Loading...
HomeMy WebLinkAbout20051151 Ver 1_Complete File_20050627WAT 9 r Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality July 5, 2005 Michael Talbert, County Manager Polk County 40 Courthouse Street Columbus, NC 28722 Subject Property: White Oak Creek EWP (DSR 2005-7 & 8) DWQ Project # 05-1151 Polk County Approval of 401 Water Quality Certification with Additional Conditions Dear Mr. Talbert: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 1,150 feet of streams for the purpose of streambank stabilization at the subject properties, as described within your application received by the N.C. Division of Water Quality (DWQ) on July 1, 2005. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3367 (3367). The Certification(s) allows you to use Nationwide Permit(s) 37 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge, and stormwater regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose, but not the design, that you described in III. 10. of your application. (Nothing in this approval should be interpreted as giving permission to remove bedload material form the existing channel, nor allowing for the construction of berms which would not allow the stream access to it's floodplain.) If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 401 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786/ FAX 919-733-6893/ Internet: http://h2o.enr.state.no.us/ncwetlands NorthCarol ma A aturally An Equal Opportunity/Affirmative Action Employer-50°o Recycled/ 100/6 Post Consumer Paper Polk County: Page 2 of 6 July 5, 2005 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Approved Units Plan Location or Reference Stream 1,150 feet White Oak Creek 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. Polk County: Page 3 of 6 July 5, 2005 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 5. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 6. Construction in this creek and disturbance within a 25-foot trout buffer should be avoided during the January 1 to April 15 rainbow trout spawning period to avoid adverse effects of sediment on eggs and larvae. However, Wildlife Resources Commission will not object to construction of Natural Resources Conservation Service "urgent and compelling" sites during the spawning period provided these projects are, to the extent appropriate and practical, constructed by: (1) using flow diversion structures such as sand bags, (2) placing large-sized rock toes and filter cloth backing for stabilization sites before backfilling, and (3) excavating new channel alignments in dry areas. Construction at the other non-"urgent and compelling" sites should not occur during the spawning period to minimize the potential adverse effects of multiple construction activities on trout resources in this creek. 7. Sediment and erosion control measures must be implemented prior to construction and maintained on the sites to minimize sediment in downstream areas. Seeding for a temporary cover of wheat, millet, or similar annual grain or permanent herbaceous cover should occur on all bare soil within five (5) days of ground disturbing activities to provide long-term erosion control. The projects should be accomplished in stages instead of leaving large tracts exposed to further storm events. Erosion control matting should be used in conjunction with appropriate seeding on disturbed soils in steep slope and riparian areas. Matting should be secured in place with staples, stakes, or, wherever possible, live stakes of native trees. Straw mulch and tall fescue should not be used in riparian areas. In addition, because of an anticipated difficulty in establishing ground cover during the winter, reseeding should be conducted, as necessary, in the spring-time with a native annual and perennial seed mix with a temporary nursery crop of wheat, millet or other grain. Polk County: Page 4 of 6 July 5, 2005 8. Only clean, large, angular rock, large woody material, or other natural stream design materials and techniques should be used for bank stabilization. Rock should not be placed in the stream channel in a manner that constricts stream flow or that will impede aquatic life movements during low flow conditions. Filter cloth should be placed behind large rock that is used for bank stabilization. Properly designed rock vanes should be constructed wherever appropriate on bank stabilization and channel realignment stream reaches to improve channel stability and to improve aquatic habitat. Root wads should be installed low enough in the bank so that a significant portion (at least one-third) the root wad is inundated during normal flows. 9. The channel should be restored to a more stable condition. However, under no circumstances should river rock, sand or other materials be dredged from the stream channel under authorization of this permit except, if necessary, in the immediate vicinity of the eroding banks for the explicit purpose of anchoring stabilizing or flow/grade control structures or for reestablishing the natural and more stable stream channel dimensions. Stream bed materials are unstable in flowing-water situations and are unsuitable for bank stabilization. In stream dredging has catastrophic effects on aquatic life and disturbance of the natural form of the stream channel can cause downstream erosion problems. The natural dimension, pattern, and profile of the stream upstream and downstream of the permitted area should not be modified by widening the stream channel or changing its depth. 10. Stabilization measures should only be applied on or near existing erosion sites, leaving other stable stream bank areas in a natural condition. Grading and backfilling should be minimized and tree and shrub growth should be retained where possible to ensure long term availability of stream bank cover for aquatic life and wildlife. Backfill materials should be obtained from upland sites except in cases where excess stream bed materials are available. Berms should not be permitted because they block the floodplain, constrict and accelerate flood flows, and often fail and sometimes impede drainage during large flood events. 11. Repairs to eroded banks should be conducted in a dry work area where possible. Sandbags or other clean diversion structures should be used where possible to minimize excavation in flowing water. Channel realignments should be constructed by excavating the new channel from downstream to upstream before connecting it to the old channel. 12. Heavy equipment should be operated from the bank whenever possible. All mechanized equipment operated near surface waters should be inspected and maintained regularly to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids or other toxic materials. Equipment used in stream channel must be clean, new or low hour equipment. 13. Disturbed stream banks and a 25-foot vegetated zone, or the widest width that is practical under the site conditions, should be restored where possible along the construction sites to natural riparian conditions with native trees and shrubs (e.g., silky dogwood, rhododendron, dog hobble, red maple, silky willow, tag alder, black willow, sycamore) to provide long-term bank stability and stream shading. Note, silky dogwood, silky willow and black willow can be planted as live stakes collected during the dormant growing season. Cuttings should be randomly planted on four Polk County: Page 5 of 6 July 5, 2005 (4) foot centers from the waters edge to the top of the bank. Trees should be planted on ten (10) to twelve (12) foot centers. Stream banks in these areas should also be seeded with a native annual and perennial seed mix with a temporary nursery crop of wheat, millet or other grain. 14. If pasture along the stream is to be used for grazing, a fence must be constructed outside of the riparian zone and the stream to prevent livestock from entering these areas. 15. Diffuse Flow All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at non-erosive velocities through the protected riparian zones such that it will not re-concentrate before discharging into a stream. If this is not possible, it may be necessary to provide stormwater facilities that are considered to remove nitrogen. This may require additional approval from this Office. 16. Riparian Zone Replanting Replanting of vegetation within disturbed areas located within 25 feet of the streambank associated with any land disturbing activity, repair, replacement and/or maintenance must be done in a manner consistant with the Guidelines for Riparian Buffer Restoration immediately following construction. (Please see attached.) 17. Deed Notifications Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective woody riparian zones in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place prior to impacting any wetlands, waters and/or buffers approved for impact under this Certification Approval and Authorization Certificate. A sample deed notification can be downloaded from the 401/Wetlands Unit web site at http://h2o.enr.state.nc.us/ncwetlands. The text of the sample deed notification may be modified as appropriate to suit to this project. 18. Turbidity Standard The turbidity standard of 10 NTUs (Nephelometric Turbidity Units) shall not be exceeded as described in 15 A NCAC 2B. .0200. Appropriate sediment and erosion control practices must be used to meet this standard. 19. No Sediment and Erosion Control Measures in Wetlands Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources or locally delegated program has released the project. Polk County: Page 6 of 6 July 5, 2005 Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Cyndi Karoly in the Central Office in Raleigh at 919-733-9721 or Mr. Kevin Barnett in the DWQ Asheville Regional Office at 828-296-4657. Sincerely, Alan W. Klimek, P.E., Director Division of Water Qulaity AW Klkhb Enclosures: GC 3367 Certificate of Completion Guidelines for Riparian Buffer Restoration cc: Mike Osborne, CH2M Hill 4824 Parkway Plaza Blvd. Suite 200 Charlotte, NC 28217 USACE Asheville Regulatory Field Office DWQ Asheville Regional Office DLR Asheville Regional Office File Copy Central Files Filename: 05-1151. EW P.W hiteOakCreek.Approval Triage Check List Date: 06/29/05 Project Name: Polk County EWP - White Oak Creels 2005-7, 8 DWQ#: 05-1151 County: Polk Kevin Barnett, Asheville Regional Office To: 60-day Processing Time: 6/27/05 to 8/25/05 From: Cyndi Karoly Telephone : (919) 733-9721 The file attached is being forwarded to your for your evaluation. Please call if you need assistance. ? Stream length impacted ? Stream determination Wetland determination and distance to blue-line surface waters on USFW topo maps ? Minimization/avoidance issues ? Buffer Rules (Neuse, Tar-Pamlico, Catawba, Randleman) ? Pond fill Mitigation Ratios ? Ditching ? Are the stream and or wetland mitigation sites available and viable? ? Check drawings for accuracy Is the application consistent with pre-application meetings? ? Cumulative impact concern ? UT to Young's Creels (TROUT WATERS) Comments: As per our discussion regarding revision of the triage and delegation processes, please review the attached file. Note that you are the first reviewer, so this file will need to be reviewed for administrative as well as technical details. If you elect to place this project on hold, please ask the applicant to provide your requested information to both the Central Office in Raleigh as well as the Asheville Regional Office. As we discussed, this is an experimental, interim procedure as we slowly transition to electronic applications. Please apprise me of any complications you encounter, whether related to workload, processing times, or lack of a "second reviewer" as the triage process in Central had previously provided. Also, if you think of ways to improve this process, especially so that we can plan for the electronic applications, let me know. Thanks! (CH2 HILL TRANSMITTAL To: NC Division of Water Quality 401 Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699 JG From: CH2M HILL 4824 Parkway Plaza Blvd., Suite 200 Charlotte, NC 28217 Attn: Date: June 23, 2005 Re: 401 Permit Review - EW P Projects PCNs We Are Sending You: Method of shipment: X Attached Under separate cover via Shop Drawings Documents Tracings Prints Specifications Catalogs Copy of letter Other: Quantity Description 5 PCN - EWP 2005- 20,21 5 PCN - EWP 2005- 4,14 5 PCN - EWP 2005- 5, 11, 12, 16 5 PCN - EWP 2005- 9, 13, 15, 24 5 PCN - EWP 2005- 7,8 J - If the material received is not as listed, please notify us at once. Remarks: One copy of the PCNs has been sent to Kevin Barnett of DWQ, Asheville and one to WRC at his request. PCNs may contain more than one DSR site. EWP DSR sites have been grouped by drainage area for ease of permit review. Copy To: file ????aW?p JUN 2 7 2005 DENR - WATER QUALITY WETLANDS AND STORPAPATER BRANCH TRANSMITTAL_PCNS_DWO_2. DOC COPYRIGHT 2005 BY CH2M HILL, INC. - COMPANY CONFIDENTIAL 1 J t .J Office Use Only: Form Version May 2002 USACE Action ID No. DWQ No. J ., . (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide 37 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete section VIII and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details , check here: ? II. Applicant Information R 12 ? I N Q \J ? D o JUN 2 7 2005 1. Owner/Applicant information Name: Michael Talbert/ County Manager DENR- WATER QUALITY U5AJ65T0RMWAT RBRAIJCH Mailing Address: 40 Courthouse Street r1:TtxJ Columbus, NC 28722 Telephone Number: 828-894-3301 Fax Number: E-mail Address: 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Mike Osborne Company Affiliation: CH2M HILL Mailing Address: 4824 Parkway Plaza Blvd. Suite 200 Charlotte NC 28217 Telephone Number: 704-329-0073 ext 252 Fax Number: 704-329-0141 E-mail Address: mike.osbome(a c 12rn.com Page 1 of 10 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Whiteoak Creek EWP 2005-7, EWP 2005-8 2. T.I.P. Project Number or State Project Number (NCDOT Only): NA 3. Property Identification Number (Tax PIN): SEE TABLE 1 4. Location County: Polk Nearest Town: Columbus Subdivision name (include phase/lot number): NA Directions to site (include road numbers, landmarks, etc.): From Columbus, NC travel east on US-74, exit south onto NC-9. Follow NC-9 approximately 3 miles and turn left (east) onto Sandy Plains Rd. Follow Sandy Plains Rd for approximately 3 miles to Meadow Crest Rd. Sites EWP 2005-7 and EWP 2005-8 are downstream of where Sandy plains Rd Crosses Whiteoak Creek just after the intersection of Sandy Plains Rd and Meadow Crest Rd. See Attachments 1 and 2 for site vicinity and parcel locations. 5. Site coordinates, if available (UTM or Lat/Long): SEE SITE DESCRIPTIONS (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres): SEE TABLE 1 7. Nearest body of water (stream/river/sound/ocean/lake): Whiteoak Creek 8. River Basin: Broad (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://Ii2o.enr.state.nc.us/admin/maps/.) Page 2 of 10 Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: The proposed site consists of light residential and agricultural uses. The stream and stream banks were heavily impacted during Tropical Storms Frances and Ivan. Extensive stream bank erosion threatens the stability of existing structures. 9. Describe the overall project in detail, including the type of equipment to be used: EWP 2005-7 This project area includes approximately 500 linear feet of the right bank of Whiteoak Creek. The project area is located 35.267500°N 82.046944°W. High-water flows have threatened structures and property including hay fields. Attachment 1 contains representative photos of the project area. Repairs in this reach of stream will involve the following: - Stabilize the channel in its pre-flood configuration using organic and rock structures - Reseed and plant woody vegetation -Debris removal EWP 2005-8 This project area includes approximately 650 linear feet of the right bank of Whiteoak Creek. The project area is located at 35.266944°N 82.046667°W. High-water flows have threatened structures and property including pasture lands. Attachment 2 contains representative photos of the project area. Repairs in this reach of stream will involve the following: - Stabilize the channel in its pre-flood configuration using organic and structures - Reseed and plant woody vegetation -Debris removal The techniques that will be utilized for the proposed repairs at the EWP site listed above are described below. Streambank Repair When possible, excavation equipment will access streambank repair areas from the dry and will not track into the stream channel. Most of the steep eroded streambanks are opposite or adjacent to the debris removal areas. At these areas, the rocky material removed from the floodplain will be used to stabilize the stream bank, with the addition of large boulders along the toe of the slope as necessary to stabilize and protect the toe. Where suitable material is available, rock vane and root wads will be installed in the restored bank section to reduce bank stress and provide stability to the unconsolidated fill. Banks will be planted with native grasses and woody material. An existing cross section and site specific design components are included in Attachments 1 and 2, for each of the impacted channel sections requiring stabilization. Drainage areas of Page 3 of 10 project areas are also included in those attachments. The drainage area is used to determine the design storm peak flow using USGS Rural Regression equations for the Blue Ridge- Piedmont. Design storm velocity and shear stress values were also calculated. This information, in conjunction with the field investigation analysis, DSR notations, and agency guidance and regulations, are used to develop an appropriate streambank stabilization design. Additional information on general design features, erosion control practices and debris removal practices is included in Attachment 3. Equipment that may be used to accomplish the above listed tasks includes; rubber tired skidders, 15 ton dump truck, hydraulic track mounted excavator with thumb, and chainsaws. 10. Explain the purpose of the proposed work: The work addressed in this application is intended to improve post flood hydraulic capacity of the stream reaches discussed and stabilize severely eroded streambanks that are threatening structures or other property. The proposed actions are not intended to enhance existing conditions or restore stream reaches using natural channel design techniques. Such activities would require detailed engineering evaluation and design, which are beyond the intent of the EWP program. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe pen-nits issued for prior segments of the same T.I.P. project, along with construction schedules. NA V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. NO VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream Page 4 of 10 evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: Proposed impacts include limited streambed disturbances, debris removal, and streambank stabilization. 2. Individually list wetland impacts below: Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact (acres) Located within 100-year Floodplain** (es/no Distance to Nearest Stream linear feet Type of Wetland*** * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains arc identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps arc available through the FEMA Map Service Center at 1-800-358-9616, or online at http://www.fenm.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (detemtination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: None Total area of wetland impact proposed: NA 3. Individually list all intermittent and perennial stream impacts below: Stream Impact Site Number indicate on ma) Type of Impact* Length of Impact linear feet) Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? (please secif EWP 2005-7 Streambank 500 Whiteoak Creek 30 perennial stabilization EWP 2005-8 Streambank 650 Wltiteoak Creek 30 perennial stabilization * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.usgs.gov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.tOnoZOnc.com, vvww.mapquest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 1150 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.) below: Page 5 of 10 Open Water Impact Area of Name of Waterbody Type of Waterbody Site Number Type of Impact* Impact (if applicable) (lake, pond, estuary, sound, (indicate on ma (acres bay, ocean, etc. * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 5. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): NA Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): NA Size of watershed draining to pond: NA Expected pond surface area: NA VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. When at all possible equipment will be kept out of the stream channel, stream crossings will be minimized, and no excavation will be below the existing channel bed. When at all possible stream material will be moved from dry areas to banks, minimizing the movement of wet (or below water line) stream material. Creating wide, shallow channels will be avoided. Temporary and/or permanent herbaceous vegetation shall be planted on all bare soil within 15 days of ground disturbing activities. Rocky material shall not be used for bank stabilization above the normal high water mark. Large rocky material will be brought in to stabilize the toe of impacted streambanks where necessary. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Page 6 of 10 USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at littp://112o.enr.state.nc.us/newetlands/strmL?ide.litml. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. NA 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCWRP, check the NCWRP website at http://ii2o.enr.state.nc.us/wrp/index.litm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): NA Amount of buffer mitigation requested (square feet): NA Amount of Riparian wetland mitigation requested (acres): NA Amount of Non-riparian wetland mitigation requested (acres): NA Amount of Coastal wetland mitigation requested (acres): NA Page 7 of 10 IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ® If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet Multiplier Required Mitigation 1 3 2 1.5 Total Zone t extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Page 8 of 10 Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 213.0242 or.0260. XL Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. Imperviousness will not change. Erosion and sedimentation prevention and control will be maintained throughout this project primarily through: proper water management, construction sequencing, proper staging and stockpiling of materials, and the maintenance, at all times, of suitable channel capacity for expected flow events. Equipment, fuels, lubricants, or other potential sources of water pollution will not be stored in areas that could be flooded during this project. XIL Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Portable facilities shall be provided at the work site. XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No Page 9 of 10 MV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). 4i (*licant/A`gent's SignatiilYe i Date signature is valid only if an authorization letter from the applicant is provided.) Page 10 of 10 Table 1 DSR Map ID PIN Owner Property Owner's City State Zip Streambank Number size Address stabilization (acres) EWP 2005- DSR7 11646 Richard and Pia 27.4 29 Meadow Tryon NC 28782 500 LF 7 Prince Crest Road EWP 2005- DSR8 11628 Vista Developers 65.3 525 North Hendersonville NC 28792 650 LF 8 Main St Attachment 1 - DSR 7 Ia. Vicinity Map 1 b. Site Map 1 c. Site Photos ld. Cross Section and Site Specific Design Page 1 e. Drainage Area Access Agreements ? ' ±?' f - 'i f .? ? r - 'L' ?9 1 ? 1 J ?- l! 1 '?-1,-' ? iv ? '/]]! ??? I I , /' ; a _.• ??-_ '\,•t- '?•?t ? ? ? '^?lr :- _ _1' y, , I `, ; ?' ,.: -_??'rrJ• .??`•-?' _ I?I ?'-t i t e r?MY 'r q ('rJ'J ?'" - •> I' - lrt, ?- .4 • (f^ I ?.._ my-ti } 3 ?- j. r-. ..--.? _ ? , --, J /,^ ".?S 1 s ?(' ? r; ?, `,'`yam ?• ` r?.., ? t.- 't / '.• r: , ' ;{ P3- 7. rt aC$i I f '^?y'I-\? i ,'\?, ,I `! r `? ., _ ??•` ?', r( i,f' l 't -? 'L?/'1 r - `' I ' ? .-1 y ? ? ?1 ? 4r J , .'? 1. ??! • .? f , r- r `<iY... ' i `.. Jr IJ ? s 1 ', r ?'. •, '? ' `i .fr 4?,•a4 ?.. '`.I a:` 1 J , .-.. r. _?\`• i' t 1 •.rl .,• r i _,? ? - `, ?` 1 r f'. _. ?.' .- J j`•;._?j .? .?}'i l ,_ `'`., .. ` ???=d 1- _?\ 67 7, i?°.?? J' ? r f• _?, `l ;_i j .^.. ?\i'•L, `'?'', _.,- r`-? _ 7 ?L11', ?? - i? f' __ .o` ~I `??i 'r` r r' Y r r A . ;.,?, ..y^ y '; r 1 I s , \•_, r, it j _ • -• •r / ' - . . ?Nq ?S_T -?'a`Y;.-?.ss' `?''•. r t I ???' _ `'ti 1I f G j - I r, ? •. _, ;1`', /f .. ?r l _ \V _ , ..4 _ --.• r ?? +. ,l?'• ` t/ / s: I ?•l y.. ? t 1•J `,`?? , f 1 (!. r ??E4. ? ?' \? '•-' ? 1 ?l `?. is 111' t ' V i? r f t,J ?r ( ci yr pis r? z. s r..a --?»i Tom.-. , i C ..ter ? .. ,?. -..-r•---.. "_lr ?'?`.??'i ".. .??. ...f. ?.t' ?. -• _ ?? \••-?'-' 9 `'T '? -- "' ? ? ? _ ? ?'`. - •? :?_ ICI ?: N ?,. r i tyre ??T-+ .? 5 \` i r.r?. •??` ?l, . (. •. _` J\9 )• `mil r tS6'? I ??r- ? ?F 't J ? ? \II T ?.?f ?'i• \'?\..` r' ? ?y: `j Y?1?``, ..`? //. ???C r• i ?-1 ?L _' .. _ ? . a?V JON ti 7 \ r DS R-7 --77--y}}?1•. '..?' _ r I fs?/!. ? I , - a ' t ... •-?-i'-?.?5 ? '? . l `4J.'• I ?. : r Jjf ,lf ? ?" r`' . •4 .t-?' +}F??' ` - f '..r ti rCF,. ` _ ,-mow -" . , I' '. fir`."' ..aV Y- , ?-- 4r?, _ ,? r.?` `? - y ?f' 1 ?.i' .. 'I it t ?, ,` .`?; ??. ???' ? , .rr- ?n ?' '--."-•? j?''?/?'". -:?J f f 0 1,250 2,500 5,000 Feet Attachment 1a DSR 7 - White Oak Stream Polk County, NC Prince - Vicinity Map Attachment 1 b DSR 7 - N. Pacolet River Polk Co., NC Prince Parcel 46 Richard Price Photo Z - bank erosion. Photo 1 - Bank erosion and sediment deposits. Photo 3 - Bank erosion and debris removal. Attachment 1 d DSR 7 - White Oak Stream Polk County, NC Prince existing cross section Right Top of Bank Left Top of Bank 1 10 8 6 4 2 0 -2 -4 s a? Width (feet) Polk Co., White Oak Creek, DSR 7 Design Parameters Apply to Site Figure Title 1 BANK STABILIZATION TYPICAL SECTION X 2 BANK STABILIZATION WITH ROCK TOE TYPICAL SECTION X 3 STREAM CHANNEL BENCH TYPICAL SECTION 4 TYPICAL J HOOK DETAIL 5 TYPICAL CROSS VANE DETAIL X 6 SUGGESTED VEGETATION LIST X 7 STABILIZATION PLANTING PLAN X 8 BENCH PLANTING PLAN X 9 LIVE STAKE DETAIL X 10 DEAD STOUT STAKE DETAIL X 11 EC FABRIC INSTALLATION DETAIL X 12 EC FABRIC ANCHOR DETAIL X 13 STABILIZATION CONSTRUCTION ENTRANCE DETAIL X 14 TEMPORARY SILT FENCE DETAIL X 15 TEMPORARY STREAM CROSSING DETAIL X 16 LAND QUALITY STOCK PILE LAYOUT X 17 LAND QUALITY STREAM CROSSING LAYOUT X 18 LAND QUALITY DEBRIS REMOVAL LAYOUT Note: 1.) 50 LF of woody debris removal from the channel 2.) Protect the existing trees on the top of bank during construction Notes and/or Measurements downstream 200 LF of right bank; A= 4.5 it upstream 300 LF of right bank; A= 4.5 ft; C= 5 ft; B=0 downstream 200 LF of right bank upstream 300 LF of right bank EC fabric = 4.5 Ib/ft2 ACA o° ti o e 0 © ?4 °L ° ° o o? ?A ELF S.J. 6/15/2005 SO, '2Z"- a himney Rock Village % 31 Legend A DSR Project Site Interstate Highway Major Roads e Major Hydrography ® Subwatershed Municipality County Boundary i therfor o 1 I DSR7 SR8 o y \ I mbus \ J- v l o?hpacoletRi DSR7 and DSR8 \ Drainage Area 37.7 sq miles ryo? Attachment 1 e 0 1 2 4 Miles DSR 7- White Oak Stream J Cr[*32RAHILL N I . . . I . . . I Polk County, NC A Prince - Drainage Area Map ACCESS AGREEMENT This Access Agreement is made between Polk county and: Property Owner: Richard M. & Pia L. Prince Street Address: 29 Meadow Crest Rd. City / State: Tryon. N. C. 28722 Polk County is requesting access to the property for the purpose of assessing and repairing damage to the streambank, stream channel, and floodplain that was caused by hurricanes Frances and Ivan. The repair efforts are being funded by the United States Natural Resource Conservation Service through the emergency watershed protection (EWP) program. The repair work will include some or all of the following elements: • Streambank Stabilization Re-vegatation • Channel Relocation to Pre-Flood Location Debris Removal Polk County and the Property Owner agree: 1. Property owner grants permission to Polk County and its contracts and agents to enter upon our land for the purpose of assessing and repairing the flood damage caused by Hurricanes Frances and Ivan. Additionally, this agreement includes"the right of ingress and egress on the land for the purpose of - maintaining the`emergency works for the period of one year from the date of completion: 2. Property owner grants permission to Polk County and its contractors and agents to conduct stream stabilization measures, which may include debris removal, stream bank stabilization using rocks, wood, and/or, mulching and seeding, and/or channel relocation. 3. Polk County agrees to comply with local, state, and federal laws applicable to the work, and further agrees to exercise due care and caution in the performance of all work on the Property. 4. Tis Agreement constitutes the entire understanding between the parties. All prior agreements or understandings, whether oral or written, are superseded. This Agreement may be amended only by a written document duly executed by the parties. 5. Emergency Watershed Protection measures are intended to repair flood damage to the stream and to return affected areas to pre-flood conditions. Repair and/or improvements to structures are not part of this EWP project. Damaged bridges, driveways, and eroded fields are not addressed by EWP measures. Polk County and its contractors will strive to minimize impacts to adjacent properties. However, some impact may be unavoidable. The Property owner releases Polk County and its contractors from liability for any damage incurred as a result of this work: 6. This agreement does not provide confirmation that the subject site is eligible for Emergency Funds, nor does it encumber funds for any repair work at this sits. 7. Property owner agrees not to remove or modify construction repairs, including vegetation, for one year from the date of completion. Polk County or Representative Property Owner By: r7( C/it /R ` l d B . L r ----- - Date: - ?' Date: qI2o"105- I Attachment 2 - DSR 8 2a. Vicinity Map 2b. Site Map 2c. Site Photos 2d. Cross Section and Site Specific Design Page 2e. Drainage Area Access Agreements ?/??\ ? 7???, ? J I ? ? jl 1 / V ? 1. ? - / ? _ `, ? / -l ?.?, -' (1? _ ? I ' ) / j l j 1 f _C H - ' ? I / t rIl / `\ / i`, 7 J / JI` C`0 • ? . ._ I I i .. ? i .\ (?"? ? , /f2.J .J ?\ d - \ Ice t Creek '_ f ( ?'utpu 0- 9M Bridge 756 5M F?65 966 781 1352 Zinn /i J "0 t r? v . " c l 1?, 1095 1\ v ?? •? ' i v ??? (? - _J 11 e DSR-8 ? ?? , -FV? ? Vl? - ?'?" ?• ? ee It ? t, i L ? z \ ` -\, ? r • ? -- \ . ter"-` / _ . / , y l J S 1 \ ` y` \t V'753 _ CreenCrcek y 0 1,250 2,500 5,000 Feet Attachment 2a 09-32RR HI LL 1 1 1 1 1 1 DSR 8- White Oak Stream Polk County, NC Vista Developers - Vicinity Map ,}N UN > ? a) U cu . o ?c n- - o a aa c ?t z . o co a) e .r N, - 4.? ?r:? Photo 1 - Severe erosion and debris removal. Photo 2 - Severe erosion. Attachment 2c: Polk Co. DSR 8 - Vista Developers Photo 4 - Bank erosion. Photo 3 - Debris removal. POLK COUNTY Attachment 2d DSR 8 - White Oak Stream Polk County, NC Vista Developers existing cross section ©_-Right Top of Bank Left Top of Bank Water Surface I i i 0 81 0 4?0 2 10 _ 11 10 8 6 a? -4 y' .rr 2 0 = -2 -4 Width (feet) Polk Co., White Oak Creek, DSR 8 Design Parameters Apply to Site Figure Title 1 BANK STABILIZATION TYPICAL SECTION X 2 BANK STABILIZATION WITH ROCK TOE TYPICAL SECTION 3 STREAM CHANNEL BENCH TYPICAL SECTION 4 TYPICALJ HOOK DETAIL 5 TYPICAL CROSS VANE DETAIL X 6 SUGGESTED VEGETATION LIST X 7 STABILIZATION PLANTING PLAN 8 BENCH PLANTING PLAN X 9 LIVE STAKE DETAIL X 10 DEAD STOUT STAKE DETAIL X 11 EC FABRIC INSTALLATION DETAIL X 12 EC FABRIC ANCHOR DETAIL X 13 STABILIZATION CONSTRUCTION ENTRANCE DETAIL X 14 TEMPORARY SILT FENCE DETAIL X 15 TEMPORARY STREAM CROSSING DETAIL X 16 LAND QUALITY STOCK PILE LAYOUT X 17 LAND QUALITY STREAM CROSSING LAYOUT X 18 LAND QUALITY DEBRIS REMOVAL LAYOUT Note: 1.) 650 LF of woody debris removal from the channel. Notes and/or Measurements 650 LF of right bank; A= 4.5 it EC fabric = 4.5 Ib/fe S.J. 6/16/2005 2.) Protect the existing road beds and structures on the top of bank during construction. Any damage caused by the contractor shall be repaired at the contractor's expanse. 3.) Relocate 700 LF of fence and 2 gazebos. CAI? X14 , ZiC.?5 zo himney Rock Village Legend A DSR Project Site Interstate Highway Major Roads Major Hydrography Subwatershed Municipality County Boundary therfor o DSR7 SR8 e? CIO Col mhus - o v i i t 0rtI) 300ietR? DSR7 and DSR8 \ Drainage Area 37.7 sq miles 1 I, 7 i i 0 1 2 4 Miles Attachment 2e DSR 8 - White Oak Stream ?9-2PJIHILL N Polk County, NC J A Vista Developers - Drainage Area Map Vista oeveic"G Vs ACCESS AGREEMENT APR t u 'oi;1 This Access Agreement is made between Polk county and: Ulf l.l.l l uuI GJJ. . J I I - Y 1 ?,.1 (. I l ,\ ' 1 1(_ City / State: '71r," hn V? 2, S -7 r Polk County is requesting access to the property for the purpose of assessing and repairing damage to the streambank, stream channel, and floodplain that was caused by hurricanes Frances and Ivan. The repair efforts are being funded by the United States Natural Resource Conservation Service through the emergency watershed protection (EWP) program. The repair work will include some or all of the following elements: • Streambank Stabilization Re-vegatation • Channel Relocation to Pre-Flood Location Debris Removal Polk County and the Property Owner agree: 1. Property owner grants permission to Polk County and its contracts and agents to enter upon our land for the purpose of assessing and repairing the flood damage caused by Hurricanes Frances and Ivan. Additionally, this agreement includes the right of ingress and egress on the land for the purpose of maintaining the emergency works for the period of one year from the date of completion. 2. Property owner grants permission to Polk County and its contractors and agents to conduct stream stabilization measures, which may include debris removal, stream bank stabilization using rocks, wood, and/or, mulching and seeding, and/or channel relocation. 3. Polk County agrees to comply with local, state, and federal laws applicable to the work, and further agrees to exercise due care and caution in the performance of all work on the Property. 4. Tis Agreement constitutes the entire understanding between the parties. All prior agreements or understandings, whether oral or written, are superseded. This Agreement may be amended only by a written document duly executed by the parties. 5. Emergency Watershed Protection measures are intended to repair flood damage to the stream and to return affected areas to pre-flood conditions. Repair and/or improvements to structures are not part of this EWP project. Damaged bridges, driveways, and eroded fields are not addressed by EWP measures. Polk County and its contractors will strive to minimize impacts to adjacent properties. However, some impact may be unavoidable. The Property owner releases Polk County and its contractors from liability for any damage incurred as a result of this work. 6. This agreement does not provide confirmation that the subject site is eligible for Emergency Funds, nor does it encumber funds for any repair work at this sits. 7. Property owner agrees not to remove or modify construction repairs, including vegetation, for one year from the date of completion. Polk County or Representative By: , -? Date: Addendum #1 Proper I, By tirG? h•wl Cq ?s a? (.cam `E. Date:_ Y) Access is given provided engineering scope of work is reviewed and approved by Vista Developers, LLC in a preliminary on-site meeting. We are concerned with disturbance to existing road beds and structures. y ?co Attachment 3 General Design Notes Typical Design Drawings Debris Removal SOP General Notes The Contractor shall make his own determination of the existing subsurface conditions. In areas where proposed construction may conflict with existing utilities, the Contractor shall take all necessary precautions to avoid damage to the utilities. Notify and locate all impacted utilities at least 48 hours prior to excavation. Any damage sustained to utilities shall be repaired by or under the direction of the utility owner at the Contractor' s expense. All existing facilities, including but not limited to sidewalks, roads, lawns, landscape vegetation, etc., inside and outside of construction limits that are disturbed under this contract shall be reestablished and/or reconstructed to the original condition at the Contractor' s expense. Construction Sequence 1. Begin work at the upstream end of the project reach. 2. Construct proposed structures according to the plans and specifications. 3. Grade stream banks to proposed grade, and tie into existing banks upstream and downstream. 4. Overbank areas (beyond top of bank) adjacent to the project reach shall be graded for positive drainage toward the stream. 5. Apply temporary stabilization to the disturbed areas at the end of each work day. Site Stabilization 1. Conduct soil test to confirm necessary lime and fertilizer amendments. Appropriate lime and fertilizer shall be applied prior to seeding and incorporated to a depth 3 to 5 inches below the surface. Temporary stabilization will be applied to all disturbed areas on a daily basis. Areas shall be seeded with rye grass at a rate of 15 lbs./ac. and long straw or hay mulched. Straw shall consist of thoroughly threshed wheat, rye or oat straw, reasonably bright in color, and shall not be musty, moldy, caked, decayed, or excessively dusty and shall be free of noxious weed seeds. 3. Permanent soil stabilization shall be completed within 7 calendar days of initial soil disturbance or re-disturbance. Planting and seeding shall be incorporated into the subsoil at the rates prescribed on Figures 6, 7, and 8. 4. Erosion Control (EC) Fabric shall be woven coir mat, secured with dead stout stakes, and shall meet the following standards: 50% open area (maximum) 0.5 inch maximum opening size 4.5 lbs. per sq. foot maximum sheer stress 10 fps minimum velocity 5. Filter fabric shall be Amoco Propex 2002 woven geotextile or equivalent. Cut excess filter fabric so no fabric is visible after installation. 6. Repeat steps 1 through 5 for each segment of the project 6. All rock used for bank stabilization and in-stream structures reach, working downstream. shall be 3 ft to 4 ft angular rock. CLTIGENERAL NOTES_FINAL.DOC USE OR DISCLOSURE OF DATA CONTAINED ON THIS SHEET IS SUBJECT TO THE RESTRICTION ON THE TITLE PAGE OF THIS PROPOSAL. 7. Seeded areas not specified for coir fabric, shall be mulched with long straw or hay mulch immediately after seeding areas at a rate of 2 tons/acre (uniform loose depth of 1" to 2" ). Straw shall consist of thoroughly threshed wheat, rye or oat straw, reasonably bright in color, and shall not be musty, moldy, caked, decayed, or excessively dusty and shall be free of noxious weed seeds. Mulch shall be secured with biodegradable netting (Robex Super Flow or Equal). 8. The Contractor shall be responsible for maintaining seeded areas until 95% vegetative cover is established. Should any seeded area fail to germinate, or washing of any areas occur requiring re-establishment of seeding, the Contractor shall replace any lost soil material and re-seed and re-mulch such areas at Contractor' s expense. Standard Erosion and Sediment Control Notes 1. The Contractor shall protect all points of construction ingress and egress by installing a temporary construction entrance as shown in details to prevent the deposition of materials onto public roads. All materials deposited onto public roads shall be removed immediately. 2. The Contractor shall re-vegetate or restore access roads (including construction entrance) to match pre-construction conditions. 3. The Contractor shall inspect daily and maintain continuously in an effective operating condition all erosion and sediment control measures until such times as they are removed with prior permission from Engineer or agency inspector. 4. The Contractor shall protect trees and landscaping not marked for disposal from damage. Any damage that occurs shall be repaired at the Contractor' s expense. 5. Fencing shall be maintained for animal containment. The Contractor shall provide temporary fencing to allow for execution of the work. The Contractor shall keep construction equipment away from livestock and take all precautions to prevent injury to animals. CLT/GENERAL NOTES_FINAL.DOC USE OR DISCLOSURE OF DATA CONTAINED ON THIS SHEET IS SUBJECT TO THE RESTRICTION ON THE TITLE PAGE OF THIS PROPOSAL. EXISTING TOP OF BANK PROPOSED GRADE CUT \ tl L 3MIN. (NOT STEEPER) EC FABRIC SEE FIGURE 7 EXISTING GRADE /11 BASE FLOW 1 NOTE: HEIGHT "A" IS MEASURED FROM DEEPEST POINT IN CHANNEL CROSS-SECTION DRAWN: GMH PROJ. MANAGER: JMO DATE: 512005 4824 PARKWAY PLAZA BOULEVARD SUITE 200 CHARLOTTE, NC 28217 TITLE BANK STABILIZATION TYPICAL SECTION N TS FIGURE EXISTING STREAMBED EXISTING TOP OF BANK ?- CUT 2' MIN. OF EXPOSED PROPOSED GRADE 1 ROCK 3 MIN. ROCK TOE (NOT STEEPER) 2' MIN. OF ROCK EMBEDDED IN BANK EC FABRIC SEE FIGURE 7 1 BASE FLOW A NOTES: 1 2 1. HEIGHT "A" IS MEASURED FROM DEEPEST POINT IN CHANNEL CROSS-SECTION. FILTER FABRIC 2. FILTER FABRIC SHALL BE AMOCO PROPEX 2002 WOVEN GEOTEXTILE OR EQUIVALENT. LAY FILTER FABRIC UNDER TRENCH ROCK AND UP BEHIND ROCKS. CUT EXCESS FILTER FABRIC SO NO FABRIC IS VISIBLE AFTER INSTALLATION. BACKFILL WITH WELL-DRAINING SOIL (USE NATIVE MATERIAL WHENEVER POSSIBLE). MIN. OVERLAP OF COIR OVER FILTER FABRIC OF 12". DRAWN: GMH PROJ. MANAGER: JMO DATE: 5/2005 %3.-9 em n 0 4824 PARKWAY PLAZA BOULEVARD SUITE 200 CHARLOTTE, INC 28217 EXISTING STREAMBED TITLE BANK STABILIZATION WITH ROCK TOE TYPICAL SECTION N TS FIGURE 2 KEY IN ROCK TOE ONE ROCK DIAMETER 4' MIN. EXISTING TOP OF BANK EXISTING GRADE CUT PROPOSED GRADE 1 1 3 MIN. CB (NOT STEEPER) EC FABRIC I ' SEE FIGURE 7 GRADE TO DRAIN (1% MAX.) I FILL STREAM CHANNEL BENCH NOTES 1. HEIGHT "A" IS MEASURED FROM DEEPEST POINT IN CHANNEL CROSS-SECTION. 2. FILTER FABRIC SHALL BE AMOCO PROPEX 2002 WOVEN GEOTEXTILE OR EQUIVALENT. LAY FILTER FABRIC UNDER TRENCH ROCK AND UP BEHIND ROCKS. CUT EXCESS FILTER FABRIC SO NO FABRIC IS VISIBLE AFTER INSTALLATION. BACKFILL WITH WELL-DRAINING SOIL (USE NATIVE MATERIAL WHENEVER POSSIBLE). MIN. OVERLAP OF COIR OVER FILTER FABRIC OF 12". DRAWN: GMH PROJ. MANAGER: JMO DATE: 5/2005 4824 PARKWAY PLAZA BOULEVARD SUITE 200 CHARLOTTE, INC 28217 EXISTING STREAMBED ` FILTER FABRIC KEY IN ROCK TOE ONE ROCK DIAMETER 4' MIN. TITLE 2 1 1 STREAM CHANNEL BENCH TYPICAL SECTION N TS T BASE FLOW A 1 FIGURE 3 BANKFULL ELEVATION B 9y FLOW G DIRECTION C\ CROSS SECTION VIEW BANKFULL ELEVATION l Slll CAPS \ (1/4-1/3 ROCK DIA.) \1 Q O( 1 BOULDERS BOULDER SCOUR FOOTER -J CHANNEL BED NOTES: 1. BOULDER SIZE IS 4' MINIMUM OR AS SPECIFIED ON PLANS. 2. WRAP FILTER FABRIC AROUND FOOTER STONES AND BACKFILL WITH TYPE 3 RIPRAP OR EQUIVALENT (ON SITE COBBLE WHEN AVAILABLE). DRAWN: GMH PROJ. MANAGER: JMO DATE: 5/2005 t20- M.'tm T . M LL 4824 PARKWAY PLAZA BOULEVARD SUITE 200 CHARLOTTE, NC 28217 PLAN VIEW W SOURCE: APPLIED ECOLOGICAL SERVICES, INC TITLE FIGURE TYPICAL J HOOK DETAIL 4 NOT TO SCALE 5'MIN. CROSS SECTION VIEW BANKFULL ELEVATION FLOW -12_72 DIRECTION f- BOULDERS /-CHANNEL BED FCOL . FLOW J D,RECTION J Q m 3-t-4/3U -+ t/ PLAN VIEW NOTES: 1. BOULDER SIZE IS 4' MINIMUM OR AS SPECIFIED ON PLANS. PROFILE VIEW 2. WRAP FILTER FABRIC AROUND FOOTER STONES AND BACKFILL WITH TYPE 3 RIPRAP OR EQUIVALENT (ON SITE COBBLE WHEN AVAILABLE). TITLE LDERS TRENCHED IN 3' MIN. AND COVERED SILL MUST BE TIED IN TO BANKFULL ELEVATION SOURCE: APPLIED ECOLOGICAL SERVICES, INC DRAWN: GMH PROJ. MANAGER: JMO DATE: 5/2005 lQour-u 4824 PARKWAY PLAZA BOULEVARD SUITE 200 CHARLOTTE, NC 28217 1 2 2/3 W lco 1 O SCOUR POOL 20' FIGURE TYPICAL CROSS VANE DETAIL NOT TO SCALE 5 J J W Q m Mountain Region Suggested Vegetation List TREES S P F SMALL TREES/SHRUBS S P F HERBACEOUS VEGETATION FOR SEED MIX Betula lenta Alnus serrulata Arisaema triphyllum Scirpus validus cherry birch x x tag alder x x x jack-in-the-pulpit soft stem bulrush Betula nigra Amelanchierarborea Asclepias incarnata Sparganium americanum river birch x x serviceberry x x swamp milkweed bur-reed Carya cordilormis Aronia arbutitolia Carex crinata Thelypteris palustris bitternut hickory x x x red chokeberry x x fringed sedge marsh fern Carya ovata Asimina triloba Carex intumescens Uniola latilolia shagbark hickory x x x common pawpaw x x bladder sedge river oats Diospyros virginiana Calycanthus tloridus Carex lupulina Vernonia noveboracensh persimmon x x x sweet-shrub x x hop sedge ironweed Fraxinus pennsylvanica Carpinus caroliniana Carex lurida Leersia oryzoides green ash x x ironwood x x lurid sedge rice cutgrass Halesia caroliniana Cornus alternitolia Carex scoparia Lobelia cardinalis silverbell x x alternate leaf dogwood x x broom sedge cardinal flower Nyssa sylvatica Cornus amomum Carex stricta Lobelia siphilitica blackgum x x x silky dogwood x x tussock sedge great blue lobelia Platanus occidentalis Corylus americana hazel- Carex vu/pinoidea Ludwigia alternilolia sycamore x x nut x x fox sedge bushy seedbox Prunus serotina Hamamelis virginiana Chelone glabra Panicum virgatum black cherry x x x witch-hazel x x turtlehead switchgrass Salix nigra Ilex verticillata Cyperus strigosus Polygonum sagittatum black willow x x winter berry x x x umbrella sedge tearthumb Tilia heterophylla Leucothoe axillaris Elymus hystrix Scirpus atrovirens white basswood x x doghobble x bottlebrush grass green bulrush Lindera benzoin Eupatorium tistulosum Scirpus cyperinus S = Shade spicebush x Joe-pye-weed woolgrass P = Partial Sun Lyonia ligustrina x Eupatorium pertoliatum Juncus ettusus F = Full Sun Lyonia ligustrina boneset soft rush Magnolia tripetala x Impatiens capensis umbrella tree jewel-weed Physocarpus opulitolius ninebark x x x Rhododendron periclymenoides wild azalea x x Rhododendron viscosum swamp azalea x x Rosa palustris swamp rose x x Salix sericea silky willow x x Spirea latilolia meadowsweet x Symplocos tinctoria sweet leaf x x Viburnum cassinoides W ithe-rod x x x Xanthorhiza simplicissima yellow-root x TITLE DRAWN: GMH SUGGESTED VEGETATION LIST DATE: MANAGER: 5JMO 2005 1%0"' H 2 M H"n ILL FIGURE 4824 PARKWAY PLAZA BOULEVARD ?1 SUITE 200 ? /' 1 CHARLOTTE, NC 28217 ` / APPROX. WIDTH OF CHANNEL ]T3' 1 LIVE STAKE ZONE TO EDGE OF WATER PLANTING WIDTH WILL VARY TO LANDOWNER COMPLIANCE AND PROJECT SPECIFICATIONS. EXISTING SURFA ELEVATI ZONE I ZONE 2 SYMBOL HERBACEOUS SEEDING DESCRIPTION SYMBOL WOODY VEGETATION DESCRIPTION NATIVE TREE AND SHRUB SPECIES TO BE PLANTED AT -TO BE SEEDED IMMEDIATELY WITH TEMPORARY RYE GRASS A DENSITY OF 436 TREES/ACRE, WHICH IS AT 15 LBS/ACRE SEEDING RATE. SUFFICIENT TO PROVIDE 320 TREES/ACRE -FOLLOWING CONSTRUCTION, AREA TO BE SEEDED WITH A NATIVE PERMANENT GR SS/ ER AT MATURITY. FOLLOW NCDWO GUIDELINES FOR RIPARIAN BUFFER RESTORATION , A H B MIXTURE AT 15-20 LBS/ACRE SEEDING RATE . -SHRUB SPECIES INCLUDE BUT ARE NOT LIMITED TO: . -HERB/GRASS SPECIES C Alnus serratula, Cephalanthus occidentalis, IN LUDE BUT ARE NOT LIMITED TO: Agrostis alba Carex s p Dact lis /omerata Cornus stricta, Rhododendron maximum, salix , p ., g , y Panicum spp., Pennisetum g/aucum, Seca/e cereale, serecla, Sambucus canadensis, etc. -TREE SPECIES INCLUDE BUT ARE NOT LIMITED T0: ETC. LIVE STAKES TO INCLUDE Cornus spp. and Acerspp., Betula spp., Fraxinus spp., Juglands Salix serica Nigra, Liriodendron Tulipifera., Pinus strobus., LIVE STAKES SPACED ON 2' CENTERS Platanus occidentalis., Robinia Pseudoacacia., etc. -TO BE SEEDED IMMEDIATELY WITH TEMPORARY RYE GRASS. -FOLLOWING CONSTRUCTION, AREA TO BE SEEDED WITH A NATIVE, PERMANENT GRASS/HERB MIXTURE AT I5-20 LBS/ACRE SEEDING RATE. AT LEAST 3 SPECIES OF TREES AND 5 SPECIES OF SHRUBS SHOULD BE USED. •Nf1TFC- -TREE/SHRUB/GRASS SPECIES LISTED ARE SUBJECT TO CHANGE DUE TO AVAILABILITY FROM LOCAL NURSERIES AND FORESTRY SUPPLY STATIONS. SUBSTITUTION MUST BE APPROVED BY ENGINEER. SOURCE: ALTAMONT ENVIRONMENTAL, INC. DRAWN: GMH PROJ. MANAGER: JMO DATE: 5/2005 ? 'U_'U0LL 4824 PARKWAY PLAZA BOULEVARD SUITE 200 CHARLOTTE, NC 28217 O EXISTING STREAMBED )OOK TITLE STABILIZATION PLANTING PLAN FIGURE 7 APPRO%. WIDTH OF CHANNEL LIVE STAKE ZONE TO EDGE OF WATER PLANTING WIDTH WILL VARY TO LANDOWNER COMPLIANCE AND PROJECT SPECIFICATIONS. ZONE I ZONE 2 SYMBOL HERBACEOUS SEEDING DESCRIPTION SYMBOL WOODY VEGETATION DESCRIPTION NATIVE TREE AND SHRUB SPECIES TO BE PLANTED AT -TO BE SEEDED IMMEDIATELY WITH TEMPORARY RYE GRASS A DENSITY OF 436 TREES/ACRE, WHICH IS AT 15 LBS/ACRE SEEDING RATE. SUFFICIENT TO PROVIDE 320 TREES/ACRE -FOLLOWING CONSTRUCTION, AREA TO BE SEEDED WITH A NATIVE PERMANENT GRASS/ ERB I T RE AT AT MATURITY. FOLLOW NCDWO GUIDELINES FOR RIPARIAN BUFFER RESTORATION. , H M X U I5-20 LBS/ACRE SEEDING RATE -SHRUB SPECIES INCLUDE BUT ARE NOT LIMITED TO: . -HERB/GRASS SPECIES INCLUDE BUT ARE NOT LIMITED TO: Alnus serratula, Cephalanthus occidentalis, t C t Rh d d d i li i Agrostis albs, Carex spp., DacWis glomerate, ornus s c a, o o en ron max mum, sa x r serecia, Sambucus canadensis etc. Panicum spp., Pennisetum glaucum, Secale cerea/e, , -TREE SPECIES INCLUDE BUT ARE NOT LIMITED TO: ETC LIVE STAKES TO INCLUDE Cornus spA and Acer spp., Betula spp., Fraxinus spp., Juglands Salix serica Nigra, Liriodendron Tulipitera., Pinus strobus., LIVE STAKES SPACED ON 2' CENTERS Pla tanus occidentalis., Robinia Pseudoacacia., etc. -TO BE SEEDED IMMEDIATELY WITH TEMPORARY RYE GRASS. -FOLLOWING CONSTRUCTION, AREA TO BE SEEDED WITH A NATIVE, PERMANENT GRASS/HERB MIXTURE AT I5-20 LBS/ACRE SEEDING RATE. AT LEAST 3 SPECIES OF TREES AND 5 SPECIES OF SHRUBS SHOULD BE USED. 'NOTES: -TREE/SHRUB/GRASS SPECIES LISTED ARE SUBJECT TO CHANGE DUE TO AVAILABILITY FROM LOCAL NURSERIES AND FORESTRY SUPPLY STATIONS. - PLANT ZONE I TO EDGE OF WATER - SUBTITUTION MUST BE APPROVED BY ENGINEER SOURCE: ALTAMONT ENVIRONMENTAL, INC. DRAWN: GMH PROJ. MANAGER: JMO DATE: 5/2005 klo am MILL 4824 PARKWAY PLAZA BOULEVARD SUITE 200 CHARLOTTE, INC 28217 TITLE BENCH PLANTING PLAN EXISTING STREAMBED J FIGURE 8 30" LIVE CUTTING (DORMANT) - TYP DEAD STOUT STAKE TYP, SEE FIGURE 10 NOTE: INSTALL LIVE STAKE SO 2/3 LENGTH IS (MIN. 20") BELOW GROUND DRAWN: GMH PROJ. MANAGER: JMO DATE: 5/2005 HILL 4824 PARKWAY PLAZA BOULEVARD SUITE 200 CHARLOTTE, NC 28217 EC FABRIC 2' MAX SPACING '" ? - 1 0/// NITS FIGURE 9 ESTABLISHED PLANT SHOWN FOR INFORMATION ONLY GROUND TITLE LIVE STAKE DETAIL NOTES 18" STANDARD (30" IF USED AT TOE OF SLOPE) 1. DEAD STOUT STAKES SHALL BE FASHIONED FROM UNTREATED 2" BY 4" (NOMINAL) BOARDS. 2. DEAD STOUT STAKES TO BE USED IN LIEU OF METAL OR OTHER STAPLES OR FASTENERS FOR SECURING EC FABRIC IN PLACE. 3. THE CONTRACTOR MAY USE "ECOSTAKE" 12" LENGTH OR APPROVED EQUAL IN LIEU OF DEAD STOUT STAKES FOR INSTALLATION IN THE CENTER OF THE EC FABRIC "FIELD". 4. INSTALL EC FABRIC PER MANUFACTURER'S INSTRUCTIONS. DRAWN: GMH PROJ. MANAGER: JMO DATE: 5/2005 TITLE FIGURE k1:9 m0LL 4824 PARKWAY PLAZA BOULEVARD SUITE 200 CHARLOTTE, NC 28217 DEAD STOUT STAKE DETAIL NTS 10 SOIL BIOENGINEERING E DEAD STOU TIE TO TYPICAL SECTION NOTES: 1. INSTALL ON ALL CUT AND FILL SLOPES AND NEAR BANK DISTURBED AREAS. 2. INSTALL PER MANUFACTURER'S INSTRUCTIONS. 3. EC FABRIC SHALL BE WOVEN COIR MAT WITH 50% OPEN AREA (max.), 0.5 INCH MAX. OPENING SIZE, 4.5 Ibs/sq. ft. MAX. SHEER STRESS, 10 fps MIN. VELOCITY. OF BANK ANCHOR, TYP SEE FIGURE 12 JND, TYP P DRAWN: GMH TITLE FIGURE PROJ. MANAGER: JMO DATE: 5/2005 nrunULL 4824 PARKWAY PLAZA BOULEVARD SUITE 200 CHARLOTTE, NC 28217 EC FABRIC INSTALLATION DETAIL 11 NTS F:\CAD\NRCS\Cad-Details\Figl 1.dwg, 05/12/2005 03:52:00 PM, PDF995 (temporary).pc3 TOP OF BANK EC FABRIC BASE FLOW DEAD STOUT STAKE SEE FIGURE 10 MAT WRAPS OVER TOP OF STAKE Q TOE TOP OF BANK ANCHOR NOTES: 1. CLEAN SOIL BACKFILL SHALL BE USED TO SECURE DEAD STOUT STAKES AND FABRIC INTO THE SOIL 2. FOR TOE OF SLOPE APPLICATIONS. FABRIC SHALL BE INSTALLED AS TO OVERLAP TRENCH & DEAD STOUT STAKE TO POSITION THE FABRIC FOR INSTALLATION UP THE BANKS. 3. START INSTALLATION OF EC FABRIC AT TOE OF SLOPE. WRAP FABRIC OVER TOE OF BANK ANCHOR AND PROCEED UP THE BANK TO THE TOP OF BANK ANCHOR. 4. FOR END OF GRADING APPLICATIONS, FABRIC SHALL BE INSTALLED PERPENDICULAR TO BANK AND ANCHORED PER TOP OF BANK DETAIL, WITH THE EXCEPTION THAT FABRIC DOES NOT EXTEND OUTSIDE OF TOE OF BANK ANCHOR TRENCH & FABRIC IS NOT EXPOSED. DRAWN: GMH TITLE FIGURE PROJ. MANAGER: JMO DATE: 5/2005 EC FABRIC ANCHOR ??? ULL DETAIL 2 4824 PARKWAY PLAZA BOULEVARD SUITE 200 CHARLOTTE, NC 28217 NTS 50' MIN. EXISTING GROUND m PUBLIC STREET SOIL STABILIZATION FABRIC UNDER 2'-3' WASHED STONE OR AS SPECIFIED z ON PLAN SHEETS .n NOTES F- W W F- U J D] 7 a 1. A STABILIZED ENTRANCE PAD OF 2' - 3' WASHED STONE OR RAILROAD BALLAST SHALL BE LOCATED WHERE TRAFFIC WILL ENTER OR LEAVE THE CONSTRUCTION SITE ONTO A PUBLIC STREET. 2. FILTER FABRIC OR COMPACTED CRUSHER RUN STONE MAY BE USED AS A BASE FOR THE CONSTRUCTION ENTRANCE. 3. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS WARRANT AND REPAIR OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 4. ANY SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY. 5. WHEN APPROPRIATE, WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET. WHEN WASHING IS REQUIRED, IT SHALL BE DONE IN AN AREA STABILIZED WITH CRUSHED STONE. DRAWN: GMH PROJ. MANAGER: JMO DATE: 5/2005 4824 PARKWAY PLAZA BOULEVARD SUITE 200 CHARLOTTE, NC 28217 TITLE I FIGURE STABILIZED CONSTRUCTION ENTRANCE DETAIL 13 N.T.S. A STE WIRE FENCING WOVEN FILTER FABRIC o z I N ? B - STEEL POST WIRE FENCING z FILTER FABRIC J ? O N I6' _?,?? r W O I I I r ANCHOR SKIRT 6' MINIMUM IN LIEU OF BURYING SKIRT, 6' OF N5 WASHED STONE MAY BE USED OVER TURNDOWN. SEE SECTION B-B. SECTION A-A ONE GENERAL NOTES: 1. FILTER FABRIC FENCE SHALL BE A MINIMUM OF 32" IN WIDTH AND SHALL HAVE A MINIMUM OF 6 LINE WIRES WITH 12" STAY SPACING. 2. WOVEN FILTER FABRIC BE USED WHERE SILT FENCE IS TO REMAIN FOR A PERIOD OF MORE THAN 14 DAYS. 3. STEEL POSTS SHALL BE 5'-0' IN HEIGHT AND BE OF THE SELF-FASTENER ANGLE STEEL TYPE. 4. WIRE FENCING SHALL BE AT LEAST #10 GAGE WITH A MINIMUM OF 6 LINE WIRES WITH 12" STAY SPACING. 5. TURN SILT FENCE UP SLOPE AT ENDS. 6. WIRE MESH SHALL BE MIN. 13 GAGE WITH MAXIMUM 12" OPENINGS. 7. WIRE AND WASHED STONE WILL BE REQUIRED WHEN: AT TOE OF SLOPES GREATER THAN 10 FEET VERTICAL (2:1 SLOPE) DRAWN: GMH PROJ. MANAGER: JMO DATE: 512005 MAINTENANCE NOTES: 1. FILTER BARRIERS SHALL BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. 2. SHOULD THE FABRIC DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL IS NECESSARY, THE FABRIC SHALL BE REPLACED PROMPTLY. 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH APPROX. HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED. 4. REMOVE SILT FENCE 1 YEAR PAST CONSTRUCTION. 4824 PARKWAY PLAZA BOULEVARD SUITE 200 CHARLOTTE, NC 28217 N.T.S. TITLE TEMPORARY SILT FENCE DETAIL STEEL POST WIRE FENCING z FILTER FABRIC /j5 WASHED STONE ? M o W S?' 6 N EoY ? T I} ANCHOR SKIRT 6" MINIMUM SECTION B-B FIGURE 14 5' MAX. BANK HEIGHT STREAM CHANNEL p SURFACE FLOW DIVERSION du N, 11 1 IY \? c) C) 0 \??) IN % 10, )1 `, \1?U) \ p 1. USE #57 WASHED STONE `V h/I \ ICJ y N) \?iV1 \ \ ^ 2. OMIT #57 WASHED STONE ON \«) \`?(?) CHANNEL BOTTOM IF CROSSING A COBBLED BED STREAM. STONE APPROACH SECTION 5:1 MAX. SLOPE ON ROAD 3. REMOVE STONE AND FILTER STONE OVER FILTER FABRIC (SEE NOTE 2) FABRIC AFTER CONSTRUCTION AND TIE INTO EXISTING GRADE. VEGETATE SITE ACCORDING TO PLANTING PLAN. ORIGINAL STREAMBANK o STONE OVER " "';. FILTER FABRIC 6" MIN. DRAWN: GMH PROJ. MANAGER: JMO DATE: 5/2005 ?? m"0LL 4824 PARKWAY PLAZA BOULEVARD SUITE 200 CHARLOTTE, NC 28217 r TEMPORARY ACCESS AS SPECIFIED BY ENGINEER FILTER FABRIC 9- TITLE FIGURE TEMPORARY STREAM CROSSING DETAIL 15 NTS VsmarLER` "' 937 811 E Engineer's Computation Pad I Stab; 1 i t ' t ! S 7'414-14'10 •'le. ` L oacb- f?rac, ` Co.fs>!i'Kyy` !,.'o¢cr' ?ar•S as neces5c-7 1`'0 WAVOrY, /'ci no ?•?a«-i Zaul road,, 5e8 azeasS -Oaw S?•?ea•ti . Sec ?G-+?oe?a.7, s?`-gyn..-, ?rpss:.,? Use i. ?. ' ?es rc S f.>ra », ban /c C..-?o??k 7P,- i' Lf/,? O 1 C O -c- G T ?O?•IwP,- / 1 ? G? 172c as e4 ee 13,,, fro, S7` i' e a,r, /t/07F- to SC4/L Source: NC Land Quality Section Figure 16 4r/t rlv f VSGgEMIER® No. 937 811 E Engineer's Computation Pad 57.6; 1. i?c? Cons)`/NG}!`N ? ? g/'aknG? G'a••sr/ ssaliM(•f!/w?%v? n /""d 1;0x01 + Cori /?7 L04 fares Spa /l l c t t A- ni t-4, /g re y 1 ??rp ?, O?ic? 7'0 1Oeo ler,7' 7f'-4e t Sfrea.., L , t 5 eo1',.,e.+7L ro? 11'J0051(41'E rti.? ? > a 1 oil X (2 4 ` T tie!tf 40 ? ?c.77 e/ cs/?JE..ev?.- /=?ODU? /"/o.%, .OetYr, S r CJc. OT/` ? c+S Gt SeGuN? D?IL'b^• ? - ? KJNY'TQ/ S?O«/A/?, STA.f?/ ?/ZQR Source: NC Land Quality Section Figure 17 VSTAEDTLER® No. 937 811 E Engineer's Computation Pad tCV v, J? /« a l'r0 7 G c. Ct?n3??rHO? ?nJ.s?ti ,&-.s r,.5 / ?eGe$sGi/ Cl%vB L /4? /;/ {ro.-I A4-1 see. r ? ?e s forte S fie..?«s ?G if / o? J N/VOrr C o rn?J?t 7?. vr, c? 7? G?e.? r• $ e no ? A J '/ elect , wow 4, Sec%•??Y..y` G o.,?o ! ?6GS 6t /G S7/mli. l: jet G? t? r?M r,r? /Joel .? 5 ? 9&4 F ??o riC L?J ?- 5?/Ca,v? - -- - - - - _ - Sp M /VC,-?L' fv Scale- Source: NC Land Quality Section Figure 18 4/.??os Organic Debris Removal Standard Operation Procedures (SOP) Emergency Watershed Protection (EWP) Stream Repair Projects McDowell County, North Carolina SCOPE OF WORK The work shall consist of the cleanup of designated stream areas by the removal and disposal of trees, logs, stumps, brush, tops, rubbish, and other debris deposited in the stream channel and floodplain by the storms of September 8 and 16, 2004. CLEARING AND DEBRIS REMOVAL Debris removal crews shall remove only that material which has been clearly marked by a representative of McDowell County and/or CH2M HILL, INC (Representative) as indicated by flagging and/or orange/red spray paint. ONLY marked debris is to be removed. Representative cannot authorize additional work. Any work that will result in an increase in cost must be submitted to CH2M HILL for approval prior to starting such work. In the event that the contractor uses on-site clopping, the chipper may follow the clean-up crew along the length of the project reach. The Contractor is responsible to properly dispose of chips. Proper disposal may include spreading on site or removing off-site. On-site disposal requires written approval by the property owner. Unless specifically requested to leave the chips in a pile by a property owner the chipper shall make reasonable efforts to spread the chips as chipping progresses. Chippers and other heavy equipment will be staged and used at least 30-feet from the top of the streambank or on existing paved or graveled areas prepared in accordance with standard details described in Figure 18 (Attachment 1). Repair of any property damage resulting from debris removal is the sole responsibility of the Contractor. All debris removal shall be within the included sites as identified in this solicitation and as directed by the Representative. For bid preparation purposes, the Representative has marked and identified debris to be removed. Removed debris shall be placed only in those areas as directed by the Representative. For Bid purposes, debris staging areas are assumed to be within 300 feet of top of bank. On-site burning is not allowed. Fallen trees, limbs and dislodged brush within the cross section of the existing or original channel up to and including the debris line of the subject storm shall be removed. Any foreign (man-made) debris washed in from upstream, shall be removed. Marked trees severely undercut by stream bank erosion and trees severely leaning over the channel whose near term fall is apparent shall be removed. In general, Contractor clearing will be limited to the cutting of severely damaged trees leaning across the channel, and other trees as needed to gain access for equipment to points of channel blockage. P:\PolkCountyNortliCarol\327550\Pennits\PCN's_Polk_Complete\Polk_FinaIPCN_DSR_2_3_22\Attachlnent 4\Dcbris Removal SOP final.doc 1 Disturbance of the channel bottom and banks, and equipment access areas shall be held to the minimum necessary to allow the construction equipment to remove the debris and shall be consistent with all state and federal permits. All areas disturbed due to debris removal or equipment access shall be reshaped and reseeded in accordance with standard details described in Figures 7-18 (Attachment 1). Access to the channel will generally be perpendicular to the channel so cutting of trees is held to a minimum with precaution taken to protect mast producing and stream canopy trees. Un-marked dead trees that provide den habitat and are determined to pose no hazard to the channel shall be protected. As such, the contractor will only remove marked debris. The contractor will exercise care in the areas of existing crops to minimize damages. PROVIDED EQUIPMENT & FACILITIES The Contractor shall provide adequate sanitary facilities for equipment operators and work crews. Portable facilities shall be provided at the worksite and arrangements made for proper servicing. A portable facility will be provided within 1,000 feet of the equipment and/or work crews at all times. COMMUNICATIONS Each mechanized piece of equipment and each work crew shall be equipped with a two way, battery operated radio. Radios shall be FM, have a minimum range of 5 miles. Radios shall be maintained "on" and in the receive mode at all times while the operator is at the site. Batteries shall be recharged overnight or as needed. An extra set of fully charged batteries shall be maintained on board the equipment at all times. Radios shall be equipped with clip-on hand mikes or headsets. Radios shall be maintained in good operating condition and equipment operators shall be knowledgeable in the use and care of the radios. Each Contractor site supervisor shall also maintain a secondary communication system compatible with the Representative's system. Brush Removal Guidelines • Small diameter brush and limbs (less than four inches in diameter) that will not cause damage if remobilized by high water will be cut into short lengths (five feet long or less) and left in place. All marked, dislodged or uprooted larger diameter brush will be removed from the channel or streambank and chipped in designated areas greater than 30-feet from the top of the bank. • Saplings and shrubs with an intact root system are not to be removed. P:\PolkCountyNortliCarol\327550\Pennits\PCN's_Polk_Complete\Polk_FinaIPCN_DSR_2_3_22\.4ttachmcnt 4\Dcbris Removal SOP final.doc 2 Tree Removal Guidelines • Trees will be chipped in designated areas greater than 30-feet from the top of the streambank. Chippers and/or tub grinders may be staged on-site with written consent from the property owner or at a central location approved by the County. • Larger diameter trees may be pulled to the chipper using a mechanized winch provided the process does not create excess disturbance to the streambank. • Marked trees whose near term fall is apparent should be cut at the marked location, which will be indicated by a painted ring around the trunk at least three- feet above the ground surface. The root system shall not be removed from the streambank. • As approved by the Representative, larger diameter trees that cannot be moved using hand equipment will be cut to manageable lengths and removed. • The sale of chips or firewood is not allowed. Foreign Debris and Trash Removal Guidelines • Foreign (manmade) debris and trash will be bagged in orange trash bags where possible. • Filled trash bags will be removed from the channel and transported directly offsite by the Contractor to the local landfill. • Large debris must be loaded into a dump truck or roll-off container and transported to the local landfill for disposal. • Local landfill is located at McDowell County Landfill. Tipping fees are $ 32/ton, which shall be paid by the Contractor. Stream bed and Bank Repair Guidelines • All temporary stream crossings shall be installed as described in Figures 15 -18 (Attachment 1). • All Stream embankments disturbed by Contractor activities, denuded, or left bare as a result of debris removal shall be regraded, planted, and erosion control fabric installed as described in Figures 6, 7, and 9 -12 (Attachment 1). • Temporary staging, chipping, and work access points shall be regraded and grassed using a native grass/herb mix as outlined in Figures 6, 7, and 16 -18 (Attachment 1). P:\PolkCountyNortliCarol\327550\Permits\PCN's_Polk_Complcte\Polk_FinaIPCN_DSR_2_3_22\Attachment 4\Dcbris Removal SOP final.doc 3 Contractor shall install erosion control measures as outlined in Figures 10 -18. SUPERINTENDENCE OF EQUIPMENT AND WORK CREWS Any contractor providing three (3) or more pieces of equipment or five (5) or more work crew or equipment operators shall provide a non-working crew superintendent in addition to the required laborers and operators. The contractor shall designate in writing the names of the crew superintendent and an alternate prior to award of the contract. The crew superintendent shall provide on-site supervision of work crews and equipment operators. The crew superintendent shall be responsible for the safety of work crews and for the location and servicing of portable sanitary facilities. He/she shall be equipped with a portable communication as specified above. The crew superintendent shall communicate with the Representative to assure that work crews and equipment are performing at a satisfactory level. The crew Superintendent shall coordinate with the Representative to schedule equipment and operators for each days work and as far in advance as possible. The superintendent shall be responsible for keeping up with the daily operating times of all work crews and equipment and shall maintain a log of daily equipment and work crew operations. He/she shall coordinate daily with the Representative to concur on actual footage of streambank cleared. WORK DIRECTION Contractors and equipment operators will not perform activities requested or instructed by landowners or others at the worksite, except as confirmed by the assigned Representative. ENVIRONMENTAL CONSIDERATIONS Earth moving equipment will cross and operate in the stream flow only when necessary and only when directed to do so by the Representative. Equipment shall be maintained to prevent fuel, oil and lubricant spills in the vicinity of the stream. Refueling, repairs and lubrication will be performed at safe distances from the stream and only at locations approved by the Representative. Should fuel leaks, oil leakages or hydraulic pipe rupture occur during construction, the operators will immediately remove the equipment to a "safe" area and proceed with repairs. The Representative will direct operators to remove equipment from the stream whenever a leak is observed or suspected. P:\PolkCountyNortliCarol\327550\Pennits\PCN's_Polk_Complcte\Polk_FiiialPCN_DSR_2_3_22\Attachlnent 4\Debris Removal SOP final.doc 4 SAFETY Contractor shall be responsible for the safe execution of this work and conform to all applicable state and federal regulations. Additionally, at work sites, where equipment will be operating on public roads, flagmen shall be stationed to warn oncoming traffic of congestion, construction road signs shall be in place and a means of removing sediment, mud or rocks from roadways shall be established. Residue deposited on roadways may be removed by sweep machine, manual sweeping methods or pressurized water. The contractor will be responsible for the implementation of these measures. Chain saw operators will be expected to perform debris removal operations during periods of extreme weather conditions and in areas of deep and fast moving water. The contractor is responsible for providing the necessary equipment, clothing and other gear to insure that laborers can perform effectively and safely under these conditions. The Contractor shall determine if working conditions are hazardous and/or of sufficient extreme to prevent efficient and effective operation. When such conditions exist, the Contractor shall shut down work crews until conditions improve. EQUIPMENT Equipment selection to complete the work is the Contractor's responsibility. The following list of equipment has been utilized on similar debris removal projects and is provided as a courtesy to the Contractor. This is not a requirement. Item No.1 Hydraulic Track Mounted Excavator with Experienced Operator Min. Weight 48,000 lbs Min. Reach 26 feet Min. Digging depth 22 feet Equipped with thumb Min. Bucket size 1.0 cu yds. Equipped with two-way radio Min Horse Power 140 HP Item No. 2 Skidder with Experienced Operator and Two Helpers Rubber Tired with Winch and Blade Min Horse Power 80HP Min. Winch Cable Wire Rope -150 ft and 5/8 inch diameter Min Chokers: 4 with 2 Chain saws Min. 20-inch bars with daily supply of sharpened chains (min. 3 chains) Equipped with two-way radio Item No. 3 Dump Truck with Experienced Driver Rear dump haul truck tandem axle min. Capacity -15 tons equipped with two-way radio P:\PolkCountyNorthCaro 1\327550\Penuits\PCN's_Polk_Coinplcte\Polk_FinalPCN_DSR_2_3_22\Attachment 4\Debris Removal SOP final.doc 5 Item No. 4 Chipper 14-inch capacity Tub Grinder 8-foot interior tub diameter P:\PolkCountyNorthCarol\327550\Permits\PCN's_Polk_Complcte\Polk_FinaIPCN_DSR_2_3_22\Attachment 4\Debris Removal SOP final.doc f x [Fwd: [Fwd: [Fwd: STream Clearing Activities]]] Subject: [Fwd: [Fwd: [Fwd: STream Clearing Activities]]] From: Cyndi Karoly <cyndi.karoly@ncmail.net> Date: Wed, 16 Mar 2005 15:58:57 -0500 To: Laurie J Dennison <Laurie. J.D enni son@ncmail.net> fyi - so please note that fees are waived when you create these files - perhaps a brief handwritten note in the file jacket, or we can add a copy of this message Subject: [Fwd: [Fwd: STream Clearing Activities]] From: Tom Reeder <tom.reeder@ncmail.net> Date: Wed, 16 Mar 2005 15:43:18 -0500 To: Cyndi Karoly <cyndi.karoly@ncmail.net> Cyndi - In answer to your question yesterday it appears that the fees are being waived for the EWP associated 401s. Subject: [Fwd: STream Clearing Activities] From: Alan Klimek <alan.klimek@ncmail.net> Date: Wed, 16 Mar 2005 15:37:40 -0500 To: Tom Reeder <Tom.Reeder@ncmail.net> Yes, the fees are being waived. See attachment. Alan -------- Original Message -------- Subject:STream Clearing Activities Date:Mon, 28 Feb 2005 09:40:08 -0500 From:"Robin W. Smith" <robin.w.smith@ncmail.net> Organization:NC DENR To:Alan Klimek <Alan.Klimelc@ncmail.net>, Jim Simons <Jim.Simonsnncmail.net>, David Vogel <David.VogeI(a%ncmail. net> CC:Johanna Reese <Johanna.Reesepncmai 1. net>, Nann Guthrie <Nann.Guthrie .ncmail.net> `A`ll: Attached is an electronic copy of the letter and information sheet sent to the 19 counties and one town that have contracts with NRCS for stream clearing projects. Those letters went out over the Secretary's signature on Friday. We will hand-deliver a memo containing the same basic information to the mountain area legislators tomorrow. We are also working with the Governor's office on a news release; I am not sure how soon that will go out. Give me a call if you have any questions. Thanks for working toward getting meetings set up. Robin. 1 of 2 3/17/2005 6:46 AM [Fwd: [Fwd: [Fwd: STream Clearing Activities]]] Robin W. Smith <robin.w.smith(q-),ncmail.net> Assistant Secretary of Planning & Policy Office of the Secretary NC DENR Content-Type: message/rfc822 [Fwd: [Fwd: STream Clearing Activities]] Content-Encoding: 7bit Content-Type: message/rfc822 [Fwd: STream Clearing Activities], Content-Encoding: 7bit Content-Type: application/msword EWP letter to counties.doc' Content-Encoding: base64 Content-Type: application/msword Stream-Clearing Activities-3.doe Content-Encoding: base64 2 of 2 3/17/2005 6:46 AM i February 25, 2005 Page 1 of 2 February 25, 2005 RE: Emergency Watershed Protection Stream-Clearing Projects Dear I know that County experienced stream damage as a result of the fall hurricanes. Our department would like to work closely with your county to insure that stream restoration projects receiving state and federal funds under the Emergency Watershed Protection (EWP) program move as smoothly as possible through the environmental review and permitting process. I have enclosed for your information a brief summary of the types of permits and approvals that may be required for these projects. For projects that involve work directly affecting the streambed, the United States Army Corps of Engineers will be the primary environmental permitting agency. For those projects, our staff in the Division of Water Quality and the Division of Land Resources play a supporting role and issue related state approvals. I have asked our staff to meet with all of the western counties, either individually or in small groups, to talk about each county's proposed stream restoration projects and answer your questions about permit requirements. Our staff will ask the Corps of Engineers and Soil and Water Conservation staff to join in those meetings in an effort to put together a plan of action for reviewing and approving stream restoration projects as quickly as possible. You should receive a telephone call from DENR staff soon to talk about a date and time that would be convenient to meet and talk about your projects. I have also directed our staff to waive fees for state water quality certifications (under Section 401 of the Clean Water Act) and for approval of erosion and sedimentation I February 25, 2005 Page 2 of 2 control plans for stream-clearing projects funded under EWP. Fees will be waived for all EWP pen-nit s requested by September 1, 2005. I hope these efforts will ease the burden on county governments already challenged by the demands of reconstruction and recovery. If we can help you in any other way, please do not hesitate to call. I have asked Assistant Secretary Robin Smith to be a' primary contact on these projects for DENR; you can reach Ms. Smith at (919) 715-4141. The enclosed information sheet also provides contact information for DENR staff in both the Asheville and Winston-Salem Regional Offices and for the Corps of Engineers office in Asheville. Sincerely, William G. Ross, Jr. Q-? F Certification of Com letiox? RED DWQ Project No.: 05-1151 County: Polk County, NC Applicant: Michael Talbert/ County Manager Project Name: White Oak Creek EWP (DSR 2005-7.& 8) Date of issuance of Wetland Permit: Jul 5 20 Certificate of Com letion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wctlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401. Water Quality Certification and duffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification 1? hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I, Mike Osborne as a duly registered Professional Engineer (i.c., n' ccr, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe ically, s; du ar e weekly, full time) the construction of the project, for the Pennittee hereby state that, to the best of my abi.lferiod and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and -intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Z &/V J-A'Registration No. Z 7 5 / t? Date l 2- -70-0 LEGEND - BANK FULL A BANKFULL BENCH PLANTED \ Q lOW FLOW ~ 10-FOOT SPACINGS WITH ASSORTED SHRUBS FROM 0 TABLE BELOW AND WETLAND L SEED MIX ~ ~ ~ O POOL 1 Q , ~ ~ RIFFLE ~ BANKS ~ zO ----L--~--~-- ~ z POOL 3 O - - N 0 B ' M AN R WI TH N 30 E DE D ~ w Q PLAN CROSS SECTIONS U ~ w w Z~Z a 0 J a -WQ J N ° •J w ~ THALWEG ~ Y ~ ~ l~ ~ W ~ w I- Q O o / w O w ~ O ° I- W r ~ ~ _ ~ ~ J ~F / THALWEG P~ i ~ Z 8 ~ .i' ~ J Q ~ (n O w a' ~ I- ~ ~ W -~NZ - - ~ ° Z QOW ~ ' 3 ~ a o ~I~m - ~ - Z RIFFLE ~ 0 / - ~7 ~ } U Z J _ G~10E RAN - Z POOL o Z ~ a - w POOL Lt1 Z J N W W Q U a a ~ 0 DISTANCE ALONG CHANNEL ~ ~ ~ LL ~ - A PROFILE 0 D Z JUN 2 3 200 \ ~ DENR - ~JA7ER gUA61TY TYPICAL RECONSTRUCTED MEANDER DETAIL \ LARDS IuNb Sl'ORMWATER BRANCH O ~T ~ J ~ ~ ~ ~ td Q ~ o0 EROSION CONTROL MAT OUTSIDE PROBABLE DESIGN CRITERIA FOR TAE PROPOSED CHANNEL 1 OF MEANDER TO BE PLANTED WITH TWO ROWS OF SINIGRA LIVE PARAMETER CRITERIA STAKES ® 3' X 3' SPACINGS, pr,~, 0.06 (35 Acre Post-Conshuction) W PLANT NAME COMMON NAME Abkf(sq. ft.) 1.2 1 r Wbkf (ft) 4.0 J Z Adnus serrulata Tag Alder Db~(ft.) 03 i ~ V Cephalanthus occidentalis Buttonbush Qbkf (cfs) 1.1 Q SCALE. 1 10 V) w Corpus amomum Silky Dogwood V el (mss) 0.9 J a V s ~~ft) 0.0029 W - EXISTING GRADE EXISTING CHANNEL ~ w Lindera benzoin Spicebush WS (g/ft) 0.0024 ~ Exisrwc J W Q 2__ _ _ ~ _ _ _ I v W Salix nigra Black Willow Rc (ft) 10 \ 2 1 2q SLOPE W blt eft) 30 1 SHEET N0, Yaccinium corym6osum Highbush blueberry M~ g ~ 1 Lm 50 4' Sinuosity 1.2 Wgpa (ft) 42 40' ER 10 TYPICAL SHRUBS 1~SEVALUESWII,LBEVERIFIEDUSINGAREFERENCE SCALE; 1" = 10' REACH. THESE VALUES BASED ON REGIONAL CURVES DIMENSIONS AND WILLItYM'S EQUATIONS. _ _ _ ~r:MCE_Rii~r ,1~cP15fdIE ~TAidCnFl~° File I ,.'1355 Fr~al,ni~f ur~o 1 ~7uii. ,ire ~ ,~u5~ n i's~i ul: VJcI ',;lart Fern ,tii~]\,~ ,a,~'-~na~ _ I'I °i'i ~FT_F C~'~~ ~ I I t ~ - _ v .1; 1 / ~ Ill~i;`! ' ~ ~ 'r~'~wl SEE NOTES REGUARDING :GUARDING ' `I v , loll},I ~ / ~ I ~l MEP ACTUAL CHANNEL ALIGN IljliE! i r, 1 - ~ _ - NEL ALIGNMENT ,,.~Frt, _ r US HWY 25 ~ 81NC 24 li "P°' it ~ I ~ . ! ~ ~(i 1 < ! ~ i , Ih,i~~~~ I~ ~ , ~ ~ 0~ . ' I~n.,lli vv ~ v ~ G ~ s r . fi. r, ,r ~ l~, ~ ~ ~ ~~a, t ! y I r T~ rr IJI~;llli ~ ~j IV ~ 1i, ~ ~ r ' 1 ~ 7 ~rK /r ~ r ~ A / ~ ~ o'er / .9 ~J U , r r; r S 0 1 I ' vv ~ , h;' ti ~l Ijlill,l+ v~ r ~ ~ v II ` 1 I I i 30 f~C ~ 1 1 n l~ / ~ ~ j ii,~ i I r 8x5 ` BOX CUL~/ff2T ; ,j ! ~ 5~ ~ ~ l ~ l l i l ,I 30~` RCP vv ~ ~ ~ ~t EMSEDED 1.0 _ ~ , rj t I r ~ I 111111 i l 1 ~ ~ _ 10 PVC ° Irt~ ~;f lli ~ ~ _ ~rrl t ~ ~ ~ ~ Yr/r ~ ~l:llli;l 1 i~~ ~ ~____s I;~ ~ f 1 ~ ~I ~I, l ~ MIN.) i , ly~l , r~ rl l rr~ii ~ ? „ r ` , a., /fir i It Q ~ r~,,r C I III}i l 1 ~ ~ ~ . ~ 1 Il r~ ~l ~ / ~V`. rri l i I ~ ~ err t ~~'il ~ 9~ ~ ,I~ iw \ r .i~ill(~ I,~;IIi3 ~ ~ t )r~la,l11 ~ l I 90 ~ ~r~"r 'r ' y ~ I I' l l l ~ ~ ~l l~ ll~"'r' ~ n ~ u.,. A / ~ li i'~ A r. ~ ~ ~r~ , ~ ~ ~ ~ r ~ ~ K. ~ (1 I ,Ili 'I f I!, l,l!!` `4 Ij ,1~( ~ ~ v !lj I)f1,, it ~ Ili 111 ~ ~ 'r11 (1,l llii~. 22 i ,i I ~ _~~--~~y ~ ~Ir~!,' , ti 0, \ / / I \ r' \ ~ i ~ lr I ? ~ ~ ~ l~ r ~ lr II I i ~ 1 ~ `ff ,r+ 11111 ~ ~ iF~~ - ~ LI+~ y,, , ; I± i l l l i l l t ~ S~ 1 i~ f f r'r ~ , ~ it l III 1 ~ ` bll~l~ lr~ ~ . I . I , ~ . ~ 1 ~ 24 24 ~ _ ~~rr„ r r~ , 1'i1l'i ~ rr r y' I 1 I \ M1a~\ ':'I I!~! f r I c~` tt E1 X111, 1 ~ ,1~ t 'i rrrr ~ ~ ~ r~r r r t i jil}I ~f ` ~ ~ ~,I'? ~ I,II,,f, , i ~ A ~ ~ ,i ~V r~lrrr 1 IIII"II i 1 ~ ~ ~~i~. U`~ ~ _ ~ rrr rr , ' l ? ~ ~r,rrrr ~r ~ I l i I I 1 I ~ 1 ~ ~ ~ ~ vV - _ ~ I'i~illl 1 4 i` ~ I 1 ~ c~ ~ ~ I I' I I I I I U / ~y D ~ 1 1, yy i v 1~ ~ ~ , r ry l , ~ / 'Y 1 ~ 1: 11 1 ~ 1 ~ i ~ ~ ,1 , o ~ 1 I i I l " ,i ~ r~ r VICINI MAP ~ ~ r rrrr (NOT 0 SCALD , ' I ~~fl I 11,;11 I ~ ~ ! ( \ 1 ~ + ' 1 ~ r rrrr /rr ~r~ l~;ill i ~ ti ~ ~;M~.> ; ~,f r r 1 ~ ° i ~ r' _ f I ,I~!1I o ~ 1. 4, 22 ~ i r , 12 PVC @1.00% ~ , , \ ;I 111 1 ; ? ~ I h I I I i MI l i 1 _ r r ~ ~ r ~ N ,~i~,; I 1 I 1 ~tl rrr EE NOTES REGUARDING C, 1 I i I~ I+~' ~ ~ 1 ~ ~l I f' I ~ I~~ / 1 r/r l~s~ i CTUAL CF3ANNEL ALIGNMENT ~ rrr M l l l i i ~ a~;~~. d r'i, r^> , ~ , ~ ~ r ~ » i li 1. y l l I / t t J{ zY.,, r ~ r ~ r r / r / / ~~7 _ r rr~~ r ~h u I , ~ d r; r rrir _ ~ .r U (n r rrr ,rrrr / ~ ` ~ ~ ' Q 11 11 - 12" PVC @1.00% IIiI' ~ l ` U ~ i~~ 1~ l' N. 1 ,F~V 1.00 ~ `v I ~ rr rr, 1, 11 / ~ _ ~ ~ i ~I ,I, , ~~4P) ~ I11}}~I W ~ PROPOSED WAL-MART ' (I?~'~ ` ~ o r rrr r l-_-, ~ ,Ilil~l ~ o ~'v. ~ t r rrr ~ ~ _ t rrr rrrJ r riri ~ `~.i"~w~ , r W Q ~'lil,;, ~ SUPERCENTER ~ ? ,;1;,,111 I -o ~ ~ ~rr,r r,r ~ WY I~ill'li~'~ C-195-SGR-OR r' ~ t ~ f ;'r r rr'r~ ~ ~ RI ~ ~ r ~r/l r r, it "~q W ~ III ~ 22 ~ 111 I, i i f I ~ ~v l ~ ~ 1 ~ l",~ ~ % rrr %!rrrr ~ ~ ~ - ~ ~ 203 819 ~5F` v_ I I f ~ ,v , ~ .d 23 i I~' lif II O 1 ,,r~ I ~,t ~ r r~,, ~ f W F.F.E- 24.00 , ~ ~ ~ j U'~rr / IJ~r ~ ` l I f i iy r f ~ ' J IN i ~ D 'Il}1111 si f 1 , D ~ 1 ,rrr _ r I r e„~'~ Q r,,r'hrr , ~ J ,f,~l _ ~ , ~ ~ r r /J ~ - 'rl~,,' ~riryr PROJECT LIMITS ~ r, ~ ~ I '1,1,111 w ~ t t rrrrr Q rr trrl , ~ Z r ~ > r Q fr rr ~ r, ~ ~I11~ a . ~ ~ 1! ~ II{I1~ U k v" l tJ J lG1 ~ T° , t ~ ~ V ~ O i'I 'IIII I ~ I 1 ~-z'f~~..._ , i~ ~'~;~'r , t + W ~ ~ r ,.r V' s'~ ~1 1 W ~ I j i I`~ ° ALL DOWN SPOUTS TO BE ~ r~ i r. Ili'~`j ~ ~ ~ ~ '1 1 ~ r ~ y~~r ~ >rr~~~~ ~ ~ O Z N Z i~ ~ ~'r,f r.` rrrra ~ ~ ~ ' Q W ~ r' ` GJ ~~~r 1' ~ ~ I I I I i ~i PVCIHDPE @ 1.00% MIN., i ' ~ .t t o ~~m r j ~jJ + ~ ' ~ III ! 1 ~ 1 SIZED AS NOTED i i r v ~ I l~ I ~ ~ r rv ~ r~'rr r 4r ; ~ r e\ r i i; f ~ ~ ~ ~ ` , \ I~~I / l\~ \ ,,;rr , LEGEND: ~ Z ,Iii I ' J ~ ' 1 , ~1 I- I I I 1 I I ~ i-0 \ ;r~,'rr ~ D 0 i =V_ r~~~~ lr~~{~ ~ ~ t ~ ` Il j (IIII I ~ I, d ~ ~ ;rrrr !ur GROUNDWATER ~ r; } r ' 1111111 ~ ~ ~ U ',r, i ll l l ~ . r~ r, r , %"~~'r MONITORING WELL ~ ~ ` ? Z J U r' r` r r /rli' i ~ ~ c>'- ~~Il,l~ ~ r t , rf rry - ` ~ ~ Z rr ~~'r;ti ~ - ~ . ~ rrr. r, ry EDGE OF FLOODWAY O I ~ I I ~ ~ ,1 I a I U / Air 1 '~~/I ~rj ; ~ ~ ~ 'f I FPS ~ ! F ~ ~ ~ ~ ~ 22 ' , , , !l rq,rrrr r ~ % ~ ' ;rr r/,r,~rr CENTERLINE r , ~ ~ . ~y W Z rrl(F/ ~ 1 ~ t LL 1 I i I f ~ A AAA ~ ~ - ~ ~ \ \'r O I ~ ~ . ^1 ~ 1 1 1 l l I Q r ~ ~ ~ M 1, ~ ,rr r ~ 1 ~ Q r ,r ~ - - r ~ 1 / , }IG1'I .i t,, ..~x ~ tr r i ~ + ? ` ' ~ ` LU ~,,rr I STREAM IMAPCT ~ ~ ~ , O U r,r a a ,,-r'a r~'"'r , 0.20 ACRES j ' 1 ~ ;~~11 II,i',I - ' ` I II i ~ r' r~ f r ~'r7 ~ _ ~ I ~y r r r l r /r~ ~ LL `IIII r i _ ~ ~ f 111!1 +Ii I; r _ e !lt rri 1 rrrU ~ - - c ~ O .I WETLAND IMPACT ~ / ? r y d 1111,1 ~ - ~ ~ r 'irri ~ ~ilill, 0 .-ii/ ! tidy" ~ r~ / ~/f~ . ,r` r'~ ~o- rr rr ~ ~ I (0.20 ACRES) LL ,r/t; q r,, I- V ~r~. rrr r. r, ir~rrr ` WETLAND MITIGATION AREA t~ t ~ 1 ' i l f 1 / ?w:+,r^J • ~ ~ ` ~ , Sri i~ l ,rr r ,r 1 , Z r 3. ~hr;! ~ (0.30 ACRES, EXCLUDING ' ~ I I I ~ ~ / I 't l fs•r, / ~ r rrrr.. CHANNEL) ` ~ k III I ~ l ~ / 11 l////'// ~ ' t s ,Ja f~ i 1 ~ 1 I / lii ll I s' ~ ~ 11 ~ ~ ir" r f~,l ' t ~h'r r , ~ ~ JUN 2 3 ?_005 'fi'r i ,t ~ ~ ` ` r, ~ ~ ~ , APPROXIMATE LOCATION ; ~ .'r !r ~ ~ ~ ~ ~ ~ DENR • 4VAf~R (3UALITY , II}1} ~ . ~ ~ 1 l " I~ OF WETLANDS t ~ I H O ~r r r , rf 'WETLANDS AND STORf~VAI'ER 8 r r III ~ } „ ~ ??r "~,r'~W/ ~ I ` ,llt t ~ l ' 1 i ~ l l ! I 12 PV 1,00% i/`° _ ~ ~~v`,.._- - i / ~ t r . t i l , I I ~ I I~ @ ~i ~/i%, ~ .h .°.°`4 ~ r l ill r r , ~ ~ (TO BE SURVEYED) ~ ~ ~~t , ~ 10 PVC 1.00 ~ ,lrl i t i 1!'1111 (MIN.) r I ~i~ III} 2 _ / . ~.i•~ (MIN.) ~ ~ ~ / ~ r' ~ _ j ~ , ~ r VL- 1,695 r t ~ ~ , ; I r trll ~ w ~ ~ i4 / ii - r , l , I ~fi, : may,.,- CP 2 , ~ ~ - SL= 1,988 r Q I l t i LI,IrII d 3 R, i' 00 r ' %,-W"rW' 7 ~ a~ K= ~ _ _ 1.17 ~ f r IIi~~ t l - O I l/1 , l w. ~ t } lr, J . . ~,r,-~ ` ; 1 ~ 111 ? ? ~ ~ 1 illr l •*t ..,.ti`•+'! I l l l l l l ACA „ u ~ ~ I ,ili~/ I/ v 1111,11 1 r ? ~ 10 PVC @1.00/ E~ i ~ rt,~ , lr NOTE: Il~,j~l± (MIN.) ~ it 4 ~ l i l l~ ~ rW , , i,, ~ .,r, , 1. BASE GRADING PLAN PROVIDED BY ~ ~ t ; , ~w~~ ~ ~ y ~ ~ FREELAND AND KAUFMAN DATED , ' ~ ~ SEE NOTES REGUARDING J 1 ,~~r ;II,s, ~ ~~"~;1~~`~ti 5 24 05. ~ ` ~ ' ACTUAL CHANNEL G ~ 11~1i~flil i / ~ 30"R r~~~. 2 ~ ' ALIGNMENT ~ ~ ~ ~ r'` 1 ~ e,, i ~ it ~ l _ ~ ~I~~ ~ t ~ ` , 2. FINAL CHANNEL AND CULVERT SIZING ~ I I' i I 1 i I. 30 ~ rl rrl ~ l , I! ? ti ~ ` R F R NCE REACH ~,y, ; I'~ Z ~ ~ WILL BE BASED ON E E E r4,f r ~ Illillll ~ ~ ~°v l , o ~ I Ilil 1 / ~ i r,>;Il M i ill, I„ill 1 1 ~ r r~--_._ ~1 i /,I fl~i t_ ~ AND DETAILED HYDRAULIC ANALYSIS. ; r ; ~'~rr , t 1 IlIl;il~ll I ~ J ~ ~ f 1l fit/ I ~ ,1,1,1 ~a / 1/ ! e° R 0 ~ / rt / 7~ }x,411". \ r 0 l ' ~t/i I Ijlltl 3. TH ANKFULL POSITION SHOWN HERE ~ E B rri 4 ~ IS APPROXIMATE AND WILL BE ,~'rrti ' w .l ill I I lil I t_. _ VALIDATED AND FINALIZED BASED ON r I 'll~lj 20 i I ~ , l ~ _ SIDE SLOPE 3:1 _ + ~ f`f ~ ~ ~ 1 r „f - f PROPERTY LINE ~ REFERENCE REACH DATA. r t r ~ I j' ~ I 1 SIDE SLOPE ~ ' ' j ~';'i1 / P f> 1 W J , ~~111! ~ i C I ~ !III I _ /r j /l ,t l _ E LLI Q / 4.,, ~ ~ ! I', i I I tl!! II` , / . ' ° r I i w. / ~ f Mme, \ ~ ~ I i I / IIII I ° Jl1/ ,r-`~.._„_ 11,11, Ailfl I E I , I . -i ! ~ if id r ~ IIII' ! ~ ! ~ ,r ~'~°-BOTTOM OF`PO~D,EL~V, - .n...~ ~~,~,,,rt~ f ~ r' SHEET NO ~ a F , ti , BOTTOM OF POND ELEV. - /t%/ ! r/, i Ill , FOREBAY ~ r~-~q.~ l 1~,~ i 4 I I' I 1 , I -13.00 3 RCP - r,`il ~ / , ~ . ~ d 1,1 I 1 l I INV:13.00 INV:13.00 ~ ,f l ,F • , \ III I ~ ~ f~~ r~' ' ~ vav I{ ~ I I rl t 1 t a, ~ ~ ~Si _ , ~ „ ~ ~ ~ V , i 1~ b* 1 ,I;~I 1 ~ ~ ~ ~ . I l ~ ~ 20 ~ ~ \ 0~~~'~, 'il; 1111 t ~ t ~ , I,i, i ~ 1 / !t I' I } ~ A A ,~,L ~ . X1.5 r SIDE SLOPE 3:1 i t, r r ~ ' icQ~l SIDE SLOPE 3:1 ~ ~ ,s 1 ~ t i ;li~ ~ t ~ ~ ill'' •``a ` ~i lp r'~ 30 0 30 60 I I I~~ ~'f l vv ~fr ! t l s 1 i i IIII`( ~ t i /I it ~ ~ ~ I' W„ ~`e l i ~Nr / ~ ~ ~ , ~k ~ n i i I ill r' ~ \ f l r ` ~ I l l i~l r 1' r ! ti ~ SCALE: 1 = 60 i ~ , ~ ~ ~ f it ~ - I i < „ ~ ~ - ~ ~ ~ - di'~~ `"v l-fvlart Pern',itt~-~- ;c;J;J`r~r~{I r~ F J ~i~ t _~~.~I,L~_F.~.i I•-~:PI~~LL ~I~PIL„R(JY ru- _ Fr ~~a{~d .u~~ I ~ul.iiun n ~ , LAS Ju~_ ~ . _ _.F'~_~ E _~tl_ UVr~ ar: i. ~ ~r:~~ ~ir~~ Li ;.,w~u 1 4' I III I ! q 4 i.J~ ji{1111! r,__ ~ !,~~w;l SEE NOTES REGUARDING , r * vl, ZDING , 1!111!1 1 / r ? il~) ,'f ACTUAL CHANNEL ALIGNMENT ii, I ~ ALIGNMENT 1,11 ! I - ~ US H WY 2581NC 24 rsl 1~1~~{i; i I' 111CPP ~1 - ~ ~ I \ ~ i__ ~ T! \ 1 ~ ~'v III I ~ ~ l i ~ l li r ~ A ~ ~ ~ r ~ ~ ~ ~ 0,~ .E , ~ _ ,1 A r ~ ` ~ 1 / y'~y Iljlllj~', 1 ! ~ II;"'{Ir 1 1 \ !1 ~I~I I r I~ ` ;'f' 1 I~IjIIl~lli ` I 1~ rr / ijijll!11 ` Ll rH ; ~y ~ 0 r ~ A f' ~ / ,1,~ , / S r . J I . y , ~i 1111111 ` A $ x5` BOX CUL`IfRT , ,r, ,r 5~ N 1I ; I I ^ RCP \ t ~ '~Irll ~ t .1i 30 \ ~ tf~ / !1 ~ ~ ~ EMQEflED 1.0 w~ r i ~ Jrt ~ - ~ / I 111111 I ~ ~ i ' . ~ ~ ,ii r v I I ~ I I I l I ~ I % ~ _ 10" PVC ° - i'j c f' ~ ~ ~ ~ ~ rl ! 1 ~ ii ~I II;III I y `--s- MIN. ~t, 11 ` ? ~ ~ . Ji; ! ~ ~ PI111 r ~t z. I{;{~: jIl a{l, ~ ~ ~t IJJ 1 J~ ~ ° ~ ` ~r / 1 ,~r~/ ~ K' 9 ! ~ y. ! 111' Ij!Illly~ ~ ryr~';Ij~~l,!i1{ o 3 I!')IIII 1`11/~11('li~;l \ ~v ~ 'r ~ 1,{ { ,;1~,~1, ~ _ r,~r ~ ~ , _ 'A / ~ ~ ~ ~ ~ / k... X. I ,;i111 , ! I . " ~ 22 ~ ~ `~°y, '~'~1~,' ~ J r 1i' `II'I, i \ 1 li '1, , y1,~ - v" ~ rJ ~r/1~ r l1 I , i Y,+rl , r j1i1111 ~ ~ ~ r" r , 24 ~ ~ llrJl r t,~.. ~ _ r r ~ / 1..I I ~ ~ I! f? \ k i 1 1 1 1 1 \ 'C' \ \ l ~ 11, l 1. i I a,/; Jr! /I i i , { ~ I ' ~ IIII '~.Ii I 11 1 ~ \ 1{~i 1, l ~ \ ) r!l/ 1 r ~p r~rl li ~ li 11111,11 , 1 ~ I~tll: Uc ~ ~ 1 ilii~I ~ I A ~ ~ ~~I I~ ~ ~ ~ /i ~ r\ ~ _.i ~I rI' j!=1J ~ i r/ 1J ' JrrJ ~ . ~ (1111111 ~ i 1 ~ 1~,\ o ~ _ I I 1 I I I I j 1 a I`\ t~ I ~1 \ ~ ~ ~ \ 1 ~ I I I l l l I U 1 1 ~ 1 I ~'~1 \ ! \ ` r~ / VICINI 'MAP / 1 tint / //i , (NOT 0 SCALES ~ ' 1111111 I~ 1 o I S ,1 ~ I~IIIII ~ 0 11 / 1 ~ ' ~ I M ~ ~ ~ ~ ~ l 1 /l /r l,vl 1~ r 11111 1 I ! ) ! ~ ~ II I II I 1 ~ ~ • i 1~ ' l r lr r' 1 ! 1 / ~ / i I` 1 III ;III / 12" P)JC @1.00% ` ! 1 I ~4 22 LI,j11 1 I 1 i11~ ~ ~ ~ l 1/ ~ i 1 I r' y ~ _ ~ r i ~I {I 111 I , (MI~.) i ~ t. v ~ - 11~ ! 1 /1/ EE NOTES REGUARDING ~ N r ri / ~u• ~ ,I ; t ~;'l~ ~ I ' I t ~1; y ~ r;J ~ CTUAL CHANNEL ALIGNMENT 1 III {III i i ti - z"~. III ! ! I ! 1 r ' ~ i' ~'Y., ' ~ a~ r /r~ 1 ~ , ~ ~ N I ° i l' ~FQ I 2 1 1 1 ~l \ ~ ; 1~ ~d. ~r ~ , 1 r 1 a 4 t ~',1.1~ 12" PVC 1.00% 1 ~ ~ ~ ( JrJr( ~ ! ~ ~ @ e U I ; iii{1 ~ I i 1~;,;`i ~`A4lN) 1 ,~W 1.00 ~ ~ ~ 1 ,l/,/ ,~Ir/1 ~ ~ ; `V ~ ~ ! ! i 1,!11,! a ~ PROPOSED WAL-MART (I~• ~ ~ ~ ' ; ,Jr „'rr r ,~1 I{III I, ~ ~ `1 2 !/t jr ~ ~ ~ ~ ~ Z t - , ~ / ~ / J I~IIII! ~ ~ SUPERCENTER ~ 1 1 ,Q ~ ~i ~ . ~ ~ t I~Illlill ,lr rr! 1 ~tl .,l r J w i +II 11 i ~ ~ ~ 1 i I~ ~ C-195-SGR-OR ~ 1 s m~ ) ~r0_ ~ l ~;l ~ rr l ~ - Y ~ r r U? 'r ~ 1 ~1 r 1 i r ~ / ~ r ~ ~ ~ ' 1 ~ / i rr r1 s ~ ' ~ LLI 203 819~F~ !1 ~~1~ I ' r 23 l i I I ~ 1 1 YJ ~ ~ ~r~; i l / r / `'r,r i ~ ~ r° ! ~ ~ l,r r j/r; ~ ~ ~ 0 ~Ilillil FI ~ I ,1 ~ F.F.E- 24.00 U rj JI J 1 i ` ' ~ I ~ ~ LLB d i r, /I r l ~ A 1 111111 ! r' ~ 1 k I .i t ° r rrJ Q 1 r/ ll1 f, ~X ~ ~ J a J Ji Q 1/ . , , ^-I. ~ 1, r p r Jr:11 !I~~1,IIt ' ±27.62 A.C. t 11/ ~J I'll` 1,+//l ,JJi, PROJECT LIMITS r~` ~ , ~ ~5 ~ ~ '1'I~i;1 ~ 1 ~ I ~ll`~ Q' r/ 11 Q ~rJjlll ~ ~ ` ` k 'a / Q r ~ ~ ~ Z 1111 a 'l,fr ~~i f ~ ; f' ~ Q J r ,r/ ~ ~ O 0 '~~II1~ 1 ~ ~--~r±__-..._ 1 S ~ ~ ~ w ~ ~ I- I I ° ALL DOWN SPOUTS TO BE i ~ i ` _ r,;~i ? ,Ir3~, ~ ~ i , ~ w J ~ , ~~ti/ ~r ~Jr J~ ~ 1 , k~' 0 z N Z • f I I I I PVCIHDPE @ 1.00% MIN., I 1 IIII 1 1 1 ~ SIZED AS NOTED i l ~ r T 1 iIJ ~ ~C r,i ;i ~ d ~IU11 I 1 / 1 l i 'w; lI 1f ~ ~ , ~ 0 ~ ~ m 1111 1 D ! ~ 9 ~ r ~ , - m I I ~ ~ 1 t~~ ~ ! ~ LEGEND. ~ ~ , r~'/r`1 ~Jty ~ t I ~ \ ~ !"k I \ \ j1 ! ~ I ! Q ! /J Y ! i I~/,rl //'~e t ~ 1 Q ~ 1,y, r rJ~l' _ I. I I I I I I ~ a rr / ?Jl,! GROUNDWATER ~ C~ ~ Iljlil I ~ U ri ~,I I j ! 1 I ~ ` r ~ 1% l/r r ~r'rr~JJ MONITORING WELL ° , ~ ~ ` , . ~ Z U I r~ f I II ~ ~ I Ii IIfiII I I \ M / i l/ ~ / rr l ` Z ? ~ 9 ~ ~ ~ . I, ~ ~ 1 a ~ / / I ~ _ / / / EDGE OF FLOODWAY / / . 15 i'~ \ 1~,~ U I /l ' lr l /~~i~'~l CENTERLINE 1 i ' ` ~ . ; ~ ~ l it / 1 . ~ 1 ~ I { e , 1 V - ~ ` / I I. ~ ~ t4 ° 1 ~ j I I I I R / ~ M ~ ~ J, 1 I 1 ~ i ~ I / iii ur ! / r/`!/ ~ i / I . W Z VIII r t 1 / fr ; .r,, ; I I EAM IMAPCT ~ ~ ` . y . W 0 IIIIiIi r'-. / -_f ~ ~ ~ ~ I 1 I 1 ; tr ?r. I,rJ l _ r U r ~ 1 / 1 ~r _ ~ - - I (0.20 ACRES) Q. tl ~ I I I ~ / / l i I I I' j ~ ~ r ~lr, 1 i ~ ~ ~ / [r~ , ,rgi ; WETLAN ~ ~ O /ft~,,/, ;J/ I, ; •I D IMPACT ~ i I IIII, v ~ ~ r ~~C ~ ~/~~1-,t ~-',/l ,.rr.`l --'r /i 0.20 ACRES ~ d. ~ t1/,: ,rr ~ ~ III 11 ~ ;1 I ~ ~ . ~"r:s; ~ o i 7 rg;l/ ~i// ~ WETLAND MITIGATION AREA ~ _ 0 IIII 1 ~ ,r ~ ~ r/ 1 t ~ . ~ -r ~ < ` Z r ~ (0.30 ACRES, EXCLUDING ~ / / / 1 ~ ' . ~ i IIII i 1 ~ ~ 1 ~ ~ ~ / J ` CHANNEL ` r t 1 I I I I I I ~r~. ~ `Q~ ~ E l1/ / r~ ~ I I ~ y . ~ ~ ` 1 t y ~ ~l \ ~ Ill~ii, 1 , a ~~~R ~ ~ ~ f, ~ / r ~ ~ r t t , III 1 I i ~!R ~ ~ /l// " ~ APPROXIMATE LOCA ` ` ` ~ , 3~ TION V.. r ; ~ : ~ OF WETLANDS r ' k r i~ - ~"'~`^~"h;~,v{;t~r'A!crtbiiA~i~h Q I I 12 PV 1.00% ' ~ ~ ? r / , r r ~ TO BE SURVEYED ~ • rYtiLU~u4w ~ - ~ ( ) J - i I~ I I ~ I I ; I I (MIN.) ~ 10 PVC 1.00 _ i~/ / / ~ `i !111!111 2 r ~ r (MIN.) \ fyi / 1 ~ VL- 1,695 1 'N~ .R i ,`~1 r i ~ ~ ; r \ I I I 1~ ~'~'~r/'r i i \ i ~ 22 ~ xti ? rr I 1 i I! I ~ ~ 1 ~„',-;may r ~ o ~ ~ / ~ I t w sL= ~p f 1,988 ; 0 r w~ Q ` w'• 0 0 1111,11 ~ ~ r' 1 1 r / ~ 1.17 ~ I I I ~ ~ I ' . b ~ , r-rl l r ~ - ~ , II~!III ~ c , I I IIII I . - A v 10 PVC @1.00 v ~ ,~'~ii/ r : - NOTE: ; c ~ I,;IIIi ~ (MIN.) ~ \ / , 'cJ I~ ~ I -i v ~ \ /t f/t r/i{ I ~ II ,s , \ u~, / / BASE GRADING PLAN PROVIDED BY ~ ~ ; ; , ~ FRE D ~ II!Ils~j I! IIl11Ifl r / - v ~P vv ~ , ELAND AND KAUFMAN DATED ' SEE NOTES REG I~ -w~, ~ UARDING .J l o l l r ~ \ 3!~ ~ I ~ ' ACTUAL CHANNEL .I. ~ ~ . a ~ I~1,~ / / 30' rllr U I I X111 II,. ~ ~ ~ / ~ ALIGNMENT ! 2. FINAL CHANNEL AND CULVERT SIZING ' ~`y~ t` ~ ,4 111IIIIII', \ ~ ' ~ WILL B ~ ,i~ t , E BASED ON REFERENCE REACH , ~ IIIIIIII ~ ~ ~ti ° i 1 II, \ ~ ~ hJr1/ M /1, I y III I I I \ , r, 1 r Irl ll/ t.._ i / Z ~ AND DETAILED HYDRAULIC ANALYSIS. ; ry`;' 'i ~ ~ , ~ r , /,r , , ~ II~1~}- 3. THE BANKFULL P ' ~ OSITION SHOWN HERE ` , , / ,r , Q I, I I II111 I - - ~ ' IS APPROXIMATE AND WILL BE ! I ir` ' . _ _ VALIDATED A rf ,,lr w ' J 111111 ~ 1 20 I! I I I I I I I _ SIDE SLOPE 3:1 1 ~ ~ r I ND FINALIZED BASED ON / / W ~ , ' r / F- REF R - i''~ _ , E ENCE REACH DATA. , , ; ~ PROPERTY LINE ~ .I I w i' I i ; SIDE SLOPE - ' r J .II, 111;1 ~ ~ / N r. ~ ! I - i I I ,III I ! /i/i ~ . i Q 1j,III , - r /ill ~ r _ / I ~ rl - I I ~ ~ / ; ~ i ' ~ r I / ~l i U - ~ i' II' _ _ II j' ~ I I -I - ~ i ~~BQTTOMbF 1 ~ BOTTOM OF POND ELEV. Pf~IVAFl~~/. - y ~ t lrl , ~ --ti..._._.'~ ,~~•:rrrJ SHEET NO. I i l 1 I' I FOREBAY _ III -13.00 13.E - '~\,////r . ~ I II 1 RCP rr// ~ ~ ~ I I / ~ ri ~ t i ~ I I I ! /r INV:1 I INV:13.00 INV:13.00 ~"i It c~ i 1111 1 ~ I ~ ~ '``O. I I I 1 ~ ~ / I / v ~ ~ ~ ~ \ 9 \ ~ IIII / I 20 / % i~ ^e ~ ~ A~ ~ '~'\~A I~ ~ / a 1111 I .ti) IIII / ~ 1 //l 1. +~a 111 I 1 _ ~ i ~ . = ti ~r . i t 115 r . . fr I IcFFI - , . SIDE SLOPE 3:1 / r / ~ • ~ r- I 1{ I 1 SIDE SLOPE 3:1 c e _ I l ~ 1~ ~'b III 1 / ~ ,r / / I' l l ! ~ I r t 1 ~ r III I ~ / / ~ I III ~ 1 / / l I ~ 1 ~ j ~ , r,. ~ , ti Il~lil ~ r 1 I 1 f Il~~i~ ~ 1~1 t~ ! / ) _ ~ , ~ i , ~ ~ , , ~ SCALE: 1 = 60 I LEGEND - BANK FULL A BANKFULL BENCH PLANTED \ Q LOW FLOW ~ 10-FOOT SPACINGS WITH ASSORTED SHRUBS FROM ~ U TABLE BELOW AND WETLAND SEED MIX N - O POOL ~ Q . ~ ~ RIFFLE BANKS / O _._z ~ - 2 POOL 3 N 0 M ~ 30' MEANDER WIDTH N B w Q PLAN CROSS SECTIONS W U ~ w ZH-Z a J d -wQ 0 N ° .I w J WEG ~ Y 4 N THAL ~ ~ ~ ~ ~ w W~~ O o / ~ W O w O H ° ~ W ~ ~ _ ~ (n f- J ~ J ~ ~ ~ ~F F~ i ~ Z ~ ~ THALWEG ~ .,I Q ~n o W ~ ~ I- ~ w JNZ / ° Z QOW ~ 3 a 0 ~~m Z 0 / - RIFFLE ~ ~7 ~ g~lOE RUry - - ~ U Z ~ o POOL Z ~ rY ~ 0 N N > POOL w J ~ Z ~ N W 0 W O ~i(~ U o ~ - a a ~ ~ 0 DISTANCE ALONG CHANNEL JiJN2~~~~~ ~ 0 r1 a~NR • ware ~~a~i~ ~ LL I- h yVE'{tpNpSAND STOR~iWA~ER 6R~~~r+ O = A PROFILE ~ ~ TYPICAL RECONSTRUCTED MEANDER DETAIL \ 0 w \ 1\ J ~ ~ ~ ~ w t~ Q \ 00 EROSION CONTROL MAT OUTSIDE OF MEANDER TO BE PLANTED PROBABLE DESIGN CRITERIA FOR TAE PROPOSED CHANNEL 1 WITH TWO ROWS OF SINIGRA LIVE PARAMETER CRITERIA STAKES ® 3' X 3' SPACINGS. pw ~sq mi 0.06 (35 Acre Post-Construction) W ~ ~ Abkf (sq. ft~ 1.2 W PLANT NAME COMMON NAME Wb~~g~ 4.0 J Alnus serrulata Tag Alder Dbkf (ft.) 03 Z i ~ V SCALE: 1" = 10' V~ Cephalanthus occidentalis Buttonbush Qbkf (cfs) 1.1 w a Corms amomum Silky Dogwood V el (ft1s) 0.9 W ` V s (eft) 0.0029 STING GRADE EXISTING CHANNEL w V Lindera benzoin Spicebush WS ($/ft) 0.0024 ~ EXISTING GRADE J W Q ~ I U Salix nigra Black Willow Rc eft) 10 2 ~ ~ 1 - W blt (ft) 30 ~ ~ 2~ SLOPE Vaccinium corymbosum Highbush blueberry M~ g ~ 1 SHEET N0. 1 Lm 50 4' Sinuosity 1.2 Wfpa (ft) 42 40' ER 10 TYPICAL SHRUBS I~ESEVALUESWILLBEVERIFIEDUSINGAREFERENCE REACH. THESE VALUES BASED ON REGIONAL CURVES SCALE: 1" = 10' DIMENSIONS AND WILLIAM'S EQUATIONS.