828.281.3350 FAC.828.281.3351
www.altamontenvironmental.coin
w"
BRAIDED/AGGRADED SECTION TO BE TURNED
'. INTO SINGLE -THREAD CHANNEL WITH
ASSOCIATED BANKFULL BENCH
- j- -
r� -
INSTALL ROOTWADS
GREEN CREEK
MIA LTAMONT ENVIRONMENTAL, INC. BANK STABILIZATION
50 COLLEGE STREET, ASHEVILLE, N -C 28801
GREEN CREEK -AREA
FWP-1: ►• _ OR M2
rr. x K :a.r
30
?.-
?.w r f,
Figure 7
Streambank Stabilization Area 4
Green Creek
DSR No. 2004-04b
Mitchell County, North Carolina
LEGE STREET, ASHEVILLE, NC 28801
828.281.3350 Fnc.828.281.3351
w.altamontenviron mental. com
s
r-
ALTAMONT M GREEN CREEK FIGURE
ENGINEERING & HYDR0GEOL0GY BANK STABILIZATION
?O COLLEGE STREET. ASHE%ILLE. NC 28801
L .aISL»>o E.acazs.2a1.",` GREEN CREEK-AREA 4
w ??
• _--"' EWP DSR No. 2004-04g
,._ RODE PAUL DOW
MITCHELL COUNTY, NC
=,OJECT MANAGER: : STU RYMAN
" :'DENT: MITCHELL COUNTY
- z .ATE: 6/09/05 FILE PATH: P:\MITCFiELL\DSRs\DSR 04 - GREEN CREEK, CONCEPTUAL DESIGN PHOTOS.DWG
:?
??' # y r
44
awtrr .x
;
?K -
r a M "t+
ji-v
Figure 8 ALTAMONT ENVIRONMENTAL, INC.
StreambankStabilization Area S ENOINEERINO & HYDROOEOLOG YJ
Green Creek 50 COLLEGE STREET, ASHEVILLE, TIC 28801
DSR No. 2004-04b TEL. 828.281.3350 PAC. 828.281.3351
Mitchell County, North Carolina www.altamontenvironmental. coin
Log=
r- '
77
Air
f _ J?+
lw-
Ant,
_ is T
•
tip - lie,
- - . ..'?r '`+?'? _- '.. - ? ? ^ ? X14 _ "i11,'-?.. __ •w.r??>4
-
-ZT T
t c
4
?j KCCN LKCCC\' u', L
.;ENGINEERING & IN YOR0GE0L0GY BANK STABILIZATION
50 COLLEGE STREET, ASHEVILLE, NC 28801
TEL. 828.281.3350
amont0 FAc 828.28.28 iromn1.3351 GREEN CREEK-AREA 5
www,alenvcom
EWP DSR No. 2004-04B
DRAWN BY: PAUL DOW MITCHELL COUNTY, NC
PROJECT MANAGER: STU RYMAN
CLIENT: MITCHELL COUNTY
DATE: 6/09/05 FILE PATH: P:\MITCHELL\DSRS\DSR 04 - GREEN CREEK\ CONCEPTUAL DESIGN PHOTOS.DWG
- q mw
k: V n?
Figure 9 ?:? ¦¦ ?:???? fu?¦ ¦ ?n???i ?c¦??n?? ??¦ ?:? n??
Streambank Stabilization Area 6 ENOI NEERING & HvDROOEO?oov
Green Creek 50 COLLEGE STREET, ASI-IEVILLE, NC 28801
DSR No. 2004-04b TEL. 828.281.3350 FAC. 828.281.3351
Mitchell County, North Carolina www.aItamontenvironinental.coin
i
T
51
GREEN CREEK FIGURE
LTAMONT ,EWMONMENTAL, INC.
•IENGIN EERING & HYDROGEOLOGY BANK STABILIZATION
50 COLLEGE STREET, ASHEVILL.E, NC 28801
TEL828.281.3350 FAC828.281.3351 GREEN CREEK-AREA 6 Q d
w ww. altaznontenvironmental. com
EWP DSR No. 2004-048
-RAWN BY: PAUL DOW MITCHELL COUNTY, NC
=ROJE OJECT MANAGER: STU RYMAN
-1ENT: MITCHELL COUNTY
DATE: 6/09/05 FILE PATH: P:\MITCHELL\DSRS\DSR 04 - GREEN CREEK\ CONCEPTUAL DESIGN PHOTOS.DWG
JR i s
. we?
=r
M }??%?
004 4w
- .?? -, .esq.. .
i L ? Y7 ?
ve, }
r x ?.?Se
Figure 10
Streambank Stabilization Area 7
Green Creek
DSR No. 2004-04b
Mitchell County, North Carolina
y
,- s
' fl,
E N O I N E E R I N 6 & H Y D R O O E O L O O Y
50 COLLEGE STREET, ASHEVILLE, NC 28801
TEL. 828.281.3350 FAC.828.281.3351
www.altamontenvironmental.com
I E N Q I N E E R I H YOR0QEOLOGYI
50 COLLEGE STREET, ASHEVILLE, NC 28801
TEL 828.281.3350 FAC.828.281.3351
www.altamontenvironmental. coin
DRAWN BY: PAUL DOW
PROJECT MANAGER: STU RYMAN
CLIENT: MITCHELL COUNTY
DATE: 6/09/05
GREEN CREEK FIGURE
BANK STABILIZATION
GREEN CREEK -AREA 7 Ind
EWP DSR No. 2004-04B
MITCHELL COUNTY, NC
FILE PATH: P:\MITCHELL\DSRS\DSR 04 - GREEN CREEK\ CONCEPTUAL DESIGN PHOTOS.DWG
Office Use Only: FU&rtn,?4a 2002
153
USACE Action ID No.
DWQ No. 0511.91
(lt any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
1. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit ? Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
® 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide 37
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete
section VIII and check here: ?
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ?
II. Applicant Information
1. Owner/Applicant Information
Name: Kathy Young, Mitchell County Clerk to the Board of Com lfffngoygy
Mailing Address: Administration Building, Suite 2 26 Crimson Laurel Circle
Bakersville, North Carolina 28705 JUN 2 3 2005
DEN ATER QUALITY
Telephone Number: (828) 688-2139 Fax Number: (8281A? _ iT0RVWATERBRMCH
E-mail Address: kyoung@mtchell. main. nc. us
Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: Stuart A. Ryman
Company Affiliation: Altamont Environmental, Inc.
Mailing Address: 50 College Street, Asheville, NC 28801
Telephone Number: (828) 281-3350 Fax Number: (828) 281-3351
E-mail Address: sryman@altamontenvironmental. com
III. Project Information
+A!4atl? a'viAnity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. 'I'he specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Green Creek EWP M2004-04b
2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A
3. Property Identification Number (Tax PIN): See attached Table 1
4. Location
County: Mitchell County Nearest Town: Bakersville
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers, landmarks, etc.): From Burnsville,. follow NC
Highway 197 North to Red Hill. In Red Hill, turn right on NC Highway 226 South. Follow
Highway 226 to the flashing yellow light in Bakersville. Turn left on Highway 261. Proceed
north on Highway 261 to the crossroads community of Glen Ayre. Turn right onto Green
Creek Road at Thomas' Grocery. Proceed approximately one-half mile to the bridge across
Green Creek. This bridge is the upstream end of the area covered by this PCN. The project
area consists of Green Creek downstream of this point. The stream is accessible from Green
Creek Road throughout the area.
5. Site coordinates, if available (UTM or Lat/Long): 36.0591 ° N 82.1146° W (approximate
center of project area)
(Note - If project is linear, such as a road or utility line, attach a sheet that separately list's the
coordinates for each crossing of a distinct waterbody.)
6. Property size (acres): See attached Table I
7. Nearest body of water (stream/river/sound/occan/lake): Green Creek
8. River Basin: French Broad
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.)
Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application:
Land use in the vicinity of the proposed project site consists of agricultural uses, including
Christmas tree farms and grazing lands (cattle). Portions of Green Creek were heavily
impacted during Tropical Storms Frances and Ivan. In some locations, the stream is clogged
with woody and non-native debris, reducing the hydraulic capacity of the channel. Multiple
areas of minor streambank erosion have been noted. Additionally, several areas of
streambank erosion threaten the stability of adjacent properties and structures, including
gravel roads, driveways, residences and bridges.
9. Describe the overall project in detail, including the type of equipment to be used:
The lower portion of the exigency EWP project area known as DSR No. M2004-04b is
addressed by this permit application. Specifically, this application addresses the downstream
reach of this DSR. The project area consists of Green Creek downstream of the first bridge on
Green Creek Road, approximately 525 linear feet. The upstream portion Green Creek was
addressed in a permit application submitted on April 13, 2005.
Areas 1-7 exist on two parcels of land, and are entirely located in an agricultural field
(christmas trees). Since all areas are located on agricultural land, a formal approval of the
Erosion and Sediment Control Plan elements of this plan is not needed. Furthermore, a trout
waiver is also not required.
Green Creek is classified as `Class C', `Trout' waters and High Quality Waters (HQ W)
throughout the project area. The following activities are proposed in the project area:
1) Seven distinct areas in need of streambank stabilization have been identified, totaling
approximately 525 linear feet. High water flow has severely eroded stream banks in these
areas. In places, riverbanks are over-steepened and very unstable, threatening roads, bridges,
residences, utilitypoles, driveways and property. Repairs in the areas will involve the
following:
• Stabilize the channel in its post flood configuration using organic and rock structures
• Stabilize the river banks by removing unstable vegetation, placing large angular stone
at the toe of the slope to an elevation just above the water level, bacolling behind and
above the stone with rocky debris removed from the floodplain or imported to the site,
topping with planting media and planting native vegetation. Additionally, in-stream
structures will be used to deflect flow from the stream bank.
2) Removal of organic, mineral, and non-native material from areas where the hydraulic
capacity of the stream channel has been reduced based upon evaluation of existing cross-
sections and regional curves
3) Softening of minor over-steepened banks and riparian planting.
Work will include: stream bank stabilization in the areas described below. Equipment used to
accomplish the above tasks includes: rubber tired skidders, 15 ton dump truck, hydraulic track
mounted excavator with thumb, and chainsaws.
The general location of'the seven stream bank repair areas is provided in Figure 2 .
Representative photos for areas one through seven are included as Figures 4 through 10.
Repairs for each of these areas are detailed in Figures 4a through IOa. Typical rock vane
structure details are included in Figure 11.
Streambank Stabilization
Streambank stabilization is needed on approximately 525 linear feet of'banks within the project
area. Stabilization is required at the seven distinct locations shown in Figure 2.
Repair at each of the areas will generally include stabilizing the bank in its current location's to
maintain the channels post-flood sinuosity. A key in trench will be excavated at the base of the
existing slope as necessary. Large (three to four,foot diameter) angular rock will be used 101
stabilize the toe of'the bank. A second tier of rock will be used, as needed. The area behind the
boulders will be backfilled with rocky debris material excavated from the floodplain or
imported material, and topsoil will be placed on the top gf'the reconstructed bank to aid in the
establishment of vegetation. Where sufficient space is available, a bankfull bench will be
constructed in the fill area to increase hydraulic capacity and enhance future bank stability.
The area will be seeded with grasses upon completion of'heavy equipment work. With the
landowner's permission, live stakes and bare root stock native trees and shrubs will be planted
on top of the bank stabilization work.
Green Creek appears to have been straightened and channelized during the construction of, the
existing paved Green Creek Road. During the increased flows of hurricanes Francis and Ivan
the project reach apparently found it's natural pattern (sinuosity > 1.2) between Green Creek
Road and Croft Way (private). The goal within the Lower Green Creek reach is to maintain the
channels post flood pattern while stabilizing eroded banks adjacent to private driveways and
roads using a combination of'rock vanes and root wads.
Work will be performed from the riverbank to the extent possible. In some locations, work will
occur in the dry above the normal water surface level. However, given the existing condition of'
the stream bank and channel at these locations, it is likely that the stabilization of the toe of the
banks will occur in the wet. In such cases, sand bags, or the equivalent, will be used to deflect
water flow away from the work area, as well as prevent water from accumulating in the work
area. Standard erosion and sedimentation control measures will be utilized throughout the,
project.
The work addressed in this application is intended to improve the post-flood hydraulic capacity
of the stream reaches discussed and stabilize severely eroded streambanks that are threatening
structures. The proposed actions are not intended to enhance existing conditions or restore the
stream reaches using natural channel design techniques. Such activities would require detailed
engineering evaluation and design, which are beyond the intent of the EWP program.
On May 5, 2005, in anticipation gf'upcoming work under the EWP Program, the Board of'
Commissioners of Mitchell County passed a resolution authorizing access to private land in
order to conduct EWP repairs. For this reason, individual Access Agreements are not
necessary for the work proposed in this PCN. A summary of property owners is included as
Table 1.
At each work site, work shall proceed from downstream to upstream to reduce sediment
loading. All staging areas will be less than half an acre in size. Work will proceed as follows
at each work area (as applicable):
1. Flag the work limits.
2. Mark live trees and shrubs to be protected.
3. Construct temporary construction entrancelexits, where necessary.
4. Install sediment fence around staging areas.
5. At the end of each workday install erosion control matting on exposed soil using removable
stakes. Erosion control mats will be constructed offaber or a coir fiber mixture fabric for
maximum erosion protection, vegetation establishment assistance, and_for minimal impact
on wildlife.
6. During construction, place large boulders at the toe of repaired streambanks where
necessary.
7. Fill and compact behind boulders. Cover with topsoil, install erosion control mat, and seed.
8. Inspect and maintain repairs.
A site-specific engineering design based on a specific storm event was not completed because
the EWP program is not intended to fund stream restoration design or construction work.
Rather, the EWP program is designed to quickly stabilize eroding stream banks to prevent on-
going erosion, sedimentation and possible loss ofproperty or life. Because natural channel
design methods are beyond the scope of the EWP program, published literature values were
consulted in order to specify the bank stabilization and erosion control materials and methods
described in this document. For example, we have specified that filter cloth will be placed
behind large rock used for streambank stabilization or for in-stream structures to increase the
stability of the repair measures and minimize sediment loading to the stream. If root-wads are
used they will be installed so that at least 113 of the root is inundated during normal flows.
Clean, large, angular rock, large woody material, and natural fiber erosion control mats will be
used for streambank stabilization.
Once site construction has ceased the banks of*the restored channel will be seeded with a
native floodplain seed mix and the high stress areas will be lined with erosion control (EC)
matting to ensure bank stability. Furthermore, sod matting will be grubbed on-site and used
(when available) to line the near bank regions of the constructed/stabilized channel to provide
immediate stability. Live stakes and matting staples will be used to secure the EC fabric%sod-
matting in these high stress areas. Broadcast seeding rates will he as specified from the local
nursery, generally 15-20 lbs/acre depending on species. With landowner permission, native
shrub and tree species will be planted throughout the project reach at a rate of 320 stems/acre,
securing near bank areas and providing future shading to the channel. Existing woody
vegetation will be preserved to minimize project impacts. The following steps will be observed
with respect to vegetation.
1. Exposed soil will be covered with erosion control matting at the end of* every workday.
Mats will be secured using removable stakes.
2. The project riparian zone and/or buffer areas will be re-vegetated with a combination of
native trees, shrubs and herbs/grasses. All disturbed areas will be seeded with a temporary
native grass mixture immediately following completion of the work in those areas. Tall
fescue will not be used in riparian areas.
3. When possible sod will be taken from adjacent areas (with landowner permission) and
placed on exposed soil to provide immediate stabilization within five days of ground
disturbing activities.
4. If sod is not available on-site temporary seeding will occur on all bare soil within five days
of ground disturbing activities to provide long-term erosion control. If sod is used, the bare
area left after removal of'sod will be planted.
5. Re-seeding will be conducted, as necessary, with a native annual and perennial seed 'mix
with a temporary nursery crop of wheat, millet, or other grain.
6. Woody vegetation will be planted during the dormant growing season assuming landowner
permission.
10. Explain the purpose of the proposed work:
The work being described is exigency work under the Emergency Watershed Protection program
to protect existing property and structures. Streambank stabilization will also prevent further
erosion and sedimentation to the Green Creek and North Toe River resource.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
N/A
V. Future Project Plans
6
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
No
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts:
Proposed impacts include stream bank stabilization. Precautions will be taken to keep heavy
equipment out of the stream channel except where absolutely necessary to install bank
stabilization measures. Work will be conducted in the dry to the extent practicable. Sediment
and erosion control measures, including sand bags, silt fences and reseeding, will be utilized to
minimize sedimentation.
2. Individually list wetland impacts below:
There will be no wetlands impacted at this site.
Wetland Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres) Located within
100-year Floodplain**
(es/no) Distance to
Nearest Stream
(linear feet)
Type of Wetland***
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local Ooodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at http://www.fema.gov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only).
i
List the total acreage (estimated) of all existing wetlands on the property: None
Total area of wetland impact proposed: N/A
3. Individually list all intermittent and perennial stream impacts below:
Average Width
Stream Impact Length of Stream of Stream Perennial or
Site Number (see Type of Impact* Impact Name** Before Impact Intermittent?
Figure 2) (linear feet) (ft)
Area 1 Streambank Stabilization 110 Green Creek 20-30 Perennial
Area 2 Streambank Stabilization 100 Green Creek 20-30 Perennial
Area 3 Streambank Stabilization 100 Green Creek 50 Perennial
Area 4 Streambank Stabilization 30 Green Creek 20-30 Perennial
Perennial
Area 5 Streambank Stabilization 70 Green Creek 20-30
Perennial
Area 6 Streambank Stabilization 55 Green Creek 20-30
Perennial
Area 7 Streambank Stabilization 60 Green Creek 20-30
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap',
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain);
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.usps.gov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com,
www.inapquest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 525 linear feet
4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.) below:
There will be no impacts to open waters.
Open Water Impact
Site Number
Type of Impact* Area of
Impact
ody
Name of Type of Waterbody
lake, pond, estuary, sound,
indicate on ma) (acres) (if applicable) ble) bay, ocean, etc.)
8
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads, etc.
5. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.): N/A
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.): N/A
Size of watershed draining to pond: N/A Expected pond surface area: N/A
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
On behalf *of Mitchell County, Altamont will provide contractors engaged in the implementation of
this work both written and verbal instructions of all impact avoidance statements provided below.
All heavy equipment will be kept out of the stream channel during streambank stabilization and
stream relocation work, except where absolutely necessary to install bank stabilization measures.
Disturbance of channel bottom and banks and equipment access areas shall be held to the
minimum necessary to allow for bank stabilization and debris removal sufficient to restore the
hydraulic capacity of the stream channel. Temporary grass cover shall be planted on all bare soil
within 5 days of ground disturbing activities. Provided landowners give permission, herbaceous
and woody shrub and tree vegetation will also be installed on the riverbank upon completion of
bank stabilization work. Mitchell County will provide a site manager to routinely inspect and
supervise contractor work to help ensure impact avoidance instructions are being followed.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to,
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc.us/ncwetlands/strmgide.html.
Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
N/A
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at
(919) 733-5208 to determine availability and to request written approval of mitigation prior
to submittal of a PCN. For additional information regarding the application process for the
NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of
the NCWRP is proposed, please check the appropriate box on page three and provide the
following information:
Amount of stream mitigation requested (linear feet): N/A
Amount of buffer mitigation requested (square feet): N/A
Amount of Riparian wetland mitigation requested (acres): N/A
10
Amount of Non-riparian wetland mitigation requested (acres): N/A
Amount of Coastal wetland mitigation requested (acres): N/A
IX. Environmental Documentation (required by DWQ)
Does the project involve an expenditure of public (federal/state) funds or the use of public
(federal/state) land?
Yes ® No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify)?
Yes ? No ® If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
*
Zone Impact
(square feet)
Multiplier Required
Mitigation
1 3
2 1.5
Total
* Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or .0260.
XI. Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
Impervious acreage will not change. Erosion and sedimentation prevention and control will be
maintained throughout this project primarily through proper water management, construction;
sequencing, proper staging and stockpiling of materials, and the maintenance, at all times, of
suitable channel capacityfor expected flow events. Equipment, fuels, lubricants, or other
potential sources of water pollution will not be stored in areas that could be flooded during this
project.
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
Portable facilities shall be provided at the work site.
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application?
Yes ? No
XIV. Other Circumstances (Optional):
12
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
NIA
Applicant/Agent's Siglature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
13
Table 1
Affected Parcels
Green Creek DSR No. M2004-04b
Mitchell County, North Carolina
BANK
REPAIR
AREA PARCEL SIZE STREAMBANK
NO. PIN OWNER (ACRES) ADDRESS CITY STATE ZIP STABILIZATION
1-7 0875-9318 Jo H. Griffen 66.6 145 Old Tram Wa Pawley's Island SC 29585 x
TABLE 2
REPAIR AREA COORDINATES
GREEN CREEK
DSR 2004-04b
MITCHELL COUNTY, NORTH CAROLINA
Green Creek EWP Project Area 2004-04b
Repair Area Coordinates
Area Latitude Longitude
1 36.0588091 82.1128317
2 36.0587401 82.1138901
3 36.0587746 82.1149905
4 36.0588783 82.1149909
5 36.0587747 82.1154143
6 36.0587747 82.1160070
Mai 03 05 09:51a
NORTH CAROLINA
AN EMERGENCY PROCLAMATION
OF THE
MITCHELL COUNTY BOARD OF COMMISSIONERS
p.2
MITCHELL COUNTY
WHEREAS, Mitchell County suffered "severe flooding" during the month of September; and
WHEREAS, severe property damage has occurred within Mitchell County, creating debris
accumulation and mud slides; and
WHEREAS, pursuant to Chapter 166A of the General Statutes and Article 36A Chapter 14 of
the General Statutes, an emergency proclamation was issued to maintain order
and protect lives or property during the state of emergency.
NOW, THEREFORE IT IS PROCLAIMED by the Chairman of the Mitchell County Board of
Commissioners that it is necessary to authorize county officials, their agents, or
assigns to enter onto private property within Mitchell County for the purpose of
removing debris accumulation and stabilizing mud slides.
IT IS FURTHER PROCLAIMED that the Mitchell County Board of Commissioners adopted an
Emergency Proclamation on September 29, 2004 to take effect upon its
execution and remain in effect for one hundred and eighty days thereafter. It has
since been determined that term needs to be extended for and additional one
hundred and eighty days for a total of three hundred and sixty days.
Proclaimed this the 2"d day of May 2005.
-2
':?
O Masters, Chairman
Attest:
Ka n Cle to the Board
°%Feh 17 05 04:50p
s°
°o
MITCHELL COUNTY
26 CRIMSON LAUREL CIRCLE, Suite 1 E-mail: mitcty0mitchell.main.nc.us
BAKERSVILLE, NC 28705
Telephone: 828-688-2139 Fax: 828-688-4443
February 17, 2005
Altamont Environmental; Inc.
50 College Street
Asheville, NC 28801
Dear Stu:
p.I
r
On January 20, 2005 at the Special Session of the Mitchell County Board of
Commissioners, they executed a contract for professional services relative to
EWP Project. Pursuant to this the Mitchell County Board of Commissioners
upon approval by County Attorney Hise, hereby authorizes Altamont
Environmental, Inc. to sign and execute all necessary permits and coordinate
communications with said regulatory agencies.
If you should have any questions concerning this matter or require additional
information, please do not hesitate to contact me.
Sincerely,
Phil Castro
Acting County Manager
N
* # W E
rf l?f
C rf ? { S
.? r k'jd
r }
rf- i,r - L .ti, ---- .- A
40
Downstream Extent
Upstream Extent r
`tz ij-
y -
J
_+++J?77yyI????¦¦, l
ff I ¦ ?
r 1• ?. qtr
Figure 1
Green Creek
DSR No. M2004-04b
400 0 400 Feet
Mitchell County, North Carolina
ALTAMOTNT iR i
ENGINEERING & HYDROGEOLOGY
50 COLLEGE STREET, ASHEVILLE, NC 28801
TEL. 828.281.3350 FAC. 828.281.3351
www. altamonterrvironm ental. com
02-15-05
It
ifi. - --
3& 7
7_1 j
't
q???''ip r? 1r
Area 4
Area 3 - - - ?- -
f ?z
1 ?-
_ t
77.
'Area 2 r !Area 1_'
5? ?. _
V, 1
.,`
_ of hie . ?.
1q
y
goo
?
w-w
_ - ,
?-
_ 47,
?t
• _ - f" i
4
• - Tom{ .. ._ _ - - - ? ? Z ?-- • `•? 4? ? ?f
200 0 200 Feet
Figure 2
Green Creek
DSR No. M2004-04b
Mitchell County, North Carolina
50 COLLEGE STREET, ASHEVILLE, NC 28801
TEL. 828-281.3350 FAC. 828.281.3351
www.altamontenvironmental.com
02-15-05
55 LF OF BANK REPAIR NEEDED
4' VERTICAL BANKS i
(AREA 6)
70 LF OF BANK REPAIR NEEDED
4' VERTICAL BANKS i
ROCK VANE +/OR RW
(AREA 5)
Rl dv
? of
100 LF OF WIDE/AGGRADED
AREA
(AREA 3) I I
ICI I
lol I
<
N IuI
U) W QI
ICD
U
110 LF OF BANK REPAIR NEEDEn I \
ENCROACHING ON DRIVEWAY
PROPOSE DIVERSION STRUCTURE
(AREA 1) \
60 LF OF BANK REPAIR NEEDED
5-6' VERTICAL BANKS
(AREA 7)
30 LF OF BANK REPAIR NEEDED
2-3' VERTICAL BANKS
(A
REA 4)
Try
Y
LLJ
LLJ
ry
100 LF OF BANK REPAIR NEEDED
z 6' VERTICAL BANKS
LIJ
Lij (AREA 2)
CD
OT RIPRAP
XISTING FENCE
%,
QI
Q:
QI
,I
OT RIPRAP
LOWER GREEN CREEK FIGURE
ALTAMONT ENVIRONMENTAL, INC.
LEN 1N R. Y ROGEOCO-0-Y71 BANK STABILIZATION
50 COLLEGE STREET, ASHEVILLE, NC 28801
AREAS
TEL.828.281.3350 FAC.828.281.3351
www.altatnontenvironroental. coin
EWP DSR# 2004-04B
DRAWN BY: PAUL DOW
PROJECT MANAGER: STU RYMAN MITCHELL COUNTY, NORTH CAROLINA
CLIENT: MITCHELL COUNTY
DATE: 6/16/05 FILE PATH: P:\MITCHELL\DSRS\DSR 04 - GREEN CREEK\ BANK STABILIZATION AREAS.DWG
IN RIN Y R Y
50 COLLRGH STREE'T', AsllEvtl.LE, NC 28801
Tn. 828.281.3350 FAC 828.281.3351
www.nltamontenvironmentel.coin
DRAWN BY: PAUL DOW
PROJECT MANAGER: STU RYMAN
CLIENT: MITCHELL COUNTY
DATE: 6/15/05
¦
GREEN CREEK FIGURE
BANK STABILIZATION
GREEN CREEK-AREA I 4A
EWP DSR No. 2004-04B
MITCHELL COUNTY, NC
PATH: P:\MITCHELL\DSRS\DSR 04 - GREEN CREEK\ CONCEPTUAL DESIGN PIIOTOS.DWG
11
I r
06 k,
WORK
q?',H??'..'`?.w y?!yr /wM?l?".-,;fief ¦
k
Figure 5
Streambank Stabilization Area 2
Green Creek
DSR No. 2004-04b
Mitchell County, North Carolina
m
0 COLLEGE STREET, ASHEVILLE, NC 28801
TEL. 828.281.3350 FAC.828.281.3351
www.altamontenvironmental.corn
I
l!
1F t777? ,y? i'
? t
?4 t?? r p
:1. Ak'
Itn
???????-??? :i.•'r?7il??.'?A71? as?.v~? as .. - ??`~?
E N G I N E E R I N H Y D R O O L O G Y
x
50 COLLEGE STREET, ASHEVII.LE, NC 28801
?:? 3/f?1?71?1?"' _ s rr?x • TEL 828.2813350 EAC 828.281.3351
f - w _.altamontemtrottmental.com
'-? • ,:. - RAWN BY: PAUL DOW
r•"*"?" - 'rte
- rjr' -?OJECT MANAGER: STU RYMAN
-LIENT: MITCHELL COUNTY
r="" a7
E: 6/09/05
1-
:.? ? -.:;calla ?.,; /j ? x?'"w. ?--:•
GREEN CREEK FIGURE
BANK STABILIZATION
GREEN CREEK-AREA 2 5A
EWP DSR No. 2004-04B
MITCHELL COUNTY, NC
FILE PATH: P:\MITCHELL\DSRS\DSR 04 - GREEN CREEK\ CONCEPTUAL DESIGN PHOTOS.DWG
r
Figure 6
Streambank Stabilization Area 3
Green Creek
DSR No. 2004-04b
Mitchell County, North Carolina
J COLLEGE. STREET,
TEL. 828.281.3350
www.altamontei
NC 28801
281.3351
al.com
wt g
INSTALL ROOTWADS
C-
BRAIDED/AGGRADED SECTION TO BE TURNED
INTO SINGLE -THREAD CHANNEL NTH
ASSOCIATED BANKFULL BENCH
qk
- ALTAMONT ENVIRONMENTAL, INC.GREEN CREEK
STABILIZATION
?,
Lity? 1 4tV ..1 M.
,
d?f . •
y' I
• .I1 -s.
II
P.
h oar,
Figure 7
Streambank Stabilization Area 4
Green Creek
DSR No. 2004-04b
Mitchell County, North Carolina
) COLLEGE STREET, ASHEVILLE, NC 28801
TEL. 828.281.3350 FAC.828.281.3351
www.altamontenvironmental.com
yy ? ,4
?. GREEN CREEK FIGURE
ALTAMONT
& HYDROGEOLOGY BANK STABILIZATION
50 COLLEGE STRFET..?5HE% LE. \C 28801
TEL 828.28133:0 F.=en.281.3351 GREEN CREEK-AREA 4
o ??
EWP DSR No. 2004-04g
F JECT PAUL MANAGER: Dow STU RYMAN MITCHELL COUNTY, NC
_-?J
=NT: MITCHELL COUNTY
E: 6/09/05 FILE PATH: P:\MITCHEL_\DSRS\DSR 04 - GREEN CREEK\ CONCEPTUAL DESIGN PHOTOS.DWG
_ __ -- _ .?
77
s
All
..:+i?+'? !"alb. _+?? _ `
-
"llir
, In
I. vI?CCiV l.i?CCI? IVIJ`C
'ENGINEERING & HYOROGEOLOGY BANK STABILIZATION
50 COLLEGE STREET, ASHEVILLE, NC 28801
TEL. 828.281.3350 FAC.828.2813351 GREEN CREEK-AREA 5
www Q?
.altamontenvironmental.com (,
EWP DSR No. 2004-048
DRAWN BY: PAUL DOW
PROJECT MANAGER: STU RYMAN MITCHELL COUNTY, NC
CLIENT: MITCHELL COUNTY
DATE: 6/09/05 PILE PATH: P:\MITCHELL\DSRS\DSR 04 - GREEN CREEK\ CONCEPTUAL DESIGN PHOTOS.DWG
e
Figure 9
Streambank Stabilization Area 6
Green Creek
DSR No. 2004-04b
Mitchell County, North Carolina
a
W? ?.YA .M.... ..ll
1 ,
mk k "I IN TAW r M6
E N O 1 N E E R I N O & H Y O R O O E O 7L. -Y
50 COLLEGE STREET, ASHEVILLE, NC 28801
TEL. 828.281.3350 FAC.828.281.3351
www.altamontcnvironmetital.com
I .
'y
3
50 COLLEGE STREET, ASHEVaLE, NC 28801
TEL828.281.3350 EAC.828.281.3351
ww .altamontenvironmental.com
DRAWN BY: PAUL DOW
PROJECT MANAGER: STU RYMAN
CLIENT: MITCHELL COUNTY
DATE: 6/09/05
s
L7L__47?'
hKCCi? ?.I?CCf? FIGURE
BANK STABILIZATION
GREEN CREEK-AREA 6 Q ?
EWP DSR No. 2004-04g
MITCHELL COUNTY, NC
FILE PATH: P:\MITCHELL\DSRS\DSR 04 - GREEN CREEK\ CONCEPTUAL DESIGN PHOTOS.OWG
M ?? ? ? ?+? '..L?' 4 wry •?.+?
?+. k4
?.. rill'-" ',•` ? ?;.. ^.
Figure 10
Streambank Stabilization Area 7
Green Creek
DSR No. 2004-04b
Mitchell County, North Carolina
!
^ ?y
k
'-r
?* OAVA"""'
E N O 1 N E E R I N O & H Y D R O O E O L O O Y
50 COLLEGE STREET, ASHEVILLF, NC 28801
TEL. 828.281.3350 FAC.828.281.3351
www.altainontenvironinental.com
I E N 0 IN E E 9 I N 0 & H Y Q RY
50 COLLEGE STREET, ASHEVILLE, NC 28801
TEL.828.281.3350 FAC.828.281.3351
www.altamontenv ironmental.com
DRAWN BY: PAUL DOW
PROJECT MANAGER: STU RYMAN
CLIENT: MITCHELL COUNTY
DATE: 6/09/05
IWA
GREEN CREEK
BANK STABILIZATION
FIGURE
GREEN CREEK -AREA 7 10A
EWP DSR No. 2004-04B
MITCHELL COUNTY, NC
FILE PATH: PAMITCHELL\DSRS\DSR 04 - GREEN CREEK\ CONCEPTUAL DESIGN PHOTOS.DWG
, [Fwd: [Fwd: [Fwd: STream Clearing Activities]]]
Subject: [Fwd: [Fwd: [Fwd: STream Clearing Activities]]]
From: Cyndi Karoly <cyndi.karoly@ncmail.net>
Date: Wed, 16 Mar 2005 15:58:57 -0500
To: Laurie J Dennison <Laurie. J. D ennison@ncmail. net>
fyi - so please note that fees are waived when you create these files - perhaps a
brief handwritten note in the file jacket, or we can add a copy of this message
Subject: [Fwd: [Fwd: STream Clearing Activities]]
From: Tom Reeder <tom.reeder@ncmail.net>
Date: Wed, 16 Mar 2005 15:43:18 -0500
To: Cyndi Karoly <cyndi.karoly@ncmail.net>
Cyndi - In answer to your question yesterday it appears that the fees are being
waived for the EWP associated 401s.
Subject: [Fwd: STream Clearing Activities]
From: Alan Klimek <alan.klimek@ncmail.net>
Date: Wed, 16 Mar 2005 15:37:40 -0500
To: Tom Reeder <Tom.Reeder@ncmail.net>
Yes, the fees are being waived. See attachment.
Alan
-------- Original Message --------
Subject:STream Clearing Activities
Date:Mon, 28 Feb 2005 09:40:08 -0500
From:"Robin W. Smith" <robin.w.smith??,ncmail.net>
Organization:NC DENR
To:Alan Klimek <Alan.Klimek@ncmail.net>, Jim Simons <Jim.Simons(a),ncmail.net>,
David Vogel <David.Vogel(d)ncmail.net>
CC:Johanna Reese <Johanna.Reese(a,ncmai1.net>, Nann Guthrie
<Nann.Guthrie@ncmail.net>
,V?,
`x;11: Attached is an electronic copy of the letter and information sheet
sent to the 19 counties and one town that have contracts with NRCS for
stream clearing projects. Those letters went out over the Secretary's
signature on Friday. We will hand-deliver a memo containing the same
basic information to the mountain area legislators tomorrow. We are
also working with the Governor's office on a news release; I am not sure
how soon that will go out. Give me a call if you have any questions.
Thanks for working toward getting meetings set up. Robin.
[Fwd: [Fwd: [Fwd: STream Clearing Activities]]]
Robin W. Smith <robin.w.smith(q_?ncmai1.net>
Assistant Secretary of Planning & Policy
Office of the Secretary
NC DENR
Content-Type: message/r&822
[Fwd: [Fwd: STream Clearing Activities]]
Content-Encoding: 7bit
Content-Type: message/rfc822
[Fwd: STream Clearing Activities]
Content-Encoding: 7bit
EWP letter to counties.doc Content-Type: application/msword
'
Content-Encoding: base64
Content-Type: application/msword
Stream-Clearing Activities-3.doc
Content-Encoding: base64
I r f 1 2/1'7/101)c A.nA Ara
February 25, 2005
Page 1 of 2
February 25, 2005
RE: Emergency Watershed Protection Stream-Clearing Projects
Dear
I know that County experienced stream damage as a result of the fall
hurricanes. Our department would like to work closely with your county to insure that
stream restoration projects receiving state and federal funds under the Emergency
Watershed Protection (EWP) program move as smoothly as possible through the
environmental review and permitting process. I have enclosed for your information a
brief summary of the types of permits and approvals that may be required for these
projects. For projects that involve work directly affecting the streambed, the United
States Army Corps of Engineers will be the primary environmental permitting agency.
For those projects, our staff in the Division of Water Quality and the Division of Land
Resources play a supporting role and issue related state approvals.
I have asked our staff to meet with all of the western counties, either individually or in
small groups, to talk about each county's proposed stream restoration projects and answer
your questions about permit requirements. Our staff will ask the Corps of Engineers and
Soil and Water Conservation staff to join in those meetings in an effort to put together a
plan of action for reviewing and approving stream restoration projects as quickly as
possible. You should receive a telephone call from DENR staff soon to talk about a date
and time that would be convenient to meet and talk about your projects.
I have also directed our staff to waive fees for state water quality certifications (under
Section 401 of the Clean Water Act) and for approval of erosion and sedimentation
February 25, 2005
Page 2 of 2
control plans for stream-clearing projects funded under EWP. Fees will be waived for all
EWP permit s requested by September 1, 2005.
I hope these efforts will ease the burden on county governments already challenged by
the demands of reconstruction and recovery. If we can help you in any other way, please
do not hesitate to call. I have asked Assistant Secretary Robin Smith to be a' primary
contact on these projects for DENR; you can reach Ms. Smith at (919) 715-4141. The
enclosed information sheet also provides contact information for DENR staff in both the
Asheville and Winston-Salem Regional Offices and for the Corps of Engineers office in
Asheville.
Sincerely,
William G. Ross, Jr.
1
MI
FLOW BOULDER
DIRECTION
_.=._ _.4._._._._
a' A2-7%
2
FOOTER PROFILE VIEW
TYPICAL J HOOK DETAIL
NOT TO SCALE
J
7
Y
Q
WD
MIN.
LL
FOOT
PROFILE VIEW
TYPICAL CROSS VANE DETAIL
NOT TO SCALE
SCOUR
FLOW
IRECTION
B
9Z? 1 /3 w
G
!! x1/3 w
W
GAPS
(1/4-1/3 )ROK DIA.) /
? 00
2
I
SCOUR POOL
PLAN VIEW
FLOW
DIRECTION J
J
PLAN VIEW
50 COLLEGE STREET, ASBEVIUE, NC 28801
TEL.828.281.3350 FAC 828.281.3351
www.altamontenvironmental.com
DRAWN BY: ZAN PRICE
PROJECT MANAGER: STUART A.RYMAN SCALE:
CLIENT: YANCEY COUNTY NOT TO SCALE
DATE DESCRIPTION BY CHK APV DATE: 05/16/05
MITCHELL COUNTY, NC
SOURCE: APPLIED ECOLOGICAL SERVICES, INC
FLOW
DIRECTION
24" FIELDSTONE
o r"' R?v9
JUN 2 2QQ5
LDERS WDSWoS1r gERBf??
TRENCHED IN 3' MIN LW
/-AND COVERED
\-SILL MUST BE TIED IN TO
BANKFULL ELEVATION
FOOTER
TYPICAL J HOOK AND FIGURE
CROSS VANE DETAILS
EMERGENCY WATERSHED PROTECTION 1 1
MI
FLOW
IRECTION
a
1/3 W
G
?C 1 /3 W
3 w`i 24" FIELDSTONE
BOULDERS
GAPS
FLOW BOULDER (1/4-1/3 RO K DIA.)
DIRECTION 00 l
1.1i' 20' I
w
2 ..
NO GA S
t
FOOTER PROFILE VIEW
SCOUR POOL
TYPICAL J HOOK DETAIL
NOT TO SCALE PLAN VIEW
FLOW QR161%2111 19 Ole (9 P
? DIRECTION ?
JUN 2 3 2005
Y { Y
Q Q
MIN.
LL
w I DENR • WATER QUALITY
I- /3W 3W - /3Vj WETLANDS AND STORMWATER BRANCH
LDERS
FOO
2-7/ LOW
DIRECTION
/-BOULDERS
??ll
TRENCHED IN 3' MIN.
AND COVERED
SILL MUST BE TIED IN TO
BANKFULL ELEVATION
SCOUR
TYPICAL CROSS VANE DETAIL
NOT TO SCALE
PLAN VIEW
50 COLLEGE STREET, ASHEVILLE, NC 28801
TEL.828.281.3350 FAC.828.281.3351
www.altamontenvironmental.wm
SOURCE: APPLIED ECOLOGICAL SERVICES, INC
DRAWN BY: ZAN PRICE
PROJECT MANAGER: STUART A.RYMAN SCALE:
CLIENT: YANCEY COUNTY NOT TO SCALE
DATE DESCRIPTION BY CHK APV DATE: 05/16/05
TYPICAL J HOOK AND FIGURE
CROSS VANE DETAILS
EMERGENCY WATERSHED PROTECTION
MITCHELL COUNTY, NC
FOOTER-/
PROFILE VIEW