Loading...
HomeMy WebLinkAbout20190662 Ver 1_2019-04-16 2nd Submittal Full Set_20190520DEVELOPMENT TEAM SEPI ENGINEERING & CONSTRUCTION, INC. 1025 WADE AVE. RALEIGH, NC 27605 PH: (919) 789-9977 CONTACT: JEFFREY W. WESTMORELAND, RLA EMAIL: jwestmoreland@sepiengineering.com ANGIER AVENUE RESIDENTIAL CONSTRUCTION DRAWINGS 3846 ANGIER AVENUE DURHAM, NORTH CAROLINA VICINITY MAP - NTS SITE DATA OWNER/DEVELOPER SPECIAL CONDITIONS OF APPROVAL GENERAL CONDITIONS OF APPROVAL 1.STATE AND FEDERAL PERMIT AUTHORIZATION MAY BE REQUIRED FROM THE DEHNR AND THE U.S. CORPS OF ENGINEERS PRIOR TO THE COMMENCEMENT OF ANY LAND DISTURBING ACTIVITIES IN OR NEAR A LAKE, STREAM, CREEK, TRIBUTARY OR ANY UNNAMED BODY OF WATER AND ITS ADJACENT WETLANDS. 2.FOR DEVELOPMENTS WITHIN THE NEUSE RIVER BASIN (PAYMENT, IF REQUIRED, TO BE DETERMINED DURING SITE PLAN REVIEW): A SITE PLAN CANNOT BE APPROVED UNTIL A RECEIPT FROM THE NORTH CAROLINA ECOSYSTEM ENHANCEMENT PROGRAM HAS BEEN RECEIVED BY THE CITY OF DURHAM CONFIRMING THE PAYMENT OF $X.XX IN OFFSET FEES. 3.FOR DEVELOPMENTS REQUIRED TO HAVE A STORMWATER BMP FACILITY: FINAL DESIGN CALCULATIONS FOR THE STORMWATER BMP FACILITY WILL REQUIRE THE USE OF STORAGE INDICATION ROUTING METHODOLOGY SUCH AS TR-20 OR HEC-1 MODELS. FOR THE BMP FACILITY, PROVIDE STAGE-STORAGE RELATIONSHIP AND INFLOW AND OUTFLOW HYDROGRAPHS. PROVIDE ALL TABULATED DATA INCLUDING CALCULATIONS SHOWING THE OUTLET UNDER ORIFICE CONTROL, BARREL CONTROL AND WEIR CONTROL, AS APPROPRIATE, TO SHOW HOW THE ROUTING WAS DEVELOPED. 4.FOR DEVELOPMENTS REQUIRED TO HAVE A STORMWATER BMP FACILITY: AN EXECUTED STORMWATER FACILITY OPERATION AND MAINTENANCE PERMIT AGREEMENT (PREPARED BY STORMWATER SERVICES, CITY OF DURHAM), PAYMENT OF STORMWATER FACILITY PERMIT FEE PER BMP FACILITY AND PERPETUAL SURETY FOR THE CONTINUED OPERATION AND MAINTENANCE OF THE FACILITY IS REQUIRED PRIOR TO CONSTRUCTION PLAN APPROVAL. 5.AN AS-BUILT CERTIFICATION FOR THE STORMWATER BMP(S), PROVIDED BY THE DESIGN ENGINEER, IS REQUIRED. THE AS-BUILT SHALL BE SUBMITTED PER THE REFERENCE GUIDE FOR DEVELOPMENT, APPROVED BY THE STORMWATER SERVICES DIVISION AND THE BMP(S) SHALL BE INSPECTED AND APPROVED BY THE STORMWATER SERVICES DIVISION PRIOR TO ISSUANCE OF ANY CERTIFICATES OF OCCUPANCY OR CERTIFICATES OF COMPLIANCE FOR THE PROJECT. 6.FOR DEVELOPMENTS REQUIRED TO HAVE A STORMWATER BMP FACILITY: A COMPLETED CITY OF DURHAM DESIGN SUMMARY IS REQUIRED FOR EACH STORMWATER BMP FACILITY NO LATER THAN AT THE FIRST CONSTRUCTION DRAWING SUBMITTAL. 7.FOR DEVELOPMENTS REQUIRED TO HAVE A STORMWATER BMP FACILITY: STORMWATER BMP FACILITY DESIGN CALCULATIONS WILL NOT BE REVIEWED OR APPROVED WITH THE SITE PLAN/PRELIMINARY PLAT SUBMITTAL. ALL STORMWATER BMP FACILITY DESIGNS WILL BE REVIEWED AND APPROVED DURING THE CONSTRUCTION DRAWING SUBMITTAL PROCESS. 8.OFF-SITE ROADWAY IMPROVEMENTS: BY REFERENCING ROADWAY IMPROVEMENTS ON THE PLAN, THE APPLICANT AGREES TO CONSTRUCT SAID IMPROVEMENTS PRIOR TO ISSUANCE OF CERTIFICATE OF OCCUPANCY IN A MANNER THAT WILL ALLOW THEM TO FUNCTION AS NOTED ON THE PLAN AND IN ACCORDANCE WITH NCDOT AND CITY OF DURHAM STANDARDS AND POLICIES. THIS INCLUDES (WHERE APPROPRIATE) BUT IS NOT LIMITED TO: ADEQUATE TRANSITION TAPERS, ALIGNMENT OF LANES THROUGH INTERSECTIONS, ASSOCIATED SIGNAL MODIFICATIONS, PAVEMENT MARKINGS, ASSOCIATED SIGNAGE, CURB AND GUTTER, COORDINATION WITH OTHER PROPOSED ROADWAY IMPROVEMENTS AND BIKE LANES. THE APPLICANT ALSO ACCEPTS THE FINANCIAL RESPONSIBILITY FOR ACQUISITION OF ANY ADDITIONAL RIGHT-OF-WAY NECESSARY TO ACCOMMODATE THESE IMPROVEMENTS AND ANY REQUIRED SIDEWALK CONSTRUCTION. 9.OFF-SITE ROADWAY IMPROVEMENTS ON THE SITE: ALL OFF-SITE ROADWAY IMPROVEMENTS MUST BE COMPLETE PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. 10.SIGNS AND/OR PAVEMENT MARKINGS TO BE INSTALLED BY THE DEVELOPER (NEW SUBDIVISIONS OR OFF-SITE ROADWAY IMPROVEMENTS THAT NEED NEW MARKINGS FOR EXAMPLE): THE DEVELOPER IS RESPONSIBLE FOR FABRICATION AND INSTALLATION OF ALL REQUIRED SIGNS AND PAVEMENT MARKINGS WITHIN THE PUBLIC RIGHT- OF-WAY. THE DEVELOPER SHALL SUBMIT A SIGNING AND MARKINGS PLAN TO THE CITY AT CONSTRUCTION PLAN STAGE FOR REVIEW AND APPROVAL. ALL SIGNS AND PAVEMENT MARKINGS, SHOWN ON THE CONSTRUCTION PLANS, MUST BE IN PLACE PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY AND/OR STREET ACCEPTANCE, AS DETERMINED BY THE CITY. 11.RIGHT-OF-WAY DEDICATION ON A MAJOR/MINOR THOROUGHFARE ADJACENT TO THE SITE: DEDICATE AN ADDITIONAL 10 FEET OF RIGHT-OF-WAY ALONG THE FRONTAGE OF THE SITE ON ANGIER AVENUE PRIOR TO THE ISSUANCE OF ANY BUILDING PERMIT. A COPY OF THE RECORDED PLAT MUST BE SUBMITTED WITH THE FIRST BUILDING PERMIT APPLICATION. 12.PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY, AN APPROVED AND EXECUTED DUKE ENERGY STREET LIGHT SERVICE AGREEMENT MUST BE PROVIDED TO THE CITY OF DURHAM. FOR ADDITIONAL DETAILS CONCERNING LIGHTING REQUIREMENTS AND DESIGN PROCESS, CONTACT THE CITY DEPARTMENT OF TRANSPORTATION (TERRY THOMPSON AT 919-560-4366). 13.PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY: a.CONSTRUCT A WESTBOUND LEFT-TURN LANE ON ANGIER AVENUE AT PUBLIC ROAD 1 WITH ADEQUATE STORAGE AND APPROPRIATE TAPERS AND AN EASTBOUND LEFT-TURN LANE ON ANGIER AVENUE AT BUNGALOW AVENUE WITH ADEQUATE STORAGE AND APPROPRIATE TAPERS. PROVIDE A CONTINUOUS TWO-WAY LEFT-TURN BETWEEN PUBLIC ROAD 1 AND BUNGALOW AVENUE. b.CONSTRUCT A MINIMUM OF 4 FT. OF ADDITIONAL ASPHALT (IN ADDITION TO THE PROPOSED ROADWAY IMPROVEMENTS) FOR THE FULL FRONTAGE OF THE SITE ALONG THE SOUTH SIDE OF ANGIER AVENUE. THE ADDITIONAL ASPHALT WIDENING WILL BE PROVIDED TO ALLOW FOR A FUTURE BICYCLE LANE. 1.FOR SITES WITHOUT FLOODPLAIN: THIS SITE IS NOT IN ANY SPECIAL FLOOD HAZARD AREAS OR FUTURE CONDITIONS FLOOD HAZARD AREAS, AS SHOWN ON FIRM PANEL 3720084000J DATED 05/02/06 AND 370084900J DATED 05/02/06. 2.NCDWQ BUFFER AUTHORIZATION NOTE: BUFFER AUTHORIZATION BY THE NORTH CAROLINA DIVISION OF WATER QUALITY (NCDWQ) IS REQUIRED PRIOR TO CONSTRUCTION DRAWING APPROVAL. SITE PLAN CHANGES OCCURRING AS A RESULT OF ALTERATIONS NEEDED TO RECEIVE BUFFER AUTHORIZATION MAY RESULT IN THE NEED FOR A SITE PLAN AMENDMENT OR A NEW SITE PLAN BASED ON THE SCOPE OF THE REQUIRED CHANGES. IF A SITE PLAN AMENDMENT OR NEW SITE PLAN IS REQUIRED IT MUST BE APPROVED PRIOR TO CONSTRUCTION DRAWING APPROVAL. CONTACT THE DURHAM CITY-COUNTY PLANNING DEPARTMENT AT 919-560-4137 TO DETERMINE IF A SITE PLAN AMENDMENT OR A NEW SITE PLAN WILL BE REQUIRED. 3.STREAM BUFFERS: 50 FOOT WIDE UNDISTURBED STREAM BUFFER, MEASURED FROM TOP OF BANK, EACH SIDE OF STREAM. NO CLEARING OR GRADING OTHER THAN SELECTIVE THINNING AND ORDINARY MAINTENANCE OF EXISTING VEGETATION PERMITTED, EXCEPT IN ACCORDANCE WITH 15A NCAC 02B.233 (6) VEGETATION MANAGEMENT. NO STRUCTURES OR FEATURES REQUIRING GRADING OR CONSTRUCTION MAY BE BUILT WITHIN THE 10 FOOT STREAM BUFFER SETBACK. ANY USE ALLOWED BY SECTION 8.5.5 OF THE UDO SHALL BE DESIGNED AND CONSTRUCTED TO MINIMIZE THE AMOUNT OF INTRUSION INTO THE STREAM BUFFER AND TO MINIMIZE CLEARING, GRADING, EROSION AND WATER QUALITY DEGRADATION. (UDO SECTION 8.5). 4.FOR SITES CONTAINING WETLANDS: STATE AND FEDERAL PERMIT AUTHORIZATION MAY BE REQUIRED FROM THE NC DENR, NC DWQ, AND THE U.S. ARMY CORPS OF ENGINEERS PRIOR TO THE COMMENCEMENT OF ANY LAND DISTURBING ACTIVITIES IN OR NEAR A LAKE, STREAM, CREEK, TRIBUTARY, OR ANY UNNAMED BODY OF WATER AND ITS ADJACENT WETLANDS (UDO SECTION 8.9) 5.WETLAND BUFFER NOTE: AS THE EXISTING WETLAND IS LESS THAN 1 ACRE, NO WETLAND BUFFER IS REQUIRED (UDO SECTION 8.9.3.c). ZERO (0) FOOT WIDE WETLAND BUFFER TO REMAIN IN NATURAL, UNDISTURBED VEGETATION. WETLAND BUFFERS MAY BE USED FOR PASSIVE RECREATIONAL ACTIVITIES, SUCH AS WALKING AND BICYCLING TRAILS, PROVIDED THAT SERVICE FACILITIES FOR SUCH ACTIVITIES, INCLUDING BUT NOT LIMITED TO PARKING, PICNICKING AND SANITARY FACILITIES, ARE LOCATED OUTSIDE OF THE WETLAND BUFFER. ANY USE ALLOWED BY THIS SECTION SHALL BE DESIGNED AND CONSTRUCTED TO MINIMIZE THE AMOUNT OF INTRUSION INTO THE WETLAND BUFFER AND TO MINIMIZE CLEARING, GRADING, EROSION AND WATER QUALITY DEGRADATION. (UDO SECTIONS 8.9) 6.FOR RESIDENTIAL PROJECTS APPROVED FOR PAYMENT IN LIEU OF OPEN SPACE DEDICATION: PAYMENT IN LIEU OF OPEN SPACE DEDICATION TO BE MADE PRIOR TO THE APPROVAL OF ANY FINAL PLATS PER UDO SECTION 7.2. OR SECTION 12.5. 7.STREET EASEMENT NOTE:50 FOOT WIDE CITY OF DURHAM PUBLIC STREET EASEMENT, SUBJECT TO THE TERMS STATED IN THE DECLARATION IN REAL ESTATE BOOK 2350, PAGE 938. NO STRUCTURES, FILLS, EMBANKMENTS OR OBSTRUCTIONS PERMITTED WITHIN THE EASEMENT EXCEPT ACCORDING TO THOSE TERMS. 8.LANDSCAPE MULCH: PINE STRAW SHALL NOT BE USED AS MULCH OR GROUNDCOVER WITHIN TEN FEET OF ANY STRUCTURES CONSISTING OF EXTERIOR COMBUSTIBLE CONSTRUCTION AS SPECIFIED BY DURHAM CITY CODE SECTION 46-87. 9.LANDSCAPING/C.O. STANDARDS NOTE: ALL LANDSCAPING MUST BE IN PLACE PRIOR TO REQUEST FOR A CERTIFICATE OF COMPLIANCE. CONTACT DURHAM CITY COUNTY PLANNING DEPARTMENT SITE COMPLIANCE STAFF FOR INSPECTION. 10.LANDSCAPE RE-INSPECTION FEE: EACH LANDSCAPING COMPLIANCE INSPECTION AFTER THE INITIAL INSPECTION WILL INCUR A RE-INSPECTION FEE. PAYMENT MUST BE RECEIVED BY THE DURHAM CITY COUNTY PLANNING DEPARTMENT PRIOR TO RE-INSPECTION. 11.STREET TREE NOTE FOR ALL PRELIMINARY AND FINAL PLATS WHERE TREES WILL BE PLANTED: STREET TREES MEETING THE REQUIREMENTS OF UDO SECTION 9.6 SHALL BE PLANTED PRIOR TO THE ISSUANCE OF A CERTIFICATE OF COMPLIANCE, UNLESS THE PLANTING HAS BEEN POSTPONED IN ACCORDANCE WITH THE REQUIREMENTS OF UDO SEC. 9.11. 12.UNDISTURBED LANDSCAPE BUFFERS:A LANDSCAPE BUFFER IS NOT REQUIRED FOR THIS PROJECT (UDO 9.4.3.B). ZERO (0) FOOT WIDE UNDISTURBED LANDSCAPE BUFFER. NO CLEARING OR GRADING OTHER THAN SELECTIVE THINNING AND ORDINARY MAINTENANCE OF EXISTING VEGETATION PERMITTED. 13.CONSTRUCTION IN PRESERVED TREE COVERAGE AREAS (UDO SECTION 8.3): a.PRESERVED TREE COVERAGE AREAS SHALL NOT BE USED FOR ACTIVE RECREATIONAL PURPOSES, EXCEPT FOR WALKING PATHS AND FOOT TRAILS CONSTRUCTED WITH MINIMAL DISTURBANCE OF TREE ROOTS AND EXISTING VEGETATION PROVIDED A REGISTERED ARBORIST HAS CERTIFIED THAT THE CONSTRUCTION OF THE TRAIL HAS BEEN DESIGNED TO MINIMIZE IMPACT TO THE EXISTING TREES. NO TREE OVER 10 INCHES SHALL BE REMOVED FOR THE CONSTRUCTION OF TRAILS. SITE PLAN APPROVAL IS REQUIRED FOR CONSTRUCTION OF TRAILS IN PRESERVED TREE COVERAGE AREAS. b.ALL BUILDINGS SHALL BE SET BACK AT LEAST 10 FEET FROM THE EDGE OF ANY PRESERVED TREE COVERAGE AREA. c.UTILITY LINES AND DRAINAGE CHANNELS SHALL BE MINIMIZED WITHIN THE ROOT PROTECTION ZONES OF THE TREES TO BE SAVED. PREFERABLY, SUCH FACILITIES SHOULD BE LOCATED ADJACENT TO DRIVEWAYS AND IN GROUPINGS ALLOWED BY SOUND ENGINEERING PRACTICES. 6.TREE PROTECTION NOTE (UDO SEC. 8.3): TREE PROTECTION FENCING MUST BE IN PLACE PRIOR TO ANY DEMOLITION, LAND DISTURBANCE, OR ISSUANCE OF A GRADING PERMIT AND SHALL INCLUDE WARNING SIGNS POSTED IN BOTH ENGLISH AND SPANISH, AS FOLLOWS: “NO TRESPASSING/TREE PROTECTION AREA/PROHIBIDO ENTRAR / ZONA PROTECTORA PARA LOS ÁRBOLES.” 7.ROOT PROTECTION ZONE (UDO SEC. 8.3): EQUALS ONE FOOT OF RADIUS FOR EVERY INCH OF DIAMETER OF EXISTING TREES, OR SIX FOOT RADIUS, WHICHEVER IS GREATER. NO DISTURBANCE ALLOWED WITHIN THIS AREA. AREA MUST BE PROTECTED WITH BOTH TREE PROTECTION FENCING AND WARNING SIGNS. 8.PROTECTION OF EXISTING VEGETATION (UDO SEC. 8.3): AT THE START OF GRADING INVOLVING THE LOWERING OF EXISTING GRADE AROUND A TREE OR STRIPPING OF TOPSOIL, A CLEAN, SHARP, VERTICAL CUT SHALL BE MADE AT THE EDGE OF THE TREE SAVE AREA PRIOR TO OR AT THE SAME TIME AS SILT FENCE AND OTHER EROSION CONTROL MEASURES ARE INSTALLED. THE TREE PROTECTION FENCING SHALL BE INSTALLED ON THE SIDE OF THE CUT FARTHEST AWAY FROM THE TREE TRUNK AND SHALL REMAIN IN PLACE UNTIL ALL CONSTRUCTION IN THE VICINITY OF THE TREES IS COMPLETE. NO STORAGE OF MATERIALS, FILL, OR EQUIPMENT AND NO TRESPASSING SHALL BE ALLOWED WITHIN THE BOUNDARY OF THE PROTECTED AREA 9.FOR PROJECTS SUBJECT TO FEDERAL FAIR HOUSING REGULATIONS: BE ADVISED THAT THE PROVISIONS OF APPENDIX II OF THE FEDERAL FAIR HOUSING REGULATIONS (ACCESSIBILITY GUIDELINES -24 CFR, CH. 1, SUBCH. A, APP II) EFFECTIVE MARCH 6, 1991 ARE REQUIRED ON THIS PROJECT. IT IS THE RESPONSIBILITY OF THE OWNER/DEVELOPER/BUILDER TO COMPLY WITH THESE REGULATIONS. ALSO BE AWARE THAT THESE REQUIREMENTS ARE BEYOND THE SCOPE OF VOLUME I-C (HANDICAP ACCESSIBILITY) OF THE NC STATE BUILDING CODE AND AS SUCH THE BURDEN OF COMPLIANCE IS BORNE BY THE OWNER/DEVELOPER/BUILDER. 10.UDO SITE LIGHTING NOTE (UDO SEC. 7.4): MEASURES SHALL BE PROVIDED TO PREVENT LIGHT SPILLOVER ONTO ADJACENT PROPERTIES AND GLARE TOWARD MOTOR VEHICLE OPERATORS AND SHALL BE INDICATED ON THE SITE PLAN. EXTERIOR LIGHTS SHALL BE SHIELDED SO THAT THEY DO NOT CAST DIRECT LIGHT BEYOND THE PROPERTY LINE. IN ACCORDANCE WITH THESE STANDARDS: a.THE MAXIMUM ILLUMINATION AT THE EDGE OF THE PROPERTY LINE ADJACENT TO RESIDENTIAL ZONING IS 0.5 FOOT CANDLES. b.THE MAXIMUM ILLUMINATION AT THE EDGE OF THE PROPERTY LINE ADJACENT TO NONRESIDENTIAL ZONING IS 5.0 FOOT CANDLES. c.THE MAXIMUM ILLUMINATION AT THE EDGE OF THE PROPERTY LINE ADJACENT TO A STREET IS 5.0 FOOT CANDLES. d.THE LEVEL OF ILLUMINATION AS MEASURED IN FOOT CANDLES AT ANY ONE POINT SHALL MEET THE STANDARDS IN THE TABLE IN UDO SECTION 7.4 WITH MINIMUM AND MAXIMUM LEVELS MEASURED ON THE PAVEMENT WITHIN THE LIGHTED AREA. e.THE MAXIMUM HEIGHT FOR DIRECTIONAL OR FULL CUT-OFF LIGHTING FIXTURES (FIXTURES DESIGNED TO INSURE THAT NO LIGHT IS EMITTED ABOVE A HORIZONTAL LINE PARALLEL TO THE GROUND) SHALL BE 30 FEET ABOVE GRADE, MEASURED TO THE TOP OF THE FIXTURE. f.THE MAXIMUM HEIGHT FOR NON-DIRECTIONAL LIGHTING FIXTURES, WHICH ARE DEFINED AS FIXTURES DESIGNED TO ALLOW LIGHT TO BE EMITTED ABOVE A HORIZONTAL LINE PARALLEL TO THE GROUND, SHALL BE 15 FEET ABOVE GRADE, MEASURED TO THE TOP OF THE FIXTURE. g.THESE STANDARDS MUST BE VERIFIED BY FIELD SURVEY (BY USE OF PHOTOMETRIC SURVEY) PRIOR TO THE CERTIFICATE OF COMPLIANCE BEING ISSUED. ALL OF THIS INFORMATION, INCLUDING DETAILS, WILL BE REQUIRED ON BUILDING PLANS PRIOR TO ISSUANCE OF BUILDING PERMIT 10.CITY SANITARY SEWER EASEMENTS: SEE PUBLIC WORKS STANDARD NOTES, BELOW. 11.CITY STORM DRAINAGE EASEMENTS: SEE PUBLIC WORKS STANDARD NOTES, BELOW. COUNTY STORM OR PRIVATE DRAINAGE EASEMENTS: CENTERLINE OF FOOT WIDE DRAINAGE EASEMENT FOR THE BENEFIT OF ADJACENT PROPERTY OWNERS NOT MAINTAINED BY PUBLIC AUTHORITIES. NO BUILDINGS, STRUCTURES, FILLS, EMBANKMENTS OR OBSTRUCTIONS PERMITTED WITHIN THE EASEMENT EXCEPT ACCORDING TO THOSE TERMS. 12.FOR RESIDENTIAL DEVELOPMENTS USING CURBSIDE COLLECTION: AN AUTOMATED SOLID WASTE COLLECTION VEHICLE HAS AN 18-FOOT WHEELBASE AND A TURNING RADIUS OF 45 FEET WALL-TO-WALL AND 43 FEET CURB-TO-CURB. THE DEPARTMENT OF SOLID WASTE MANAGEMENT RESERVES THE RIGHT TO MODIFY COLLECTION OF GARBAGE AND RECYCLABLES FOR ANY ROADWAY OR CUL-DE-SAC NOT CONSTRUCTED TO ACCOMMODATE THOSE SPECIFICATIONS. 13.FIRE NOTES TO BE INCLUDED ON COVER SHEET: a.TEMPORARY OR PERMANENT ROADWAYS OF ALL-WEATHER DRIVING SURFACE, CAPABLE OF SUPPORTING A 75,000 POUND VEHICLE WEIGHT, SHALL BE ESTABLISHED PRIOR TO THE COMMENCEMENT OF BUILDING CONSTRUCTION ACTIVITIES. THESE ROADWAYS SHALL BE EXTENDED WITH THE PROGRESS OF CONSTRUCTION SO THAT: 1. ALL POINTS AROUND THE PERIMETER OF A BUILDING UNDER CONSTRUCTION IS NO GREATER THAN 150 FEET TRAVEL DISTANCE FROM A ROADWAY. 2. FIRE DEPARTMENT CONNECTIONS (FDC), EITHER TEMPORARY OR PERMANENT, ARE NO GREATER THAN 100 FEET TRAVEL DISTANCE FROM A ROADWAY. b.TEMPORARY WEATHER-RESISTANT STREET SIGNS OF STANDARD SIZE AND LETTERING SHALL BE PROVIDED AT THE INTERSECTIONS OF TEMPORARY OR PERMANENT ROADWAYS AND SHALL REMAIN IN PLACE UNTIL REPLACED BY PERMANENT SIGNS. c.FIRE HYDRANTS, AS SHOWN ON THE APPROVED SITE PLAN, SHALL BE PLACED IN SERVICE AND MADE AVAILABLE TO THE FIRE DEPARTMENT AS SOON AS COMBUSTIBLE MATERIAL ARRIVES ON SITE. NO CONSTRUCTION FENCING OR OTHER BARRIERS ARE TO BE PLACED BETWEEN THE ROADWAY AND THE HYDRANTS, WITH MINIMUM 3 FEET WORKING CLEARANCE AROUND HYDRANTS. HYDRANT SERVICE SHALL BE EXTENDED WITH THE PROGRESS OF CONSTRUCTION SO THAT: 1. ALL POINTS AROUND THE PERIMETER OF A BUILDING UNDER CONSTRUCTION IS NO GREATER THAN 500 FEET TRAVEL DISTANCE FROM A HYDRANT, 2. FIRE DEPARTMENT CONNECTIONS (FDC), EITHER TEMPORARY OR PERMANENT, ARE NO GREATER THAN 50 FEET TRAVEL DISTANCE FROM A HYDRANT. 14.FOR COUNTY SOIL AND EROSION CONTROL: a.A SEDIMENTATION AND EROSION CONTROL PLAN MUST BE SUBMITTED AND APPROVED PRIOR TO THE ISSUANCE OF A LAND-DISTURBANCE PERMIT. b.IF AN OFFSITE SOIL SPOIL OR BORROW SITE IS UTILIZED, THEN THE DISTURBED AREA FOR THE SPOIL/BORROW SITE MUST BE INCLUDED IN THE LAND- DISTURBANCE PLAN AND PERMIT UNLESS THE SPOIL/BORROW SITE ALREADY HAS A LAND-DISTURBANCE PERMIT. 15.THE LOCATION OF THE SIDEWALK SHOWN ON THIS PLAN IS SCHEMATIC. A CITY OF DURHAM AND/OR NCDOT ENCROACHMENT PERMIT IS REQUIRED PRIOR TO ANY CONSTRUCTION. AFTER OBTAINING THE REQUIRED PERMITS, PLEASE CONTACT THE CITY OF DURHAM ENGINEERING CONSTRUCTION INSPECTION OFFICE AT 560-4326 FOR A PRE-CONSTRUCTION CONFERENCE AND FIELD VISIT PRIOR TO ANY WORK ON THE PROPOSED SIDEWALK 16.THE SITE WILL BE FULLY COMPLIANT WITH THE NORTH CAROLINA ACCESSIBILITY CODES (ANSI 117.1 -2009 AND CHAPTER 11 OF THE NCBC) UNLESS AND EXCEPT IN AREAS WHERE AN APPROVED STATEMENT FROM A SITE ENGINEER, SURVEYOR OR ARCHITECT VERIFIES THAT SITE CONDITIONS EXIST WHERE THE TOPOGRAPHY OF THE SITE IS EXTREME AND ONLY ALTERNATE METHODS OF COMPLIANCE ARE POSSIBLE. 17.SOLID WASTE: a.SOLID WASTE CONTAINMENT CAPACITY AND COLLECTION FREQUENCY WILL PREVENT ILLEGAL PLACEMENT OF GARBAGE AND RECYCLABLES. ANGIER DEVELOPMENT, LLC, 7700 KENCOT COURT RALEIGH, NC 27615 PHONE: (919) 601-2816 CONTACT: DAVID LAZZO EMAIL: dlazzo2100@gmail.com PUBLIC WORKS CONDITIONS OF APPROVAL 1.THE DESIGNING PROFESSIONAL (A NCPE, NCPLS OR NCRLA – AS REQUIRED) SHALL SUBMIT THREE (3) SETS OF CONSTRUCTION DRAWINGS TO THE PUBLIC WORKS DEPARTMENT – DEVELOPMENT REVIEW FOR REVIEW AND APPROVAL. CONSTRUCTION DRAWING APPROVAL IS REQUIRED PRIOR TO COMMENCING CONSTRUCTION (SEE CONSTRUCTION PLAN APPROVAL PROCESS). THE APPROVAL OF CONSTRUCTION DRAWINGS IS SEPARATE FROM SITE PLAN APPROVAL. CITY OFFICIALS SHALL REVIEW ALL SIZES, MATERIALS, SLOPES, LOCATIONS, EXTENSIONS AND DEPTHS FOR ALL PROPOSED UTILITIES (WATERLINES, SANITARY SEWER LINES AND STORM DRAINAGE CONVEYANCE SYSTEMS) FOR COMPLIANCE WITH ALL APPLICABLE REGULATORY STANDARDS, SPECIFICATIONS, AND BEST MANAGEMENT PRACTICES. 2.THE DESIGNING PROFESSIONAL (A NCPE, NCPLS OR NCRLA – AS REQUIRED) SHALL SUBMIT ONE (1) SET OF AS-BUILT DRAWINGS TO THE PUBLIC WORKS DEPARTMENT – DEVELOPMENT REVIEW FOR REVIEW AND APPROVAL. AS-BUILT DRAWING APPROVAL IS REQUIRED PRIOR TO WATER METER INSTALLATION AND/OR SANITARY SEWER SERVICE CONNECTION AND PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. 3.FIRE FLOW ANALYSIS REQUIRED FOR REVIEW AND APPROVAL AS PART OF THE CONSTRUCTION DRAWING APPROVAL PROCESS. TO SCHEDULE FLOW TEST OR TO OBTAIN CURRENT SYSTEM DATA, COMPLETE THE ONLINE APPLICATION (HTTP://DURHAMNC.GOV/1538/FIRE-FLOW-TEST-REQUEST). 4.IF A METER 2” OR LARGER IS PROPOSED, CONTACT WATER MANAGEMENT AT 560-4381 EXTENSION 35268 PRIOR TO THE CONSTRUCTION OF THE METER VAULT TO VERIFY THE TYPE AND DIMENSIONS OF THE METER. 5.WATER PERMIT REQUIRED AFTER CONSTRUCTION DRAWING APPROVAL AND PRIOR TO COMMENCING WATER MAIN INSTALLATION. 6.SEWER PERMIT REQUIRED AFTER CONSTRUCTION DRAWING APPROVAL AND PRIOR TO COMMENCING SANITARY SEWER MAIN INSTALLATION. 7.PIPES AND/OR STRUCTURES SHOWN IN THE EROSION CONTROL PLAN OF THE SITE PLAN THAT ARE PROPOSED TO BE PERMANENT WILL BE REVIEWED AND APPROVED AS PART OF THE GRADING PLAN DURING CONSTRUCTION DRAWING REVIEW. THESE PIPES AND/OR STRUCTURES MAY NOT BE INSTALLED PRIOR TO CONSTRUCTION DRAWING APPROVAL AND PAYMENT OF INSPECTION FEES. 8.AN NCDOT OR CITY OF DURHAM DRIVEWAY PERMIT IS REQUIRED. 9.WHEN SIDEWALK AND CURB RAMPS ARE PROPOSED: a.PROWAG STANDARDS ARE TO BE USED. SEE CITY OF DURHAM CURB CUTS DETAILS HTTP://DURHAMNC.GOV/DOCUMENTCENTER/HOME/VIEW/2114. b.FOR RAMPS IN ‘TIGHT’ EXISTING DEVELOPED AREAS WITH SMALL ROW’S (DOWNTOWN, ETC) IT IS RECOMMENDED SPECIFIC RAMP DETAILS ARE NEEDED TO PREVENT CONSTRUCTION DELAYS. THE BURDEN TO MAKE IT WORK IS ON THE DESIGNING ENGINEER. 9.WATER EASEMENT NOTE: CENTERLINE OF 25 FOOT WIDE CITY OF DURHAM WATER EASEMENT. SUBJECT TO TERMS STATED IN THE DECLARATION IN REAL ESTATE BOOK 1510, PAGE 958. NO STRUCTURES, FILL, EMBANKMENTS, TREES OR OBSTRUCTIONS PERMITTED WITHIN THE EASEMENT EXCEPT ACCORDING TO THOSE TERMS. 10.SANITARY SEWER EASEMENT NOTE: CENTERLINE OF 30 FOOT WIDE COUNTY OF DURHAM SANITARY SEWER EASEMENT. SUBJECT TO TERMS STATED IN THE DECLARATION IN REAL ESTATE BOOK 1626, PAGE 145. NO STRUCTURES, FILL, EMBANKMENTS, TREES OR OBSTRUCTIONS PERMITTED WITHIN THE EASEMENT EXCEPT ACCORDING TO THOSE TERMS. 11.THE LOCATION OF THE SIDEWALKS SHOWN ON THIS PLAN IS SCHEMATIC. A CITY OF DURHAM AND/OR NCDOT ENCROACHMENT PERMIT IS REQUIRED PRIOR TO ANY CONSTRUCTION. AFTER OBTAINING THE REQUIRED PERMITS, PLEASE CONTACT THE CITY OF DURHAM ENGINEERING CONSTRUCTION INSPECTION OFFICE AT 560-4326 FOR A PRE-CONSTRUCTION CONFERENCE AND FIELD VISIT PRIOR TO ANY WORK ON THE PROPOSED SIDEWALK. 12.DRIVEWAY PERMIT NOTE: A CITY OF DURHAM DRIVEWAY PERMIT IS REQUIRED PRIOR TO ANY DRIVEWAY CONSTRUCTION ON PUBLIC RIGHT-OF-WAY. SUBMIT PLANS FOR DRIVEWAY PERMIT APPROVAL TO CITY ENGINEERING DEVELOPMENT REVIEW. AFTER OBTAINING THE PERMIT, PLEASE CALL CITY OF DURHAM ENGINEERING INSPECTION OFFICE AT 919-560-4326 PRIOR TO START OF CONSTRUCTION. 13.A UTILITY MAINLINE CONSTRUCTION PERMIT IS REQUIRED PRIOR TO THE INSTALLATION OF EACH UTILITY. ALL UTILITIES SHALL SUBMIT PLAN DRAWINGS AND APPLICATIONS TO THE CITY ENGINEERING DIVISION. 14.ABANDONMENT OF WATER SERVICES SHALL INCLUDE EXCAVATING DOWN TO CORPORATION STOP, TURNING IT OFF AND CUTTING SERVICE LINE FREE FROM CORPORATION STOP. THE METER, IF PRESENT, SHALL BE RETURNED TO CITY OF DURHAM. PRIOR TO ANY CREDIT OR REFUND BEING PROCESSED THE METER MUST BE RETURNED TO WATER MANAGEMENT DEPARTMENT AND THE METER NUMBER VERIFIED AND CODED PROPERLY AS RETURNED. UTILITY SERVICE ABANDONMENTS WILL TAKE PLACE PRIOR TO BEGINNING UTILITY CONSTRUCTION WORK FOR A PROJECT. ANY EXCAVATION AS PART OF ABANDONING UTILITIES WILL REQUIRE BACKFILLING PER CITY OF DURHAM STANDARDS. 15.ABANDONMENT OF SANITARY SEWER SERVICE LINES SHALL CONSIST OF EXCAVATING DOWN TO THE SERVICE CONNECTION TO THE MAIN, CUTTING THIS CONNECTION AND INSTALLING A WATERTIGHT PLUG IN THE MAIN. THE SERVICE LINE AND ALL CLEAN-OUT RISERS ON THE SERVICE LINE SHALL BE REMOVED. UTILITY SERVICE ABANDONMENTS WILL TAKE PLACE PRIOR TO BEGINNING UTILITY CONSTRUCTION WORK FOR A PROJECT. ANY EXCAVATION AS PART OF ABANDONING UTILITIES WILL REQUIRE BACKFILLING PER CITY OF DURHAM STANDARDS. 16.AT A MINIMUM, THE STORMWATER DESIGN DETAILS FOR THIS PROJECT SHALL BE GOVERNED BY THE MINIMUM STANDARDS OF THE MOST RECENT EDITION OF THE CITY OF DURHAM (CITY) REFERENCE GUIDE FOR DEVELOPMENT (RGD) AND ANY LETTERS TO INDUSTRY (POSTED ON THE CITY'S WEBSITE) THAT ARE IN EFFECT THE DATE CONSTRUCTION DRAWINGS ARE FIRST RECEIVED FOR REVIEW BY THE CITY. 17.TO RECEIVE SITE PLAN/PRELIMINARY PLAT APPROVAL FOR DEVELOPMENTS OTHER THAN SINGLE FAMILY DETACHED, TOWNHOME AND DUPLEX RESIDENTIAL DEVELOPMENTS THAT ARE MAKING USE OF NUTRIENT BANKS OR NCEEP, THE APPROVAL OF THE SITE PLAN/PRELIMINARY PLAT IS CONTINGENT UPON THE PURCHASE OF NUTRIENT CREDITS. IF A REVISED SITE PLAN/PRELIMINARY PLAT IS SUBMITTED FOR THIS DEVELOPMENT, THE REVISED SITE PLAN/PRELIMINARY PLAT WILL BE SUBJECT TO ANY ORDINANCES IN PLACE AT THE TIME OF THE REVISED SITE PLAN/PRELIMINARY PLAT SUBMISSION. PRIOR TO THE APPROVAL OF THE SITE PLAN/PRELIMINARY PLAT, A LETTER/RECEIPT SHOWING THE PURCHASE OF THE NUTRIENT CREDITS FOR THIS DEVELOPMENT AND A COPY OF THE NUTRIENT BANK LEDGER IF APPLICABLE, SHOWING THE TOTAL NUTRIENT CREDITS AVAILABLE MINUS ANY AND ALL DEDUCTIONS, IS TO BE PROVIDED TO THE STORMWATER DEVELOPMENT REVIEW SECTION. 18.STORMWATER DRAINAGE EASEMENT NOTE (WIDTH DETERMINED AT CONSTRUCTION DRAWINGS): “CENTERLINE OF _____ FOOT WIDE PUBLIC STORM WATER DRAINAGE EASEMENT. OWNERSHIP OF AND RESPONSIBILITY FOR IMPROVEMENT AND MAINTENANCE OF STORM WATER FACILITIES IN THIS EASEMENT REMAINS WITH THE CURRENT OWNER. IF THE PROPERTY IS WITHIN OR BECOMES A PART OF THE CITY, THE EASEMENT AND ACCESS POINTS TO THE EASEMENT ARE SUBJECT TO THE TERMS AND RESTRICTIONS STATED IN THE "REVISED DECLARATION OF RIGHTS AND PRIVILEGES OF THE CITY OF DURHAM IN STORM WATER MANAGEMENT FACILITY EASEMENTS" RECORDED IN REAL ESTATE BOOK 2298, PAGE 208, WHICH DOCUMENT IS INCORPORATED HEREIN. THIS EASEMENT AND THE REVISED DECLARATION DO NOT CREATE THE OBLIGATION TO PROVIDE PUBLIC MAINTENANCE. NO BUILDING, STRUCTURES, FILLS, EMBANKMENTS OR OBSTRUCTIONS PERMITTED WITHIN THE EASEMENT EXCEPT ACCORDING TO THOSE TERMS.” 19.STREAM BUFFER NOTES (WIDTH DETERMINED AT REZONING OR SITE PLAN): "50 FOOT WIDE UNDISTURBED STREAM BUFFER EACH SIDE OF STREAM, MEASURED FROM TOP OF BANK. NO CLEARING OR GRADING OTHER THAN SELECTIVE THINNING AND ORDINARY MAINTENANCE OF EXISTING VEGETATION PERMITTED.” 20.FLOODPLAIN NOTES: “ALL DEVELOPMENT WITHIN THE FLOODWAY AND FLOODWAY FRINGE, INCLUDING FILL, NEW CONSTRUCTION, SUBSTANTIAL IMPROVEMENTS, MANUFACTURED HOUSING, STORAGE OF MATERIALS AND STORAGE OF TOXIC OR FLAMMABLE SUBSTANCES, IS PROHIBITED EXCEPT AS PROVIDED BY APPLICABLE FLOOD HAZARD REGULATIONS.” 21.GENERAL NOTES: “STATE AND FEDERAL PERMIT AUTHORIZATION MAY BE REQUIRED FROM THE DEHNR AND THE U.S. CORPS OF ENGINEERS PRIOR TO THE COMMENCEMENT OF ANY LAND DISTURBING ACTIVITIES IN OR NEAR A LAKE, STREAM, CREEK, TRIBUTARY OR ANY UNNAMED BODY OF WATER AND ITS ADJACENT WETLANDS.” 22.AN ENCROACHMENT AGREEMENT WILL BE REQUIRED AFTER CONSTRUCTION DRAWING APPROVAL. CONTACT ENGINEERING SERVICES AT 560-4326. 23.FINAL DESIGN CALCULATIONS FOR THE STORMWATER CONTROL MEASURE(S) (SCM[S]) REQUIRE THE USE OF STORAGE INDICATION ROUTING METHODOLOGY SUCH AS TR-20 OR HEC-1 MODELS. FOR EACH SCM, AS APPLICABLE, STAGE-STORAGE RELATIONSHIP AND INFLOW AND OUTFLOW HYDROGRAPHS ARE REQUIRED. ALL TABULATED DATA INCLUDING CALCULATIONS SHOWING THE LIMITING DISCHARGE, WHETHER ORIFICE, WEIR, BARREL, OR OUTLET CONTROL, AS APPROPRIATE IS REQUIRED. HYDROCAD, HYDRAFLOW HYDROGRAPHS, AND PONDPACK ARE COMMONLY USED AND RECOGNIZED SOFTWARE PROGRAMS WHICH INCORPORATE ROUTING METHODOLOGY ACCEPTED BY THE CITY. 24.STORMWATER CONTROL MEASURE(S) (SCM[S]) PERMIT FEE(S), THE EXECUTED STORMWATER FACILITY AGREEMENT AND COVENANTS (PREPARED BY THE CITY OF DURHAM STORMWATER DEVELOPMENT REVIEW SECTION) AND A PAYMENT INTO THE STORMWATER REPLACEMENT FUND ARE REQUIRED FOR ALL SCM(S) ASSOCIATED WITH THIS DEVELOPMENT. CONSTRUCTION OF THE DEVELOPMENT IS NOT ALLOWED TO COMMENCE UNTIL THESE ITEMS ARE PROVIDED IN ACCORDANCE WITH THE TERMS AND CONDITIONS OUTLINED IN THE STORMWATER FACILITY AGREEMENT AND COVENANTS OR IN ACCORDANCE WITH WRITTEN POLICY. THE DESIGNER SHALL SUBMIT A SEALED ENGINEER'S CONSTRUCTION COST ESTIMATE FOR EVERY SCM PROPOSED IN THE DEVELOPMENT PRIOR TO APPROVAL OF THE CONSTRUCTION DRAWINGS. 25.AN AS-BUILT CERTIFICATION FOR THE STORMWATER CONTROL MEASURE(S) (SCM[S]), PROVIDED BY THE BMP CERTIFYING ENGINEER (BCE), IS REQUIRED. THE AS-BUILT CERTIFICATION SHALL BE SUBMITTED IN ACCORDANCE WITH THE CITY OF DURHAM BCE PROGRAM, REFER TO SECTION 8.6, BMP CERTIFYING ENGINEER PROGRAM FOR STORMWATER BMPS IN THE CITY OF DURHAM, OF THE REFERENCE GUIDE FOR DEVELOPMENT. THE SCM AS-BUILT CERTIFICATION(S) SHALL BE APPROVED BY THE STORMWATER DEVELOPMENT REVIEW SECTION PRIOR TO ISSUANCE OF ANY FINAL CERTIFICATES OF OCCUPANCY/COMPLIANCE FOR DEVELOPMENT, WITH THE EXCEPTION OF WHEN AN APPROPRIATE CONSTRUCTION SECURITY HAS BEEN PROVIDED FOR SINGLE FAMILY OR TOWNHOME DEVELOPMENT. WITH THIS PROVIDED CONSTRUCTION SECURITY, CERTIFICATES OF OCCUPANCY/COMPLIANCE CAN BE ISSUED FOR A PERCENTAGE OF SINGLE FAMILY LOTS IN ACCORDANCE WITH CITY REQUIREMENTS. 26.STORMWATER CONTROL MEASURE(S) (SCM[S]) DESIGN CALCULATIONS WILL NOT BE REVIEWED OR APPROVED WITH THE SITE PLAN/PRELIMINARY PLAT SUBMITTAL. ALL SCM DESIGNS WILL BE REVIEWED AND APPROVED DURING THE CONSTRUCTION DRAWING SUBMITTAL PROCESS. IF, AT THE TIME OF CONSTRUCTION DRAWING SUBMITTAL, IT IS FOUND THAT THE PROPOSED SCM(S) IS UNDERSIZED, NOT PROPERLY ACCESSIBLE, OR OTHERWISE INSUFFICIENT OR UNSUITABLE FOR THE SITE, IT IS THE RESPONSIBILITY OF THE APPLICANT TO INSURE THAT THE APPLICABLE STORMWATER ORDINANCE REQUIREMENTS ARE MET. A REVISED SITE PLAN OR PRELIMINARY PLAT MAY BE REQUIRED IF THE ORIGINALLY PROPOSED SCM(S) ARE FOUND INSUFFICIENT, NOT PROPERLY ACCESSIBLE, OR UNSUITABLE AND ALTERNATIVE SCM(S) WITH ASSOCIATED EASEMENTS ARE REQUIRED. 27.THE DEVELOPER/CONTRACTOR SHALL SCHEDULE A PRECONSTRUCTION MEETING WITH THE STORMWATER DEVELOPMENT REVIEW SECTION PRIOR TO COMMENCING WORK ON ANY STORMWATER CONTROL MEASURE (SCM). IF THE SCM WILL BE CONSTRUCTED INITIALLY AS A SEDIMENTATION AND EROSION CONTROL (S&EC) DEVICE, TO BE CONVERTED TO A PERMANENT SCM AT A LATER TIME, THE PRECONSTRUCTION MEETING SHOULD BE SCHEDULED PRIOR TO CONSTRUCTION OF THE S&EC DEVICE. CALL 919-560-4326 EXT. 30238 TO SCHEDULE THE REQUIRED MEETING A MINIMUM OF THREE BUSINESS DAYS PRIOR TO THE DESIRED MEETING DATE. THIS IS IN ADDITION TO OTHER PRECONSTRUCTION MEETING REQUIREMENTS FOR EROSION CONTROL, ENGINEERING INSPECTIONS, ETC. 28.TO RECEIVE CONSTRUCTION DRAWINGS APPROVAL FOR SINGLE FAMILY DETACHED, TOWNHOME AND DUPLEX RESIDENTIAL DEVELOPMENTS THAT ARE MAKING USE OF NUTRIENT BANKS AND/OR THE NCEEP, THE APPROVAL OF THE CONSTRUCTION DRAWINGS IS CONTINGENT UPON THE PURCHASE OF NUTRIENT CREDITS. IF A REVISED SITE PLAN/PRELIMINARY PLAT IS SUBMITTED FOR THIS SITE, THE REVISED SITE PLAN/PRELIMINARY PLAT WILL BE SUBJECT TO ANY ORDINANCES IN PLACE AT THE TIME OF THE REVISED SITE PLAN/PRELIMINARY PLAT SUBMISSION. PRIOR TO THE APPROVAL OF ANY CONSTRUCTION DRAWINGS OR PRIOR TO THE RELEASE OF ANY BUILDING PERMITS PERTAINING TO THIS DEVELOPMENT, WHICHEVER COMES FIRST, A LETTER/RECEIPT SHOWING THE PURCHASE OF THE NUTRIENT CREDITS FOR THIS DEVELOPMENT AND A COPY OF THE NUTRIENT BANK LEDGER IF APPLICABLE, SHOWING THE TOTAL NUTRIENT CREDITS AVAILABLE MINUS ANY AND ALL DEDUCTIONS, IS TO BE PROVIDED TO THE STORMWATER DEVELOPMENT REVIEW SECTION. HOWEVER, IF INSUFFICIENT CREDITS ARE AVAILABLE FROM NUTRIENT BANKS AND NCEEP WILL NOT ACCEPT PAYMENT, THEN THE APPLICANT SHALL SUBMIT A REVISED SITE PLAN/PRELIMINARY PLAT BACK TO THE DURHAM CITY-COUNTY PLANNING DEPARTMENT AND SHALL COMPLY WITH THE CURRENT STORMWATER PERFORMANCE STANDARDS IN PLACE AT THE TIME OF THE REVISED SITE PLAN/PRELIMINARY PLAT SUBMISSION. AN G I E R A V E STAGE RDNC RA I LROAD R .O .W . BETHESDA PARKWRENN RDMARLY DRTYONEK DRBUNGALOW AVERURITAN RDSITE PROJ. MGR: PRELIMINARYCOPYRIGHT ©2018 SEPI ENGINEERING & CONSTRUCTION, INC DRAWN BY: sepiengineering.com E N G I N E E R I N G & C O N S T R U C T I O N 1025 WADE AVENUE RALEIGH, NORTH CAROLINA 919.789.9977 11020 DAVID TAYLOR DR., SUITE 115 CHARLOTTE, NORTH CAROLINA 704.714.4880 5030 NEW CENTRE DR., SUITE B WILMINGTON, NORTH CAROLINA 910.523.5715 LP16010 Construction Drawings 02/05/2019 Revisions Per Comments 04/16/2019 .. .. .. .. .. .. .. .. PROJECT: DATE ISSUE: CHECKED BY: J. WESTMORELAND REVISIONS: 1 .. NOTICE: 3 WORKING DAYS FOR THE LOCATION OF UNDERGROUND FACILITIES BEFORE YOU DIG R Callbefore you dig. below.Know what's THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. CLIENT: Angier Development, LLC 7700 Kencot Court Raleigh, NC 27615 Contact: David Lazzo PH: (919) 601-2816 dlazzo2100@gmail.com L. SMITH J. BEARD .. ANGIER AVENUE RESIDENTIAL CONSTRUCTION DRAWINGS 3846 Angier Avenue Durham, NC CITY OF DURHAM PUBLIC WORKS DEPARTMENT APPROVED ENGINEERING DATE STORMWATER DATE TRANSPORTATION DATE DATE DATEPRELIMINAR Y - N O T F O R C O N S T R U C T I O N BENCHMARK TBM: 13 IN. OAK N: 799151.14636 E: 2045555.4021 EL: 363.381 COVER SHEET C-1.0 SHEET INDEX SURVEYOR / ENGINEER / LANDSCAPE ARCHITECT REFERENCES: ZP170102 (REZONING) Z170009 (REZONING) BDG1700005 (ANNEXATION) DI800067 (PLANNING) 1st SUBMITTAL: FEBRUARY 5, 2019 2nd SUBMITTAL: APRIL 16, 2019 DEVELOPMENT PLAN COMMITMENTS 1.ULTIMATE ANGIER AVENUE ROADWAY SECTION TO INCLUDE: a.WESTBOUND LEFT-TURN LANE WITH STORAGE AND TAPERS AT SITE ACCESS. b.EASTBOUND LEFT-TURN LANE WITH STORAGE AND TAPERS AT BUNGALOW AVENUE. c.CONTINUOUS TWO-WAY LEFT-TURN LANE BETWEEN THE TWO LEFT-TURN LANES. d.FOUR FEET (4') ADDITIONAL ASPHALT ACROSS ENTIRE FRONTAGE ALONG SOUTH SIDE OF ANGIER AVENUE FOR FUTURE BIKE LANE. e.SIDEWALK 2.PEDESTRIAN CONNECTION FROM PROJECT SITE TO BOUNDARY WITH BETHESDA PARK. PRIOR TO ISSUANCE OF A BUILDING PERMIT: 1.DEDICATE AN ADDITIONAL 10' OF RIGHT-OF-WAY FOR THE FRONTAGE OF THE SITE ALONG ANGIER AVENUE. PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY: 2.CONSTRUCT A WESTBOUND LEFT-TURN LANE WITH ADEQUATE STORAGE AND APPROPRIATE TAPERS ON ANGIER AVENUE AT SITE ACCESS #1 AND AN EASTBOUND LEFT TURN LANE WITH ADEQUATE STORAGE AND APPROPRIATE TAPERS ON ANGIER AVENUE AT BUNGALOW AVENUE WITH A CONTINUOUS TWO-WAY LEFT-TURN LANE BETWEEN THE TWO LEFT-TURN LANES. 3.A MINIMUM OF 4' OF ADDITIONAL ASPHALT WILL BE PROVIDED FOR THE FULL FRONTAGE OF THE SITE ALONG THE SOUTH SIDE OF ANGIER AVENUE. THE ADDITIONAL ASPHALT WIDENING WILL BE PROVIDED TO ALLOW FOR A FUTURE BICYCLE LANE. 4.SUBJECT TO A DETERMINATION BY GoDurham AND GoTriangle ON THE NEED FOR TRANSIT RELATED IMPROVEMENTS AT THE TIME OF SITE PLAN SUBMITTAL, CONSTRUCT A BUS PULL-OUT AND A CONCRETE PAD/BUS SHELTER TO GoDurham/GoTriangle SPECIFICATIONS ALONG THE SOUTH SIDE OF ANGIER AVENUE ADJACENT TO THE SITE. DURHAM COUNTY SEDIMENTATION & EROSION CONTROL NOTES 1.IF MORE THAN 12,000 SQ.FT. IS DISTURBED A LAND-DISTURBING PERMIT WILL BE REQUIRED PRIOR TO THE COMMENCEMENT OF ANY LAND-DISTURBING ACTIVITIES. 2.IF MORE THAN 20,000 SQ.FT. IS DISTURBED, A SEDIMENTATION AND EROSION CONTROL PLAN MUST BE SUBMITTED AND APPROVED PRIOR TO THE ISSUANCE OF A LAND-DISTURBANCE PERMIT. 3.TREE PROTECTION IS REQUIRED BY THE CITY/COUNTY PLANNING DEPARTMENT , TREE PROTECTION CERTIFICATION MUST BE SUBMITTED TO THE DURHAM COUNTY EROSION CONTROL DIVISION, AND TREE PROTECTION INSPECTION COMPLETED PRIOR TO LAND-DISTURBANCE PERMIT. 4.IF AN OFFSITE SPOIL OR BORROW SITE IS UTILIZED, THEN THE DISTURBED FOR THE SPOIL/BORROW SITE MUST BE INCLUDED IN THE LAND DISTURBANCE PLAN AND PERMIT UNLESS THE SPOIL/BORROW SITE ALREADY HAS A LAND DISTURBANCE PERMIT. 5.IF THE DISTURBED AREA EXCEEDS FIVE (5) ACRES, AN IMPROVEMENT SECURITY WILL BE REQUIRED PRIOR TO LAND-DISTURBANCE PERMIT ISSUANCE. C-1.0 COVER SHEET C-2.1 EXISTING CONDITIONS C-2.2 DEMOLITION PLAN C-3.0 OVERALL SITE PLAN C-3.1 ENLARGED SITE PLAN (NORTH) C-3.2 ENLARGED SITE PLAN (SOUTH) C-3.3 EASEMENT PLAN C-4.1 EROSION CONTROL PLAN - PHASE 1 C-4.2 EROSION CONTROL PLAN - PHASE 2 C-5.0 OVERALL GRADING & STORM DRAINAGE PLAN C-5.1 ENLARGED GRADING & STORM DRAINAGE PLAN (NORTH) C-5.2 ENLARGED GRADING & STORM DRAINAGE PLAN (SOUTH) C-6.1 STORMWATER PLAN - WETLAND #1 C-6.2 STORMWATER PLAN - WETLAND #2 C-6.3 STORMWATER PLAN - DETAILS C-7.0 OVERALL UTILTY PLAN C-8.1 PLAN & PROFILE - STREET A C-8.2 PLAN & PROFILE - STREET A (CONT.) C-8.3 PLAN & PROFLE - STREET B C-8.4 PLAN & PROFILE - STREET B (CONT.) & STREET C C-8.5 PLAN & PROFILE - ANGIER AVENUE C-8.6 PLAN & PROFILE - OFFSITE SANITARY SEWER MAIN C-9.0 SIGNAGE NOTES C-9.1 ENLARGED SIGNAGE PLAN (NORTH) C-9.2 ENLARGED SIGNAGE PLAN (SOUTH) C-9.3 ENLARGED SIGNAGE PLAN (ANGIER AVE.) C-10.1 SITE DETAILS C-10.2 SITE DETAILS (CONT.) C-11.1 WATER DETAILS C-11.2 WATER DETAILS (CONT.) C-12.1 SANITARY SEWER DETAILS C-12.2 SANITARY SEWER DETAILS (CONT.) C-12.3 SANITARY SEWER DETAILS (CONT.) C-13.1 STORM DRAINAGE DETAILS C-13.2 STORM DRAINAGE DETAILS C-14.1 EROSION CONTROL DETAILS C-14.2 EROSION CONTROL DETAILS (CONT.) C-15.1 NCDOT DETAILS C-15.2 NCDOT DETAILS (CONT.) C-15.3 NCDOT DETAILS (CONT.) C-15.4 NCDOT DETAILS (CONT.) C-15.5 NCDOT DETAILS (CONT.) L-1.0 LANDSCAPE PLAN L-1.1 LANDSCAPE PLAN - WETLAND #1 L-1.2 LANDSCAPE PLAN - WETLAND #2 DocuSign Envelope ID: 8C264526-3E7F-4569-8C3F-0ABD8FCCA50D 4/17/2019 400380395390395 405395 385385385390390390390390390390390390 3953 9 5 3 9 5395395395395395395395395395395395395395395 40040040040 0 40 0 40 0 4 0 0400 400400400400400400400400400400400 4004004 0 5405405 405405405405405 405410410410410410 410410390390390390390390385385385385385385380380380380380375375375375375375375375370370370370370365365360 R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WN/F RODNEY PAUL JENKINSAND WIFETERESA DEVORE JENKINSD.B. 3665, PG. 454P.B. 76, PG. 79PIN: 0749-02-59-8792PID: 163536ZONING: RS-20USE: RESIDENTIALR/WR/WR/WR/WR/WR/WR/WR/WR/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/ WR/WR/WR/WR/Wxxxxxxxx x x x x x x x x x x N/F MONICA MURPHYD.B. 7776, PG. 67P.B. 17, PG. 163PIN: 0840-04-50-2584PID: 163496ZONING: RS-20USE: RESIDENTIALN/F MARTHA WEISSMESSICKD.B. 2378, PG. 474PIN: 0840-04-50-5754PID: 163497ZONING: RS-20USE: RESIDENTIALN/F LATTIE F. GOODWIN,JR.D.B. 1360, PG. 338P.B. 29, PG. 145PIN: 0840-04-50-6648PID: 163498ZONING: RS-20USE: RESIDENTIALN/F PENNY PIERCE, POLLY PIERCESMITH,SCOTT PIERCE AND, ANDREWPIERCED.B. 7115, P.G. 665 (TRACT 1)P.B. 22, PG. 37PIN: 0840-04-50-5342PID: 163500ZONING: RS-20USE: VACANTAREA: 363739 SQ. FT.8.350 ACRESN/F KENNETH REID INSCOED.B. 4328, PG. 600PIN: 0840-04-60-0232PID: 163509ZONING: RS-20USE: COM/WHSE-STORAGEN/F ANGIER DEVELOPMENT, LLCD.B. 2644, PG. 710P.B. 22, PG. 37PIN: 0840-04-50-8205PID: 163501ZONING: PDRUSE: VACANTAREA: 346132 SQ. FT.7.946 ACRESN/F MARIAN THOMASD.B. 7723, PG. 917PIN: 0840-04-60-0101PID: 163506ZONING: RS-20USE: RESIDENTIALN/F CITY OF DURHAMD.B. 2713, PG. 558D.B. 8184, PG. 9P.B. 144, PG. 126PIN: 0749-02-58-3669PID: 163527ZONING: RS-20USE: PARK20.00'100'100'GARAGESTAG E R O A D - S R 2 0 2 3 60' RI G H T - O F - W A Y ( P U B L I C )N/F PENNY PIERCE, POLLY PIERCE SMITH, SCOTT PIERCE AND, ANDREW PIERCED.B. 7115, PG. 665 (TRACT 2)P.B. 17, PG. 38P.B. 22, PG. 37P.B. 193, PG. 160PIN: 0840-04-50-3358PID: 163499ZONING: RS-20USE: VACANTAREA: 74950 SQ. FT.1.721 ACRESN/F A PORTION OFJOYCE M. APPELSOLE HEIR TOBERTHA MAYNARDSEE: D.B. 56, PG. 494& D.B. 56, PG. 459PIN: 0840-02-40-5199PID: 163391ZONING: I-2 & RS-20USE: INDUSTRIAL/VACANTN/F BELARMINO ROSALESANDIRIS D. GLADAMEZD.B. 7835, PG. 643P.B. 76, PG. 79PIN: 0749-02-59-7264PID: 163516ZONING: RS-20USE: RESIDENTIALN/F DANNY L. JUSTICEAND WIFECYNTHIA H. JUSTICED.B. 1776, PG. 195P.B. 71, PG. 72PIN: 0749-02-59-7384PID: 163515ZONING: RS-20USE: RESIDENTIALN/F HOWARD V. BOUNDSAND WIFEJOAN C. BOUNDSD.B. 400, PG. 180P.B. 71, PG. 72PIN: 0749-02-59-8413PID: 163514ZONING: RS-20USE: RESIDENTIALN/F MICHAEL R. KELLYAND WIFEMARY ELAINE E. KELLYD.B. 407, PG. 123P.B. 76, PG. 72PIN: 0749-02-59-8663PID: 163535ZONING: RS-20USE: RESIDENTIALN/F KEVIA YONIKA BRAXTONAND HUSBANDJACKIE LAVAL BRAXTOND.B. 7476, PG. 507P.B. 71, PG. 72PIN: 0749-02-59-9812PID: 163537ZONING: RS-20USE: RESIDENTIALN/F DEVON RENEE WINKIEESTATE FILE: 2013-E-404D.B. 2013-E, PG. 404P.B. 71, PG. 72PIN: 0749-02-59-9942PID: 163538ZONING: RS-20USE: RESIDENTIALN/F PETER A. TRANANDBENJAMIN A. TRAND.B. 7423, PG. 773PIN: 0840-02-50-9071PID: 163507ZONING: RS-20USE: RESIDENTIALN/F MABLE A HUTCHINSD.B. 1042, PG. 850P.B. 98, PG. 10PIN: 0840-04-60-0355PID: 163510ZONING: RS-20USE: RESIDENTIALN/F RON WALKERD.B. 1625, PG. 828P.B. 27, PG. 189PIN: 0840-04-60-0530PID: 163502ZONING: RS-20USE: RESIDENTIALN/F RUBERT E. BYRDAND WIFESHIRLEY B. BYRDD.B. 7845, PG. 615P.B. 71, PG. 72PIN: 0749-02-59-8543PID: 163513ZONING: RS-20USE: RESIDENTIAL17.38'7.67'S 27°27'33" E44.88' (TIE)N/F CITY OF DURHAMD.B. 5173, PG. 452P.B. 64, PG. 32P.B. 45, PG. 77PIN: 0749-02-59-7030PID: 163518ZONING: RS-20USE: VACANT/PARKN/F NORTH CAROLINARAILROAD COMPANYPIN: 0749-02-48-8696PID: 218143N/F MARIO CABRERAZAMARRIPAD.B. 8130, PG. 977P.B. 27, PG. 189PIN: 0840-04-60-0496PID: 163503ZONING: RS-20USE: RESIDENTIALN/F WILLIAM H. JEFFREYSSEE: D.B. 239, PG. 420P.B. 29, PG. 82PIN: 0749-02-59-2496PID: 163526ZONING: RS-20USE: VACANTAREA: 84655 SQ. FT.1.943 ACRESAPPARENT DEED GAP(LEGAL RESOLUTIONIN PROCESS)POINT OF BEGINNINGCONTROL CORNERN: 800599.60E: 2046020.56EIP11.78' NW OF EIPEIPEIPEIPEIPEIP0.33' SE OF EIP0.18' NW OF EIPEIPEIP BENT0.06' SE OF EIP BENT0.10' SE OF EIP ON LINEEIP IN CONC0.21' NW OF EIR0.08' SE OF EIPEIP0.32' NW OF EIP0.10' NW OF EIPEIPEIPEIRS 66°12'39" E 0.22' FROM AXLEAXLEAXLEEIPEIREIPEIPEIPEIPEIPEIPIRSIRSIRSIRSIRSIRSIRSIRSIRSN 82°37'35" W 3.24' FROM EIPIRSIRSIRS72" OAK51" OAK29" PINE32" OAK32" OAK40.5" TWIN OAK36" OAK25" OAK25" OAK31" OAK23" OAK28.5" OAK25" OAK33" OAK26" OAK21" OAK44" TWIN OAK24" OAKIRSS54°28'18"E105.00'S57°55'45"E99.81'N30°51'29"E 210.18'S62°22'58"E165.99'N27°42'17"E 669.81'S14°56'37"W1601.25' TOTALN27°27'33"W179.97'172.05'137.30'108.84'190.25'99.96'99.88'499.50'108.87'147.22'S30°02'43"E121.54' TIEN27°42'17"E87.07' (TIE)S16°58'17"E291.42' (TIE)N 27°47'33" E 25.24' (TIE)S87°51'08"E69.14'S56°21'20"E99.95' (TIE)S62°10'49"E77.32' (TIE)S62°10'54"E117.01' (TIE)S30°50'42"W 212.93' (TIE)N25°21'39"W100.04' (TIE)N25°54'55"W115.14' (TIE)N25°48'19"W30.00' (TIE)N27°27'27"W382.82'C5S87°41'00"E326.34'C1N02°07'25"W2.70'S23 ° 4 8 ' 1 2 " W 148. 4 0 'S63°50'37"E39.00'S17°33'21"W1215.28'160.00'222.82'318.67'S30°48'05"W 206.52'C2C3C4C6ANGIER AVENUE - SR 1926EX. 60' RIGHT-OF-WAY (PUBLIC)XXXXXXXX X X X X X X X X X X R/W BUNGALOW AVENUE - SR 2036 EX. 50' RIGHT-OF-WAY (PUBLIC) R/W R/WR/WN/ F E R I K P O T E N Z A D. B . 4 5 9 6 P G . 5 2 3 P.B . 9 P G . 1 1 PI N : 08 4 0 - 0 4 - 5 0 - 9 8 7 4 PI D : 1 6 3 0 7 2 ZO N I N G : R S - 2 0 US E : V A C A N T R E S / L O T - S M L T R A C T N/ F E R I K P O T E N Z A D. B . 4 5 9 6 P G . 5 2 3 P. B . 9 P G . 1 1 08 4 0 - 0 4 - 6 0 - 0 8 5 1 PI D : 1 6 3 0 7 3 ZO N I N G : R S - 2 0 US E : R E S I D E N T I A L N/ F E R I K P O T E N Z A D. B . 4 5 9 6 P G . 5 2 3 P.B . 9 P G . 1 1 08 4 0 - 0 4 - 6 0 - 1 7 2 3 PI D : 1 6 3 0 7 4 ZO N I N G : R S - 2 0 US E : V A C A N T R E S / LO T - S M L T R A C T N/ F E R I K P O T E N Z A D. B . 4 1 4 2 P G . 4 7 2 PI N : 08 4 0 - 0 4 - 5 0 - 8 9 6 3 PI D : 1 6 3 0 7 1 ZO N I N G : R S - 2 0 US E : R E S I D E N T I A L N/F SUN HS WAREHOUSEGROUP LLCD.B. 8301 PG. 350P.B.9 PG. 11APIN:0840-04-51-7011PID:204498ZONING: RS-20USE:RESIDENTI A LN/F APPEL JOYCE MD.B. 56, PG. 494PIN:0840-02-40-5199PID: 163391ZONING: ILUSE: VACANT INDUSTRIALN25°24'00"W27.46' (TIE)EOPEOPR/WR/WR/WS27°47'33"W 782.20'INV: 399.2612" RCPINV: 399.19INV: 396.45INV: 395.40INV: 399.61INV: 399.2615" CMPN/F NORTH CAROLINARAILROAD COMPANYPIN: 0840-02-40-8265PID: 219065N/F PATRICIA PEACOCKAND HUSBANDRICHARD AVON PEACOCK, SR.D.B. 6345, PG. 255P.B. 76, PG. 79PIN: 0749-02-59-7123PID: 163517ZONING: RS-20USE: RESIDENTIALEXISTINGCONCRETECREEKTOP OF BANKTOP OF BANKEXISTINGSIDEWALKCLEANOUTSGRAVELENTRANCExxR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WCATCH BASINTOP GRATE: 401.37'INV. (S.E.): 398.05'INV. (N.W.): 397.91'CATCH BASINTOP GRATE: 403.39'INV. (S.W.): 399.50'CATCH BASINTOP GRATE: 402.35'INV. (N.E.): 399.18'INV. (S.E.): 399.22'INV. (N.W.): 398.97'INV. = 397.82'INV. = 401.15'INV. = 399.76'INV. = 401.43'INV. = 401.47'INV. = 401.12'INV. = 400.99'INV. = 398.35'INV. = 398.53'INV. = 400.68'INV. = 399.64'INV. = 398.73'INV. = 398.46'INV. = 397.97'INV. = 397.38'INV. = 396.33'INV. = 394.32'INV. = 393.70'INV. = 396.12'INV. = 395.02'15" RCP18"RCP15"RCP15"CMP15" RCP24" RCP24" RCP2 4 " RC P SSANITARY MHRIM: 407.18'INV. (S.W.): 400.97'INV. (S.E.): 400.93'SSANITARY MHRIM: 410.22'INV. (N.E.): 401.75'8" D I P WWVWVWWWVWVWWWVWWV15" RCP15" RCP12" RCP15" CPP15" CMP15" RCPEX. STREAMEX. 50' STREAMBUFFERSSSSSSSN25°39'12"W99.74' (TIE)EXISTING CITY LIMITSN/F JENN IFER B . LUNDYD.B . 1029 , PG . 964P.B . 45 , PG . 78PIN : 0749 -02 -58 -7899ZONING : RS -20USE: RES IDENT IAL N/F COUNTY OF DURHAMD.B. 5749, PG. 998P.B. 123, PG. 188PIN: 0749-02-59-6042PID: 163519ZONING: RS-20USE: PUMP STATIONN/F DEYS I A IDA AGU ILARAND HUSBANDALEX O . AGU ILARD.B . 1181 , PG . 924PIN : 0749 -02 -58 -8830ZONING : RS -20USE: RES IDENT IAL WWWWWWWWWWWWWWWWWWWWWWWWR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/ W R/ W R/ W R/WGENERAL NOTES1.BOUNDARY INFORMATION SHOWN ON THIS PLAN WAS OBTAINED FROM A SURVEY ENTITLED "CONTIGUOUS ANNEXATIONPLAT" PREPARED FOR: ANGIER DEVELOPMENT LLC. PREPARED BY: HENRY FITTS, P.L.S. OF SEPI ENGINEERING &CONSTRUCTION DATED FEBRUARY 07, 2017.2.STREAM AND WETLANDS INFORMATION SHOWN ON THIS PLAN WAS OBTAINED FROM A PRELIMINARY WATERS OF THE USASSESSMENT PREPARED BY ANGLER ENVIRONMENTAL DATED SEPTEMBER 2016, AND A BUFFER DETERMINATION LETTERDATED APRIL 6, 2017 FROM THE NC DIVISION OF WATER RESOURCES.3.TOPOGRAPHIC INFORMATION OBTAINED FROM CITY/COUNTY OF DURHAM G.I.S., AND DIGITAL TOPOGRAPHIC SURVEY FILEOBTAINED FROM SEPI ENGINEERING & CONSTRUCTION DATED 08-15-2018.4.TO THE BEST OF OUR KNOWLEDGE, THERE IS NO PRESENCE OF THE FOLLOWING ON THE PROJECT SITE:·NON-ENCROACHMENT AREA / NON-ENCROACHMENT AREA FRINGE·FLOODWAY / FLOODWAY FRINGE·STEEP SLOPES5.TO THE BEST OF OUR KNOWLEDGE THE PROJECT SITE IS NOT INCLUDED IN THE FOLLOWING INVENTORIES:·DURHAM COUNTY INVENTORY OF NATURAL AREAS, PLANTS AND WILDLIFE INVENTORY·DURHAM ARCHITECTURAL AND HISTORIC INVENTORY·DURHAM COUNTY ARCHAEOLOGICAL INVENTORY, OTHER ARCHAEOLOGICAL SITES, OR OTHER PROTECTED AREAS6.THE LOCATION OF EXISTING UNDERGROUND UTILITIES AS SHOWN (IF ANY) IS APPROXIMATE ONLY; UTILITIES MAY EXISTWHICH ARE NOT SHOWN. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL PUBLIC OR PRIVATE UTILITIES WHICH LIE INOR ADJACENT TO THE CONSTRUCTION SITE WITHIN THE LIMITS OF ANY GRADING OR EXCAVATION. THE CONTRACTORSHALL BE RESPONSIBLE FOR REPAIRING AT HIS EXPENSE, ANY EXISTING UTILITIES DAMAGED DURING CONSTRUCTION.7.ANY ONSITE UTILITIES DESIGNATED TO BE RELOCATED, AS REQUIRED FOR CONSTRUCTION, WILL BE DONE AT OWNER'SEXPENSE. CONTRACTOR TO CONTACT CITY OF DURHAM AND ANY APPLICABLE UTILITY COMPANIES PRIOR TORELOCATION.8.DAMAGE DONE TO ANY ITEMS NOT SHOWN IN THESE PLANS TO BE REMOVED, ADDED, OR REPLACED SHALL BEREPAIRED/REPLACED AT THE CONTRACTOR'S EXPENSE.PROPERTY LINE (PL)RIGHT-OF-WAY LINER/WEXISTING WATER LINEEXISTING GRAVITY SEWEREXISTING OVERHEAD ELECTRIC LINEEXISTING MAJOR CONTOUREXISTING MINOR CONTOUREXISTING FENCE140139LEGENDSURVEY BENCHMARKFIRE HYDRANTWATER VALVEPROPERTY CORNER/MONUMENTUTILITY POLEWVEDGE OF PAVEMENTEOPEX. IRON REBAREX. IRON PINEIREIPGUY WIREEX. WETLANDSADJACENT PROPERTY LINEPROJ. MGR: P R E L I M I N A R YCOPYRIGHT ©2018SEPI ENGINEERING & CONSTRUCTION, INCDRAWN BY:sepiengineering.comE N G I N E E R I N G &C O N S T R U C T I O N1025 WADE AVENUERALEIGH, NORTH CAROLINA919.789.997711020 DAVID TAYLOR DR., SUITE 115CHARLOTTE, NORTH CAROLINA704.714.48805030 NEW CENTRE DR., SUITE BWILMINGTON, NORTH CAROLINA910.523.5715LP16010Construction Drawings02/05/2019Revisions Per Comments04/16/2019................PROJECT:DATEISSUE:CHECKED BY:J. WESTMORELANDREVISIONS:1..NOTICE:3 WORKING DAYSFOR THE LOCATION OFUNDERGROUND FACILITIESBEFORE YOU DIGRCallbefore you dig.below.Know what'sTHE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATEWAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITSREPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALLEXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLEFOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURETO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES.CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THECONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BEEXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THEWORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBYSTRUCTURES, OR OF ANY OTHER PERSONS.CLIENT:Angier Development, LLC7700 Kencot CourtRaleigh, NC 27615Contact:David LazzoPH: (919) 601-2816dlazzo2100@gmail.comL. SMITHJ. BEARD..ANGIER AVENUERESIDENTIALCONSTRUCTIONDRAWINGS3846 Angier AvenueDurham, NCCITY OF DURHAMPUBLIC WORKS DEPARTMENTAPPROVEDENGINEERINGDATESTORMWATERDATETRANSPORTATIONDATEDATEDATEPRELIMINARY - NOT FOR CONSTRUCTIONBENCHMARKTBM: 13 IN. OAKN: 799151.14636E: 2045555.4021EL: 363.381EXISTING CONDITIONSC-2.1CURVE #CURVE TABLEC12050.00'2029.00'2029.00'2815.18'RADIUSC2C3C4C5C62029.00'2815.18'423.11'24.98'62.79'153.08'LENGTH163.20'95.33'11° 49' 32"0° 42' 19"1° 46' 24"3° 06' 56"DELTA4° 36' 31"1° 56' 24"N03° 47' 21" E 422.36'CHORDN02° 28' 35" W 24.98'N08° 10' 14" W 62.79'N11° 21' 41" W 163.16'S60° 49' 30" E 153.06'S60° 14' 14" E 95.32'EX. WETLANDSEX. STREAMEX. STREAM EX. 50' STREAMBUFFEREX. STREAM BUFFEREX. TREEEX. WETLANDS1 inch = 100 ft.100'0100'DocuSign Envelope ID: 8C264526-3E7F-4569-8C3F-0ABD8FCCA50D4/17/2019 400 380395 3903954 0 5 39538 5 3 8 5 385 390390390 390 390390390390390395 395395395 395 3953953953953953953 9 5 39539 5 395 3953 9 5 400 400 40 0 400400400400400 400 400 400 400400400400400400400400 4004004054 0 5 4 0 5 405 4054054 0 5 4 0 5 40 5 410 4104104104104 1 0 410390 390 390 3 9 0390390 3853853 8 5 385385385 38038038 0 3803 8 0 37 5375375375375375375 375 370 3 7 0370370370 365 365 360R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WN/F R O D N E Y P A U L J E N K I N S AND W I F E TERES A D E V O R E J E N K I N S D.B. 3 6 6 5 , P G . 4 5 4 P.B. 7 6 , P G . 7 9 PIN: 0 7 4 9 - 0 2 - 5 9 - 8 7 9 2 PID: 1 6 3 5 3 6 ZONI N G : R S - 2 0 USE: R E S I D E N T I A L R /W R /WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WxxxxxxxxxxxxxxxxxxN/F MONICA MURPHY D.B. 7776, PG. 67 P.B. 17, PG. 163 PIN: 0840-04-50-2584 PID: 163496 ZONING: RS-20 USE: RESIDENTIAL N/F MARTHA WEISS MESSICK D.B. 2378, PG. 474 PIN: 0840-04-50-5754 PID: 163497 ZONING: RS-20 USE: RESIDENTIAL N/F LATTIE F. GOODWIN, JR. D.B. 1360, PG. 338 P.B. 29, PG. 145 PIN: 0840-04-50-6648 PID: 163498 ZONING: RS-20 USE: RESIDENTIAL N/F PENNY PIERCE, POLLY PIERCE SMITH, SCOTT PIERCE AND, ANDREW PIERCE D.B. 7115, P.G. 665 (TRACT 1) P.B. 22, PG. 37 PIN: 0840-04-50-5342 PID: 163500 ZONING: RS-20 USE: VACANT AREA: 363739 SQ. FT. 8.350 ACRES N/F KENNETH REID INS C O E D.B. 4328, PG. 600 PIN: 0840-04-60-0232 PID: 163509 ZONING: RS-20 USE: COM/WHSE-STOR A G E N/F ANGIER DEVELOPMENT, LLC D.B. 2644, PG. 710 P.B. 22, PG. 37 PIN: 0840-04-50-8205 PID: 163501 ZONING: PDR USE: VACANT AREA: 346132 SQ. FT. 7.946 ACRES N/F M A R I A N T H O M A S D.B. 77 2 3 , P G . 9 1 7 PIN: 0 8 4 0 - 0 4 - 6 0 - 0 1 0 1 PID: 1 6 3 5 0 6 ZONIN G : R S - 2 0 USE: R E S I D E N T I A L N/F CITY OF DURHAM D.B. 2713, PG. 558 D.B. 8184, PG. 9 P.B. 144, PG. 126 PIN: 0749-02-58-3669 PID: 163527 ZONING: RS-20 USE: PARK 20.00' 100' 100' GAR A G E STAGE ROAD - SR 202360' RIGHT-OF-WAY (PUBLIC)N/F PENNY PIERCE, POLLY PIERCE SMITH, SCOTT PIERCE AND, ANDREW PIERCE D.B. 7115, PG. 665 (TRACT 2) P.B. 17, PG. 38 P.B. 22, PG. 37 P.B. 193, PG. 160 PIN: 0840-04-50-3358 PID: 163499 ZONING: RS-20 USE: VACANT AREA: 74950 SQ. FT. 1.721 ACRES N/F A PORTION OF JOYCE M. APPEL SOLE HEIR TO BERTHA MAYNARD SEE: D.B. 56, PG. 494 & D.B. 56, PG. 459 PIN: 0840-02-40-5199 PID: 163391 ZONING: I-2 & RS-20 USE: INDUSTRIAL/VACANT N/F BE L A R M I N O R O S A L E S ANDIRIS D. G L A D A M E Z D.B. 7 8 3 5 , P G . 6 4 3 P.B. 7 6 , P G . 7 9 PIN: 0 7 4 9 - 0 2 - 5 9 - 7 2 6 4 PID: 1 6 3 5 1 6 ZONIN G : R S - 2 0 USE: R E S I D E N T I A L N/F D A N N Y L . J U S T I C E AND W I F ECYNT H I A H . J U S T I C E D.B. 1 7 7 6 , P G . 1 9 5 P.B. 7 1 , P G . 7 2 PIN: 0 7 4 9 - 0 2 - 5 9 - 7 3 8 4 PID: 1 6 3 5 1 5 ZONIN G : R S - 2 0 USE: R E S I D E N T I A L N/F H O W A R D V . B O U N D S AND W I F E JOAN C . B O U N D S D.B. 4 0 0 , P G . 1 8 0 P.B. 7 1 , P G . 7 2 PIN: 0 7 4 9 - 0 2 - 5 9 - 8 4 1 3 PID: 1 6 3 5 1 4 ZONI N G : R S - 2 0 USE: R E S I D E N T I A L N/F M I C H A E L R . K E L L Y AND W I F E MARY E L A I N E E . K E L L Y D.B. 4 0 7 , P G . 1 2 3 P.B. 7 6 , P G . 7 2 PIN: 0 7 4 9 - 0 2 - 5 9 - 8 6 6 3 PID: 1 6 3 5 3 5 ZONIN G : R S - 2 0 USE: R E S I D E N T I A L N/F KE V I A Y O N I K A B R A X T O N AND H U S B A N D JACKI E L A V A L B R A X T O N D.B. 7 4 7 6 , P G . 5 0 7 P.B. 7 1 , P G . 7 2 PIN: 0 7 4 9 - 0 2 - 5 9 - 9 8 1 2 PID: 1 6 3 5 3 7 ZONIN G : R S - 2 0 USE: R E S I D E N T I A L N/F D E V O N R E N E E W I N K I E ESTAT E F I L E : 2 0 1 3 - E - 4 0 4 D.B. 2 0 1 3 - E , P G . 4 0 4 P.B. 7 1 , P G . 7 2 PIN: 0 7 4 9 - 0 2 - 5 9 - 9 9 4 2 PID: 1 6 3 5 3 8 ZONI N G : R S - 2 0 USE: R E S I D E N T I A L N/F PE T E R A . T R A N ANDBENJA M I N A . T R A N D.B. 7 4 2 3 , P G . 7 7 3 PIN: 0 8 4 0 - 0 2 - 5 0 - 9 0 7 1 PID: 1 6 3 5 0 7 ZONI N G : R S - 2 0 USE: R E S I D E N T I A L N/F MABLE A HUTCHINS D.B. 1042, PG. 850 P.B. 98, PG. 10 PIN: 0840-04-60-0355 PID: 163510 ZONING: RS-20 USE: RESIDENTIAL N/F RON WALKER D.B. 1625, PG. 828 P.B. 27, PG. 189 PIN: 0840-04-60-0530 PID: 163502 ZONING: RS-20 USE: RESIDENTIAL N/F R U B E R T E . B Y R D AND W I F E SHIRL E Y B . B Y R D D.B. 7 8 4 5 , P G . 6 1 5 P.B. 7 1 , P G . 7 2 PIN: 0 7 4 9 - 0 2 - 5 9 - 8 5 4 3 PID: 1 6 3 5 1 3 ZONI N G : R S - 2 0 USE: R E S I D E N T I A L 17.38' 7.67' S 27°27'33" E 44.88' (TIE) N/F CITY OF DURHAM D.B. 5173, PG. 452 P.B. 64, PG. 32 P.B. 45, PG. 77 PIN: 0749-02-59-7030 PID: 163518 ZONING: RS-20 USE: VACANT/PARK N/F NO R T H C A R O L I N A RAILRO A D C O M P A N Y PIN: 074 9 - 0 2 - 4 8 - 8 6 9 6 PID: 218 1 4 3 N/F MARIO CABRERA ZAMARRIPA D.B. 8130, PG. 977 P.B. 27, PG. 189 PIN: 0840-04-60-0496 PID: 163503 ZONING: RS-20 USE: RESIDENTIAL N/F WILLIAM H. JEFFREYS SEE: D.B. 239, PG. 420 P.B. 29, PG. 82 PIN: 0749-02-59-2496 PID: 163526 ZONING: RS-20 USE: VACANT AREA: 84655 SQ. FT. 1.943 ACRES APPARENT DEED GAP (LEGAL RESOLUTION IN PROCESS) POINT OF BEGINNING CONTROL CORNER N: 800599.60 E: 2046020.56 EIP 11.78' NW OF EIP EIP EIP EIP EIP EIP 0.33' SE OF EIP 0.18' NW OF EIP EIP EIP BENT 0.06' SE OF EIP BENT 0.10' SE OF EIP ON LINE EIP IN CONC 0.21' NW OF EIR 0.08' SE OF EIP EIP 0.32' NW OF EIP 0.10' NW OF EIP EIP EIP EIR S 66°12'39" E 0.22' FROM AXLE AXLE AXLE EIP EIR EIP EIP EIP EIP EIP EIP IRS IRS IRS IRS IRS IRS IRS IRS IRS N 82°37'35" W 3.24' FROM EIP IRS IRS IRS 72" OAK 51" OAK 29" PINE 32" OAK 32" OAK 40.5" TWIN OAK 36" OAK 25" OAK 25" OAK 31" OAK 23" OAK 28.5" OAK 25" OAK 33" OAK 26" OAK 21" OAK 44" TWIN OAK 24" OAK IRS S5 4 ° 2 8 ' 1 8 " E 10 5 . 0 0 ' S5 7 ° 5 5 ' 4 5 " E 99 . 8 1 'N30°51'29"E210.18'S6 2 ° 2 2 ' 5 8 " E 165 . 9 9 'N27°42'17"E669.81'S14°56'37"W1601.25' TOTALN27°27 '33 "W179.97 '172.05'137.30'108.84'190.25'99.96'99.88'499.50'108.87'147.22'S30°02 '43 "E121.54 ' T IE N27°42'17"E 87.07' (TIE)S16°58'17"E291.42' (T IE) N 27°47'33" E 25.24' (TIE) S87°51'08"E 69.14' S5 6 ° 2 1 ' 2 0 " E 99 . 9 5 ' ( T I E ) S62 ° 1 0 ' 4 9 " E 77. 3 2 ' ( T I E ) S6 2 ° 1 0 ' 5 4 " E 11 7 . 0 1 ' ( T I E )S30°50'42"W212.93' (TIE)N25°21'39"W 100.04' (TIE) N25°54'55"W 115.14' (TIE) N25°48'19"W 30.00' (TIE)N27°27 '27 "W382.82 ' C5 S87°41'00"E 326.34'C1N02°07'25"W 2.70'S23°48'12"W148.40'S63°50'37"E 39.00'S17°33'21"W1215.28'160.00 '222.82 ' 318.67'S30°48'05"W206.52'C2 C3C4C6 A N G I E R A V E N U E - S R 1 9 2 6 E X . 6 0 ' R I G H T - O F - W A Y ( P U B L I C )XXXXXXXXXXXXXXXXXXR/WBUNGALOW AVENUE - SR 2036EX. 50' RIGHT-OF-WAY (PUBLIC)R/WR/WR/WN/F ERIK POTENZAD.B. 4596 PG. 523P.B. 9 PG. 11PIN:0840-04-50-9874PID: 163072ZONING: RS-20USE: VACANT RES/ LOT-SML TRACTN/F ERIK POTENZAD.B. 4596 PG. 523P.B. 9 PG. 110840-04-60-0851PID: 163073ZONING: RS-20USE: RESIDENTIALN/F ERIK POTENZAD.B. 4596 PG. 523P.B. 9 PG. 110840-04-60-1723PID: 163074ZONING: RS-20USE: VACANT RES/LOT-SML TRACTN/F ERIK POTENZAD.B. 4142 PG. 472PIN:0840-04-50-8963PID: 163071ZONING: RS-20USE: RESIDENTIALN/F SUN HS WAREHOUSEGROUP LLCD.B. 8301 PG. 350P.B.9 PG. 11APIN:0840-04-51-7011PID:204498ZONING: RS-20USE:RESIDENTIALN/F APPEL JOYCE M D.B. 56, PG. 494 PIN:0840-02-40-5199 PID: 163391 ZONING: IL USE: VACANT INDUSTRIAL N25°24'00"W 27.46' (TIE) EO P EO P S27°47'33"W782.20'IN V : 3 9 9 . 2 6 12" R C P IN V : 3 9 9 . 1 9 IN V : 3 9 6 . 4 5 IN V : 3 9 5 . 4 0 IN V : 3 9 9 . 6 1 IN V : 3 9 9 . 2 6 15" C M P N/F NO R T H C A R O LI N A RAILR O A D C O M P A N Y PIN: 0 8 4 0 - 0 2 - 4 0 - 8 2 6 5 PID: 2 1 9 0 6 5 N/F P A T R I C I A P E A C O C K AND H U S B A N D RICH A R D A V O N P E A C O C K , S R . D.B. 6 3 4 5 , P G . 2 5 5 P.B. 7 6 , P G . 7 9 PIN: 0 7 4 9 - 0 2 - 5 9 - 7 1 2 3 PID: 1 6 3 5 1 7 ZONIN G : R S - 2 0 USE: R E S I D E N T I A L EXISTING CONCRETE CREE K TOP OF BANK TOP OF BANK EXISTING SIDEWALK CLEANOUTS GRAVEL ENTRANCE xxR/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W CATCH BASIN TOP GRATE: 401.37' INV. (S.E.): 398.05' INV. (N.W.): 397.91' CATCH BASIN TOP GRATE: 403.39' INV. (S.W.): 399.50' CATCH BASIN TOP GRATE: 402.35' INV. (N.E.): 399.18' INV. (S.E.): 399.22' INV. (N.W.): 398.97' INV. = 397.82' INV. = 401.15' INV. = 399.76'INV. = 401.43' INV. = 401.47' INV. = 401.12' INV. = 400.99' INV. = 398.35' INV. = 398.53' INV. = 400.68' INV. = 399.64' INV. = 398.73' INV. = 398.46' INV. = 397.97' INV. = 397.38' INV. = 396.33' INV. = 394.32' INV. = 393.70' INV. = 396.12' INV. = 395.02'15"RCP18" RCP 15" RCP 15" C M P 15" RCP 24" R C P 24" RCP24" RCP S SANITARY MH RIM: 407.18' INV. (S.W.): 400.97' INV. (S.E.): 400.93' S SANITARY MH RIM: 410.22' INV. (N.E.): 401.75'8" DIPW WV WV WW WV WV W W WV W WV 15" RCP 15" RCP 12" RCP 15" CPP 15" CMP 15" RCP EX. STREAM EX. 50' STREAM BUFFER TPTPTPTPTPTPTPTPTPTPTP TPTPTPTPTPTPTPTPTPTPTPLDLDLDLDLDLDLDLDLDTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTP LDLDLDLDTPTPTPTPTPTPTPT P TP TP TP TP TP TP TP TP TPTPTPTPTPTPTPTPTPTP TP TP TPTPTPTPS S S S S S S N25°39'12"W 99.74' (TIE)EXIST ING C ITY L IM ITS N/F JE N NI F E R B. L U N D Y D.B. 1 0 2 9, P G. 9 6 4 P.B. 4 5, P G. 7 8 PIN: 0 7 4 9- 0 2- 5 8- 7 8 9 9 ZONI N G: R S- 2 0 USE: R E SI D E N TI A L N/F COUNTY OF DURHAM D.B. 5749, PG. 998 P.B. 123, PG. 188 PIN: 0749-02-59-6042 PID: 163519 ZONING: RS-20 USE: PUMP STATION N/F D E Y SI AI D A A G UI L A R AND H U S B A N D ALEX O. A G UI L A R D.B. 1 1 8 1, P G. 9 2 4 PIN: 0 7 4 9- 0 2- 5 8- 8 8 3 0 ZONI N G: R S- 2 0 USE: R E SI D E N TI A L W W W W W W W W W W W W W W W W W W WWWWWW L D L D L D LDLDLDLDLDLDLDLDL D LD LDLD LD LD LD LD LDLDLDLDLDLDLDLDLD LDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLD LD LDLDLDLDLDLDLDLDLDLDLD LD LD L D LD LD LD LD LD LD LD LD LD LD LD LDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLD LD LD LD L D L D LD LD LDLDLDLDLDLDLDLD LD LD LDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDEXISTING PROPERTY LINE TO BE REMOVED A PROJ. MGR: PRELIMINARYCOPYRIGHT ©2018 SEPI ENGINEERING & CONSTRUCTION, INC DRAWN BY: sepiengineering.com E N G I N E E R I N G & C O N S T R U C T I O N 1025 WADE AVENUE RALEIGH, NORTH CAROLINA 919.789.9977 11020 DAVID TAYLOR DR., SUITE 115 CHARLOTTE, NORTH CAROLINA 704.714.4880 5030 NEW CENTRE DR., SUITE B WILMINGTON, NORTH CAROLINA 910.523.5715 LP16010 Construction Drawings 02/05/2019 Revisions Per Comments 04/16/2019 .. .. .. .. .. .. .. .. PROJECT: DATE ISSUE: CHECKED BY: J. WESTMORELAND REVISIONS: 1 .. NOTICE: 3 WORKING DAYS FOR THE LOCATION OF UNDERGROUND FACILITIES BEFORE YOU DIG R Callbefore you dig. below.Know what's THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. CLIENT: Angier Development, LLC 7700 Kencot Court Raleigh, NC 27615 Contact: David Lazzo PH: (919) 601-2816 dlazzo2100@gmail.com L. SMITH J. BEARD .. ANGIER AVENUE RESIDENTIAL CONSTRUCTION DRAWINGS 3846 Angier Avenue Durham, NC CITY OF DURHAM PUBLIC WORKS DEPARTMENT APPROVED ENGINEERING DATE STORMWATER DATE TRANSPORTATION DATE DATE DATEPRELIMINAR Y - N O T F O R C O N S T R U C T I O N BENCHMARK TBM: 13 IN. OAK N: 799151.14636 E: 2045555.4021 EL: 363.381 DEMOLITION PLAN C-2.2 DEMOLITION NOTES 1.EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO ANY CONSTRUCTION ACTIVITIES. 2.WORK ON THIS PROJECT SHALL CONFORM TO THE LATEST EDITIONS OF THE CITY OF DURHAM STANDARDS AND SPECIFICATIONS, THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT) ROAD AND BRIDGE SPECIFICATIONS, THE NCDOT ROAD AND BRIDGE STANDARDS, THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL HANDBOOK, THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL REGULATIONS. THE MOST STRINGENT SHALL GOVERN. 3.ANY DISCREPANCIES FOUND BETWEEN THESE DRAWINGS AND SPECIFICATIONS AND SITE CONDITIONS, OR ANY INCONSISTENCIES OR AMBIGUITIES IN DRAWINGS OR SPECIFICATIONS, SHALL BE IMMEDIATELY REPORTED TO THE OWNER'S REPRESENTATIVE AND ENGINEER, IN WRITING, WHO SHALL PROMPTLY ADDRESS SUCH INCONSISTENCIES OR AMBIGUITIES. WORK DONE AFTER DISCOVERY, WITHOUT ATTEMPTING TO CONTACT THE OWNER'S REPRESENTATIVE AND DESIGN ENGINEER, WILL BE DONE AT THE CONTRACTOR'S RISK. 4.MAINTENANCE OF TRAFFIC AND TRAFFIC CONTROL IS THE SOLE RESPONSIBILITY OF THE SITE CONTRACTOR. THESE PLANS ARE TO SERVE ONLY AS A GENERAL GUIDE AND IN NO WAY LIMITS THE SITE CONTRACTOR FROM MAINTAINING TRAFFIC CONTROL IN ACCORDANCE WITH NCDOT STANDARDS AND THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES, OR AS DIRECTED BY THE CITY OF DURHAM. 5.BEFORE STARTING ANY CONSTRUCTION OF IMPROVEMENTS WITHIN ANY NCDOT STREET OR HIGHWAY RIGHT-OF-WAY, OBTAIN ALL PERMITS AND ENCROACHMENTS. CROSS CHECK SPECIAL PROVISIONS WITH PLANS. MAINTAIN A COPY OF ALL PERMITS ON SITE. CONTACT LOCAL DISTRICT ENGINEER (919) 733-3213 24 HOURS BEFORE PLACING ANY CURB AND GUTTER WITHIN NCDOT RIGHT-OF-WAY. 6.CONTRACTOR TO ACQUIRE A DEMOLITION PERMIT PRIOR TO REMOVAL OF EXISTING STRUCTURES. 7.SITE CONTRACTOR SHALL BE RESPONSIBLE TO CONTROL AND TO INITIATE CLEAN-UP OF LITTER AND REFUSE GENERATED BY HIMSELF AND SUBCONTRACTORS. THE CLEAN-UP OF LITTER AND REFUSE SHALL BE DONE ON A REGULAR BASIS, AND SHALL INCLUDE INITIATING ACTION AND ASSUMING ANY COST IN REMEDYING THE SITUATION. THE SITE CONTRACTOR, AT NO COST TO THE OWNER, SHALL SUPPLY, PLACE AND MAINTAIN SUITABLE REFUSE CONTAINERS THROUGHOUT THE PROJECT AREA DURING THE ENTIRE CONSTRUCTION PHASE.\ 8.ABANDONMENT OF WATER SERVICES SHALL INCLUDE EXCAVATING DOWN TO CORPORATION STOP, TURNING IT OFF AND CUTTING SERVICE LINE FREE FROM CORPORATION STOP. THE METER, IF PRESENT, SHALL BE RETURNED TO CITY OF DURHAM. PRIOR TO ANY CREDIT OR REFUND BEING PROCESSED THE METER MUST BE RETURNED TO WATER MANAGEMENT DEPARTMENT AND THE METER NUMBER VERIFIED AND CODED PROPERLY AS RETURNED. UTILITY SERVICE ABANDONMENTS WILL TAKE PLACE PRIOR TO BEGINNING UTILITY CONSTRUCTION WORK FOR A PROJECT. ANY EXCAVATION AS PART OF ABANDONING UTILITIES WILL REQUIRE BACKFILLING PER CITY OF DURHAM STANDARDS. 9.ABANDONMENT OF SANITARY SEWER SERVICE LINES SHALL CONSIST OF EXCAVATING DOWN TO THE SERVICE CONNECTION TO THE MAIN, CUTTING THIS CONNECTION AND INSTALLING A WATERTIGHT PLUG IN THE MAIN. THE SERVICE LINE AND ALL CLEAN-OUT RISERS ON THE SERVICE LINE SHALL BE REMOVED. UTILITY SERVICE ABANDONMENTS WILL TAKE PLACE PRIOR TO BEGINNING UTILITY CONSTRUCTION WORK FOR A PROJECT. ANY EXCAVATION AS PART OF ABANDONING UTILITIES WILL REQUIRE BACKFILLING PER CITY OF DURHAM STANDARDS. 10.ANY SIDEWALK DAMAGED OR REMOVED DURING CONSTRUCTION SHALL BE REPLACED TO NEAREST JOINT ACCORDING TO CITY OF DURHAM STANDARDS. DEMOLITION KEYNOTES A REMOVE EXISTING TREE TREE PROTECTION FENCE (SEE DETAIL THIS SHEET)B EXISTING PROPERTY LINE TO BE REMOVED EXISTING PROPERTY LINE TO BE REMOVED EXISTING PROPERTY LINE TO BE REMOVED EX. WETLANDS EX. STREAM BUFFER EX. STREAM PROPERTY LINE (PL) RIGHT-OF-WAY LINER/W EXISTING WATER LINE EXISTING GRAVITY SEWER EXISTING OVERHEAD ELECTRIC LINE EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR EXISTING FENCE 140 139 LEGEND SURVEY BENCHMARK FIRE HYDRANT WATER VALVE PROPERTY CORNER/MONUMENT UTILITY POLE WV EDGE OF PAVEMENTEOP EX. IRON REBAR EX. IRON PIN EIR EIP GUY WIRE EX. WETLANDS ADJACENT PROPERTY LINE EX. STREAM BUFFER EX. TREE RELOCATE EXISTING UTILITY POLE; CONTRACTOR TO COORDINATE WITH UTILITY COMPANIES C REMOVE EXISTING CULVERTD D C C C B STEEL POST FRONT VIEW SIDE VIEW2'-0"3'-0"32" MIN. WIDTH26"WOVEN WIRE FABRIC WARNING SIGN VARIABLE AS DIRECTED BY THE ENGINEER 8' MAX. GRADE WIRES MIN. 10 GA. LINE WIRES TREE PROTECTION AREA DO NOT ENTER ORANGE, UV RESISTANT HIGH - TENSILE STRENGTH POLY BARRICADE FABRIC (TYPICAL) WARNING SIGN ORANGE, UV RESISTANT HIGH - TENSILE STRENGTH POLY BARRICADE FABRIC (TYPICAL) NOTES: 1.WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL. LETTERS TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE AND SPACED AS DETAILED. 2.SIGNS SHALL BE PLACED AT 50' MAXIMUM INTERVALS. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA. 3.ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. 4.MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT. 5.ADDITIONAL SIGNS MAY BE REQUIRED BY CITY OF RALEIGH INSPECTIONS DEPARTMENT BASED ON ACTUAL FIELD CONDITIONS. 2STANDARD TREE PROTECTION FENCE SCALE: NTS 40" DO NOT ENTER TREE PROTECTION AREA 18"3"4"3"4"4"DE LOS ARBOLES AREA PARA PROTECCION3"4"3"3"4"PROHIBIDO ENTRAR3"4"24" WARNING SIGN DETAIL D D D D D LD LD TP TP LIMITS OF DISTURBANCE TREE PROTECTION FENCE 1 inch = 100 ft. 100'0 100' DocuSign Envelope ID: 8C264526-3E7F-4569-8C3F-0ABD8FCCA50D 4/17/2019 R/W R/ WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/W R/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/ WR/WR/WR/WR/WR/WR/WR/Wxxxxxxxxxxxxxxx x x x x x x x x x x x x x x x x x x20.00'GARAGESTAG E R O A D - S R 2 0 2 3 60' RI G H T - O F - W A Y ( P U B L I C )17.38'72" OAK51" OAK29" PINE32" OAK40.5" TWIN OAK36" OAKS54°28'18"E105.00'S57°55'45"E99.81'N30°51'29"E 210.18'N27°42'17"E 669.81'S14°56'37"W1601.25' TOTALN27°27'33"W179.97'172.05'137.30'108.84'190.25'99.96'99.88'499.50'108.87'147.22'S87°51'08"E69.14'S87°41'00"E326.34'C1N02°07'25"W2.70'222.82'318.67'C2C3C4ANGIER AVENUE - SR 1926EX. 60' RIGHT-OF-WAY (PUBLIC)XXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X R/ W R/W R/W R/WR/W R/W R/WR/WBUNGALOW AVENUE - SR 2036 EX. 50' RIGHT-OF-WAY (PUBLIC) R/W R/W R/WR/WR/WR/WN/ F E R I K P O T E N Z A D. B . 4 5 9 6 P G . 5 2 3 P.B . 9 P G . 1 1 PI N : 08 4 0 - 0 4 - 5 0 - 9 8 7 4 PI D : 1 6 3 0 7 2 ZO N I N G : R S - 2 0 US E : V A C A N T R E S / L O T - S M L T R A C T N/ F E R I K P O T E N Z A D. B . 4 5 9 6 P G . 5 2 3 P. B . 9 P G . 1 1 08 4 0 - 0 4 - 6 0 - 0 8 5 1 PI D : 1 6 3 0 7 3 ZO N I N G : R S - 2 0 US E : R E S I D E N T I A L N/ F E R I K P O T E N Z A D. B . 4 5 9 6 P G . 5 2 3 P.B . 9 P G . 1 1 08 4 0 - 0 4 - 6 0 - 1 7 2 3 PI D : 1 6 3 0 7 4 ZO N I N G : R S - 2 0 US E : V A C A N T R E S / LO T - S M L T R A C T N/ F E R I K P O T E N Z A D. B . 4 1 4 2 P G . 4 7 2 PI N : 08 4 0 - 0 4 - 5 0 - 8 9 6 3 PI D : 1 6 3 0 7 1 ZO N I N G : R S - 2 0 US E : R E S I D E N T I A L N/F SUN HS WAREHOUSEGROUP LLCD.B. 8301 PG. 350P.B.9 PG. 11APIN:0840-04-51-7011PID:204498ZONING: RS-20USE:RESIDENTI A LN/F APPEL JOYCE MD.B. 56, PG. 494PIN:0840-02-40-5199PID: 163391ZONING: ILUSE: VACANT INDUSTRIALR/W R/ W EOP12" RCPINV: 396.45INV: 395.40INV: 399.61INV: 399.2615" CMPR/WR/WR/WR/WR/WR/WR/WR/WR/W R/W R/W R/W R/W R/W R/WEXISTINGCONCRETECREEKTOP OF BANKTOP OF BANKEXISTINGSIDEWALKGRAVELENTRANCExxx xR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WCATCH BASINTOP GRATE: 401.37'INV. (S.E.): 398.05'INV. (N.W.): 397.91'CATCH BASINTOP GRATE: 403.39'INV. (S.W.): 399.50'CATCH BASINTOP GRATE: 402.35'INV. (N.E.): 399.18'INV. (S.E.): 399.22'INV. (N.W.): 398.97'INV. = 397.82'INV. = 401.15'INV. = 399.76'INV. = 401.43'INV. = 401.47'INV. = 401.12'INV. = 400.99'INV. = 398.35'INV. = 398.53'INV. = 400.68'INV. = 399.64'INV. = 398.73'INV. = 398.46'INV. = 397.97'INV. = 397.38'INV. = 396.33'INV. = 394.32'INV. = 393.70'INV. = 396.12'INV. = 395.02'15" RCP18"RCP15"RCP15"CMP15" RCP24" RCP24" RCP2 4 " RC P SSWWVWVWWWVWVWWWVWWV15" RCP15" RCP12" RCP15" CPP15" CMP15" RCPEX. STREAMEX. 50' STREAMBUFFERR/WR/WR/W12345678912131415161819202122111017232425262728293031545556575859606162636465666753525150494847464544434232333435363738394041686970OPEN1OPEN2OPEN3SSSSSSSEXISTING CITY LIMITSWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW10' NO-BUILDSETBACK10' NO-BUILD SETBACKE X . W E T L A N D S POINT OF BEGINNINGCONTROL CORNERN: 800599.60E: 2046020.56SEE SHEET C-3.1 FORROADWAYIMPROVEMENTS50' STREAMBUFFERDDNSOCCER GOALALL-WEATHERTRAILCHILDREN'SPLAYGROUNDSHELTERMCMULTI-PURPOSEFIELDALL-WEATHER TRAILTURF PLAY AREAR37.0R35.0R46.0R300.0'R280.0'R208.0'R181.0 'R250.0'R25.0R25.0R25.0R25.0R30.0R30.0MAIL KIOSKPROPOSEDSTORMWATERCONTROL MEASUREPU B L I C R O A D A PUBLIC ROAD B EX. STREAMR25.0R25.0PROPOSEDSTORMWATERCONTROL MEASURERECREATIONAL OPEN SPACEACTIVE:Children's PlaygroundAll-weather TrailPASSIVE:Multi-Purpose FieldRECREATIONAL OPEN SPACEACTIVE:Turf Play FieldAll-weather TrailTREE COVERAGE AREA1.33 ACTREE COVERAGE AREA1.76 ACTREE COVERAGE AREA0.71 ACNOTE: ALL DRIVEWAYS TO BELOCATED TO AVOID CONFLICTSWITH PROPOSED CATCH BASINSAND UTILITY SERVICESPEDESTRIAN CONNECTION EXACTROUTING TO BE DETERMINEDRE-VEGETATION AREASEE NOTES THIS SHEETRE-VEGETATION AREASEE NOTES THIS SHEETRE-VEGETATION AREASEE NOTES THIS SHEETRE-VEGETATION AREA (TYP.)NOTES:1.SHOWN FOR REFERENCE ONLY.2.NOT REQUIRED FOR TREE COVERAGE AREACALCULATIONS.3.ADDITIONAL PLANTINGS PROPOSED ARE PART OF ANOVERALL STORMWATER MANAGEMENT STRATEGY.PUBLICROAD CRECREATIONAL OPEN SPACEACTIVE:All-weather TrailTREE COVERAGE AREA0.22 AC±94°12364571.BEFORE YOU DIG, STOP. CALL THE NC ONE-CALL CENTER AT 1-800-632-4949. IT'S THE LAW. EXISTING UTILITIES ARE SHOWNFROM THE BEST AVAILABLE INFORMATION AND ARE APPROXIMATE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFYTHESE AND OTHER UTILITIES BEFORE STARTING CONSTRUCTION. NOTIFY UTILITY LOCATING COMPANY (ONE CALL @1-800-632-4949) OR INDIVIDUAL UTILITY OWNERS FOR UNDERGROUND LOCATIONS AT LEAST 48 HOURS IN ADVANCE.2.CONTRACTOR SHALL CONTACT ALL OWNERS OF EASEMENTS, RIGHT-OF-WAYS AND UTILITIES, PUBLIC OR PRIVATE, BEFOREWORKING IN THESE AREAS.3.CONTRACTOR SHALL PUT INTO PLACE SUCH TEMPORARY EROSION CONTROL MEASURES AS INDICATED ON THE PLANS.THESE MEASURES SHALL BE INSPECTED AND EVALUATED DURING CONSTRUCTION OPERATION FOR THEIR EFFECTIVENESS INPREVENTING EROSION MATERIAL AND SEDIMENT FROM DISCHARGING FROM THE WORK AREA. IF REQUIRED, AND ASDIRECTED BY THE CITY INSPECTOR, ADDITIONAL TEMPORARY EROSION CONTROL MEASURES SHALL BE INSTITUTED ANDINSTALLED.4.UNLESS EXPLICITLY SPECIFIED IN THESE PLANS, ALL CONSTRUCTION SHALL BE COMPLETED IN ACCORDANCE WITH THE LATESTEDITION OF THE CITY OF DURHAM REFERENCE GUIDE FOR DEVELOPMENT, AND ALL OTHER APPLICABLE REGULATIONS ANDGUIDELINES. IN THE EVENT OF A DISCREPANCY BETWEEN THIS APPROVED PLAN AND THE APPLICABLE REGULATIONS ORGUIDELINES, THE MORE STRINGENT SHALL APPLY. CONTRACTOR SHALL HAVE A CURRENT COPY OF THE MSDD ON SITE.5.PROTECT ALL PROPERTY MONUMENTS AND PINS. MONUMENTS AND PINS THAT WILL BE DISTURBED DURING CONSTRUCTIONSHALL BE REFERENCED AND REPLACED BY A LICENSED LAND SURVEYOR AT A COST TO THE CONTRACTOR.6.CONTRACTOR SHALL MAINTAIN THE SITE IN A MANNER SUCH THAT WORKMEN AND THE PUBLIC WILL BE PROTECTED FROMINJURY AND ADJOINING PROPERTY PROTECTED FROM DAMAGE.7.CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE SITE UPON COMPLETION OF THE PROJECT AND AT LEASTONCE A WEEK DURING CONSTRUCTION. DEBRIS SHALL BE DISPOSED OF IN A PROPER AND LEGAL MANNER. CONTRACTORIS RESPONSIBLE FOR ANY FEES.8.CONTRACTOR IS RESPONSIBLE FOR DAMAGE TO ANY EXISTING ITEM AND/OR MATERIAL DUE TO CONSTRUCTIONOPERATIONS. ALL STREET SURFACES, UTILITY POLES, CULVERTS, DITCHES, CURB AND GUTTER OR OTHER STRUCTURES THATARE DISTURBED OR DAMAGED IN ANY MANNER AS A RESULT OF CONSTRUCTION SHALL BE REPLACED OR REPAIRED BY THECONTRACTOR IN ACCORDANCE WITH THE APPROPRIATE SPECIFICATIONS.9.IF DEPARTURES FROM THE DRAWINGS OR SPECIFICATIONS ARE DEEMED NECESSARY BY THE CONTRACTOR, DETAILS OFSUCH DEPARTURES AND REASONS THEREOF SHALL BE SUBMITTED IN WRITING TO THE OWNER FOR REVIEW. NO DEPARTURESFROM THE CONTRACT DOCUMENTS WILL BE ALLOWED WITHOUT APPROVAL BY THE OWNER.10.CONTRACTOR SHALL MAINTAIN AN "AS-BUILT" SET OF DRAWINGS TO RECORD THE EXACT LOCATION OF ALL PIPING ANDPIPE INVERT ELEVATIONS PRIOR TO CONCEALMENT. DRAWINGS SHALL BE GIVEN TO THE OWNER UPON COMPLETION OFTHE PROJECT.11.ANY AND ALL QUANTITIES SHOWN OR IMPLIED ON THE PLANS ARE FOR ESTIMATION PURPOSES ONLY.12.APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD CONDITIONSWARRANT OFF-SITE GRADING, PERMISSION IN WRITING MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS.13.NO SIGHT OBSTRUCTING, OR PARTIALLY OBSTRUCTING WALL, FENCE, FOLIAGE, BERM, SIGN, PARKED VEHICLE, OR OTHEROBJECT BETWEEN THE HEIGHTS OF TWO (2) FEET AND EIGHT (8) FEET ABOVE THE CURB LINE ELEVATION (OR THE EDGE OFPAVEMENT IF NO CURB EXISTS) SHALL BE PLACED WITHIN A SIGHT TRIANGLE.14.THIS SITE IS NOT IN ANY SPECIAL FLOOD HAZARD AREAS OR FUTURE CONDITIONS FLOOD HAZARD AREAS, AS SHOWN ONFIRM PANEL 3720084000J DATED 05/02/06 AND 3720084900J DATED 05/02/0615.THE SITE WILL BE FULLY COMPLIANT WITH THE NORTH CAROLINA ACCESSIBILITY CODES (ANSI 117.1 -2009 AND CHAPTER 11OF THE NCBC) UNLESS AND EXCEPT IN AREAS WHERE AN APPROVED STATEMENT FROM A SITE ENGINEER, SURVEYOR ORARCHITECT VERIFIES THAT SITE CONDITIONS EXIST WHERE THE TOPOGRAPHY OF THE SITE IS EXTREME AND ONLY ALTERNATEMETHODS OF COMPLIANCE ARE POSSIBLE.16.ALL SIGNS, STREET MARKERS, AND PAVEMENT MARKINGS (EVERYTHING CALLED OUT ON THE SIGNING AND MARKING SHEET)MUST BE INSTALLED ON EACH STREET PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY AND/OR STREETACCEPTANCE, AS DETERMINED BY THE CITY.17.COMMON OPEN SPACE SHALL BE DEDICATED TO A HOME OWNER'S ASSOCIATION OR OTHER APPROVED ENTITY (PER SEC7.2.6 OF THE DURHAM L.D.O.)18.THE LOCATION OF THE SIDEWALKS SHOWN ON THIS PLAN IS SCHEMATIC. A CITY OF DURHAM AND/OR NCDOTENCROACHMENT PERMIT IS REQUIRED PRIOR TO ANY CONSTRUCTION. AFTER OBTAINING THE REQUIRED PERMITS, PLEASECONTACT THE CITY OF DURHAM ENGINEERING CONSTRUCTION INSPECTION OFFICE AT 919-560-4326 FOR APRE-CONSTRUCTION CONFERENCE AND FIELD VISIT PRIOR TO ANY WORK ON THE PROPOSED SIDEWALK.19.A CITY OF DURHAM DRIVEWAY PERMIT IS REQUIRED PRIOR TO ANY DRIVEWAY CONSTRUCTION ON PUBLIC RIGHT-OF-WAY.SUBMIT PLANS FOR DRIVEWAY PERMIT APPROVAL TO CITY ENGINEERING DEVELOPMENT REVIEW. AFTER OBTAINING THEPERMIT, PLEASE CALL CITY OF DURHAM ENGINEERING INSPECTION OFFICE AT 919-560-4326 PRIOR TO START OFCONSTRUCTION.PROPERTY LINE (PL)RIGHT-OF-WAY LINESETBACK LINER/WUTILITY EASEMENTABECDHEAVY DUTY ASPHALT PAVEMENT (SEE SITE DETAIL SHEETS)NCDOT APPROVED ASPHALT PAVEMENT (SEE SITE DETAIL SHEETS)24" STANDARD CURB AND GUTTER (SEE SITE DETAIL SHEETS)4" THICK CONCRETE SIDEWALK (SEE SITE DETAIL SHEETS)(SEE NOTE 18)FADA COMPLIANT ACCESSIBILITY RAMP (SEE SITE DETAIL SHEETS)IE10' x 70' CLEAR SIGHT TRIANGLEADJACENT PROPERTY LINEGPROJ. MGR: P R E L I M I N A R YCOPYRIGHT ©2018SEPI ENGINEERING & CONSTRUCTION, INCDRAWN BY:sepiengineering.comE N G I N E E R I N G &C O N S T R U C T I O N1025 WADE AVENUERALEIGH, NORTH CAROLINA919.789.997711020 DAVID TAYLOR DR., SUITE 115CHARLOTTE, NORTH CAROLINA704.714.48805030 NEW CENTRE DR., SUITE BWILMINGTON, NORTH CAROLINA910.523.5715LP16010Construction Drawings02/05/2019Revisions Per Comments04/16/2019................PROJECT:DATEISSUE:CHECKED BY:J. WESTMORELANDREVISIONS:1..NOTICE:3 WORKING DAYSFOR THE LOCATION OFUNDERGROUND FACILITIESBEFORE YOU DIGRCallbefore you dig.below.Know what'sTHE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATEWAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITSREPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALLEXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLEFOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURETO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES.CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THECONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BEEXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THEWORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBYSTRUCTURES, OR OF ANY OTHER PERSONS.CLIENT:Angier Development, LLC7700 Kencot CourtRaleigh, NC 27615Contact:David LazzoPH: (919) 601-2816dlazzo2100@gmail.comL. SMITHJ. BEARD..ANGIER AVENUERESIDENTIALCONSTRUCTIONDRAWINGS3846 Angier AvenueDurham, NCCITY OF DURHAMPUBLIC WORKS DEPARTMENTAPPROVEDENGINEERINGDATESTORMWATERDATETRANSPORTATIONDATEDATEDATEPRELIMINARY - NOT FOR CONSTRUCTIONBENCHMARKTBM: 13 IN. OAKN: 799151.14636E: 2045555.4021EL: 363.381OVERALL SITE PLANC-3.010' R/WDEDICATIONEX. E.O.P.25.0'TREE COVERAGE AREAOPEN SPACEG25' x 25' CLEAR SIGHT TRIANGLEH8' STREET YARD SETBACKIOFF-SITE ROADWAY IMPROVEMENTS (SEE SHEET C-8.5)JRESIDENTIAL LOCAL STREET (SEE SITE DETAIL SHEETS)JEJGCCCKNOT USEDCLRETAINING WALL (SEE GRADING PLAN SHEETS FOR ADDITIONALINFORMATION)30' PUBLIC SANITARY SEWER EASEMENTSTORMWATER CONTROL MEASURE ACCESS AND MAINTENANCEEASEMENTLHHDDDDNODE / LINK DIAGRAMNOT TO SCALE9NODELINKCONNECTIVITY RATIO REQUIRED (MIN.): 1.40CONNECTIVITY RATIO PROVIDED: 1.40# STREET LINKS = 7# NODES = 5TYPICAL LOT LAYOUTNOT TO SCALE25'75'40' MIN.*30'5'18'20' 120'PROPERTYLINEBUILDINGENVELOPEDRIVEWAY5'SETBACKSETBACKSETBACK W WWWSSSSSSSSC.O.PVC SANITARYSEWERWATER METERTYPE K COPPERWATER METER*NOTE:ALL LOTS SHALL HAVE A MINIMUM 40' WIDTHAT THE 20' BUILDING SETBACK OR THE 25'REAR SETBACK, AS APPLICABLE BASED ONTHE LOT CONFIGURATION.8' STREETYARDMNHNF50.0'R/W32.0'B-BGGH50.0'R/W32.0'B-B LL30.0'LEGENDSITE NOTESSITE KEYRE-VEGETATION AREA (SHOWN FOR REFERENCE ONLY)1 inch = 100 ft.100'0100'DocuSign Envelope ID: 8C264526-3E7F-4569-8C3F-0ABD8FCCA50D4/17/2019 R/WR/WR/W R/WR/WR/WR/WR/WR/WR/W R/W xxxx x x x x x x x x x 17.38'EIP11.78' NW OF EIPEIPEIPEIPEIP0.33' SE OF EIP0.18' NW OF EIPEIP BENT0.06' SE OF EIP BENT0.10' SE OF EIP ON LINEEIP IN CONC0.21' NW OF EIR0.08' SE OF AXLEEIPEIPIRSIRSIRSIRSN 82°37'35" W 3.24' FROM EIPIRS72" OAK51" OAK29" PINE32" OAK36" OAKS54°28'18"E105.00'S57°55'45"E99.81'N3 0 ° 5 1 ' 2 9 " E 21 0 . 1 8 ' N27°42'17"E 669.81'N27°27'33"W172.05'137.30'108.84'190.25'99.96'99.88'C3C4XXXX X X X X X X X X X R/ W R /W N/ F E R I K P O T E N Z A D. B . 4 5 9 6 P G . 5 2 3 P. B . 9 P G . 1 1 PI N : 08 4 0 - 0 4 - 5 0 - 9 8 7 4 PI D : 1 6 3 0 7 2 ZO N I N G : R S - 2 0 US E : V A C A N T R E S / L O T - S M L T R A C T N/ F E R I K P O T E N Z A D. B . 4 5 9 6 P G . 5 2 3 P. B . 9 P G . 1 1 08 4 0 - 0 4 - 6 0 - 0 8 5 1 PI D : 1 6 3 0 7 3 ZO N I N G : R S - 2 0 US E : R E S I D E N T I A L N/ F E R I K P O T E N Z A D. B . 4 5 9 6 P G . 5 2 3 P. B . 9 P G . 1 1 08 4 0 - 0 4 - 6 0 - 1 7 2 3 PI D : 1 6 3 0 7 4 ZO N I N G : R S - 2 0 US E : V A C A N T R E S / N/ F E R I K P O T E N Z A D. B . 4 1 4 2 P G . 4 7 2 PI N : 08 4 0 - 0 4 - 5 0 - 8 9 6 3 PI D : 1 6 3 0 7 1 ZO N I N G : R S - 2 0 US E : R E S I D E N T I A LR/W12" RCPINV: 396.45INV: 395.40INV: 399.61INV: 399.2615" CMPR/WR/WR/WR/WR/WR/W R/W R/W R/WR/WR/WR/WR/WR/WINV. = 401.15'INV. = 398.35'INV. = 398.53'INV. = 400.68'INV. = 399.64'INV. = 398.73'INV. = 398.46'INV. = 396.33'15" RCP2 4 " RC P WVWVWWV12" RCP15" CMP15" RCPR/W123456789121314151618111017575859606162636465666753525150494847464544434232333435363738394041686970WWWWWWWWWWWPROPOSEDSTORMWATERCONTROL MEASURER25.0R25.0R25.0R25.0R30.0R30.0S14° 31' 2 6 " E 63.80' R =2 5 0 .0 0 ' L =12 8 .6 3 ' S14° 57' 18"W535.80' S27 ° 2 9 ' 0 3 " W 354 . 6 4 'R=1 8 1 . 0 0 'L=18 9 . 6 8 'S86° 28' 48"W87.35'R=208.00'L=276.19'S10° 24' 03"W140.00'R=280.00'L=417.57'S62° 37' 23"E149.80'PU B L I C R O A D A PUBLIC ROAD B PUBLICROAD CANGIER AVENUE - SR 1926EX. 60' RIGHT-OF-WAY (PUBLIC)PROJ. MGR: P R E L I M I N A R YCOPYRIGHT ©2018SEPI ENGINEERING & CONSTRUCTION, INCDRAWN BY:sepiengineering.comE N G I N E E R I N G &C O N S T R U C T I O N1025 WADE AVENUERALEIGH, NORTH CAROLINA919.789.997711020 DAVID TAYLOR DR., SUITE 115CHARLOTTE, NORTH CAROLINA704.714.48805030 NEW CENTRE DR., SUITE BWILMINGTON, NORTH CAROLINA910.523.5715LP16010Construction Drawings02/05/2019Revisions Per Comments04/16/2019................PROJECT:DATEISSUE:CHECKED BY:J. WESTMORELANDREVISIONS:1..NOTICE:3 WORKING DAYSFOR THE LOCATION OFUNDERGROUND FACILITIESBEFORE YOU DIGRCallbefore you dig.below.Know what'sTHE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATEWAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITSREPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALLEXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLEFOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURETO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES.CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THECONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BEEXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THEWORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBYSTRUCTURES, OR OF ANY OTHER PERSONS.CLIENT:Angier Development, LLC7700 Kencot CourtRaleigh, NC 27615Contact:David LazzoPH: (919) 601-2816dlazzo2100@gmail.comL. SMITHJ. BEARD..ANGIER AVENUERESIDENTIALCONSTRUCTIONDRAWINGS3846 Angier AvenueDurham, NCCITY OF DURHAMPUBLIC WORKS DEPARTMENTAPPROVEDENGINEERINGDATESTORMWATERDATETRANSPORTATIONDATEDATEDATEPRELIMINARY - NOT FOR CONSTRUCTIONBENCHMARKTBM: 13 IN. OAKN: 799151.14636E: 2045555.4021EL: 363.381ENLARGED SITE PLAN(NORTH)C-3.11 inch = 50 ft.50'050'10' NO-BUILDSETBACK50' STREAMBUFFER1.BEFORE YOU DIG, STOP. CALL THE NC ONE-CALL CENTER AT 1-800-632-4949. IT'S THE LAW. EXISTINGUTILITIES ARE SHOWN FROM THE BEST AVAILABLE INFORMATION AND ARE APPROXIMATE. IT IS THECONTRACTOR'S RESPONSIBILITY TO VERIFY THESE AND OTHER UTILITIES BEFORE STARTINGCONSTRUCTION. NOTIFY UTILITY LOCATING COMPANY (ONE CALL @ 1-800-632-4949) OR INDIVIDUALUTILITY OWNERS FOR UNDERGROUND LOCATIONS AT LEAST 48 HOURS IN ADVANCE.2.CONTRACTOR SHALL CONTACT ALL OWNERS OF EASEMENTS, RIGHT-OF-WAYS AND UTILITIES, PUBLICOR PRIVATE, BEFORE WORKING IN THESE AREAS.3.CONTRACTOR SHALL PUT INTO PLACE SUCH TEMPORARY EROSION CONTROL MEASURES ASINDICATED ON THE PLANS. THESE MEASURES SHALL BE INSPECTED AND EVALUATED DURINGCONSTRUCTION OPERATION FOR THEIR EFFECTIVENESS IN PREVENTING EROSION MATERIAL ANDSEDIMENT FROM DISCHARGING FROM THE WORK AREA. IF REQUIRED, AND AS DIRECTED BY THE CITYINSPECTOR, ADDITIONAL TEMPORARY EROSION CONTROL MEASURES SHALL BE INSTITUTED ANDINSTALLED.4.UNLESS EXPLICITLY SPECIFIED IN THESE PLANS, ALL CONSTRUCTION SHALL BE COMPLETED INACCORDANCE WITH THE LATEST EDITION OF THE CITY OF DURHAM REFERENCE GUIDE FORDEVELOPMENT, AND ALL OTHER APPLICABLE REGULATIONS AND GUIDELINES. IN THE EVENT OF ADISCREPANCY BETWEEN THIS APPROVED PLAN AND THE APPLICABLE REGULATIONS OR GUIDELINES,THE MORE STRINGENT SHALL APPLY. CONTRACTOR SHALL HAVE A CURRENT COPY OF THE MSDD ONSITE.5.PROTECT ALL PROPERTY MONUMENTS AND PINS. MONUMENTS AND PINS THAT WILL BE DISTURBEDDURING CONSTRUCTION SHALL BE REFERENCED AND REPLACED BY A LICENSED LAND SURVEYOR ATA COST TO THE CONTRACTOR.6.CONTRACTOR SHALL MAINTAIN THE SITE IN A MANNER SUCH THAT WORKMEN AND THE PUBLIC WILLBE PROTECTED FROM INJURY AND ADJOINING PROPERTY PROTECTED FROM DAMAGE.7.CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE SITE UPON COMPLETION OF THEPROJECT AND AT LEAST ONCE A WEEK DURING CONSTRUCTION. DEBRIS SHALL BE DISPOSED OF IN APROPER AND LEGAL MANNER. CONTRACTOR IS RESPONSIBLE FOR ANY FEES.8.CONTRACTOR IS RESPONSIBLE FOR DAMAGE TO ANY EXISTING ITEM AND/OR MATERIAL DUE TOCONSTRUCTION OPERATIONS. ALL STREET SURFACES, UTILITY POLES, CULVERTS, DITCHES, CURB ANDGUTTER OR OTHER STRUCTURES THAT ARE DISTURBED OR DAMAGED IN ANY MANNER AS A RESULT OFCONSTRUCTION SHALL BE REPLACED OR REPAIRED BY THE CONTRACTOR IN ACCORDANCE WITH THEAPPROPRIATE SPECIFICATIONS.9.IF DEPARTURES FROM THE DRAWINGS OR SPECIFICATIONS ARE DEEMED NECESSARY BY THECONTRACTOR, DETAILS OF SUCH DEPARTURES AND REASONS THEREOF SHALL BE SUBMITTED INWRITING TO THE OWNER FOR REVIEW. NO DEPARTURES FROM THE CONTRACT DOCUMENTS WILL BEALLOWED WITHOUT APPROVAL BY THE OWNER.10.CONTRACTOR SHALL MAINTAIN AN "AS-BUILT" SET OF DRAWINGS TO RECORD THE EXACT LOCATIONOF ALL PIPING AND PIPE INVERT ELEVATIONS PRIOR TO CONCEALMENT. DRAWINGS SHALL BE GIVENTO THE OWNER UPON COMPLETION OF THE PROJECT.11.ANY AND ALL QUANTITIES SHOWN OR IMPLIED ON THE PLANS ARE FOR ESTIMATION PURPOSES ONLY.12.APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELDCONDITIONS WARRANT OFF-SITE GRADING, PERMISSION IN WRITING MUST BE OBTAINED FROM THEAFFECTED PROPERTY OWNERS.13.NO SIGHT OBSTRUCTING, OR PARTIALLY OBSTRUCTING WALL, FENCE, FOLIAGE, BERM, SIGN, PARKEDVEHICLE, OR OTHER OBJECT BETWEEN THE HEIGHTS OF TWO (2) FEET AND EIGHT (8) FEET ABOVE THECURB LINE ELEVATION (OR THE EDGE OF PAVEMENT IF NO CURB EXISTS) SHALL BE PLACED WITHIN ASIGHT TRIANGLE.14.THIS SITE IS NOT IN ANY SPECIAL FLOOD HAZARD AREAS OR FUTURE CONDITIONS FLOOD HAZARDAREAS, AS SHOWN ON FIRM PANEL 3720084000J DATED 05/02/06 AND 3720084900J DATED 05/02/0615.THE SITE WILL BE FULLY COMPLIANT WITH THE NORTH CAROLINA ACCESSIBILITY CODES (ANSI 117.1-2009 AND CHAPTER 11 OF THE NCBC) UNLESS AND EXCEPT IN AREAS WHERE AN APPROVEDSTATEMENT FROM A SITE ENGINEER, SURVEYOR OR ARCHITECT VERIFIES THAT SITE CONDITIONS EXISTWHERE THE TOPOGRAPHY OF THE SITE IS EXTREME AND ONLY ALTERNATE METHODS OF COMPLIANCEARE POSSIBLE.16.ALL SIGNS, STREET MARKERS, AND PAVEMENT MARKINGS (EVERYTHING CALLED OUT ON THE SIGNINGAND MARKING SHEET) MUST BE INSTALLED ON EACH STREET PRIOR TO THE ISSUANCE OF ACERTIFICATE OF OCCUPANCY AND/OR STREET ACCEPTANCE, AS DETERMINED BY THE CITY.17.COMMON OPEN SPACE SHALL BE DEDICATED TO A HOME OWNER'S ASSOCIATION OR OTHERAPPROVED ENTITY (PER SEC 7.2.6 OF THE DURHAM L.D.O.)18.THE LOCATION OF THE SIDEWALKS SHOWN ON THIS PLAN IS SCHEMATIC. A CITY OF DURHAMAND/OR NCDOT ENCROACHMENT PERMIT IS REQUIRED PRIOR TO ANY CONSTRUCTION. AFTEROBTAINING THE REQUIRED PERMITS, PLEASE CONTACT THE CITY OF DURHAM ENGINEERINGCONSTRUCTION INSPECTION OFFICE AT 919-560-4326 FOR A PRE-CONSTRUCTION CONFERENCE ANDFIELD VISIT PRIOR TO ANY WORK ON THE PROPOSED SIDEWALK.19.A CITY OF DURHAM DRIVEWAY PERMIT IS REQUIRED PRIOR TO ANY DRIVEWAY CONSTRUCTION ONPUBLIC RIGHT-OF-WAY. SUBMIT PLANS FOR DRIVEWAY PERMIT APPROVAL TO CITY ENGINEERINGDEVELOPMENT REVIEW. AFTER OBTAINING THE PERMIT, PLEASE CALL CITY OF DURHAM ENGINEERINGINSPECTION OFFICE AT 919-560-4326 PRIOR TO START OF CONSTRUCTION.PROPERTY LINE (PL)RIGHT-OF-WAY LINESETBACK LINER/WUTILITY EASEMENTADJACENT PROPERTY LINETREE SAVE AREAOPEN SPACELEGENDSITE NOTESABECDHEAVY DUTY ASPHALT PAVEMENT (SEE SITE DETAIL SHEETS)NCDOT APPROVED ASPHALT PAVEMENT (SEE SITE DETAIL SHEETS)24" STANDARD CURB AND GUTTER (SEE SITE DETAIL SHEETS)4" THICK CONCRETE SIDEWALK (SEE SITE DETAIL SHEETS)FADA COMPLIANT ACCESSIBILITY RAMP (SEE SITE DETAIL SHEETS)10' x 70' CLEAR SIGHT TRIANGLE (NCDOT)G25' x 25' CLEAR SIGHT TRIANGLE (DURHAM)H8' STREET YARD SETBACKIOFF-SITE ROADWAY IMPROVEMENTS (SEE ANGIER AVE.PLAN & PROFILE AND SIGNAGE SHEETS)JRESIDENTIAL LOCAL STREET (SEE SITE DETAIL SHEETS)KSTREET NAME/ROAD SIGN (SEE ENLARGED SIGNAGE SHEETS)LRETAINING WALL (SEE GRADING PLAN SHEETS FOR ADDITIONALINFORMATION); SEE PLANS BY OTHERS FOR DESIGNMNSITE KEYNOTES:OPSHELTER (SEE LANDSCAPE SHEETS)QBENCH (SEE LANDSCAPE SHEETS)RMAIL KIOSK (SEE LANDSCAPE SHEETS)30' PUBLIC SANITARY SEWER EASEMENTSTORMWATER CONTROL MEASURE ACCESS ANDMAINTENANCE EASEMENTALL WEATHER TRAIL (SEE LANDSCAPE SHEETS)SCITY OF DURHAM STANDARD CURB RAMP WITHPROPOSED CURB AND GUTTER (SEE SITE DETAIL SHEETS)TCITY OF DURHAM STANDARD DIRECTIONAL CURB RAMPTYPE 1A (SEE SITE DETAIL SHEETS)UCITY OF DURHAM STANDARD DIRECTIONAL CURB RAMPTYPE 1 (SEE SITE DETAIL SHEETS)SUSSSUVCITY OF DURHAM STANDARD PARALLEL RAMP TYPE 3(SEE SITE DETAIL SHEETS)VIEGJEJGKLHHDDDDHNFGHKLLLF10' R/WDEDICATIONEX. E.O.P.50.0'R/W32.0'B-B50.0'R/W32.0'B-B BAREHHEAEEXIST. ANGIER AVENUE C/LSTA. 16+10.00 =PROP. ROAD ASTA. 10+00.00PROP. ROAD BSTA. 10+0.00 =PROP. ROAD ASTA. 14+28.43PROP. ROAD CSTA. 10+00.00 =PROP.ROAD ASTA. 17+68.32DocuSign Envelope ID: 8C264526-3E7F-4569-8C3F-0ABD8FCCA50D4/17/2019 R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/W R/WR/WR/WR/WR/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/WR/WR/WR/Wxxxxxxxxxxxxx20.00'GARAGESTAG E R O A D - S R 2 0 2 3 60' RI G H T - O F - W A Y ( P U B L I C )EIP ON LINEEIP IN CONC0.21' NW OF EIR0.08' SE OF EIPEIP0.32' NW OF EIP0.10' NW OF EIPEIPEIRS 66°12'39" E 0.22' FROM AXLEAXLEAXLEEIPEIPIRSIRSIRSIRSIRSIRS40.5" TWIN OAKIRSS14°56'37"W1601.25' TOTALN27°27'33"W179.97'99.96'99.88'499.50'108.87'147.22'S87°51'08"E69.14'S87°41'00"E326.34'C1N02°07'25"W2.70'222.82'318.67'C2C3C4XXXXXXXXXXXXXR/WR/WR/WR/WR/W R/W R/W R/W R/W R/WEXISTINGCONCRETECREEKTOP OF BANKEXISTINGSIDEWALKCLEANOUTSGRAVELENTRANCExxxx xxEX. STREAMEX. 50' STREAMBUFFER1213141516181920212217232425262728293031545556575859606162535251504948323334SSSSSSPROPOSEDSTORMWATERCONTROL MEASURER37.0L=157.0R35.0L=43.57R46.0R25.0R25.0S14° 57' 18"W535.80'R=300.00'L=241.87'S61° 08' 59"W28.64'N28° 51' 01"W21.00'R=280.00'L=417.57'S75° 02' 42"E32.57'PUBLIC ROAD APUBLIC ROAD B PROJ. MGR: P R E L I M I N A R YCOPYRIGHT ©2018SEPI ENGINEERING & CONSTRUCTION, INCDRAWN BY:sepiengineering.comE N G I N E E R I N G &C O N S T R U C T I O N1025 WADE AVENUERALEIGH, NORTH CAROLINA919.789.997711020 DAVID TAYLOR DR., SUITE 115CHARLOTTE, NORTH CAROLINA704.714.48805030 NEW CENTRE DR., SUITE BWILMINGTON, NORTH CAROLINA910.523.5715LP16010Construction Drawings02/05/2019Revisions Per Comments04/16/2019................PROJECT:DATEISSUE:CHECKED BY:J. WESTMORELANDREVISIONS:1..NOTICE:3 WORKING DAYSFOR THE LOCATION OFUNDERGROUND FACILITIESBEFORE YOU DIGRCallbefore you dig.below.Know what'sTHE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATEWAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITSREPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALLEXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLEFOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURETO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES.CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THECONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BEEXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THEWORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBYSTRUCTURES, OR OF ANY OTHER PERSONS.CLIENT:Angier Development, LLC7700 Kencot CourtRaleigh, NC 27615Contact:David LazzoPH: (919) 601-2816dlazzo2100@gmail.comL. SMITHJ. BEARD..ANGIER AVENUERESIDENTIALCONSTRUCTIONDRAWINGS3846 Angier AvenueDurham, NCCITY OF DURHAMPUBLIC WORKS DEPARTMENTAPPROVEDENGINEERINGDATESTORMWATERDATETRANSPORTATIONDATEDATEDATEPRELIMINARY - NOT FOR CONSTRUCTIONBENCHMARKTBM: 13 IN. OAKN: 799151.14636E: 2045555.4021EL: 363.381ENLARGED SITE PLAN(SOUTH)C-3.21 inch = 50 ft.50'050'1.BEFORE YOU DIG, STOP. CALL THE NC ONE-CALL CENTER AT 1-800-632-4949. IT'S THE LAW. EXISTINGUTILITIES ARE SHOWN FROM THE BEST AVAILABLE INFORMATION AND ARE APPROXIMATE. IT IS THECONTRACTOR'S RESPONSIBILITY TO VERIFY THESE AND OTHER UTILITIES BEFORE STARTINGCONSTRUCTION. NOTIFY UTILITY LOCATING COMPANY (ONE CALL @ 1-800-632-4949) OR INDIVIDUALUTILITY OWNERS FOR UNDERGROUND LOCATIONS AT LEAST 48 HOURS IN ADVANCE.2.CONTRACTOR SHALL CONTACT ALL OWNERS OF EASEMENTS, RIGHT-OF-WAYS AND UTILITIES, PUBLICOR PRIVATE, BEFORE WORKING IN THESE AREAS.3.CONTRACTOR SHALL PUT INTO PLACE SUCH TEMPORARY EROSION CONTROL MEASURES ASINDICATED ON THE PLANS. THESE MEASURES SHALL BE INSPECTED AND EVALUATED DURINGCONSTRUCTION OPERATION FOR THEIR EFFECTIVENESS IN PREVENTING EROSION MATERIAL ANDSEDIMENT FROM DISCHARGING FROM THE WORK AREA. IF REQUIRED, AND AS DIRECTED BY THE CITYINSPECTOR, ADDITIONAL TEMPORARY EROSION CONTROL MEASURES SHALL BE INSTITUTED ANDINSTALLED.4.UNLESS EXPLICITLY SPECIFIED IN THESE PLANS, ALL CONSTRUCTION SHALL BE COMPLETED INACCORDANCE WITH THE LATEST EDITION OF THE CITY OF DURHAM REFERENCE GUIDE FORDEVELOPMENT, AND ALL OTHER APPLICABLE REGULATIONS AND GUIDELINES. IN THE EVENT OF ADISCREPANCY BETWEEN THIS APPROVED PLAN AND THE APPLICABLE REGULATIONS OR GUIDELINES,THE MORE STRINGENT SHALL APPLY. CONTRACTOR SHALL HAVE A CURRENT COPY OF THE MSDD ONSITE.5.PROTECT ALL PROPERTY MONUMENTS AND PINS. MONUMENTS AND PINS THAT WILL BE DISTURBEDDURING CONSTRUCTION SHALL BE REFERENCED AND REPLACED BY A LICENSED LAND SURVEYOR ATA COST TO THE CONTRACTOR.6.CONTRACTOR SHALL MAINTAIN THE SITE IN A MANNER SUCH THAT WORKMEN AND THE PUBLIC WILLBE PROTECTED FROM INJURY AND ADJOINING PROPERTY PROTECTED FROM DAMAGE.7.CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE SITE UPON COMPLETION OF THEPROJECT AND AT LEAST ONCE A WEEK DURING CONSTRUCTION. DEBRIS SHALL BE DISPOSED OF IN APROPER AND LEGAL MANNER. CONTRACTOR IS RESPONSIBLE FOR ANY FEES.8.CONTRACTOR IS RESPONSIBLE FOR DAMAGE TO ANY EXISTING ITEM AND/OR MATERIAL DUE TOCONSTRUCTION OPERATIONS. ALL STREET SURFACES, UTILITY POLES, CULVERTS, DITCHES, CURB ANDGUTTER OR OTHER STRUCTURES THAT ARE DISTURBED OR DAMAGED IN ANY MANNER AS A RESULT OFCONSTRUCTION SHALL BE REPLACED OR REPAIRED BY THE CONTRACTOR IN ACCORDANCE WITH THEAPPROPRIATE SPECIFICATIONS.9.IF DEPARTURES FROM THE DRAWINGS OR SPECIFICATIONS ARE DEEMED NECESSARY BY THECONTRACTOR, DETAILS OF SUCH DEPARTURES AND REASONS THEREOF SHALL BE SUBMITTED INWRITING TO THE OWNER FOR REVIEW. NO DEPARTURES FROM THE CONTRACT DOCUMENTS WILL BEALLOWED WITHOUT APPROVAL BY THE OWNER.10.CONTRACTOR SHALL MAINTAIN AN "AS-BUILT" SET OF DRAWINGS TO RECORD THE EXACT LOCATIONOF ALL PIPING AND PIPE INVERT ELEVATIONS PRIOR TO CONCEALMENT. DRAWINGS SHALL BE GIVENTO THE OWNER UPON COMPLETION OF THE PROJECT.11.ANY AND ALL QUANTITIES SHOWN OR IMPLIED ON THE PLANS ARE FOR ESTIMATION PURPOSES ONLY.12.APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELDCONDITIONS WARRANT OFF-SITE GRADING, PERMISSION IN WRITING MUST BE OBTAINED FROM THEAFFECTED PROPERTY OWNERS.13.NO SIGHT OBSTRUCTING, OR PARTIALLY OBSTRUCTING WALL, FENCE, FOLIAGE, BERM, SIGN, PARKEDVEHICLE, OR OTHER OBJECT BETWEEN THE HEIGHTS OF TWO (2) FEET AND EIGHT (8) FEET ABOVE THECURB LINE ELEVATION (OR THE EDGE OF PAVEMENT IF NO CURB EXISTS) SHALL BE PLACED WITHIN ASIGHT TRIANGLE.14.THIS SITE IS NOT IN ANY SPECIAL FLOOD HAZARD AREAS OR FUTURE CONDITIONS FLOOD HAZARDAREAS, AS SHOWN ON FIRM PANEL 3720084000J DATED 05/02/06 AND 3720084900J DATED 05/02/0615.THE SITE WILL BE FULLY COMPLIANT WITH THE NORTH CAROLINA ACCESSIBILITY CODES (ANSI 117.1-2009 AND CHAPTER 11 OF THE NCBC) UNLESS AND EXCEPT IN AREAS WHERE AN APPROVEDSTATEMENT FROM A SITE ENGINEER, SURVEYOR OR ARCHITECT VERIFIES THAT SITE CONDITIONS EXISTWHERE THE TOPOGRAPHY OF THE SITE IS EXTREME AND ONLY ALTERNATE METHODS OF COMPLIANCEARE POSSIBLE.16.ALL SIGNS, STREET MARKERS, AND PAVEMENT MARKINGS (EVERYTHING CALLED OUT ON THE SIGNINGAND MARKING SHEET) MUST BE INSTALLED ON EACH STREET PRIOR TO THE ISSUANCE OF ACERTIFICATE OF OCCUPANCY AND/OR STREET ACCEPTANCE, AS DETERMINED BY THE CITY.17.COMMON OPEN SPACE SHALL BE DEDICATED TO A HOME OWNER'S ASSOCIATION OR OTHERAPPROVED ENTITY (PER SEC 7.2.6 OF THE DURHAM L.D.O.)18.THE LOCATION OF THE SIDEWALKS SHOWN ON THIS PLAN IS SCHEMATIC. A CITY OF DURHAMAND/OR NCDOT ENCROACHMENT PERMIT IS REQUIRED PRIOR TO ANY CONSTRUCTION. AFTEROBTAINING THE REQUIRED PERMITS, PLEASE CONTACT THE CITY OF DURHAM ENGINEERINGCONSTRUCTION INSPECTION OFFICE AT 919-560-4326 FOR A PRE-CONSTRUCTION CONFERENCE ANDFIELD VISIT PRIOR TO ANY WORK ON THE PROPOSED SIDEWALK.19.A CITY OF DURHAM DRIVEWAY PERMIT IS REQUIRED PRIOR TO ANY DRIVEWAY CONSTRUCTION ONPUBLIC RIGHT-OF-WAY. SUBMIT PLANS FOR DRIVEWAY PERMIT APPROVAL TO CITY ENGINEERINGDEVELOPMENT REVIEW. AFTER OBTAINING THE PERMIT, PLEASE CALL CITY OF DURHAM ENGINEERINGINSPECTION OFFICE AT 919-560-4326 PRIOR TO START OF CONSTRUCTION.PROPERTY LINE (PL)RIGHT-OF-WAY LINESETBACK LINER/WR/WUTILITY EASEMENTADJACENT PROPERTY LINETREE SAVE AREAOPEN SPACELEGENDSITE NOTESVEJLHDGKLVV50.0'R/W32.0'B-BDEAHH50.0'R/W32.0'B-BH DDEEJANNMADDOPQABECDHEAVY DUTY ASPHALT PAVEMENT (SEE SITE DETAIL SHEETS)NCDOT APPROVED ASPHALT PAVEMENT (SEE SITE DETAIL SHEETS)24" STANDARD CURB AND GUTTER (SEE SITE DETAIL SHEETS)4" THICK CONCRETE SIDEWALK (SEE SITE DETAIL SHEETS)FADA COMPLIANT ACCESSIBILITY RAMP (SEE SITE DETAIL SHEETS)10' x 70' CLEAR SIGHT TRIANGLE (NCDOT)G25' x 25' CLEAR SIGHT TRIANGLE (DURHAM)H8' STREET YARD SETBACKIOFF-SITE ROADWAY IMPROVEMENTS (SEE ANGIER AVE.PLAN & PROFILE AND SIGNAGE SHEETS)JRESIDENTIAL LOCAL STREET (SEE SITE DETAIL SHEETS)KSTREET NAME/ROAD SIGN (SEE ENLARGED SIGNAGE SHEETS)LRETAINING WALL (SEE GRADING PLAN SHEETS FOR ADDITIONALINFORMATION); SEE PLANS BY OTHERS FOR DESIGNMNSITE KEYNOTES:OPSHELTER (SEE LANDSCAPE SHEETS)QBENCH (SEE LANDSCAPE SHEETS)RMAIL KIOSK (SEE LANDSCAPE SHEETS)30' PUBLIC SANITARY SEWER EASEMENTSTORMWATER CONTROL MEASURE ACCESS ANDMAINTENANCE EASEMENTALL WEATHER TRAIL (SEE LANDSCAPE SHEETS)SCITY OF DURHAM STANDARD CURB RAMP WITHPROPOSED CURB AND GUTTER (SEE SITE DETAIL SHEETS)TCITY OF DURHAM STANDARD DIRECTIONAL CURB RAMPTYPE 1A (SEE SITE DETAIL SHEETS)UCITY OF DURHAM STANDARD DIRECTIONAL CURB RAMPTYPE 1 (SEE SITE DETAIL SHEETS)VCITY OF DURHAM STANDARD PARALLEL RAMP TYPE 3(SEE SITE DETAIL SHEETS)PROP. ROAD ASTA. 24+20.08 =PROP.ROAD BSTA. 16+67.75DocuSign Envelope ID: 8C264526-3E7F-4569-8C3F-0ABD8FCCA50D4/17/2019 R/W R/ WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/W R/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/ WR/WR/WR/WR/WR/WR/WR/Wxxxxxxxxxxxxxxx x x x x x x x x x x x x x x x x x x20.00'GARAGESTAG E R O A D - S R 2 0 2 3 60' RI G H T - O F - W A Y ( P U B L I C )17.38'POINT OF BEGINNINGCONTROL CORNERN: 800599.60E: 2046020.56EIP11.78' NW OF EIPEIPEIPEIPEIPEIP0.33' SE OF EIP0.18' NW OF EIPEIPEIP BENT0.06' SE OF EIP BENT0.10' SE OF EIP ON LINEEIP IN CONC0.21' NW OF EIR0.08' SE OF EIPEIP0.32' NW OF EIP0.10' NW OF EIPEIPEIRS 66°12'39" E 0.22' FROM AXLEAXLEAXLEEIPEIREIPEIPEIPEIPEIPEIPIRSIRSIRSIRSIRSIRSIRSIRSN 82°37'35" W 3.24' FROM EIPIRS72" OAK51" OAK29" PINE32" OAK40.5" TWIN OAK36" OAKIRSS54°28'18"E105.00'S57°55'45"E99.81'N30°51'29"E 210.18'N27°42'17"E 669.81'S14°56'37"W1601.25' TOTALN27°27'33"W179.97'172.05'137.30'108.84'190.25'99.96'99.88'499.50'108.87'147.22'S87°51'08"E69.14'S87°41'00"E326.34'C1N02°07'25"W2.70'222.82'318.67'C2C3C4ANGIER AVENUE - SR 1926EX. 60' RIGHT-OF-WAY (PUBLIC)XXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X R/ W R/W R/W R/WR/W R/W R/WR/WBUNGALOW AVENUE - SR 2036 EX. 50' RIGHT-OF-WAY (PUBLIC) R/W R/W R/WR/WR/WR/WN/ F E R I K P O T E N Z A D. B . 4 5 9 6 P G . 5 2 3 P.B . 9 P G . 1 1 PI N : 08 4 0 - 0 4 - 5 0 - 9 8 7 4 PI D : 1 6 3 0 7 2 ZO N I N G : R S - 2 0 US E : V A C A N T R E S / L O T - S M L T R A C T N/ F E R I K P O T E N Z A D. B . 4 5 9 6 P G . 5 2 3 P. B . 9 P G . 1 1 08 4 0 - 0 4 - 6 0 - 0 8 5 1 PI D : 1 6 3 0 7 3 ZO N I N G : R S - 2 0 US E : R E S I D E N T I A L N/ F E R I K P O T E N Z A D. B . 4 5 9 6 P G . 5 2 3 P.B . 9 P G . 1 1 08 4 0 - 0 4 - 6 0 - 1 7 2 3 PI D : 1 6 3 0 7 4 ZO N I N G : R S - 2 0 US E : V A C A N T R E S / LO T - S M L T R A C T N/ F E R I K P O T E N Z A D. B . 4 1 4 2 P G . 4 7 2 PI N : 08 4 0 - 0 4 - 5 0 - 8 9 6 3 PI D : 1 6 3 0 7 1 ZO N I N G : R S - 2 0 US E : R E S I D E N T I A L N/F SUN HS WAREHOUSEGROUP LLCD.B. 8301 PG. 350P.B.9 PG. 11APIN:0840-04-51-7011PID:204498ZONING: RS-20USE:RESIDENTI A LN/F APPEL JOYCE MD.B. 56, PG. 494PIN:0840-02-40-5199PID: 163391ZONING: ILUSE: VACANT INDUSTRIALR/W R/ W EOP12" RCPINV: 396.45INV: 395.40INV: 399.61INV: 399.2615" CMPR/WR/WR/WR/WR/WR/WR/WR/WR/W R/W R/W R/W R/W R/W R/WEXISTINGCONCRETECREEKTOP OF BANKTOP OF BANKEXISTINGSIDEWALKGRAVELENTRANCExxx xR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WCATCH BASINTOP GRATE: 401.37'INV. (S.E.): 398.05'INV. (N.W.): 397.91'CATCH BASINTOP GRATE: 403.39'INV. (S.W.): 399.50'CATCH BASINTOP GRATE: 402.35'INV. (N.E.): 399.18'INV. (S.E.): 399.22'INV. (N.W.): 398.97'INV. = 397.82'INV. = 401.15'INV. = 399.76'INV. = 401.43'INV. = 401.47'INV. = 401.12'INV. = 400.99'INV. = 398.35'INV. = 398.53'INV. = 400.68'INV. = 399.64'INV. = 398.73'INV. = 398.46'INV. = 397.97'INV. = 397.38'INV. = 396.33'INV. = 394.32'INV. = 393.70'INV. = 396.12'INV. = 395.02'15" RCP18"RCP15"RCP15"CMP15" RCP24" RCP24" RCP2 4 " RC P SSWWVWVWWWVWVWWWVWWV15" RCP15" RCP12" RCP15" CPP15" CMP15" RCPEX. STREAMEX. 50' STREAMBUFFERR/WR/WR/W12345678912131415161819202122111017232425262728293031545556575859606162636465666753525150494847464544434232333435363738394041686970SSSSSSSEXISTING CITY LIMITSWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW10' NO-BUILDSETBACK10' NO-BUILD SETBACKE X . W E T L A N D S POINT OF BEGINNINGCONTROL CORNERN: 800599.60E: 2046020.5650' STREAMBUFFERR37.0R35.0R46.0R300.0'R280.0'R208.0'R181.0 'R250.0'R25.0R25.0R25.0R25.0R30.0R30.0PROPOSEDSTORMWATERCONTROL MEASUREPUBLICROAD 3PU B L I C R O A D 1 PUBLIC ROAD 2 EX. STREAMR25.0R25.0PROPOSEDSTORMWATERCONTROL MEASURE30' WIDE SANITARYSEWER EASEMENTSEE NOTE 10SCM ACCESS ANDMAINTENANCEEASEMENT; SEENOTE 11SCM ACCESS ANDMAINTENANCEEASEMENT; SEENOTE 11RECREATIONAL OPEN SPACEACTIVE:Children's PlaygroundAll-weather TrailPASSIVE:Multi-Purpose FieldRECREATIONAL OPEN SPACEACTIVE:Turf Play FieldAll-weather TrailTREE COVERAGE AREA1.33 ACTREE COVERAGE AREA1.76 ACTREE COVERAGE AREA0.71 ACRE-VEGETATION AREASEE NOTES THIS SHEETRE-VEGETATION AREASEE NOTES THIS SHEETRE-VEGETATION AREASEE NOTES THIS SHEETRE-VEGETATION AREA (TYP.)NOTES:1.SHOWN FOR REFERENCE ONLY.2.NOT REQUIRED FOR TREE COVERAGE AREACALCULATIONS.3.ADDITIONAL PLANTINGS PROPOSED ARE PART OF ANOVERALL STORMWATER MANAGEMENT STRATEGY.RECREATIONAL OPEN SPACEACTIVE:All-weather TrailTREE COVERAGE AREA0.22 ACDRAINAGEEASEMENTSEE NOTE 11DRAINAGEEASEMENTSEE NOTE 11DRAINAGEEASEMENTSEE NOTE 11DRAINAGEEASEMENTSEE NOTE 11DRAINAGEEASEMENTSEE NOTE 111.BEFORE YOU DIG, STOP. CALL THE NC ONE-CALL CENTER AT 1-800-632-4949. IT'S THE LAW. EXISTINGUTILITIES ARE SHOWN FROM THE BEST AVAILABLE INFORMATION AND ARE APPROXIMATE. IT IS THECONTRACTOR'S RESPONSIBILITY TO VERIFY THESE AND OTHER UTILITIES BEFORE STARTINGCONSTRUCTION. NOTIFY UTILITY LOCATING COMPANY (ONE CALL @ 1-800-632-4949) OR INDIVIDUALUTILITY OWNERS FOR UNDERGROUND LOCATIONS AT LEAST 48 HOURS IN ADVANCE.2.CONTRACTOR SHALL CONTACT ALL OWNERS OF EASEMENTS, RIGHT-OF-WAYS AND UTILITIES, PUBLICOR PRIVATE, BEFORE WORKING IN THESE AREAS.3.UNLESS EXPLICITLY SPECIFIED IN THESE PLANS, ALL CONSTRUCTION SHALL BE COMPLETED INACCORDANCE WITH THE LATEST EDITION OF THE CITY OF DURHAM REFERENCE GUIDE FORDEVELOPMENT, AND ALL OTHER APPLICABLE REGULATIONS AND GUIDELINES. IN THE EVENT OF ADISCREPANCY BETWEEN THIS APPROVED PLAN AND THE APPLICABLE REGULATIONS OR GUIDELINES,THE MORE STRINGENT SHALL APPLY. CONTRACTOR SHALL HAVE A CURRENT COPY OF THE MSDD ONSITE.4.PROTECT ALL PROPERTY MONUMENTS AND PINS. MONUMENTS AND PINS THAT WILL BE DISTURBEDDURING CONSTRUCTION SHALL BE REFERENCED AND REPLACED BY A LICENSED LAND SURVEYOR ATA COST TO THE CONTRACTOR.5.IF DEPARTURES FROM THE DRAWINGS OR SPECIFICATIONS ARE DEEMED NECESSARY BY THECONTRACTOR, DETAILS OF SUCH DEPARTURES AND REASONS THEREOF SHALL BE SUBMITTED INWRITING TO THE OWNER FOR REVIEW. NO DEPARTURES FROM THE CONTRACT DOCUMENTS WILL BEALLOWED WITHOUT APPROVAL BY THE OWNER.6.APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELDCONDITIONS WARRANT OFF-SITE GRADING, PERMISSION IN WRITING MUST BE OBTAINED FROM THEAFFECTED PROPERTY OWNERS.7.NO SIGHT OBSTRUCTING, OR PARTIALLY OBSTRUCTING WALL, FENCE, FOLIAGE, BERM, SIGN, PARKEDVEHICLE, OR OTHER OBJECT BETWEEN THE HEIGHTS OF TWO (2) FEET AND EIGHT (8) FEET ABOVE THECURB LINE ELEVATION (OR THE EDGE OF PAVEMENT IF NO CURB EXISTS) SHALL BE PLACED WITHIN ASIGHT TRIANGLE.8.THIS SITE IS NOT IN ANY SPECIAL FLOOD HAZARD AREAS OR FUTURE CONDITIONS FLOOD HAZARDAREAS, AS SHOWN ON FIRM PANEL 3720084000J DATED 05/02/06 AND 3720084900J DATED 05/02/069.COMMON OPEN SPACE SHALL BE DEDICATED TO A HOME OWNER'S ASSOCIATION OR OTHERAPPROVED ENTITY (PER SEC 7.2.6 OF THE DURHAM L.D.O.)10.CENTERLINE OF 30 FOOT WIDE CITY OF DURHAM SANITARY SEWER EASEMENT. SUBJECT TO TERMSSTATED IN THE DECLARATION IN REAL ESTATE BOOK 1510, PAGE 958. NO STRUCTURES, FILL,EMBANKMENTS, TREES OR OBSTRUCTIONS PERMITTED WITHIN THE EASEMENT EXCEPT ACCORDING TOTHOSE TERMS.11.PUBLIC STORM WATER DRAINAGE EASEMENT. OWNERSHIP OF AND RESPONSIBILITY FORIMPROVEMENT AND MAINTENANCE OF STORM WATER FACILITIES IN THIS EASEMENT REMAINS WITHINTHE CURRENT OWNER. IF THE PROPERTY IS WITHIN OR BECOMES A PART OF THE CITY, THE EASEMENTAND ACCESS POINTS TO THE EASEMENT ARE SUBJECT TO THE TERMS AND RESTRICTIONS STATED IN THE"REVISED DECLARATION OF RIGHTS AND PRIVILEGES OF THE CITY OF DURHAM IN STORM WATERMANAGEMENT FACILITY EASEMENTS" RECORDED IN REAL ESTATE BOOK 2298, PAGE 208, WHICHDOCUMENT IS INCORPORATED HEREIN. THIS EASEMENT AND THE REVISED DECLARATION DO NOTCREATE THE OBLIGATION TO PROVIDE PUBLIC MAINTENANCE. NO BUILDING, STRUCTURES, FILLS,EMBANKMENTS OR OBSTRUCTIONS PERMITTED WITHIN THE EASEMENT EXCEPT ACCORDING TO THOSETERMS.PROPERTY LINE (PL)RIGHT-OF-WAY LINESETBACK LINER/WUTILITY EASEMENTADJACENT PROPERTY LINEPROJ. MGR: P R E L I M I N A R YCOPYRIGHT ©2018SEPI ENGINEERING & CONSTRUCTION, INCDRAWN BY:sepiengineering.comE N G I N E E R I N G &C O N S T R U C T I O N1025 WADE AVENUERALEIGH, NORTH CAROLINA919.789.997711020 DAVID TAYLOR DR., SUITE 115CHARLOTTE, NORTH CAROLINA704.714.48805030 NEW CENTRE DR., SUITE BWILMINGTON, NORTH CAROLINA910.523.5715LP16010Construction Drawings02/05/2019Revisions Per Comments04/16/2019................PROJECT:DATEISSUE:CHECKED BY:J. WESTMORELANDREVISIONS:1..NOTICE:3 WORKING DAYSFOR THE LOCATION OFUNDERGROUND FACILITIESBEFORE YOU DIGRCallbefore you dig.below.Know what'sTHE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATEWAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITSREPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALLEXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLEFOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURETO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES.CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THECONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BEEXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THEWORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBYSTRUCTURES, OR OF ANY OTHER PERSONS.1191N O RTH CAROLINAJEFFREY W. WESTMOR E LANDREGI S T E RE D L ANDSCAPE ARCHITECTC - 482N O RTH CAROLINASEPI ENGINEERING & CONST R U C TION, I N C .REGISTER E D L A NDS C A P E ARCHITECTURAL CORPORATIONCLIENT:Angier Development, LLC7700 Kencot CourtRaleigh, NC 27615Contact:David LazzoPH: (919) 601-2816dlazzo2100@gmail.comL. SMITHJ. BEARD..ANGIER AVENUERESIDENTIALCONSTRUCTIONDRAWINGS3846 Angier AvenueDurham, NCCITY OF DURHAMPUBLIC WORKS DEPARTMENTAPPROVEDENGINEERINGDATESTORMWATERDATETRANSPORTATIONDATEDATEDATEPRELIMINARY - NOT FOR CONSTRUCTIONBENCHMARKTBM: 13 IN. OAKN: 799151.14636E: 2045555.4021EL: 363.381EASEMENT PLANC-3.310' R/WDEDICATIONEX. E.O.P.25.0'TREE SAVE AREAOPEN SPACE50.0'R/W32.0'B-B50.0'R/W32.0'B-B30.0'LEGENDSITE EASEMENT NOTES1 inch = 100 ft.100'0100'DocuSign Envelope ID: 2A5CF5E6-202B-438B-AE61-44D99D9011B84/17/2019 400 380395 3903954 0 5 39538 5 3 8 5 385 390390390 390 390390390390390395 395395395 395 3953953953953953953 9 5 39539 5 395 3953 9 5 400 400 40 0 400400400400400 400 400 400 400400400400400400400400 4004004054 0 5 4 0 5 405 4054054 0 5 4 0 5 40 5 410 4104104104104 1 0 410390 390 390 3 9 0390390 3853853 8 5 385385385 38038038 0 3803 8 0 37 5375375375375375375 375 370 3 7 0370370370 365 365 360 165 . 9 9 'R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WN/F R O D N E Y P A U L J E N K I N S AND W I F E TERES A D E V O R E J E N K I N S D.B. 3 6 6 5 , P G . 4 5 4 P.B. 7 6 , P G . 7 9 PIN: 0 7 4 9 - 0 2 - 5 9 - 8 7 9 2 PID: 1 6 3 5 3 6 ZONI N G : R S - 2 0 USE: R E S I D E N T I A L R /W R /WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WxxxxxxxxxxxxxxxxxxN/F MONICA MURPHY D.B. 7776, PG. 67 P.B. 17, PG. 163 PIN: 0840-04-50-2584 PID: 163496 ZONING: RS-20 USE: RESIDENTIAL N/F MARTHA WEISS MESSICK D.B. 2378, PG. 474 PIN: 0840-04-50-5754 PID: 163497 ZONING: RS-20 USE: RESIDENTIAL N/F LATTIE F. GOODWIN, JR. D.B. 1360, PG. 338 P.B. 29, PG. 145 PIN: 0840-04-50-6648 PID: 163498 ZONING: RS-20 USE: RESIDENTIAL N/F PENNY PIERCE, POLLY PIERCE SMITH, SCOTT PIERCE AND, ANDREW PIERCE D.B. 7115, P.G. 665 (TRACT 1) P.B. 22, PG. 37 PIN: 0840-04-50-5342 PID: 163500 ZONING: RS-20 USE: VACANT AREA: 363739 SQ. FT. 8.350 ACRES N/F KENNETH REID INS C O E D.B. 4328, PG. 600 PIN: 0840-04-60-0232 PID: 163509 ZONING: RS-20 USE: COM/WHSE-STOR A G E N/F ANGIER DEVELOPMENT, LLC D.B. 2644, PG. 710 P.B. 22, PG. 37 PIN: 0840-04-50-8205 PID: 163501 ZONING: PDR USE: VACANT AREA: 346132 SQ. FT. 7.946 ACRES N/F M A R I A N T H O M A S D.B. 77 2 3 , P G . 9 1 7 PIN: 0 8 4 0 - 0 4 - 6 0 - 0 1 0 1 PID: 1 6 3 5 0 6 ZONIN G : R S - 2 0 USE: R E S I D E N T I A L N/F CITY OF DURHAM D.B. 2713, PG. 558 D.B. 8184, PG. 9 P.B. 144, PG. 126 PIN: 0749-02-58-3669 PID: 163527 ZONING: RS-20 USE: PARK 100' 100' GAR A G E STAGE ROAD - SR 202360' RIGHT-OF-WAY (PUBLIC)N/F PENNY PIERCE, POLLY PIERCE SMITH, SCOTT PIERCE AND, ANDREW PIERCE D.B. 7115, PG. 665 (TRACT 2) P.B. 17, PG. 38 P.B. 22, PG. 37 P.B. 193, PG. 160 PIN: 0840-04-50-3358 PID: 163499 ZONING: RS-20 USE: VACANT AREA: 74950 SQ. FT. 1.721 ACRES N/F A PORTION OF JOYCE M. APPEL SOLE HEIR TO BERTHA MAYNARD SEE: D.B. 56, PG. 494 & D.B. 56, PG. 459 PIN: 0840-02-40-5199 PID: 163391 ZONING: I-2 & RS-20 USE: INDUSTRIAL/VACANT N/F BE L A R M I N O R O S A L E S ANDIRIS D. G L A D A M E Z D.B. 7 8 3 5 , P G . 6 4 3 P.B. 7 6 , P G . 7 9 PIN: 0 7 4 9 - 0 2 - 5 9 - 7 2 6 4 PID: 1 6 3 5 1 6 ZONIN G : R S - 2 0 USE: R E S I D E N T I A L N/F D A N N Y L . J U S T I C E AND W I F ECYNT H I A H . J U S T I C E D.B. 1 7 7 6 , P G . 1 9 5 P.B. 7 1 , P G . 7 2 PIN: 0 7 4 9 - 0 2 - 5 9 - 7 3 8 4 PID: 1 6 3 5 1 5 ZONIN G : R S - 2 0 USE: R E S I D E N T I A L N/F H O W A R D V . B O U N D S AND W I F E JOAN C . B O U N D S D.B. 4 0 0 , P G . 1 8 0 P.B. 7 1 , P G . 7 2 PIN: 0 7 4 9 - 0 2 - 5 9 - 8 4 1 3 PID: 1 6 3 5 1 4 ZONI N G : R S - 2 0 USE: R E S I D E N T I A L N/F M I C H A E L R . K E L L Y AND W I F E MARY E L A I N E E . K E L L Y D.B. 4 0 7 , P G . 1 2 3 P.B. 7 6 , P G . 7 2 PIN: 0 7 4 9 - 0 2 - 5 9 - 8 6 6 3 PID: 1 6 3 5 3 5 ZONIN G : R S - 2 0 USE: R E S I D E N T I A L N/F KE V I A Y O N I K A B R A X T O N AND H U S B A N D JACKI E L A V A L B R A X T O N D.B. 7 4 7 6 , P G . 5 0 7 P.B. 7 1 , P G . 7 2 PIN: 0 7 4 9 - 0 2 - 5 9 - 9 8 1 2 PID: 1 6 3 5 3 7 ZONIN G : R S - 2 0 USE: R E S I D E N T I A L N/F D E V O N R E N E E W I N K I E ESTAT E F I L E : 2 0 1 3 - E - 4 0 4 D.B. 2 0 1 3 - E , P G . 4 0 4 P.B. 7 1 , P G . 7 2 PIN: 0 7 4 9 - 0 2 - 5 9 - 9 9 4 2 PID: 1 6 3 5 3 8 ZONI N G : R S - 2 0 USE: R E S I D E N T I A L N/F PE T E R A . T R A N ANDBENJA M I N A . T R A N D.B. 7 4 2 3 , P G . 7 7 3 PIN: 0 8 4 0 - 0 2 - 5 0 - 9 0 7 1 PID: 1 6 3 5 0 7 ZONI N G : R S - 2 0 USE: R E S I D E N T I A L N/F MABLE A HUTCHINS D.B. 1042, PG. 850 P.B. 98, PG. 10 PIN: 0840-04-60-0355 PID: 163510 ZONING: RS-20 USE: RESIDENTIAL N/F RON WALKER D.B. 1625, PG. 828 P.B. 27, PG. 189 PIN: 0840-04-60-0530 PID: 163502 ZONING: RS-20 USE: RESIDENTIAL N/F R U B E R T E . B Y R D AND W I F E SHIRL E Y B . B Y R D D.B. 7 8 4 5 , P G . 6 1 5 P.B. 7 1 , P G . 7 2 PIN: 0 7 4 9 - 0 2 - 5 9 - 8 5 4 3 PID: 1 6 3 5 1 3 ZONI N G : R S - 2 0 USE: R E S I D E N T I A L S 27°27'33" E 44.88' (TIE) N/F CITY OF DURHAM D.B. 5173, PG. 452 P.B. 64, PG. 32 P.B. 45, PG. 77 PIN: 0749-02-59-7030 PID: 163518 ZONING: RS-20 USE: VACANT/PARK N/F NO R T H C A R O L I N A RAILRO A D C O M P A N Y PIN: 074 9 - 0 2 - 4 8 - 8 6 9 6 PID: 218 1 4 3 N/F MARIO CABRERA ZAMARRIPA D.B. 8130, PG. 977 P.B. 27, PG. 189 PIN: 0840-04-60-0496 PID: 163503 ZONING: RS-20 USE: RESIDENTIAL N/F WILLIAM H. JEFFREYS SEE: D.B. 239, PG. 420 P.B. 29, PG. 82 PIN: 0749-02-59-2496 PID: 163526 ZONING: RS-20 USE: VACANT AREA: 84655 SQ. FT. 1.943 ACRES APPARENT DEED GAP (LEGAL RESOLUTION IN PROCESS) 72" OAK 51" OAK 29" PINE 32" OAK 40.5" TWIN OAK 36" OAK S30°02 '43 "E121.54 ' T IE N27°42'17"E 87.07' (TIE)S16°58'17"E291.42' (T IE) N 27°47'33" E 25.24' (TIE) S5 6 ° 2 1 ' 2 0 " E 99 . 9 5 ' ( T I E ) S62 ° 1 0 ' 4 9 " E 77. 3 2 ' ( T I E ) S6 2 ° 1 0 ' 5 4 " E 11 7 . 0 1 ' ( T I E )S30°50'42"W212.93' (TIE)N25°21'39"W 100.04' (TIE) N25°54'55"W 115.14' (TIE) N25°48'19"W 30.00' (TIE) S13°01'07"W 58.83' TIES30°48'05"W206.52'N30°51'29"E S6 0 ° 4 9 ' 3 5 " E 149 . 6 7 ' S62 ° 2 2 ' 5 8 " E S27°37'02"W A N G I E R A V E N U E - S R 1 9 2 6 E X . 6 0 ' R I G H T - O F - W A Y ( P U B L I C )XXXXXXXXXXXXXXXXXXR/WBUNGALOW AVENUE - SR 2036EX. 50' RIGHT-OF-WAY (PUBLIC)R/WR/WR/WN/F ERIK POTENZAD.B. 4596 PG. 523P.B. 9 PG. 11PIN:0840-04-50-9874PID: 163072ZONING: RS-20USE: VACANT RES/ LOT-SML TRACTN/F ERIK POTENZAD.B. 4596 PG. 523P.B. 9 PG. 110840-04-60-0851PID: 163073ZONING: RS-20USE: RESIDENTIALN/F ERIK POTENZAD.B. 4596 PG. 523P.B. 9 PG. 110840-04-60-1723PID: 163074ZONING: RS-20USE: VACANT RES/LOT-SML TRACTN/F ERIK POTENZAD.B. 4142 PG. 472PIN:0840-04-50-8963PID: 163071ZONING: RS-20USE: RESIDENTIALN/F SUN HS WAREHOUSEGROUP LLCD.B. 8301 PG. 350P.B.9 PG. 11APIN:0840-04-51-7011PID:204498ZONING: RS-20USE:RESIDENTIALN/F APPEL JOYCE M D.B. 56, PG. 494 PIN:0840-02-40-5199 PID: 163391 ZONING: IL USE: VACANT INDUSTRIAL N25°24'00"W 27.46' (TIE) EO P EO P R/ W S27°47'33"W782.20'IN V : 3 9 9 . 2 6 12" R C P IN V : 3 9 9 . 1 9 IN V : 3 9 6 . 4 5 IN V : 3 9 5 . 4 0 IN V : 3 9 9 . 6 1 IN V : 3 9 9 . 2 6 15" C M P N/F NO R T H C A R O LI N A RAILR O A D C O M P A N Y PIN: 0 8 4 0 - 0 2 - 4 0 - 8 2 6 5 PID: 2 1 9 0 6 5 N/F P A T R I C I A P E A C O C K AND H U S B A N D RICH A R D A V O N P E A C O C K , S R . D.B. 6 3 4 5 , P G . 2 5 5 P.B. 7 6 , P G . 7 9 PIN: 0 7 4 9 - 0 2 - 5 9 - 7 1 2 3 PID: 1 6 3 5 1 7 ZONIN G : R S - 2 0 USE: R E S I D E N T I A L EXISTING CONCRETE CREE K TOP OF BANK TOP OF BANK EXISTING SIDEWALK CLEANOUTS GRAVEL ENTRANCE xxR/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W INV. = 397.97'15"RCP18" RCP 15" RCP 15" C M P 15" RCP 24" R C P 24" RCP24" RCP S SANITARY MH RIM: 407.18' INV. (S.W.): 400.97' INV. (S.E.): 400.93' S SANITARY MH RIM: 410.22' INV. (N.E.): 401.75'8" DIPW WV WV WW WV WV W W WV W WV 15" CPP EX. STREAM EX. 50' STREAM BUFFER S S S S S S S N25°39'12"W 99.74' (TIE)EXIST ING C ITY L IM ITS N/F JE N NI F E R B. L U N D Y D.B. 1 0 2 9, P G. 9 6 4 P.B. 4 5, P G. 7 8 PIN: 0 7 4 9- 0 2- 5 8- 7 8 9 9 ZONI N G: R S- 2 0 USE: R E SI D E N TI A L N/F COUNTY OF DURHAM D.B. 5749, PG. 998 P.B. 123, PG. 188 PIN: 0749-02-59-6042 PID: 163519 ZONING: RS-20 USE: PUMP STATION N/F D E Y SI AI D A A G UI L A R AND H U S B A N D ALEX O. A G UI L A R D.B. 1 1 8 1, P G. 9 2 4 PIN: 0 7 4 9- 0 2- 5 8- 8 8 3 0 ZONI N G: R S- 2 0 USE: R E SI D E N TI A L W W W W W W W W W W W W W W W W W W WWWWWWR/ W R/ W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFS F S F S F S F S F S F S F S F S F S F SF SFSF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SF SF SF SF SF SF SFSFSFSF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SFSFSFSFSFSFSFSFSFSFSFSFSFSFS F S F SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SF SF SF SFSFSFSFSFSFSFSFSFSFPROPOSED STORM DRAINAGE PIPE LD LD PROPOSED LIMITS OF DISTURBANCE TP TP PROPOSED TREE PROTECTION FENCE PROPOSED WATER LINEWW PROPOSED GRAVITY SEWERSSSS EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR 140 139 140 139 PROPERTY LINE (PL) RIGHT-OF-WAY LINE SETBACK LINE UTILITY EASEMENT 10' NO-BUILD SETBACK >TEMPORARY DIVERSION DITCH PROJ. MGR: PRELIMINARYCOPYRIGHT ©2018 SEPI ENGINEERING & CONSTRUCTION, INC DRAWN BY: sepiengineering.com E N G I N E E R I N G & C O N S T R U C T I O N 1025 WADE AVENUE RALEIGH, NORTH CAROLINA 919.789.9977 11020 DAVID TAYLOR DR., SUITE 115 CHARLOTTE, NORTH CAROLINA 704.714.4880 5030 NEW CENTRE DR., SUITE B WILMINGTON, NORTH CAROLINA 910.523.5715 LP16010 Construction Drawings 02/05/2019 Revisions Per Comments 04/16/2019 .. .. .. .. .. .. .. .. PROJECT: DATE ISSUE: CHECKED BY: J. WESTMORELAND REVISIONS: 1 .. NOTICE: 3 WORKING DAYS FOR THE LOCATION OF UNDERGROUND FACILITIES BEFORE YOU DIG R Callbefore you dig. below.Know what's THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. CLIENT: Angier Development, LLC 7700 Kencot Court Raleigh, NC 27615 Contact: David Lazzo PH: (919) 601-2816 dlazzo2100@gmail.com L. SMITH J. BEARD .. ANGIER AVENUE RESIDENTIAL CONSTRUCTION DRAWINGS 3846 Angier Avenue Durham, NC CITY OF DURHAM PUBLIC WORKS DEPARTMENT APPROVED ENGINEERING DATE STORMWATER DATE TRANSPORTATION DATE DATE DATEPRELIMINAR Y - N O T F O R C O N S T R U C T I O N BENCHMARK TBM: 13 IN. OAK N: 799151.14636 E: 2045555.4021 EL: 363.381 EROSION CONTROL PLAN - PHASE 1 C-4.1 10' NO-BUILD SETBACK 50' STREAM BUFFER TEMPORARY SKIMMER BASIN #2 LIMITS OF DISTURBANCE 744,924 S.F. = 17.10 AC. LEGENDEROSION CONTROL NOTES 1.STABILIZE ALL DISTURBED AREAS WITHIN THE NUMBER OF CALENDAR DAYS AS SHOWN ON THE APPROVED GRADING PERMIT, OR PERMANENTLY SUSPENDING LAND DISTURBING ACTIVITY. PERMANENT GROUND COVER SHALL BE PLACED FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT, WITHIN THE NUMBER OF CALENDAR DAYS DICTATED IN THE APPROVED GRADING PERMIT. 2.CONTRACTOR SHALL PROVIDE RAIN GAUGE ON SITE AND PROTECT & MAINTAIN FOR DURATION OF CONSTRUCTION. 3.CONTRACTOR SHALL LOCATE AND VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO BEGINNING CONSTRUCTION. 4.EXISTING UTILITIES ARE SHOWN FROM THE BEST AVAILABLE INFORMATION AND ARE APPROXIMATE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THESE AND OTHER UTILITIES BEFORE STARTING CONSTRUCTION. NOTIFY UTILITY LOCATING COMPANY (ONE CALL @ 1-800-632-4949) OR INDIVIDUAL UTILITY OWNERS FOR UNDERGROUND LOCATIONS AT LEAST 48 HOURS IN ADVANCE. 5.EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE MAINTAINED SO THAT RUNOFF THAT CONTAINS SEDIMENT FROM THE SITE WILL NOT ENTER STORM DRAINAGE FACILITIES. 6.PROPERTIES AND RIGHT-OF-WAY ADJOINING THE SITE SHALL BE KEPT CLEAN OF MUD OR SILT CARRIED FROM THE SITE BY VEHICULAR TRAFFIC OR RUNOFF. 7.ALL CONSTRUCTION TRAFFIC SHALL ENTER AND EXIT THE SITE VIA THE CONSTRUCTION ENTRANCE. 8.EXCAVATED MATERIAL FROM TRENCHES SHALL BE PLACED ON THE UPGRADE SIDE OF THE TRENCH TO ALLOW MATERIAL TO ERODE INTO THE TRENCH. CONSTRUCTION MAINTENANCE AND REMOVAL OF ALL EROSION CONTROL DEVICES ARE THE RESPONSIBILITY OF GRADING CONTRACTOR UNLESS OTHERWISE NOTED. 9.THE EROSION CONTROL MEASURES SHOWN ON THIS DRAWING ARE RECOMMENDED AT A MINIMUM. ACTUAL MEASURES NECESSARY FOR CONTAINMENT OF RUN-OFF SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND BE FIELD VERIFIED. 10.ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION AND IS SUBJECT TO A FINE. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS ALSO A VIOLATION THAT IS IS SUBJECT TO A FINE. RE-GRADING WITHIN 100' LANDSCAPE BUFFER BEYOND WHAT IS SHOWN IS A VIOLATION. 11.ALL SLOPES 4:1 OR STEEPER MUST BE SEEDED, MULCHED, AND STABILIZED WITHIN 14 WORKING DAYS. SLOPES STEEPER THAN 3:1 MUST BE SEEDED, MULCHED, AND STABILIZED WITHIN 7 WORKING DAYS. REFER TO JURISDICTIONAL EROSION CONTROL ORDINANCE FOR ADDITIONAL REQUIREMENTS. 12.ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE OF THE COUNTY ENGINEERING DEPARTMENT. 13.SLOPES SHALL BE GRADED NO STEEPER THAN 2.5:1. 14.ON-SITE BURIAL PITS ARE NOT ALLOWED, UNLESS WRITTEN APPROVAL IS RECEIVED FROM THE OWNER AND AN ON-SITE DEMOLITION LANDFILL PERMIT IS RECEIVED FROM THE ZONING ADMINISTRATOR. 15.NO PAINT OR LIQUID WASTES IN STREAM OR STORM DRAINS. 16.DEDICATED AREAS FOR DEMOLITION, CONSTRUCTION, AND OTHER WASTES MUST BE LOCATED 50' FROM STORM DRAINS AND STREAMS UNLESS NO REASONABLE ALTERNATIVES AVAILABLE. 17.EARTHEN-MATERIAL STOCKPILES MUST BE LOCATED 50' FROM STORM DRAINS AND STREAMS. IF NO REASONABLE ALTERNATIVES ARE AVAILABLE THEN PROVIDE WITH MECHANICAL BUFFER (NCG010000). 18.CONCRETE MATERIALS MUST BE CONTROLLED TO BE 50' FROM SURFACE WATERS, WETLANDS, OR BUFFERS. IF NO REASONABLE ALTERNATIVES ARE AVAILABLE THEN PROVIDE WITH MECHANICAL BUFFER (NCG010000). 19.SITE STABILIZATION IS REQUIRED PRIOR TO FINAL APPROVAL AND ISSUANCE OF CERTIFICATE OF OCCUPANCY. SITE MUST HAVE VEGITATIVE GROWTH AND % DENSITY OF COVER ACCORDING TO LOCAL JURISDICTIONAL REQUIREMENTS IN ORDER TO PASS FINAL INSPECTION. CHECK DAM INLET PROTECTION CONSTRUCTION ENTRANCE SILT FENCE OUTLET EROSION CONTROL MATTING CONCRETE WASH RIPRAP CURB INLET SILT SOCK 1.OBTAIN A GRADING PERMIT FROM NCDEQ LAND QUALITY SECTION. 2.INSTALL TREE PROTECTION FENCE AROUND ALL TREES TO BE PROTECTED PER THE APPROVED PLANS. 3.3S FEDCON TO KEEP A COPY OF THE RECORDED MAP WITH ALL PROPOSED EASEMENTS SHOWN IN ACCORDANCE WITH DURHAM COUNTY REQUIREMENTS ON SITE AT ALL TIMES, AS PROVIDED BY THE OWNER. FAILURE TO DO SO CAN RESULT IN SHUTDOWN OF CONSTRUCTION UNTIL A FINAL MAP IS APPROVED AND RECORDED. 4.CALL NCDEQ LAND QUALITY SECTION (919-791-4200) TO INSPECT TREE PROTECTION FENCE. ONCE APPROVED, CLEARING CAN COMMENCE. 5.CALL NCDEQ LAND QUALITY SECTION CONTROL INSPECTOR AT (919-791-4200) TO SCHEDULE A PRE-CONSTRUCTION MEETING PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES, INCLUDING GRUBBING. 6.INSTALL TEMPORARY CONSTRUCTION ENTRANCE, INLET PROTECTION (SILT SOCKS, YARD INLET, ROCK PIPE, ETC.), AND SILT FENCE ALONG OLD DURHAM FREEWAY PER THE APPROVED PLANS. 7.CONSTRUCT MEDIAN IMPROVEMENTS ALONG OLD DURHAM FREEWAY. 8.INSTALL, SEED, MULCH, AND ANCHOR PERIMETER SEDIMENT CONTROLS, SILT FENCE, TEMPORARY DIVERSION DITCHES, AND TEMPORARY SKIMMER BASIN INTERIOR TO THE SITE AS SHOWN ON THE APPROVED PLANS. CLEAR ONLY THOSE AREAS NECESSARY TO INSTALL THESE MEASURES. 9.INSTALL CHECK DAMS IN TEMPORARY DIVERSIONS AND OTHER VELOCITY DISSIPATERS AS SHOWN ON THE APPROVED PLANS. 10.CALL NCDEQ LAND QUALITY SECTION EROSION CONTROL INSPECTOR AT (919-791-4200) TO SCHEDULE A SITE INSPECTION PRIOR TO BEGINNING OTHER LAND DISTURBING ACTIVITIES. 11.ONCE APPROVED, BEGIN DEMOLITION, CLEARING, GRADING, AND CONSTRUCTION OF SITE ITEMS. 3S FEDCON TO INSTALL SILT FENCE AND SILT FENCE OUTLETS ON DOWNSTREAM SIDES OF ANY STOCKPILE MATERIAL. DISPOSAL OF ANY EXCESS MATERIAL(S) TO BE TAKEN OFF SITE, SHALL BE DONE SO IN A MANNER THAT MEETS THE CONDITIONS OF LOCAL, STATE AND FEDERAL REGULATIONS. 12.AS SITE IS BROUGHT UP TO FINISHED GRADE, TSB #1 AND TSB #2 MAY NEED TO BE RECONSTRUCTED ACCORDINGLY. 3S FEDCON TO MAINTAIN MINIMUM SIZE OF TEMPORARY SEDIMENT BASINS AT ALL TIMES. 13.BEFORE MOVING TO PHASE 2, CALL NCDEQ LAND QUALITY SECTION CONTROL INSPECTOR AT (919-791-4200) TO SCHEDULE A SITE INSPECTION. IF APPROVED, PHASE 2 CAN COMMENCE. PHASE 1 CONSTRUCTION SEQUENCE (SEE GENERAL EROSION CONTROL NOTES, SHEET 1514C200) TEMPORARY SKIMMER BASIN #1 TREE COVERAGE / PRESERVATION AREA TREE COVERAGE / PRESERVATION AREA TREE COVERAGE / PRESERVATION AREA TREE COVERAGE / PRESERVATION AREA SKIMMER BAFFLE (TYP.) 25'X100' CONSTRUCTION ENTRANCE TREE COVERAGE / PRESERVATION AREA SKIMMER BAFFLE (TYP.) TREE COVERAGE / PRESERVATION AREA TREE COVERAGE / PRESERVATION AREA DocuSign Envelope ID: 8C264526-3E7F-4569-8C3F-0ABD8FCCA50D 400 380395 3903954 0 5 39538 5 3 8 5 385 390390390 390 390390390390390395 395395395 395 3953953953953953953 9 5 39539 5 395 3953 9 5 400 400 40 0 400400400400400 400 400 400 400400400400400400400400 4004004054 0 5 4 0 5 405 4054054 0 5 4 0 5 40 5 410 4104104104104 1 0 410390 390 390 3 9 0390390 3853853 8 5 385385385 38038038 0 3803 8 0 37 5375375375375375375 375 370 3 7 0370370370 365 365 360 400398394396396 402 382382386 388 3 8 6 3 8 8 394392390388 386 390 3 9 2 3 9 4 3 9 6 4 0 2 402402404 406400402400404 402 4024 0 0 R/W R/W165 . 9 9 'R/WR/WR/WR/W R/ WR/W R /W R/W R/WR/WR/WW W WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WN/F R O D N E Y P A U L J E N K I N S AND W I F E TERES A D E V O R E J E N K I N S D.B. 3 6 6 5 , P G . 4 5 4 P.B. 7 6 , P G . 7 9 PIN: 0 7 4 9 - 0 2 - 5 9 - 8 7 9 2 PID: 1 6 3 5 3 6 ZONI N G : R S - 2 0 USE: R E S I D E N T I A L R /W R /WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WxxxxxxxxxxxxxxxxxxN/F MONICA MURPHY D.B. 7776, PG. 67 P.B. 17, PG. 163 PIN: 0840-04-50-2584 PID: 163496 ZONING: RS-20 USE: RESIDENTIAL N/F MARTHA WEISS MESSICK D.B. 2378, PG. 474 PIN: 0840-04-50-5754 PID: 163497 ZONING: RS-20 USE: RESIDENTIAL N/F LATTIE F. GOODWIN, JR. D.B. 1360, PG. 338 P.B. 29, PG. 145 PIN: 0840-04-50-6648 PID: 163498 ZONING: RS-20 USE: RESIDENTIAL N/F PENNY PIERCE, POLLY PIERCE SMITH, SCOTT PIERCE AND, ANDREW PIERCE D.B. 7115, P.G. 665 (TRACT 1) P.B. 22, PG. 37 PIN: 0840-04-50-5342 PID: 163500 ZONING: RS-20 USE: VACANT AREA: 363739 SQ. FT. 8.350 ACRES N/F KENNETH REID INS C O E D.B. 4328, PG. 600 PIN: 0840-04-60-0232 PID: 163509 ZONING: RS-20 USE: COM/WHSE-STOR A G E N/F ANGIER DEVELOPMENT, LLC D.B. 2644, PG. 710 P.B. 22, PG. 37 PIN: 0840-04-50-8205 PID: 163501 ZONING: PDR USE: VACANT AREA: 346132 SQ. FT. 7.946 ACRES N/F M A R I A N T H O M A S D.B. 77 2 3 , P G . 9 1 7 PIN: 0 8 4 0 - 0 4 - 6 0 - 0 1 0 1 PID: 1 6 3 5 0 6 ZONIN G : R S - 2 0 USE: R E S I D E N T I A L N/F CITY OF DURHAM D.B. 2713, PG. 558 D.B. 8184, PG. 9 P.B. 144, PG. 126 PIN: 0749-02-58-3669 PID: 163527 ZONING: RS-20 USE: PARK 20.00' 100' 100' GAR A G E STAGE ROAD - SR 202360' RIGHT-OF-WAY (PUBLIC)N/F PENNY PIERCE, POLLY PIERCE SMITH, SCOTT PIERCE AND, ANDREW PIERCE D.B. 7115, PG. 665 (TRACT 2) P.B. 17, PG. 38 P.B. 22, PG. 37 P.B. 193, PG. 160 PIN: 0840-04-50-3358 PID: 163499 ZONING: RS-20 USE: VACANT AREA: 74950 SQ. FT. 1.721 ACRES N/F A PORTION OF JOYCE M. APPEL SOLE HEIR TO BERTHA MAYNARD SEE: D.B. 56, PG. 494 & D.B. 56, PG. 459 PIN: 0840-02-40-5199 PID: 163391 ZONING: I-2 & RS-20 USE: INDUSTRIAL/VACANT N/F BE L A R M I N O R O S A L E S ANDIRIS D. G L A D A M E Z D.B. 7 8 3 5 , P G . 6 4 3 P.B. 7 6 , P G . 7 9 PIN: 0 7 4 9 - 0 2 - 5 9 - 7 2 6 4 PID: 1 6 3 5 1 6 ZONIN G : R S - 2 0 USE: R E S I D E N T I A L N/F D A N N Y L . J U S T I C E AND W I F ECYNT H I A H . J U S T I C E D.B. 1 7 7 6 , P G . 1 9 5 P.B. 7 1 , P G . 7 2 PIN: 0 7 4 9 - 0 2 - 5 9 - 7 3 8 4 PID: 1 6 3 5 1 5 ZONIN G : R S - 2 0 USE: R E S I D E N T I A L N/F H O W A R D V . B O U N D S AND W I F E JOAN C . B O U N D S D.B. 4 0 0 , P G . 1 8 0 P.B. 7 1 , P G . 7 2 PIN: 0 7 4 9 - 0 2 - 5 9 - 8 4 1 3 PID: 1 6 3 5 1 4 ZONI N G : R S - 2 0 USE: R E S I D E N T I A L N/F M I C H A E L R . K E L L Y AND W I F E MARY E L A I N E E . K E L L Y D.B. 4 0 7 , P G . 1 2 3 P.B. 7 6 , P G . 7 2 PIN: 0 7 4 9 - 0 2 - 5 9 - 8 6 6 3 PID: 1 6 3 5 3 5 ZONIN G : R S - 2 0 USE: R E S I D E N T I A L N/F KE V I A Y O N I K A B R A X T O N AND H U S B A N D JACKI E L A V A L B R A X T O N D.B. 7 4 7 6 , P G . 5 0 7 P.B. 7 1 , P G . 7 2 PIN: 0 7 4 9 - 0 2 - 5 9 - 9 8 1 2 PID: 1 6 3 5 3 7 ZONIN G : R S - 2 0 USE: R E S I D E N T I A L N/F D E V O N R E N E E W I N K I E ESTAT E F I L E : 2 0 1 3 - E - 4 0 4 D.B. 2 0 1 3 - E , P G . 4 0 4 P.B. 7 1 , P G . 7 2 PIN: 0 7 4 9 - 0 2 - 5 9 - 9 9 4 2 PID: 1 6 3 5 3 8 ZONI N G : R S - 2 0 USE: R E S I D E N T I A L N/F PE T E R A . T R A N ANDBENJA M I N A . T R A N D.B. 7 4 2 3 , P G . 7 7 3 PIN: 0 8 4 0 - 0 2 - 5 0 - 9 0 7 1 PID: 1 6 3 5 0 7 ZONI N G : R S - 2 0 USE: R E S I D E N T I A L N/F MABLE A HUTCHINS D.B. 1042, PG. 850 P.B. 98, PG. 10 PIN: 0840-04-60-0355 PID: 163510 ZONING: RS-20 USE: RESIDENTIAL N/F RON WALKER D.B. 1625, PG. 828 P.B. 27, PG. 189 PIN: 0840-04-60-0530 PID: 163502 ZONING: RS-20 USE: RESIDENTIAL N/F R U B E R T E . B Y R D AND W I F E SHIRL E Y B . B Y R D D.B. 7 8 4 5 , P G . 6 1 5 P.B. 7 1 , P G . 7 2 PIN: 0 7 4 9 - 0 2 - 5 9 - 8 5 4 3 PID: 1 6 3 5 1 3 ZONI N G : R S - 2 0 USE: R E S I D E N T I A L 17.38' S 27°27'33" E 44.88' (TIE) N/F CITY OF DURHAM D.B. 5173, PG. 452 P.B. 64, PG. 32 P.B. 45, PG. 77 PIN: 0749-02-59-7030 PID: 163518 ZONING: RS-20 USE: VACANT/PARK N/F NO R T H C A R O L I N A RAILRO A D C O M P A N Y PIN: 074 9 - 0 2 - 4 8 - 8 6 9 6 PID: 218 1 4 3 N/F MARIO CABRERA ZAMARRIPA D.B. 8130, PG. 977 P.B. 27, PG. 189 PIN: 0840-04-60-0496 PID: 163503 ZONING: RS-20 USE: RESIDENTIAL N/F WILLIAM H. JEFFREYS SEE: D.B. 239, PG. 420 P.B. 29, PG. 82 PIN: 0749-02-59-2496 PID: 163526 ZONING: RS-20 USE: VACANT AREA: 84655 SQ. FT. 1.943 ACRES APPARENT DEED GAP (LEGAL RESOLUTION IN PROCESS) POINT OF BEGINNING CONTROL CORNER N: 800599.60 E: 2046020.56 EIP 11.78' NW OF EIP EIP EIP EIP EIP EIP 0.33' SE OF EIP 0.18' NW OF EIP EIP EIP BENT 0.06' SE OF EIP BENT 0.10' SE OF EIP ON LINE EIP IN CONC 0.21' NW OF EIR 0.08' SE OF EIP EIP 0.32' NW OF EIP 0.10' NW OF EIP EIP EIR S 66°12'39" E 0.22' FROM AXLE AXLE AXLE EIP EIR EIP EIP EIP EIP EIP EIP IRS IRS IRS IRS IRS IRS IRS IRS N 82°37'35" W 3.24' FROM EIP IRS 72" OAK 51" OAK 29" PINE 32" OAK 32" OAK 40.5" TWIN OAK 36" OAK 25" OAK 25" OAK 31" OAK 23" OAK 28.5" OAK 25" OAK 33" OAK 26" OAK 21" OAK 44" TWIN OAK 24" OAK IRS S5 4 ° 2 8 ' 1 8 " E 10 5 . 0 0 ' S5 7 ° 5 5 ' 4 5 " E 99 . 8 1 'N30°51'29"E210.18'N27°42'17"E669.81'S14°56'37"W1601.25' TOTALN27°27 '33 "W179.97 '172.05'137.30'108.84'190.25'99.96'99.88'499.50'108.87'147.22'S30°02 '43 "E121.54 ' T IE N27°42'17"E 87.07' (TIE)S16°58'17"E291.42' (T IE) N 27°47'33" E 25.24' (TIE) S87°51'08"E 69.14' S5 6 ° 2 1 ' 2 0 " E 99 . 9 5 ' ( T I E ) S62 ° 1 0 ' 4 9 " E 77. 3 2 ' ( T I E ) S6 2 ° 1 0 ' 5 4 " E 11 7 . 0 1 ' ( T I E )S30°50'42"W212.93' (TIE)N25°21'39"W 100.04' (TIE) N25°54'55"W 115.14' (TIE) N25°48'19"W 30.00' (TIE) S13°01'07"W 58.83' TIE S87°41'00"E 326.34'C1N02°07'25"W 2.70'222.82 ' 318.67'S30°48'05"W206.52'C2 C3C4N30°51'29"E S6 0 ° 4 9 ' 3 5 " E 149 . 6 7 ' S62 ° 2 2 ' 5 8 " E S27°37'02"W A N G I E R A V E N U E - S R 1 9 2 6 E X . 6 0 ' R I G H T - O F - W A Y ( P U B L I C )XXXXXXXXXXXXXXXXXXR/WR/W R/WBUNGALOW AVENUE - SR 2036EX. 50' RIGHT-OF-WAY (PUBLIC)R/WR/WR/WN/F ERIK POTENZAD.B. 4596 PG. 523P.B. 9 PG. 11PIN:0840-04-50-9874PID: 163072ZONING: RS-20USE: VACANT RES/ LOT-SML TRACTN/F ERIK POTENZAD.B. 4596 PG. 523P.B. 9 PG. 110840-04-60-0851PID: 163073ZONING: RS-20USE: RESIDENTIALN/F ERIK POTENZAD.B. 4596 PG. 523P.B. 9 PG. 110840-04-60-1723PID: 163074ZONING: RS-20USE: VACANT RES/LOT-SML TRACTN/F ERIK POTENZAD.B. 4142 PG. 472PIN:0840-04-50-8963PID: 163071ZONING: RS-20USE: RESIDENTIALN/F SUN HS WAREHOUSEGROUP LLCD.B. 8301 PG. 350P.B.9 PG. 11APIN:0840-04-51-7011PID:204498ZONING: RS-20USE:RESIDENTIALN/F APPEL JOYCE M D.B. 56, PG. 494 PIN:0840-02-40-5199 PID: 163391 ZONING: IL USE: VACANT INDUSTRIAL WWWWWWWWWWWWWWWWWWW W W W W W W W W WWWWWWWWW W W W WWWWWWWWWWWWWWWWWWWWWS S S S S S S S S S S S S S S S S R/W S S S S N25°24'00"W 27.46' (TIE) EO P EO P R/ W S27°47'33"W782.20'IN V : 3 9 9 . 2 6 12" R C P IN V : 3 9 9 . 1 9 IN V : 3 9 6 . 4 5 IN V : 3 9 5 . 4 0 IN V : 3 9 9 . 6 1 IN V : 3 9 9 . 2 6 15" C M P R/WR/WR/WR/WR/WR/WR/WR/WR/WN/F NO R T H C A R O LI N A RAILR O A D C O M P A N Y PIN: 0 8 4 0 - 0 2 - 4 0 - 8 2 6 5 PID: 2 1 9 0 6 5 N/F P A T R I C I A P E A C O C K AND H U S B A N D RICH A R D A V O N P E A C O C K , S R . D.B. 6 3 4 5 , P G . 2 5 5 P.B. 7 6 , P G . 7 9 PIN: 0 7 4 9 - 0 2 - 5 9 - 7 1 2 3 PID: 1 6 3 5 1 7 ZONIN G : R S - 2 0 USE: R E S I D E N T I A L S EXISTING CONCRETE CREE K TOP OF BANK TOP OF BANK EXISTING SIDEWALK CLEANOUTS GRAVEL ENTRANCE xxS R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W INV. = 397.97'15"RCP18" RCP 15" RCP 15" C M P 15" RCP 24" R C P 24" RCP24" RCP S SANITARY MH RIM: 407.18' INV. (S.W.): 400.97' INV. (S.E.): 400.93' S SANITARY MH RIM: 410.22' INV. (N.E.): 401.75'8" DIPW WV WV WW WV WV W W WV W WV 15" CPP EX. STREAM EX. 50' STREAM BUFFER R/W1 2 3 4 5 6 7 8 9 12 13 14 15 16 18 19 20 21 22 11 10 17 23 24 25 26 27 28 29 30 31 54 55 56 57 58 59 60 61 62 63 64 65 66 67 53 52 51 50 49 48 47 46 45 44 43 42 32 33 34 35 36 37 38 39 40 41 68 69 70 OPEN 1 OPEN 2 OPEN 3 SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPLDLDLDLDLDLDLDLDLD TPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTP LDLDLDLDTPTPTPTPTPTPTPT P TP TP TP TP TP TP TP TP TPTPTPTPTPTPTPTPTPTP TP TP TPTPTPTPS S S S S SSSSS S N25°39'12"W 99.74' (TIE)EXIST ING C ITY L IM ITS N/F JE N NI F E R B. L U N D Y D.B. 1 0 2 9, P G. 9 6 4 P.B. 4 5, P G. 7 8 PIN: 0 7 4 9- 0 2- 5 8- 7 8 9 9 ZONI N G: R S- 2 0 USE: R E SI D E N TI A L N/F COUNTY OF DURHAM D.B. 5749, PG. 998 P.B. 123, PG. 188 PIN: 0749-02-59-6042 PID: 163519 ZONING: RS-20 USE: PUMP STATION N/F D E Y SI AI D A A G UI L A R AND H U S B A N D ALEX O. A G UI L A R D.B. 1 1 8 1, P G. 9 2 4 PIN: 0 7 4 9- 0 2- 5 8- 8 8 3 0 ZONI N G: R S- 2 0 USE: R E SI D E N TI A L W W W W W W W W W W W W W W W W W W WWWWWW 396394392390398 400 402 40 2 40 0 400 398R/ W R/ W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W L D L D L D LDLDLDLDLDLDLDLDL D LD LDLD LD LD LD LD LDLDLDLDLDLDLDLDLD LDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLD LD LDLDLDLDLDLDLDLDLDLDLD LD LD L D LD LD LD LD LD LD LD LD LD LD LD LDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLD LD LD LD L D L D LD LD LDLDLDLDLDLDLDLD LD LD LDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFS F S F S F S F S F S F S F S F S F S F SF SFSF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SF SF SF SF SF SF SFSFSFSF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SFSFSFSFSFSFSFSFSFSFSFSFSFSFS F S F SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SF SF SF SFSFSFSFSFSFSFSFSFSFTREE COVERAGE / PRESERVATION AREA TREE COVERAGE / PRESERVATION AREA TREE COVERAGE / PRESERVATION AREA TREE COVERAGE / PRESERVATION AREA TREE COVERAGE / PRESERVATION AREA TREE COVERAGE / PRESERVATION AREA TREE COVERAGE / PRESERVATION AREA FLARED END SECTION FLOW ARROW CATCH BASIN STORM MANHOLE YARD INLET PROPOSED STORM DRAINAGE PIPE LD LD PROPOSED LIMITS OF DISTURBANCE TP TP PROPOSED TREE PROTECTION FENCE PROPOSED WATER LINEWW PROPOSED GRAVITY SEWERSSSS EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR 140 139 140 139 PROPERTY LINE (PL) RIGHT-OF-WAY LINE SETBACK LINE UTILITY EASEMENT 1.REFER TO THE SITE PLAN FOR RELATED NOTES. 2.BOUNDARY INFORMATION SHOWN ON THIS PLAN WAS OBTAINED FROM A SURVEY ENTITLED "CONTIGUOUS ANNEXATION PLAT" PREPARED FOR: ANGIER DEVELOPMENT LLC. PREPARED BY: HENRY FITTS, P.L.S. OF SEPI ENGINEERING & CONSTRUCTION DATED FEBRUARY 07, 2017. 3.THE CONTRACTOR SHALL NOTE THAT THE PLANS ARE SCHEMATIC IN NATURE AND DO NOT SHOW EVERY OFFSET, TRANSITION, GRADE CHANGE, ETC. THAT MAY BE REQUIRED FOR A COMPLETE AND WORKING SYSTEM. 4.CONTRACTOR SHALL VERIFY LOCATION OF ALL EXISTING UTILITIES BEFORE BEGINNING CONSTRUCTION. 5.THE OWNER OR CONTRACTOR SHALL HIRE AN INDEPENDENT GEOTECHNICAL ENGINEER, LICENSED IN NORTH CAROLINA, TO PROVIDE THE FOLLOWING SERVICES (CRITICAL GEOTECHNICAL ENGINEERING ITEMS OF CONSTRUCTION MONITORING THAT REQUIRE SPECIAL INSPECTION): • EXAMINATION OF FOUNDATION SUBGRADE CONDITIONS; • SUPERVISION OF SUBGRADE PREPARATION; • SUPERVISION OF EXCAVATION AND BACKFILL PLACEMENT AND COMPACTION; • SUPERVISION OF BEDDING, SUBGRADE AND BACKFILL CONSTRUCTION; • FILL AND PAVEMENT MATERIALS TESTING; • SUPERVISION OF PAVEMENT CONSTRUCTION; • AND, ALL TESTING NECESSARY TO ASSURE COMPLIANCE OF IN-PLACE MATERIALS • DAM COMPACTION TESTING. 6.CONTRACTOR SHALL BLEND NEW EARTHWORK SMOOTHLY TO TRANSITION BACK TO EXISTING GRADE, WITH NO SHARP OR ABRUPT CHANGES. 7.ALL FILL TO BE COMPACTED TO 95% DRY DENSITY (STANDARD PROCTOR) UNDER PAVEMENT AND BUILDING PAD. 8.THE PROPOSED CONTOURS SHOWN ARE FINISHED ELEVATIONS. REFER TO PAVEMENT AND SIDEWALK DETAILS TO ESTABLISH CORRECT SUB-BASE OR AGGREGATE BASE COURSE ELEVATIONS TO BE COMPLETED UNDER THIS CONTRACT. 9.CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE SO THAT RUNOFF WILL FLOW BY GRAVITY AWAY FROM BUILDING(S) AND ACROSS NEW PAVEMENT AND/OR LANDSCAPE AREAS TO NEW OR EXISTING STORM DRAIN INLETS, SWALES, DITCHES OR OVERLAND SHEET FLOW. 10.THE TREE PROTECTION FENCE SHALL BE MAINTAINED ON THE SITE UNTIL ALL SITE WORK IS COMPLETED AND THE FINAL SITE INSPECTION IS SCHEDULED. THE FENCING SHALL BE REMOVED IMMEDIATELY PRIOR TO FINAL EROSION CONTROL SITE INSPECTION. 11.TURF SHALL BE ESTABLISHED IN ALL DISTURBED AREAS AND AREAS LEFT UNPAVED AND WITHOUT GRAVEL IN ACCORDANCE WITH THE SPECIFICATIONS AND LANDSCAPE PLANS. 12.ROOT PROTECTION ZONE EQUALS ONE FOOT OF RADIUS FOR EVERY INCH OF DIAMETER OF EXISTING TREES, OR SIX FOOT RADIUS, WHICHEVER IS GREATER. NO DISTURBANCE ALLOWED WITHIN THIS AREA. AREA MUST BE PROTECTED WITH BOTH TREE PROTECTION FENCING AND WARNING SIGNS. HAND CLEARING ONLY; NO GRUBBING ALLOWED IN THIS AREA. 13.AT THE START OF GRADING INVOLVING THE LOWERING OF EXISTING GRADE AROUND A TREE OR STRIPPING OF TOPSOIL, A CLEAN, SHARP, VERTICAL CUT SHALL BE MADE AT THE EDGE OF THE TREE SAVE AREA PRIOR TO OR AT THE SAME TIME AS SILT FENCE AND OTHER EROSION CONTROL MEASURES ARE INSTALLED. THE TREE PROTECTION FENCING SHALL BE INSTALLED ON THE SIDE OF THE CUT FARTHEST AWAY FROM THE TREE TRUNK AND SHALL REMAIN IN PLACE UNTIL ALL OF THE CONSTRUCTION IN THE VICINITY OF THE TREES IS COMPLETE. NO STORAGE OF MATERIALS, FILL, OR EQUIPMENT AND NO TRESPASSING SHALL BE ALLOWED WITHIN THE BOUNDARY OF THE PROTECTED AREA. 14.THIS SITE IS NOT IN ANY SPECIAL FLOOD HAZARD AREAS OR FUTURE CONDITIONS FLOOD HAZARD AREAS, AS SHOWN ON FIRM PANEL 3720084000J DATED 05/02/06 AND 8720084900J DATED 05/02/06. 15.A TREE PROTECTION FENCE CONSTRUCTED OF A MATERIAL RESISTANT TO DEGRADATION BY SUN, WIND, AND MOISTURE FOR THE DURATION OF THE CONSTRUCTION, SHALL BE INSTALLED AT THE SAME TIME AS THE EROSION CONTROL MEASURES, AND SHALL REMAIN IN PLACE UNTIL ALL CONSTRUCTION IS COMPLETE. SUCH FENCING SHALL BE MOUNTED ON METAL POSTS PLACED NO FURTHER THAN TEN FEET APART. SILT FENCING SHALL NOT SERVE AS TREE PROTECTION FENCING EXCEPT IN UNUSUAL CIRCUMSTANCES, SUCH AS WHEN TOPOGRAPHY LIMITS THE AREA AVAILABLE FOR INSTALLATION OF BOTH TREE PROTECTION FENCING AND EROSION CONTROL MEASURES (UDO SECTION 8.3.2 C). 16.ALL STORM DRAINAGE PIPE SHALL BE NCDOT CLASS III RCP UNLESS OTHERWISE NOTED. MINIMUM PIPE SIZE SHALL BE 15". 10' NO-BUILD SETBACK GRADE CHANGE NOTE: ALL DRIVEWAYS TO BE LOCATED TO AVOID CONFLICTS WITH PROPOSED CATCH BASINS AND UTILITY SERVICES PROJ. MGR: PRELIMINARYCOPYRIGHT ©2018 SEPI ENGINEERING & CONSTRUCTION, INC DRAWN BY: sepiengineering.com E N G I N E E R I N G & C O N S T R U C T I O N 1025 WADE AVENUE RALEIGH, NORTH CAROLINA 919.789.9977 11020 DAVID TAYLOR DR., SUITE 115 CHARLOTTE, NORTH CAROLINA 704.714.4880 5030 NEW CENTRE DR., SUITE B WILMINGTON, NORTH CAROLINA 910.523.5715 LP16010 Construction Drawings 02/05/2019 Revisions Per Comments 04/16/2019 .. .. .. .. .. .. .. .. PROJECT: DATE ISSUE: CHECKED BY: J. WESTMORELAND REVISIONS: 1 .. NOTICE: 3 WORKING DAYS FOR THE LOCATION OF UNDERGROUND FACILITIES BEFORE YOU DIG R Callbefore you dig. below.Know what's THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. CLIENT: Angier Development, LLC 7700 Kencot Court Raleigh, NC 27615 Contact: David Lazzo PH: (919) 601-2816 dlazzo2100@gmail.com L. SMITH J. BEARD .. ANGIER AVENUE RESIDENTIAL CONSTRUCTION DRAWINGS 3846 Angier Avenue Durham, NC CITY OF DURHAM PUBLIC WORKS DEPARTMENT APPROVED ENGINEERING DATE STORMWATER DATE TRANSPORTATION DATE DATE DATEPRELIMINAR Y - N O T F O R C O N S T R U C T I O N BENCHMARK TBM: 13 IN. OAK N: 799151.14636 E: 2045555.4021 EL: 363.381 EROSION CONTROL PLAN - PHASE 2 C-4.2 10' NO-BUILD SETBACK 50' STREAM BUFFER STORMWATER WETLAND #1 (SEE SHEET C-4.3) STORMWATER WETLAND #2 (SEE SHEET C-4.4) PRE-DEVELOPED IMPERVIOUS SURFACES Area (square feet)Area (ac) Road/Driveway Roof Sidewalk Total 0 0 0 0.00 FALLS BASIN POST-DEVELOPED IMPERVIOUS SURFACES Area (square feet)Area (ac) Road/Driveway Roof Sidewalk Total 47,123 54,000 5,830 2.46 JORDAN BASIN POST-DEVELOPED IMPERVIOUS SURFACES Area (square feet)Area (ac) Road/Driveway Roof Sidewalk Total 67,119 103,500 6,861 4.07 PROPOSED VEGETATED FILTER STRIP PROP. VEGETATED FILTER STRIP SEE SHEET C-4.1/C-4.2 FOR WALL ELEVATIONS 2 SCM ACCESS & MAINTENANCE EASEMENT SEE SHEET C-4.1 FOR WALL ELEVATIONS SCM ACCESS & MAINTENANCE EASEMENT STEEL POST FRONT VIEW SIDE VIEW2'-0"3'-0"32" MIN. WIDTH26"WOVEN WIRE FABRIC WARNING SIGN VARIABLE AS DIRECTED BY THE ENGINEER 8' MAX. GRADE MIN. 12-1/2 GA. INTERMEDIATE WIRES MIN. 10 GA. LINE WIRES TREE PROTECTION AREA DO NOT ENTER ORANGE, UV RESISTANT HIGH - TENSILE STRENGTH POLY BARRICADE FABRIC (TYPICAL) WARNING SIGN ORANGE, UV RESISTANT HIGH - TENSILE STRENGTH POLY BARRICADE FABRIC (TYPICAL) NOTES: 1.WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL. LETTERS TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE AND SPACED AS DETAILED. 2.SIGNS SHALL BE PLACED AT 50' MAXIMUM INTERVALS. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA. 3.ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. 4.MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT. 5.ADDITIONAL SIGNS MAY BE REQUIRED BY CITY OF RALEIGH INSPECTIONS DEPARTMENT BASED ON ACTUAL FIELD CONDITIONS. STANDARD TREE PROTECTION FENCE SCALE: NTS 40" DO NOT ENTER TREE PROTECTION AREA 18"3"4"3"4"4"DE LOS ARBOLES AREA PARA PROTECCION3"4"3"3"4"PROHIBIDO ENTRAR3"4"24" WARNING SIGN DETAIL LIMITS OF DISTURBANCE 744,924 S.F. = 17.10 AC. LEGEND GENERAL GRADING NOTES DocuSign Envelope ID: 8C264526-3E7F-4569-8C3F-0ABD8FCCA50D 10' NO-BUILD SETBACK 400 380395 3903954 0 5 39538 5 3 8 5 385 390390390 390 390390390390390395 395395395 395 3953953953953953953 9 5 39539 5 395 3953 9 5 400 400 40 0 400400400400400 400 400 400 400400400400400400400400 4004004054 0 5 4 0 5 405 4054054 0 5 4 0 5 40 5 410 4104104104104 1 0 410390 390 390 3 9 0390390 385385385385385385 3803803803803 8 0 37 5375375375375375375 375 370 3 7 0370370370 365 365 360 400398394396396 402 382382386 388 3 8 6 3 8 8 394392390388 386 390 3 9 2 3 9 4 3 9 6 4 0 2 402402404 406400402400404 402 4024 0 0 R/W R/WR/WR/WR/WR/W R/ WR/WR /WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/Wxxxxxxxxxxxxxxxxxx20.00' 17.38' EIP 11.78' NW OF EIP EIP EIP 0.33' SE OF EIP 0.18' NW OF EIP EIP BENT 0.06' SE OF EIP BENT 0.10' SE OF EIP ON LINE EIP IN CONC 0.21' NW OF EIR 0.08' SE OF EIP EIP 0.32' NW OF EIP 0.10' NW OF EIP EIP EIR S 66°12'39" E 0.22' FROM AXLE AXLE AXLE EIP EIR EIP EIP EIP EIP IRS IRS IRS IRS IRS IRS IRS IRS N 82°37'35" W 3.24' FROM EIP IRS 72" OAK 51" OAK 29" PINE 32" OAK 40.5" TWIN OAK 36" OAK IRS S5 4 ° 2 8 ' 1 8 " E 10 5 . 0 0 ' S5 7 ° 5 5 ' 4 5 " E 99 . 8 1 'N30°51'29"E210.18'N27°42'17"E669.81'S14°56'37"W1601.25' TOTALN27°27'33 "W179.97 '172.05'137.30'108.84'190.25'99.96'99.88'499.50'108.87'147.22'S87°51'08"E 69.14' S87°41'00"E 326.34'C1N02°07'25"W 2.70'222.82 ' 318.67' C2 C3C4XXXXXXXXXXXXXXXXXXR/WR/W R/W IN V : 3 9 9 . 2 6 12" R C P IN V : 3 9 9 . 1 9 IN V : 3 9 6 . 4 5 IN V : 3 9 5 . 4 0 IN V : 3 9 9 . 2 6 15" C M P R/WR/WR/WR/WR/WR/WR/WR/WR/WEXISTING CONCRETE CREE K EXISTING SIDEWALK CLEANOUTS GRAVEL ENTRANCE xx R/ W R/ W 15" RCP24" RCP EX. 50' STREAM BUFFER R/W1 2 3 4 5 6 7 8 9 12 13 14 15 16 18 19 20 21 22 11 10 17 23 24 25 26 27 28 29 30 31 54 55 56 57 58 59 60 61 62 63 64 65 66 67 53 52 51 50 49 48 47 46 45 44 43 42 32 33 34 35 36 37 38 39 40 41 68 69 70 TPTPTPTPTPTPTPTPTPTPTP TPTPTPTPTPTPTPTPTPTPTPLDLDLDLDLDLDLDLDLDTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTP TPTPTPTPTPTPTPTPTPTPTPTP LDLDLDLDTPTPTPTPTPTPTPT P TP TP TP TP TP TP TP TP TPTPTPTPTPTPTPTPTPTP TP TP TPTPTPTPS S S S S W W W W W 396394392390398 400 402 400 398L D L D L D LDLDLDLDLDLDLDLDL D LD LDLD LD LD LD LD LDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLD LD LDLDLDLDLDLDLDLDLDLDLD LD LD L D LDLDLDLDLDLDLDLDLDL D L D LD LD LDLDLDLDLDLDLDLD LD LD LDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLD10' NO-BUILD SETBACK 50' STREAM BUFFER PROPOSED VEGETATED FILTER STRIP PROP. VEGETATED FILTER STRIP SEE SHEET C-5.1/C-5.2 FOR WALL ELEVATIONS SCM ACCESS & MAINTENANCE EASEMENT SEE SHEET C-5.1 FOR WALL ELEVATIONS SCM ACCESS & MAINTENANCE EASEMENT TREE COVERAGE / PRESERVATION AREA TREE COVERAGE / PRESERVATION AREA TREE COVERAGE / PRESERVATION AREA TREE COVERAGE / PRESERVATION AREA TREE COVERAGE / PRESERVATION AREA TREE COVERAGE / PRESERVATION AREA TREE COVERAGE / PRESERVATION AREA CI D-07 CI D-08 CI D-11 CI D-09 CI D-19 CI D-10 CI D-12 CI D-13 CI D-20 CI D-06 CI D-16 CI D-15 CI D-05 CI D-22 CI D-14CI D-21 CI D-04 CI D-03 CI D-23 CI D-02CI D-01 CI D-24 CI D-17 CI D-18 EW-W D-00 CI D-26 CI D-25 CI C-09 CI C-08 CI C-07 CI C-06 CI C-02 CI C-05 CI C-04 CI C-10 CI C-12 CI C-11 MH C-01 EW-W C-00 CI C-03 YI C-14 CI C-13 CI C-15 MH B-01 CI B-03 CI B-02 EW-L B-04 EW B-00 CB B-10 TBJB B-06 TBJB B-05 CB B-07 OE Ex. A-0110+00.0011+00.0012+00.0013+00.0014+00. 0 0 15+00.00 16+00.00 17+00.0018+00.0019+00.0020+00.0021+00.002 2 + 0 0 . 0 0 23 + 0 0 . 0 0 24+00. 0 0 20+19.7410+00.0011+00.0012+00.0013+00.0014+00.0015+00.0016+00.0017+00.0018+00.0019+00.0020+00.00 10+ 0 0 . 0 0 11+ 0 0 . 0 0 12+ 0 0 . 0 0 13+ 0 0 . 0 0 CB B-08 CB B-09 DRAINAGE SCHEDULE - NETWORK SD B STRUCT NO. B-00 B-01 B-02 B-03 B-04 B-05 B-06 B-07 B-08 B-09 B-10 Ex. A-01 STATION 12+16.15 -ROAD A- 12+16.14 -ROAD A- 10+79.91 -ROAD A- 10+79.91 -ROAD A- 11+48.26 -ROAD A- 10+31.18 -ROAD A- 16+40.96 -ANGIER AVE- 16+68.53 -ANGIER AVE- 17+23.02 -ANGIER AVE- 18+89.38 -ANGIER AVE- 15+57.55 -ANGIER AVE- 16+53.10 -ANGIER AVE- OFFSET 33.03' R 18.03' R 16.86' R -16.64' L -39.49' L 16.89' R 14.42' R 28.81' R 28.81' R 24.74' R 28.03' R -16.97' L GRT/RIM ELEV. 396.04 +/- 400.00 +/- 399.71 +/- 399.71 +/- 397.75 +/- 400.58 +/- 400.73 +/- 400.10 +/- 400.95 +/- 402.35 +/- 400.86 +/- 399.53 +/- INVERT IN 392.75 (B-P01) 392.95 (B-P02) 394.70 (B-P04) 395.92 (B-P03) 393.89 (B-P05) 395.94 (B-P10) 394.19 (B-P06) 396.27 (B-P07) 395.52 (Ex.-P1) 396.70 (B-P08) 397.45 (B-P09) UPSTRM STRUCT B-01 B-02 B-04 B-03 B-05 B-10 B-06 B-07 Ex. A-01 B-08 B-09 INVERT OUT 392.85 (B-P01) 393.79 (B-P02) 396.25 (B-P03) 395.54 (B-P04) 394.19 (B-P05) 394.50 (B-P06) 396.60 (B-P07) 397.35 (B-P08) 398.69 (B-P09) 396.90 (B-P10) 396.45 (Ex.-P1) DWNSTRM STRUCT B-00 B-01 B-02 B-01 B-02 B-05 B-06 B-07 B-08 B-05 B-06 DEPTH 2.8 ft +/- 7.4 ft +/- 6.2 ft +/- 3.7 ft +/- 2.0 ft +/- 6.6 ft +/- 6.5 ft +/- 3.7 ft +/- 3.8 ft +/- 3.9 ft +/- 4.2 ft +/- 5.1 ft +/- STRUCT TYPE EW MH CI CI EW-L TBJB TBJB CB CB CB CB OE DWNSTRM PIPE INFORMATION 15' of 36" RCP @ 0.7% (B-P01) 136' of 36" RCP @ 0.6% (B-P02) 34' of 15" RCP @ 1.0% (B-P03) 89' of 18" RCP @ 0.9% (B-P04) 49' of 36" RCP @ 0.6% (B-P05) 50' of 36" RCP @ 0.6% (B-P06) 31' of 15" RCP @ 1.1% (B-P07) 54' of 15" RCP @ 1.2% (B-P08) 166' of 15" RCP @ 0.8% (B-P09) 36' of 15" RCP @ 2.6% (B-P10) 34' of 24" Ex. RCP @ 2.8% (Ex.-P1) DRAINAGE SCHEDULE - NETWORK SD C STRUCT NO. C-00 C-01 C-02 C-03 C-04 C-05 C-06 C-07 C-08 C-09 C-10 C-11 C-12 C-13 C-14 C-15 STATION 14+07.29 -ROAD A- 14+01.02 -ROAD A- 14+46.93 -ROAD A- 14+66.20 -ROAD A- 10+48.84 -ROAD B- 10+53.84 -ROAD B- 11+31.81 -ROAD B- 11+47.94 -ROAD B- 15+73.05 -ROAD A- 15+73.05 -ROAD A- 13+83.08 -ROAD A- 13+36.22 -ROAD A- 13+36.23 -ROAD A- 13+68.18 -ROAD A- 13+36.23 -ROAD A- 12+71.75 -ROAD A- OFFSET 50.45' R 34.60' R 16.78' R -16.75' L 16.75' R -16.75' L -16.75' L 16.75' R 16.75' R -16.75' L 16.77' R 16.76' R -16.75' L -16.75' L -33.34' L -16.75' L GRT/RIM ELEV. 395.29 +/- 397.51 +/- 399.18 +/- 399.43 +/- 399.54 +/- 399.67 +/- 401.62 +/- 402.02 +/- 400.77 +/- 400.77 +/- 398.38 +/- 398.11 +/- 398.11 +/- 398.26 +/- 399.18 +/- 398.61 +/- INVERT IN 392.00 (C-P01) 393.14 (C-P10) 393.35 (C-P02) 394.78 (C-P08) 394.28 (C-P03) 394.76 (C-P04) 395.30 (C-P05) 395.89 (C-P06) 398.18 (C-P07) 396.99 (C-P09) 393.47 (C-P11) 393.99 (C-P12) 394.68 (C-P15) 394.68 (C-P13) 395.16 (C-P14) UPSTRM STRUCT C-01 C-10 C-02 C-08 C-03 C-04 C-05 C-06 C-07 C-09 C-11 C-12 C-15 C-13 C-14 INVERT OUT 392.14 (C-P01) 393.78 (C-P02) 394.66 (C-P03) 395.20 (C-P04) 395.64 (C-P05) 398.08 (C-P06) 398.58 (C-P07) 396.89 (C-P08) 397.33 (C-P09) 393.37 (C-P10) 393.89 (C-P11) 394.33 (C-P12) 395.03 (C-P13) 396.24 (C-P14) 395.38 (C-P15) DWNSTRM STRUCT C-00 C-01 C-02 C-03 C-04 C-05 C-06 C-02 C-08 C-01 C-10 C-11 C-12 C-12 C-12 DEPTH 4.8 ft +/- 5.6 ft +/- 5.7 ft +/- 5.0 ft +/- 4.6 ft +/- 4.3 ft +/- 3.8 ft +/- 3.7 ft +/- 4.1 ft +/- 3.7 ft +/- 5.3 ft +/- 4.5 ft +/- 4.0 ft +/- 3.2 ft +/- 3.2 ft +/- 3.2 ft +/- STRUCT TYPE EW-W MH CI CI CI CI CI CI CI CI CI CI CI CI YI CI DWNSTRM PIPE INFORMATION 17' of 30" RCP @ 0.8% (C-P01) 43' of 24" RCP @ 1.0% (C-P02) 39' of 18" RCP @ 1.0% (C-P03) 44' of 18" RCP @ 1.0% (C-P04) 34' of 18" RCP @ 1.0% (C-P05) 82' of 15" RCP @ 2.7% (C-P06) 37' of 15" RCP @ 1.1% (C-P07) 126' of 15" RCP @ 1.7% (C-P08) 34' of 15" RCP @ 1.0% (C-P09) 24' of 18" CL IV @ 1.0% (C-P10) 42' of 18" CL IV @ 1.0% (C-P11) 34' of 18" CL IV @ 1.0% (C-P12) 35' of 15" RCP @ 1.0% (C-P13) 17' of 15" RCP @ 6.6% (C-P14) 70' of 15" RCP @ 1.0% (C-P15) DRAINAGE SCHEDULE - NETWORK SD D STRUCT NO. D-00 D-01 D-02 D-03 D-04 D-05 D-06 D-07 D-08 D-09 D-10 D-11 D-12 D-13 D-14 D-15 D-16 D-17 D-18 D-19 D-20 D-21 D-22 D-23 D-24 D-25 D-26 STATION 18+68.63 -ROAD B- 18+63.56 -ROAD B- 18+23.48 -ROAD B- 17+20.97 -ROAD B- 23+73.51 -ROAD A- 22+99.69 -ROAD A- 22+26.92 -ROAD A- 21+24.91 -ROAD A- 20+23.82 -ROAD A- 19+52.45 -ROAD A- 18+77.63 -ROAD A- 18+09.31 -ROAD A- 10+44.68 -ROAD C- 10+44.68 -ROAD C- 16+00.97 -ROAD B- 15+20.97 -ROAD B- 15+16.09 -ROAD B- 19+34.02 -ROAD B- 19+38.96 -ROAD B- 18+77.63 -ROAD A- 22+22.26 -ROAD A- 23+70.27 -ROAD A- 16+00.97 -ROAD B- 18+14.27 -ROAD B- 18+82.29 -ROAD B- 14+00.97 -ROAD B- 13+69.36 -ROAD B- OFFSET -63.97' L -14.00' L -16.75' L -16.75' L 16.75' R 16.75' R 16.75' R 16.75' R 16.75' R 16.75' R 16.75' R 16.75' R -16.75' L 16.75' R -16.75' L -16.75' L 16.75' R -16.75' L 18.39' R -16.75' L -16.75' L -16.75' L 16.75' R 16.75' R 16.75' R -16.75' L 16.75' R GRT/RIM ELEV. 376.08 +/- 382.43 +/- 383.73 +/- 387.63 +/- 390.84 +/- 394.16 +/- 397.17 +/- 399.60 +/- 399.58 +/- 398.59 +/- 397.84 +/- 398.61 +/- 397.54 +/- 397.54 +/- 392.18 +/- 395.23 +/- 395.42 +/- 381.45 +/- 381.55 +/- 397.84 +/- 397.34 +/- 390.99 +/- 392.19 +/- 384.09 +/- 381.98 +/- 399.79 +/- 400.99 +/- INVERT IN 372.25 (D-P01) 375.77 (D-P02) 376.77 (D-P17) 378.18 (D-P24) 378.94 (D-P03) 380.09 (D-P23) 384.16 (D-P14) 383.34 (D-P04) 387.21 (D-P21) 385.38 (D-P05) 386.69 (D-P06) 387.66 (D-P07) 393.56 (D-P20) 388.95 (D-P08) 390.00 (D-P09) 391.43 (D-P10) 394.44 (D-P19) 392.86 (D-P11) 393.65 (D-P12) 394.17 (D-P13) 388.37 (D-P15) 388.42 (D-P22) 391.74 (D-P25) 391.64 (D-P16) 377.76 (D-P18) 396.35 (D-P26) UPSTRM STRUCT D-01 D-02 D-17 D-24 D-03 D-23 D-14 D-04 D-21 D-05 D-06 D-07 D-20 D-08 D-09 D-10 D-19 D-11 D-12 D-13 D-15 D-22 D-25 D-16 D-18 D-26 INVERT OUT 372.90 (D-P01) 378.44 (D-P02) 382.74 (D-P03) 385.38 (D-P04) 386.59 (D-P05) 387.46 (D-P06) 388.75 (D-P07) 390.05 (D-P08) 390.73 (D-P09) 392.31 (D-P10) 393.55 (D-P11) 394.07 (D-P12) 394.51 (D-P13) 387.62 (D-P14) 391.15 (D-P15) 391.98 (D-P16) 377.51 (D-P17) 378.12 (D-P18) 394.77 (D-P19) 393.90 (D-P20) 387.55 (D-P21) 388.75 (D-P22) 380.65 (D-P23) 378.54 (D-P24) 396.25 (D-P25) 397.56 (D-P26) DWNSTRM STRUCT D-00 D-01 D-02 D-03 D-04 D-05 D-06 D-07 D-08 D-09 D-10 D-11 D-12 D-03 D-14 D-15 D-01 D-17 D-10 D-06 D-04 D-14 D-02 D-01 D-15 D-25 DEPTH 2.1 ft +/- 9.8 ft +/- 5.5 ft +/- 5.1 ft +/- 5.7 ft +/- 7.8 ft +/- 9.9 ft +/- 11.1 ft +/- 9.6 ft +/- 8.1 ft +/- 5.8 ft +/- 5.3 ft +/- 3.7 ft +/- 3.0 ft +/- 4.8 ft +/- 4.3 ft +/- 3.7 ft +/- 4.2 ft +/- 3.7 ft +/- 3.3 ft +/- 3.7 ft +/- 3.7 ft +/- 3.7 ft +/- 3.7 ft +/- 3.7 ft +/- 3.8 ft +/- 3.7 ft +/- STRUCT TYPE EW-W CI CI CI CI CI CI CI CI CI CI CI CI CI CI CI CI CI CI CI CI CI CI CI CI CI CI DWNSTRM PIPE INFORMATION 50' of 36" RCP @ 1.3% (D-P01) 42' of 30" RCP @ 6.3% (D-P02) 107' of 30" RCP @ 3.5% (D-P03) 74' of 24" RCP @ 2.8% (D-P04) 78' of 24" RCP @ 1.6% (D-P05) 77' of 24" RCP @ 1.0% (D-P06) 108' of 24" RCP @ 1.0% (D-P07) 107' of 24" RCP @ 1.0% (D-P08) 74' of 24" RCP @ 1.0% (D-P09) 75' of 18" RCP @ 1.2% (D-P10) 70' of 15" RCP @ 1.0% (D-P11) 42' of 15" RCP @ 1.0% (D-P12) 34' of 15" CL IV @ 1.0% (D-P13) 120' of 18" RCP @ 2.9% (D-P14) 80' of 15" RCP @ 3.5% (D-P15) 34' of 15" RCP @ 1.0% (D-P16) 74' of 18" RCP @ 1.0% (D-P17) 35' of 15" RCP @ 1.0% (D-P18) 34' of 15" RCP @ 1.0% (D-P19) 34' of 15" RCP @ 1.0% (D-P20) 34' of 15" RCP @ 1.0% (D-P21) 34' of 15" RCP @ 1.0% (D-P22) 35' of 15" RCP @ 1.6% (D-P23) 36' of 15" RCP @ 1.0% (D-P24) 120' of 15" RCP @ 3.8% (D-P25) 46' of 15" RCP @ 2.6% (D-P26) 1.REFER TO THE SITE PLAN FOR RELATED NOTES. 2.BOUNDARY INFORMATION SHOWN ON THIS PLAN WAS OBTAINED FROM A SURVEY ENTITLED "CONTIGUOUS ANNEXATION PLAT" PREPARED FOR: ANGIER DEVELOPMENT LLC. PREPARED BY: HENRY FITTS, P.L.S. OF SEPI ENGINEERING & CONSTRUCTION DATED FEBRUARY 07, 2017. 3.THE CONTRACTOR SHALL NOTE THAT THE PLANS ARE SCHEMATIC IN NATURE AND DO NOT SHOW EVERY OFFSET, TRANSITION, GRADE CHANGE, ETC. THAT MAY BE REQUIRED FOR A COMPLETE AND WORKING SYSTEM. 4.CONTRACTOR SHALL VERIFY LOCATION OF ALL EXISTING UTILITIES BEFORE BEGINNING CONSTRUCTION. 5.THE OWNER OR CONTRACTOR SHALL HIRE AN INDEPENDENT GEOTECHNICAL ENGINEER, LICENSED IN NORTH CAROLINA, TO PROVIDE THE FOLLOWING SERVICES (CRITICAL GEOTECHNICAL ENGINEERING ITEMS OF CONSTRUCTION MONITORING THAT REQUIRE SPECIAL INSPECTION): • EXAMINATION OF FOUNDATION SUBGRADE CONDITIONS; • SUPERVISION OF SUBGRADE PREPARATION; • SUPERVISION OF EXCAVATION AND BACKFILL PLACEMENT AND COMPACTION; • SUPERVISION OF BEDDING, SUBGRADE AND BACKFILL CONSTRUCTION; • FILL AND PAVEMENT MATERIALS TESTING; • SUPERVISION OF PAVEMENT CONSTRUCTION; • AND, ALL TESTING NECESSARY TO ASSURE COMPLIANCE OF IN-PLACE MATERIALS • DAM COMPACTION TESTING. 6.CONTRACTOR SHALL BLEND NEW EARTHWORK SMOOTHLY TO TRANSITION BACK TO EXISTING GRADE, WITH NO SHARP OR ABRUPT CHANGES. 7.ALL FILL TO BE COMPACTED TO 95% DRY DENSITY (STANDARD PROCTOR) UNDER PAVEMENT AND BUILDING PAD. 8.THE PROPOSED CONTOURS SHOWN ARE FINISHED ELEVATIONS. REFER TO PAVEMENT AND SIDEWALK DETAILS TO ESTABLISH CORRECT SUB-BASE OR AGGREGATE BASE COURSE ELEVATIONS TO BE COMPLETED UNDER THIS CONTRACT. 9.CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE SO THAT RUNOFF WILL FLOW BY GRAVITY AWAY FROM BUILDING(S) AND ACROSS NEW PAVEMENT AND/OR LANDSCAPE AREAS TO NEW OR EXISTING STORM DRAIN INLETS, SWALES, DITCHES OR OVERLAND SHEET FLOW. 10.THE TREE PROTECTION FENCE SHALL BE MAINTAINED ON THE SITE UNTIL ALL SITE WORK IS COMPLETED AND THE FINAL SITE INSPECTION IS SCHEDULED. THE FENCING SHALL BE REMOVED IMMEDIATELY PRIOR TO FINAL EROSION CONTROL SITE INSPECTION. 11.TURF SHALL BE ESTABLISHED IN ALL DISTURBED AREAS AND AREAS LEFT UNPAVED AND WITHOUT GRAVEL IN ACCORDANCE WITH THE SPECIFICATIONS AND LANDSCAPE PLANS. 12.ROOT PROTECTION ZONE EQUALS ONE FOOT OF RADIUS FOR EVERY INCH OF DIAMETER OF EXISTING TREES, OR SIX FOOT RADIUS, WHICHEVER IS GREATER. NO DISTURBANCE ALLOWED WITHIN THIS AREA. AREA MUST BE PROTECTED WITH BOTH TREE PROTECTION FENCING AND WARNING SIGNS. HAND CLEARING ONLY; NO GRUBBING ALLOWED IN THIS AREA. 13.AT THE START OF GRADING INVOLVING THE LOWERING OF EXISTING GRADE AROUND A TREE OR STRIPPING OF TOPSOIL, A CLEAN, SHARP, VERTICAL CUT SHALL BE MADE AT THE EDGE OF THE TREE SAVE AREA PRIOR TO OR AT THE SAME TIME AS SILT FENCE AND OTHER EROSION CONTROL MEASURES ARE INSTALLED. THE TREE PROTECTION FENCING SHALL BE INSTALLED ON THE SIDE OF THE CUT FARTHEST AWAY FROM THE TREE TRUNK AND SHALL REMAIN IN PLACE UNTIL ALL OF THE CONSTRUCTION IN THE VICINITY OF THE TREES IS COMPLETE. NO STORAGE OF MATERIALS, FILL, OR EQUIPMENT AND NO TRESPASSING SHALL BE ALLOWED WITHIN THE BOUNDARY OF THE PROTECTED AREA. 14.THIS SITE IS NOT IN ANY SPECIAL FLOOD HAZARD AREAS OR FUTURE CONDITIONS FLOOD HAZARD AREAS, AS SHOWN ON FIRM PANEL 3720084000J DATED 05/02/06 AND 8720084900J DATED 05/02/06. 15.A TREE PROTECTION FENCE CONSTRUCTED OF A MATERIAL RESISTANT TO DEGRADATION BY SUN, WIND, AND MOISTURE FOR THE DURATION OF THE CONSTRUCTION, SHALL BE INSTALLED AT THE SAME TIME AS THE EROSION CONTROL MEASURES, AND SHALL REMAIN IN PLACE UNTIL ALL CONSTRUCTION IS COMPLETE. SUCH FENCING SHALL BE MOUNTED ON METAL POSTS PLACED NO FURTHER THAN TEN FEET APART. SILT FENCING SHALL NOT SERVE AS TREE PROTECTION FENCING EXCEPT IN UNUSUAL CIRCUMSTANCES, SUCH AS WHEN TOPOGRAPHY LIMITS THE AREA AVAILABLE FOR INSTALLATION OF BOTH TREE PROTECTION FENCING AND EROSION CONTROL MEASURES (UDO SECTION 8.3.2 C). 16.ALL STORM DRAINAGE PIPE SHALL BE NCDOT CLASS III RCP UNLESS OTHERWISE NOTED. MINIMUM PIPE SIZE SHALL BE 15". 17.ADVISORY COMMENT: THE DAM SAFETY LAW OF 1967 (15A NCAC 02K .0201) REQUIRES ANY PERSON WHO PROPOSES TO CONSTRUCT, ALTER OR REMOVE A DAM TO FILE A STATEMENT WITH THE STATE DAM SAFETY ENGINEER CONCERNING THE LOCATION OF THE DAM, INCLUDING THE NAME OF THE STREAM AND COUNTY, HEIGHT, PURPOSE, AND IMPOUNDMENT CAPACITY, AT LEAST 10 DAYS BEFORE THE START OF CONSTRUCTION. IF THE STATE DETERMINES THAT THE DAM IS NOT EXEMPT FROM THE LAW, ADDITIONAL REQUIREMENTS IN ACCORDANCE WITH THE DAM SAFETY LAW OF 1967 AS AMENDED WILL BE IMPOSED. PROJ. MGR: PRELIMINARYCOPYRIGHT ©2018 SEPI ENGINEERING & CONSTRUCTION, INC DRAWN BY: sepiengineering.com E N G I N E E R I N G & C O N S T R U C T I O N 1025 WADE AVENUE RALEIGH, NORTH CAROLINA 919.789.9977 11020 DAVID TAYLOR DR., SUITE 115 CHARLOTTE, NORTH CAROLINA 704.714.4880 5030 NEW CENTRE DR., SUITE B WILMINGTON, NORTH CAROLINA 910.523.5715 LP16010 Construction Drawings 02/05/2019 Revisions Per Comments 04/16/2019 .. .. .. .. .. .. .. .. PROJECT: DATE ISSUE: CHECKED BY: J. WESTMORELAND REVISIONS: 1 .. NOTICE: 3 WORKING DAYS FOR THE LOCATION OF UNDERGROUND FACILITIES BEFORE YOU DIG R Callbefore you dig. below.Know what's THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. CLIENT: Angier Development, LLC 7700 Kencot Court Raleigh, NC 27615 Contact: David Lazzo PH: (919) 601-2816 dlazzo2100@gmail.com L. SMITH J. BEARD .. ANGIER AVENUE RESIDENTIAL CONSTRUCTION DRAWINGS 3846 Angier Avenue Durham, NC CITY OF DURHAM PUBLIC WORKS DEPARTMENT APPROVED ENGINEERING DATE STORMWATER DATE TRANSPORTATION DATE DATE DATEPRELIMINAR Y - N O T F O R C O N S T R U C T I O N BENCHMARK TBM: 13 IN. OAK N: 799151.14636 E: 2045555.4021 EL: 363.381 GRADING & STORM DRAINAGE PLAN C-5.0 PRE-DEVELOPED IMPERVIOUS SURFACES Area (square feet)Area (ac) Road/Driveway Roof Sidewalk Total 0 0 0 0.00 FALLS BASIN POST-DEVELOPED IMPERVIOUS SURFACES Area (square feet)Area (ac) Road/Driveway Roof Sidewalk Total 47,123 54,000 5,830 2.46 JORDAN BASIN POST-DEVELOPED IMPERVIOUS SURFACES Area (square feet)Area (ac) Road/Driveway Roof Sidewalk Total 67,119 103,500 6,861 4.07 LIMITS OF DISTURBANCE 744,924 S.F. = 17.10 AC. LEGENDGENERAL GRADING NOTES 1 inch = 80 ft. 80'0 80' SEE SHEETS C-5.1 AND C-5.2 FOR ENLARGED/DETAILED GRADING AND DRAINAGE PLANS HEAD WALLS FLOW ARROW CURB INLET STORM MANHOLE YARD INLET PROPOSED STORM DRAINAGE PIPE LD LD PROPOSED LIMITS OF DISTURBANCE TP TP PROPOSED TREE PROTECTION FENCE PROPOSED WATER LINEWW PROPOSED GRAVITY SEWERSSSS EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR 140 139 140 139 PROPERTY LINE (PL) RIGHT-OF-WAY LINE SETBACK LINE UTILITY EASEMENT GRADE CHANGE CATCH BASIN CI DBCI YI MH CB STANDARD DETAIL STANDARD DETAIL GRATE TYPETYPE NAMETYPE CODE CURB INLET DOUBLE CURB INLET YARD INLET MANHOLE CATCH BASIN SD-2.0 SD-5.0 SD-4.0 SD-6.0 NCDOT 840.01 NCDOT 840.03 E,F,G OE OPEN END PIPE ---- EW END WALL NCDOT 838.01 ---- EW-L END WALL: L-SHAPE NCDOT 838.05 ---- EW-W END WALL: WINGED NCDOT 838.80 ---- TBJB TRAFFICE BEARING JUNCTION BOX NCDOT 840.34 NCDOT 840.54 -- SD-2.1 SD-2.1 -- SD-6.1/2 -- -- -- -- -- DocuSign Envelope ID: 8C264526-3E7F-4569-8C3F-0ABD8FCCA50D 4/17/2019 40 0 3954 0 5 39538 5 3 8 5 385 390390390 390 390390390390390395 395395395 395 39539539539539 5 400 400 40 0 400400400400400 400 400 400 400400400400400400 4054 0 5 4 0 5 405 4054054 0 5 4 0 5 410 4104104104104 1 0 410400398394396402 3 9 6 4 0 2 402402404 406400402404 402 4024 0 0 R/W R/WR/WR/WR/WR/Wxxxxxxxxxx72" OAK 51" OAK 29" PINE 32" OAK 36" OAK XXXXXXXXXXR/WR/W USE: VACANT RES/ LOT-SML TRACTN/F ERIK POTENZAD.B. 4596 PG. 523P.B. 9 PG. 110840-04-60-0851PID: 163073ZONING: RS-20USE: RESIDENTIALR/W 12" R C P IN V : 3 9 6 . 4 5 IN V : 3 9 5 . 4 0 IN V : 3 9 9 . 6 1 IN V : 3 9 9 . 2 6 15" C M P R/WR/WR/WR/WR/WR/WR/ W R/ W INV. = 401.15' INV. = 398.35' INV. = 398.53' INV. = 400.68' 15" RCP24" RCP 12" RCP R/W1 2 3 4 5 6 7 8 9 12 13 14 15 11 10 59 60 61 62 63 64 65 66 67 51 50 49 48 47 46 45 44 43 42 32 33 34 35 36 37 38 39 40 41 68 69 70 TPTPTPTPTPTPTPTPLDLDLDLDLDLDLDLDLDTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTP TPTPTPTPTPTPTPT P T P TP TP TP TP TP TP TP TPTPTPTPTPTPTPTPTPTP TP TP TPTPTPTP>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>> > > >>> >>>>> > > >>>> >>>>>>>> >> >> >>>>>>>>>>>>>>>>>>>>>>>>>>>>> > > >>>> > > > > >>>>>>>>>>>>>>>>>>>>>> W W W W W >398 400 402 400 398>>>>LDLDLDLDLDLDLDLDLDLDLD LD LDLDLDLDLDLDLDLDLDLDLD LD LDLDLDLDLDLDLDLDL D L D LD LD LDLDLDLDLDLDLDLD LD LD LDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLD10' NO-BUILD SETBACK 50' STREAM BUFFER SCM ACCESS & MAINTENANCE EASEMENT SCM ACCESS & MAINTENANCE EASEMENT TW = 404.0 BW = 390.2 TW = 403.0 BW = 390.3 TW = 390.2 BW = 389.8 CI C-07 CI C-06 CI C-09 CI C-08 CI C-05 CI C-04 CI C-02 CI C-10 CI C-11 CI C-12 MH C-01 EW-W C-00 CI C-03 YI C-14 CI C-13 CI C-15 C-P09C-P08 C-P 1 0 C-P02C-P11 C-P05C- P 0 1 C-P06C-P07 C - P 1 2 C-P15C-P13 C - P 1 4 C-P03C- P 0 4 CB B-10 TBJB B-06 TBJB B-05 CB B-07 MH B-01 OE Ex. A-01 CI B-02 CI B-03 EW-L B-04 EW B-00 B-P04 B-P 0 3 B-P02B-P 0 1 B-P06 B- P 1 0 B-P05B-P 0 7Ex.-P1CI D-26 CI D-25 CI D-08 CI D-11 CI D-09 CI D-19 CI D-10 CI D-12 CI D-13 D-P10D-P11D-P12D-P13D-P08D-P09D-P19 D-P 2 6 STORMWATER WETLAND #1 (SEE SHEET C-6.1) INV = 392.00 INV = 392.75 INV = 395.54 RETAINING WALL #4 RETAINING WALL #1 TW = 400.4 BW = 392.7 TW = 400.0 BW = 393.3 TW = 400.0 BW = 393.3 RISER LEVEL SPREADER AND FILTER STRIP (SEE SHEET C-6.1) RETAINING WALL #2 TW = 403.0 BW = 390.0 TW = 400.5 BW = 400.0 TW = 404.0 BW = 391.0 TW = 403.0 BW = 391.6 TW = 394.0 BW = 391.0 TG = 403.1 BG = 390.9 TW = 401.8 BW = 389.4 RETAINING WALL #3 TG = 403.9 BG = 392.4 TG = 410.0 BG = 400.0 TW = 408.0 BW = 404.4 CLASS B RIP-RAP O.P. 18' L x 9' W x 18" Th (13 Tons) TW = 400.0 BW = 398.0 CB B-08 CB B-09 DRAINAGE SCHEDULE - NETWORK SD B STRUCT NO. B-00 B-01 B-02 B-03 B-04 B-05 B-06 B-07 B-08 B-09 B-10 Ex. A-01 GRT/RIM ELEV. 396.04 +/- 400.00 +/- 399.71 +/- 399.71 +/- 397.75 +/- 400.58 +/- 400.73 +/- 400.10 +/- 400.95 +/- 402.35 +/- 400.86 +/- 399.53 +/- INVERT IN 392.75 (B-P01) 392.95 (B-P02) 394.70 (B-P04) 395.92 (B-P03) 393.89 (B-P05) 395.94 (B-P10) 394.19 (B-P06) 396.27 (B-P07) 395.52 (Ex.-P1) 396.70 (B-P08) 397.45 (B-P09) UPSTRM STRUCT B-01 B-02 B-04 B-03 B-05 B-10 B-06 B-07 Ex. A-01 B-08 B-09 INVERT OUT 392.85 (B-P01) 393.79 (B-P02) 396.25 (B-P03) 395.54 (B-P04) 394.19 (B-P05) 394.50 (B-P06) 396.60 (B-P07) 397.35 (B-P08) 398.69 (B-P09) 396.90 (B-P10) 396.45 (Ex.-P1) DWNSTRM STRUCT B-00 B-01 B-02 B-01 B-02 B-05 B-06 B-07 B-08 B-05 B-06 DEPTH 2.8 ft +/- 7.4 ft +/- 6.2 ft +/- 3.7 ft +/- 2.0 ft +/- 6.6 ft +/- 6.5 ft +/- 3.7 ft +/- 3.8 ft +/- 3.9 ft +/- 4.2 ft +/- 5.1 ft +/- STRUCT TYPE EW MH CI CI EW-L TBJB TBJB CB CB CB CB OE DWNSTRM PIPE INFORMATION 15' of 36" RCP @ 0.7% (B-P01) 136' of 36" RCP @ 0.6% (B-P02) 34' of 15" RCP @ 1.0% (B-P03) 89' of 18" RCP @ 0.9% (B-P04) 49' of 36" RCP @ 0.6% (B-P05) 50' of 36" RCP @ 0.6% (B-P06) 31' of 15" RCP @ 1.1% (B-P07) 54' of 15" RCP @ 1.2% (B-P08) 166' of 15" RCP @ 0.8% (B-P09) 36' of 15" RCP @ 2.6% (B-P10) 34' of 24" Ex. RCP @ 2.8% (Ex.-P1) DRAINAGE SCHEDULE - NETWORK SD C STRUCT NO. C-00 C-01 C-02 C-03 C-04 C-05 C-06 C-07 C-08 C-09 C-10 C-11 C-12 C-13 C-14 C-15 GRT/RIM ELEV. 395.29 +/- 397.51 +/- 399.18 +/- 399.43 +/- 399.54 +/- 399.67 +/- 401.62 +/- 402.02 +/- 400.77 +/- 400.77 +/- 398.38 +/- 398.11 +/- 398.11 +/- 398.26 +/- 399.18 +/- 398.61 +/- INVERT IN 392.00 (C-P01) 393.14 (C-P10) 393.35 (C-P02) 394.78 (C-P08) 394.28 (C-P03) 394.76 (C-P04) 395.30 (C-P05) 395.89 (C-P06) 398.18 (C-P07) 396.99 (C-P09) 393.47 (C-P11) 393.99 (C-P12) 394.68 (C-P15) 394.68 (C-P13) 395.16 (C-P14) UPSTRM STRUCT C-01 C-10 C-02 C-08 C-03 C-04 C-05 C-06 C-07 C-09 C-11 C-12 C-15 C-13 C-14 INVERT OUT 392.14 (C-P01) 393.78 (C-P02) 394.66 (C-P03) 395.20 (C-P04) 395.64 (C-P05) 398.08 (C-P06) 398.58 (C-P07) 396.89 (C-P08) 397.33 (C-P09) 393.37 (C-P10) 393.89 (C-P11) 394.33 (C-P12) 395.03 (C-P13) 396.24 (C-P14) 395.38 (C-P15) DWNSTRM STRUCT C-00 C-01 C-02 C-03 C-04 C-05 C-06 C-02 C-08 C-01 C-10 C-11 C-12 C-12 C-12 DEPTH 4.8 ft +/- 5.6 ft +/- 5.7 ft +/- 5.0 ft +/- 4.6 ft +/- 4.3 ft +/- 3.8 ft +/- 3.7 ft +/- 4.1 ft +/- 3.7 ft +/- 5.3 ft +/- 4.5 ft +/- 4.0 ft +/- 3.2 ft +/- 3.2 ft +/- 3.2 ft +/- STRUCT TYPE EW-W MH CI CI CI CI CI CI CI CI CI CI CI CI YI CI DWNSTRM PIPE INFORMATION 17' of 30" RCP @ 0.8% (C-P01) 43' of 24" RCP @ 1.0% (C-P02) 39' of 18" RCP @ 1.0% (C-P03) 44' of 18" RCP @ 1.0% (C-P04) 34' of 18" RCP @ 1.0% (C-P05) 82' of 15" RCP @ 2.7% (C-P06) 37' of 15" RCP @ 1.1% (C-P07) 126' of 15" RCP @ 1.7% (C-P08) 34' of 15" RCP @ 1.0% (C-P09) 24' of 18" CL IV @ 1.0% (C-P10) 42' of 18" CL IV @ 1.0% (C-P11) 34' of 18" CL IV @ 1.0% (C-P12) 35' of 15" RCP @ 1.0% (C-P13) 17' of 15" RCP @ 6.6% (C-P14) 70' of 15" RCP @ 1.0% (C-P15) DRAINAGE SCHEDULE - NETWORK SD D STRUCT NO. D-08 D-09 D-10 D-11 D-12 D-13 D-19 D-25 D-26 GRT/RIM ELEV. 399.58 +/- 398.59 +/- 397.84 +/- 398.61 +/- 397.54 +/- 397.54 +/- 397.84 +/- 399.79 +/- 400.99 +/- INVERT IN 390.00 (D-P09) 391.43 (D-P10) 394.44 (D-P19) 392.86 (D-P11) 393.65 (D-P12) 394.17 (D-P13) 396.35 (D-P26) UPSTRM STRUCT D-09 D-10 D-19 D-11 D-12 D-13 D-26 INVERT OUT 390.05 (D-P08) 390.73 (D-P09) 392.31 (D-P10) 393.55 (D-P11) 394.07 (D-P12) 394.51 (D-P13) 394.77 (D-P19) 396.25 (D-P25) 397.56 (D-P26) DWNSTRM STRUCT D-07 D-08 D-09 D-10 D-11 D-12 D-10 D-15 D-25 DEPTH 9.6 ft +/- 8.1 ft +/- 5.8 ft +/- 5.3 ft +/- 3.7 ft +/- 3.0 ft +/- 3.3 ft +/- 3.8 ft +/- 3.7 ft +/- STRUCT TYPE CI CI CI CI CI CI CI CI CI DWNSTRM PIPE INFORMATION 107' of 24" RCP @ 1.0% (D-P08) 74' of 24" RCP @ 1.0% (D-P09) 75' of 18" RCP @ 1.2% (D-P10) 70' of 15" RCP @ 1.0% (D-P11) 42' of 15" RCP @ 1.0% (D-P12) 34' of 15" CL IV @ 1.0% (D-P13) 34' of 15" RCP @ 1.0% (D-P19) 120' of 15" RCP @ 3.8% (D-P25) 46' of 15" RCP @ 2.6% (D-P26) LEGEND PROPOSED STORM DRAINAGE PIPE LD LD PROPOSED LIMITS OF DISTURBANCE TP TP PROPOSED TREE PROTECTION FENCE PROPOSED WATER LINEWW PROPOSED GRAVITY SEWERSSSS EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR 140 139 140 139 PROPERTY LINE (PL) RIGHT-OF-WAY LINE SETBACK LINE UTILITY EASEMENT GRADE CHANGE PROJ. MGR: PRELIMINARYCOPYRIGHT ©2018 SEPI ENGINEERING & CONSTRUCTION, INC DRAWN BY: sepiengineering.com E N G I N E E R I N G & C O N S T R U C T I O N 1025 WADE AVENUE RALEIGH, NORTH CAROLINA 919.789.9977 11020 DAVID TAYLOR DR., SUITE 115 CHARLOTTE, NORTH CAROLINA 704.714.4880 5030 NEW CENTRE DR., SUITE B WILMINGTON, NORTH CAROLINA 910.523.5715 LP16010 Construction Drawings 02/05/2019 Revisions Per Comments 04/16/2019 .. .. .. .. .. .. .. .. PROJECT: DATE ISSUE: CHECKED BY: J. WESTMORELAND REVISIONS: 1 .. NOTICE: 3 WORKING DAYS FOR THE LOCATION OF UNDERGROUND FACILITIES BEFORE YOU DIG R Callbefore you dig. below.Know what's THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. CLIENT: Angier Development, LLC 7700 Kencot Court Raleigh, NC 27615 Contact: David Lazzo PH: (919) 601-2816 dlazzo2100@gmail.com L. SMITH J. BEARD .. ANGIER AVENUE RESIDENTIAL CONSTRUCTION DRAWINGS 3846 Angier Avenue Durham, NC CITY OF DURHAM PUBLIC WORKS DEPARTMENT APPROVED ENGINEERING DATE STORMWATER DATE TRANSPORTATION DATE DATE DATEPRELIMINAR Y - N O T F O R C O N S T R U C T I O N BENCHMARK TBM: 13 IN. OAK N: 799151.14636 E: 2045555.4021 EL: 363.381 ENLARGED GRADING & STORM DRAINAGE PLAN (NORTH) C-5.1 1 inch = 40 ft. 40'0 40' CI DBCI YI MH CB STANDARD DETAIL STANDARD DETAIL GRATE TYPETYPE NAMETYPE CODE CURB INLET DOUBLE CURB INLET YARD INLET MANHOLE CATCH BASIN SD-2.0 SD-5.0 SD-4.0 SD-6.0 NCDOT 840.01 NCDOT 840.03 E,F,G OE OPEN END PIPE ---- EW END WALL NCDOT 838.01 ---- EW-L END WALL: L-SHAPE NCDOT 838.05 ---- EW-W END WALL: WINGED NCDOT 838.80 ---- TBJB TRAFFICE BEARING JUNCTION BOX NCDOT 840.34 NCDOT 840.54 -- SD-2.1 SD-2.1 -- SD-6.1/2 -- -- -- -- -- HEAD WALLS FLOW ARROW CURB INLET STORM MANHOLE YARD INLET CATCH BASIN GROUND ELEVATION @ TOP OF WALL GROUND ELEVATION @ BOTTOM OF WALL TW BW R/W DocuSign Envelope ID: 8C264526-3E7F-4569-8C3F-0ABD8FCCA50D 4/17/2019 380 3903953953953953 9 5 39539 5 395 3953 9 5400400400400400 4004 0 5 40 5 410390 390 390 3 9 0390390 385385385385385385 3803803803803 8 0 3 7 5375375375375375375 375 370 3 7 0370370370 365 365 360 396 382382386 388 3 8 6 3 8 8 394 392 390388 386 390 3 9 2 3 9 4 3 9 6402402 4004 0 0R/WR/WR/WR/W R/ W R/ WR/WR/WR/W R/W R/ W R/W R/W R/WR/WR/WR/WR/W R/WR/WR/WR/WxxxxxxxxxxxGAR A G E 40.5" TWIN OAK XXXXXXXXXXXR/WR/WR/WR/WR/WR/WR/WR/WEXISTING CONCRETE GRAVEL ENTRANCE 13 14 15 16 18 19 20 21 22 17 23 24 25 26 27 28 29 30 31 54 55 56 57 58 59 60 61 53 52 51 50 49 32 33 OPEN 2 TPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTP TP TPTPTPTPTPTPTPTPTPTPTPTPTPLDLDLDLDLDLD TPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPLDLDLDLDLDLDLDLDS>>>>>> >>>>> >>>>>>> > > >>> > > > > >>>>> >>>>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> > > > > > > > > >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> > > > >> > > > >>>>> > > >>> > > > > > >>>>>>>>>>>>>>> > >>>>>> > > >>>>>>>>>>>>>>>>>>396394392390>>>>>>>>>L D L D L D L D L D LDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDL D L D L D LD LD LD LDLDLD LD LD LD LD LD LD LD LDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDSCM ACCESS & MAINTENANCE EASEMENT 10' NO-BUILD SETBACK 50' STREAM BUFFER CI D-07 CI D-20 CI D-06 CI D-15 CI D-05 CI D-22 CI D-14CI D-21 CI D-04 CI D-03 CI D-23 CI D-02 CI D-01 CI D-24CI D-18 CI D-17 EW-W D-00 D-P15D-P14D-P03D-P02D-P17D - P 0 1 D - P 1 8 D-P24 D - P 2 3 D - P 0 4D-P21D-P22 D- P 0 6D-P 07 D-P20D-P 0 5 STORMWATER WETLAND #2 (SEE SHEET C-6.2) D-P 1 6 CI D-16 D-P25CI D-25D-P2 6 D-P08INV = 372.25 LEVEL SPREADER AND FILTER STRIP (SEE SHEET C-6.2) RISER TG = 410.0 BG = 402.5 TG = 397.7 BG = 395.0 TG = 397.5 BG = 397.0 TG = 402.0 BG = 393.0 DRAINAGE SCHEDULE - NETWORK SD D STRUCT NO. D-01 D-02 D-03 D-04 D-05 D-06 D-07 D-14 D-15 D-16 D-17 D-18 D-20 D-21 D-22 D-23 D-24 D-25 GRT/RIM ELEV. 382.43 +/- 383.73 +/- 387.63 +/- 390.84 +/- 394.16 +/- 397.17 +/- 399.60 +/- 392.18 +/- 395.23 +/- 395.42 +/- 381.45 +/- 381.55 +/- 397.34 +/- 390.99 +/- 392.19 +/- 384.09 +/- 381.98 +/- 399.79 +/- INVERT IN 375.77 (D-P02) 376.77 (D-P17) 378.18 (D-P24) 378.94 (D-P03) 380.09 (D-P23) 384.16 (D-P14) 383.34 (D-P04) 387.21 (D-P21) 385.38 (D-P05) 386.69 (D-P06) 387.66 (D-P07) 393.56 (D-P20) 388.95 (D-P08) 388.37 (D-P15) 388.42 (D-P22) 391.74 (D-P25) 391.64 (D-P16) 377.76 (D-P18) 396.35 (D-P26) UPSTRM STRUCT D-02 D-17 D-24 D-03 D-23 D-14 D-04 D-21 D-05 D-06 D-07 D-20 D-08 D-15 D-22 D-25 D-16 D-18 D-26 INVERT OUT 372.90 (D-P01) 378.44 (D-P02) 382.74 (D-P03) 385.38 (D-P04) 386.59 (D-P05) 387.46 (D-P06) 388.75 (D-P07) 387.62 (D-P14) 391.15 (D-P15) 391.98 (D-P16) 377.51 (D-P17) 378.12 (D-P18) 393.90 (D-P20) 387.55 (D-P21) 388.75 (D-P22) 380.65 (D-P23) 378.54 (D-P24) 396.25 (D-P25) DWNSTRM STRUCT D-00 D-01 D-02 D-03 D-04 D-05 D-06 D-03 D-14 D-15 D-01 D-17 D-06 D-04 D-14 D-02 D-01 D-15 DEPTH 9.8 ft +/- 5.5 ft +/- 5.1 ft +/- 5.7 ft +/- 7.8 ft +/- 9.9 ft +/- 11.1 ft +/- 4.8 ft +/- 4.3 ft +/- 3.7 ft +/- 4.2 ft +/- 3.7 ft +/- 3.7 ft +/- 3.7 ft +/- 3.7 ft +/- 3.7 ft +/- 3.7 ft +/- 3.8 ft +/- STRUCT TYPE CI CI CI CI CI CI CI CI CI CI CI CI CI CI CI CI CI CI DWNSTRM PIPE INFORMATION 50' of 36" RCP @ 1.3% (D-P01) 42' of 30" RCP @ 6.3% (D-P02) 107' of 30" RCP @ 3.5% (D-P03) 74' of 24" RCP @ 2.8% (D-P04) 78' of 24" RCP @ 1.6% (D-P05) 77' of 24" RCP @ 1.0% (D-P06) 108' of 24" RCP @ 1.0% (D-P07) 120' of 18" RCP @ 2.9% (D-P14) 80' of 15" RCP @ 3.5% (D-P15) 34' of 15" RCP @ 1.0% (D-P16) 74' of 18" RCP @ 1.0% (D-P17) 35' of 15" RCP @ 1.0% (D-P18) 34' of 15" RCP @ 1.0% (D-P20) 34' of 15" RCP @ 1.0% (D-P21) 34' of 15" RCP @ 1.0% (D-P22) 35' of 15" RCP @ 1.6% (D-P23) 36' of 15" RCP @ 1.0% (D-P24) 120' of 15" RCP @ 3.8% (D-P25) 1.REFER TO THE SITE PLAN FOR RELATED NOTES. 2.BOUNDARY INFORMATION SHOWN ON THIS PLAN WAS OBTAINED FROM A SURVEY ENTITLED "CONTIGUOUS ANNEXATION PLAT" PREPARED FOR: ANGIER DEVELOPMENT LLC. PREPARED BY: HENRY FITTS, P.L.S. OF SEPI ENGINEERING & CONSTRUCTION DATED FEBRUARY 07, 2017. 3.THE CONTRACTOR SHALL NOTE THAT THE PLANS ARE SCHEMATIC IN NATURE AND DO NOT SHOW EVERY OFFSET, TRANSITION, GRADE CHANGE, ETC. THAT MAY BE REQUIRED FOR A COMPLETE AND WORKING SYSTEM. 4.CONTRACTOR SHALL VERIFY LOCATION OF ALL EXISTING UTILITIES BEFORE BEGINNING CONSTRUCTION. 5.THE OWNER OR CONTRACTOR SHALL HIRE AN INDEPENDENT GEOTECHNICAL ENGINEER, LICENSED IN NORTH CAROLINA, TO PROVIDE THE FOLLOWING SERVICES (CRITICAL GEOTECHNICAL ENGINEERING ITEMS OF CONSTRUCTION MONITORING THAT REQUIRE SPECIAL INSPECTION): • EXAMINATION OF FOUNDATION SUBGRADE CONDITIONS; • SUPERVISION OF SUBGRADE PREPARATION; • SUPERVISION OF EXCAVATION AND BACKFILL PLACEMENT AND COMPACTION; • SUPERVISION OF BEDDING, SUBGRADE AND BACKFILL CONSTRUCTION; • FILL AND PAVEMENT MATERIALS TESTING; • SUPERVISION OF PAVEMENT CONSTRUCTION; • AND, ALL TESTING NECESSARY TO ASSURE COMPLIANCE OF IN-PLACE MATERIALS • DAM COMPACTION TESTING. 6.CONTRACTOR SHALL BLEND NEW EARTHWORK SMOOTHLY TO TRANSITION BACK TO EXISTING GRADE, WITH NO SHARP OR ABRUPT CHANGES. 7.ALL FILL TO BE COMPACTED TO 95% DRY DENSITY (STANDARD PROCTOR) UNDER PAVEMENT AND BUILDING PAD. 8.THE PROPOSED CONTOURS SHOWN ARE FINISHED ELEVATIONS. REFER TO PAVEMENT AND SIDEWALK DETAILS TO ESTABLISH CORRECT SUB-BASE OR AGGREGATE BASE COURSE ELEVATIONS TO BE COMPLETED UNDER THIS CONTRACT. 9.CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE SO THAT RUNOFF WILL FLOW BY GRAVITY AWAY FROM BUILDING(S) AND ACROSS NEW PAVEMENT AND/OR LANDSCAPE AREAS TO NEW OR EXISTING STORM DRAIN INLETS, SWALES, DITCHES OR OVERLAND SHEET FLOW. 10.THE TREE PROTECTION FENCE SHALL BE MAINTAINED ON THE SITE UNTIL ALL SITE WORK IS COMPLETED AND THE FINAL SITE INSPECTION IS SCHEDULED. THE FENCING SHALL BE REMOVED IMMEDIATELY PRIOR TO FINAL EROSION CONTROL SITE INSPECTION. 11.TURF SHALL BE ESTABLISHED IN ALL DISTURBED AREAS AND AREAS LEFT UNPAVED AND WITHOUT GRAVEL IN ACCORDANCE WITH THE SPECIFICATIONS AND LANDSCAPE PLANS. 12.ROOT PROTECTION ZONE EQUALS ONE FOOT OF RADIUS FOR EVERY INCH OF DIAMETER OF EXISTING TREES, OR SIX FOOT RADIUS, WHICHEVER IS GREATER. NO DISTURBANCE ALLOWED WITHIN THIS AREA. AREA MUST BE PROTECTED WITH BOTH TREE PROTECTION FENCING AND WARNING SIGNS. HAND CLEARING ONLY; NO GRUBBING ALLOWED IN THIS AREA. 13.AT THE START OF GRADING INVOLVING THE LOWERING OF EXISTING GRADE AROUND A TREE OR STRIPPING OF TOPSOIL, A CLEAN, SHARP, VERTICAL CUT SHALL BE MADE AT THE EDGE OF THE TREE SAVE AREA PRIOR TO OR AT THE SAME TIME AS SILT FENCE AND OTHER EROSION CONTROL MEASURES ARE INSTALLED. THE TREE PROTECTION FENCING SHALL BE INSTALLED ON THE SIDE OF THE CUT FARTHEST AWAY FROM THE TREE TRUNK AND SHALL REMAIN IN PLACE UNTIL ALL OF THE CONSTRUCTION IN THE VICINITY OF THE TREES IS COMPLETE. NO STORAGE OF MATERIALS, FILL, OR EQUIPMENT AND NO TRESPASSING SHALL BE ALLOWED WITHIN THE BOUNDARY OF THE PROTECTED AREA. 14.THIS SITE IS NOT IN ANY SPECIAL FLOOD HAZARD AREAS OR FUTURE CONDITIONS FLOOD HAZARD AREAS, AS SHOWN ON FIRM PANEL 3720084000J DATED 05/02/06 AND 8720084900J DATED 05/02/06. 15.A TREE PROTECTION FENCE CONSTRUCTED OF A MATERIAL RESISTANT TO DEGRADATION BY SUN, WIND, AND MOISTURE FOR THE DURATION OF THE CONSTRUCTION, SHALL BE INSTALLED AT THE SAME TIME AS THE EROSION CONTROL MEASURES, AND SHALL REMAIN IN PLACE UNTIL ALL CONSTRUCTION IS COMPLETE. SUCH FENCING SHALL BE MOUNTED ON METAL POSTS PLACED NO FURTHER THAN TEN FEET APART. SILT FENCING SHALL NOT SERVE AS TREE PROTECTION FENCING EXCEPT IN UNUSUAL CIRCUMSTANCES, SUCH AS WHEN TOPOGRAPHY LIMITS THE AREA AVAILABLE FOR INSTALLATION OF BOTH TREE PROTECTION FENCING AND EROSION CONTROL MEASURES (UDO SECTION 8.3.2 C). GENERAL GRADING NOTES PROJ. MGR: PRELIMINARYCOPYRIGHT ©2018 SEPI ENGINEERING & CONSTRUCTION, INC DRAWN BY: sepiengineering.com E N G I N E E R I N G & C O N S T R U C T I O N 1025 WADE AVENUE RALEIGH, NORTH CAROLINA 919.789.9977 11020 DAVID TAYLOR DR., SUITE 115 CHARLOTTE, NORTH CAROLINA 704.714.4880 5030 NEW CENTRE DR., SUITE B WILMINGTON, NORTH CAROLINA 910.523.5715 LP16010 Construction Drawings 02/05/2019 Revisions Per Comments 04/16/2019 .. .. .. .. .. .. .. .. PROJECT: DATE ISSUE: CHECKED BY: J. WESTMORELAND REVISIONS: 1 .. NOTICE: 3 WORKING DAYS FOR THE LOCATION OF UNDERGROUND FACILITIES BEFORE YOU DIG R Callbefore you dig. below.Know what's THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. CLIENT: Angier Development, LLC 7700 Kencot Court Raleigh, NC 27615 Contact: David Lazzo PH: (919) 601-2816 dlazzo2100@gmail.com L. SMITH J. BEARD .. ANGIER AVENUE RESIDENTIAL CONSTRUCTION DRAWINGS 3846 Angier Avenue Durham, NC CITY OF DURHAM PUBLIC WORKS DEPARTMENT APPROVED ENGINEERING DATE STORMWATER DATE TRANSPORTATION DATE DATE DATEPRELIMINAR Y - N O T F O R C O N S T R U C T I O N BENCHMARK TBM: 13 IN. OAK N: 799151.14636 E: 2045555.4021 EL: 363.381 ENLARGED GRADING & STORM DRAINAGE PLAN (SOUTH) C-5.2 1 inch = 40 ft. 40'0 40' LEGEND CI DBCI YI MH CB STANDARD DETAIL STANDARD DETAIL GRATE TYPETYPE NAMETYPE CODE CURB INLET DOUBLE CURB INLET YARD INLET MANHOLE CATCH BASIN SD-2.0 SD-5.0 SD-4.0 SD-6.0 NCDOT 840.01 NCDOT 840.03 E,F,G OE OPEN END PIPE ---- EW END WALL NCDOT 838.01 ---- EW-L END WALL: L-SHAPE NCDOT 838.05 ---- EW-W END WALL: WINGED NCDOT 838.80 ---- TBJB TRAFFICE BEARING JUNCTION BOX NCDOT 840.34 NCDOT 840.54 -- SD-2.1 SD-2.1 -- SD-6.1/2 -- -- -- -- -- PROPOSED STORM DRAINAGE PIPE LD LD PROPOSED LIMITS OF DISTURBANCE TP TP PROPOSED TREE PROTECTION FENCE PROPOSED WATER LINEWW PROPOSED GRAVITY SEWERSSSS EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR 140 139 140 139 PROPERTY LINE (PL) RIGHT-OF-WAY LINE SETBACK LINE UTILITY EASEMENT GRADE CHANGE HEAD WALLS FLOW ARROW CURB INLET STORM MANHOLE YARD INLET CATCH BASIN GROUND ELEVATION @ TOP OF WALL GROUND ELEVATION @ BOTTOM OF WALL TW BW R/W DocuSign Envelope ID: 8C264526-3E7F-4569-8C3F-0ABD8FCCA50D 4/17/2019 385390390390390390 395395395 400400400405404402R/WR/WEIP6970TP TP TP TP TPTPTPTPTP TPTPTPTPLDLDLDLDLDLDLDLDLDLDLDLDLDRISERINV OUT = 389.00 (OUTLET PIPE)INV = 388.46LS Outlet45 LF 18" RCP @ 0.99%4 LF12" PVC@ 1.00%X 390.25DEEPPOOLDEEPPOOLSHALLOWWATERSHALLOWWATERFOREBAYX 390.25X 390.75389X 390.75390X 390.75391392389388390SHALLOWLAND388389390388397391397394395396CI - C-08RIM = 400.77INV IN = 396.99INV OUT = 396.89CI - C-03CI - C-02RIM = 399.18INV IN = 394.78INV IN = 394.28INV OUT = 393.78CI - C-10RIM = 398.38INV IN = 393.47INV OUT = 393.37MH - C-01RIM = 397.51INV IN = 393.14INV IN = 393.35INV OUT = 392.14INV = 392.00EW-W34 LF 15" RCP@ 1.01%126 LF 15" RCP @ 1.67%24 LF 18" RCP@ 1.00%4 3 L F 2 4 " R C P @ 1 . 0 0% 4 2 L F 1 8 " RC P @ 1 . 0 0%17 LF 30" RCP@ 0.82%39 L F 1 8 " R C P @ 1 . 0 0 %INV = 388.00Bypass OutletSPLITTER BOXINV IN = 388.55 (OUTLET PIPE)INV OUT = 388.50 (TO LVL SPRD)INV OUT = 388.00 (BYPASS)393394395396397398399396395394393393392393394395396397398399LEGENDFLARED END SECTIONFLOW ARROWCATCH BASINSTORM MANHOLEYARD INLETPROPOSED STORM DRAINAGE PIPELDLDPROPOSED LIMITS OF DISTURBANCETPTPPROPOSED TREE PROTECTION FENCEPROPOSED WATER LINEWWPROPOSED GRAVITY SEWERSSSSEXISTING MAJOR CONTOUREXISTING MINOR CONTOURPROPOSED MAJOR CONTOURPROPOSED MINOR CONTOUR140139140139PROPERTY LINE (PL)RIGHT-OF-WAY LINESETBACK LINEUTILITY EASEMENTGRADE CHANGEPROJ. MGR: P R E L I M I N A R YCOPYRIGHT ©2018SEPI ENGINEERING & CONSTRUCTION, INCDRAWN BY:sepiengineering.comE N G I N E E R I N G &C O N S T R U C T I O N1025 WADE AVENUERALEIGH, NORTH CAROLINA919.789.997711020 DAVID TAYLOR DR., SUITE 115CHARLOTTE, NORTH CAROLINA704.714.48805030 NEW CENTRE DR., SUITE BWILMINGTON, NORTH CAROLINA910.523.5715LP16010Construction Drawings02/05/2019Revisions Per Comments04/16/2019................PROJECT:DATEISSUE:CHECKED BY:J. WESTMORELANDREVISIONS:1..NOTICE:3 WORKING DAYSFOR THE LOCATION OFUNDERGROUND FACILITIESBEFORE YOU DIGRCallbefore you dig.below.Know what'sTHE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATEWAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITSREPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALLEXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLEFOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURETO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES.CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THECONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BEEXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THEWORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBYSTRUCTURES, OR OF ANY OTHER PERSONS.CLIENT:Angier Development, LLC7700 Kencot CourtRaleigh, NC 27615Contact:David LazzoPH: (919) 601-2816dlazzo2100@gmail.comL. SMITHJ. BEARD..ANGIER AVENUERESIDENTIALCONSTRUCTIONDRAWINGS3846 Angier AvenueDurham, NCCITY OF DURHAMPUBLIC WORKS DEPARTMENTAPPROVEDENGINEERINGDATESTORMWATERDATETRANSPORTATIONDATEDATEDATEPRELIMINARY - NOT FOR CONSTRUCTIONBENCHMARKTBM: 13 IN. OAKN: 799151.14636E: 2045555.4021EL: 363.381STORMWATER PLANWETLAND #1C-6.1STANDARD CITY OF DURHAMCATCH BASIN STEP, LOCATEBENEATH TRASH RACK OPENINGNOT TO SCALESTORMWATER WETLAND #1OUTLET CONTROL STRUCTURE6"4'(1) 4' WIDE WEIR ELEV. = 394.25'TOP ELEV. = 394.50'6' x 6' x 21" THICK CONCRETEPAD FOR ANTI-FLOTATION(ATTACH TO BOTTOM OFRISER WITH MECHANICALCONNECTION)5' x 5' (OUTSIDE) PRECASTREINFORCED CONCRETE RISERSTRUCTURE WITH WEIRSTRUCTURE ON THREE SIDESBOTTOM = 388.50'18" O-RING RCP TOSPLITTER BOXINV = 389.00'(1) 4" DIA. PVC DRAWDOWN PIPEW/ REMOVABLE CAP ON END;DRILL 1.5" DIAMETER ORIFICEINTO CAP ELEV. = 391.00'T.P.E. = 392.00'P.P.E. = 391.00'BOTTOM OF WETLAND DEEP POOL = 389.00'(1) 12" DIA. ORIFICEINTO CAP ELEV. = 392.00'5:120'395.00'5:1STORMWATER WETLAND EMERGENCY SPILLWAYNOT TO SCALETOP OF STORMWATERWETLAND = 396.50'18" MIN.FOREBAYSHALLOWWATERDEEPPOOL18" MIN.4" TOPSOILDEEPPOOLPERMANENT POOL ELEVATION = 391.00'TEMPORARY POOL ELEVATION = 392.00'TOP OFSTORMWATERWETLAND100-YR W.S.E = 395.04'2-YR W.S.E = 393.10'3"-6"18" RCP TO FLOW SPLITTER @ 1.00% SLOPESEE WETLAND CONSTRUCTION NOTE #8.389.50'BOTTOMINV. = 389.50'EMERGENCY SPILLWAY3:13:1NOT TO SCALESTORMWATER WETLANDCROSS SECTION10-YR W.S.E = 394.20'1-YR W.S.E = 392.76'PROVIDE SEAL AROUNDPENETRATIONSPROVIDE SEAL AROUNDPENETRATIONSOUTLETCONTROLSTRUCTURE(SEE DETAIL,THIS SHEET)FLOW SPLITTER BOX(SEE DETAIL)RIP-RAP OUTLET(SEE DETAIL, SHEET C-13.2)UNDERCUT AND RECONDITIONSOIL 1' BENEATH DAMPERMANENTLY REINFORCEDSPILLWAY STRUCTURE, PERCITY OF DURHAM GUIDELINESFOR SPILLWAYS THROUGHFILL SLOPES.3' MIN.3:1 MIN.LEVELTOP OF DAM10.0' MIN.SEE PLANS2' MIN.PROFILE VIEWCROSS SECTIONPERMANENTLY REINFORCEDSPILLWAY STRUCTURE, PER CITY OF DURHAMGUIDELINES FOR SPILLWAYS THROUGH FILLSLOPES.CONCRETE CRADLE (SEE DETAIL)3.0'5.0'1:11:1SEDIMENTSTORAGEAREA1" = 20'STORMWATER PLAN - WETLAND #11 inch = 20 ft.20'020'FILL STRUCTURE WITH CONCRETE; FILLTO INVERT OUT ELEVATION; NO SUMPCONDITION IS ALLOWEDCONCRETE FILLWETLAND ZONES SURFACE AREA·DEEP POOLSFOREBAY - 10%NON FOREBAY - 10%·SHALLOW WATER - 40%·SHALLOW LAND - 40%NOTE: WETLAND PLANTINGS SHALL CONFORMWITH NCDEQ BMP DESIGN MANUAL. SEE LANDSCAPE PLANSHEET.VARIABLE WIDTH SCM ACCESS &MAINTENANCE EASEMENTCLASS A RIP-RAP O.P.8' L x 6' W x 12" Th(3 Tons)PLUNGE POOL(SEE DETAIL THIS SHEET)LEVEL SPREADER (ELEV=388.50)(SEE DETAIL SHEET C-6.3)50 LF VEGETATEDFILTER STRIP20' EMERGENCY SPILLWAY(SEE DETAIL THIS SHEET)OUTLET CONTROLSTRUCTURE(SEE DETAIL THIS SHEET)10' NO-BUILD SETBACK`50' STREAM BUFFERSTORM DRAINAGEDISCHARGE PIPEO-RING TO BE INSTALLEDBY CONTRACTORSHALLOW LANDCLASS B RIP-RAP O.P.15' L x 7.5' W x 12" Th(9 Tons)1 ft0.5ftINFLUENT STORMWATERPIPE FROM STORMFLOW SPLITTER4.0'NOT TO SCALEPLUNGE POOL DETAILGEOTEXTILE FABRIC,(NCDOT TYPE 2) KEYED IN1' MINIMUM, ALL SIDESNCDOT CLASS "A"RIPRAP 9" THICK395.00' (SETTLED), 395.50' (CONSTRUCTED)396.50' (SETTLED), 397.00' (CONSTRUCTED)PRE-FABRICATED TRASH RACKWITH ACCESS OPENING TOWARDSPOND BERM (SEE DETAIL SHEET C-6.3)8" PLUG VALVE W/FLYWHEEL, ORAPP'D EQUIV.SLUICE GATE OPERATORMOUNT HANDWHEEL 6"ABOVE RACK OPENINGCUT-OFF TRENCH; AS SPECIFIEDBY GEOTECHNICAL ENGINEERSEEPAGE DIAPHRAGM(SEE DETAIL)ADVISORY COMMENT: THE DAM SAFETY LAW OF 1967 (15A NCAC 02K .0201) REQUIRES ANY PERSON WHOPROPOSES TO CONSTRUCT, ALTER OR REMOVE A DAM TO FILE A STATEMENT WITH THE STATE DAM SAFETYENGINEER CONCERNING THE LOCATION OF THE DAM, INCLUDING THE NAME OF THE STREAM AND COUNTY,HEIGHT, PURPOSE, AND IMPOUNDMENT CAPACITY, AT LEAST 10 DAYS BEFORE THE START OF CONSTRUCTION.IF THE STATE DETERMINES THAT THE DAM IS NOT EXEMPT FROM THE LAW, ADDITIONAL REQUIREMENTS INACCORDANCE WITH THE DAM SAFETY LAW OF 1967 AS AMENDED WILL BE IMPOSED.NATURAL OR SYNTHETIC LINER WITH ANINFILTRATION RATE OF NO MORE THAN0.01 IN/HR; INFILTRATION RATE MUST BEVERIFIED PRIOR TO COMPLETION OFAS-BUILTS.1.ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH CITY OF DURHAM AND THE STATE OF NORTH CAROLINA DIVISION OF WATER RESOURCES STORMWATERSTORMWATER CONTROL MEASURES MANUAL, STANDARDS AND SPECIFICATIONS.2.A PORTION OF THE PERMANENT STORMWATER WETLAND WILL BE UTILIZED AS A TEMPORARY SEDIMENT AND EROSION CONTROL DEVICE UNTIL ALL UPSTREAM AREASDRAINING TO DEVICE HAVE BEEN STABILIZED AND SITE CONSTRUCTION COMPLETED; CONTRACTOR TO COORDINATE CONSTRUCTION, GRADING, PLANTINGS, ANDCERTIFICATIONS OF WETLANDS INTO SCHEDULE ACCORDINGLY.3.ALL AREAS WITHIN THE WETLAND BELOW ELEVATION 372.00 SHALL INCLUDE 4" OF SCREENED TOPSOIL SPREAD AND LIGHTLY COMPACTED TO ACHIEVE FINAL GRADE.4.SOIL BELOW ELEVATION 372.00 SHALL BE TESTED BY THE USDA AGRICULTURAL EXTENSION OFFICE FOR pH, WHICH MUST FALL BETWEEN 5.5 AND 7.0. TESTS SHALL BEPERFORMED FOR NUTRIENTS SUCH AS NITROGEN, PHOSPHOROUS, AND POTASSIUM, AND FOR MINERALS SUCH AS CHELATED IRON AND LIME. AMENDMENTS TO SOILRECOMMENDED BY USDA SHALL BE INCORPORATED INTO SOIL TO PROMOTE VIGOROUS VEGETATION AND PLANT GROWTH. RECORDS OF TESTS AND AMENDMENTSPROVIDED BY CONTRACTOR SHALL BE PROVIDED TO THE ENGINEER.5.LANDSCAPING PLANTINGS SHOWN ON THE LANDSCAPE PLAN SHALL BE INSTALLED DURING FALL SEASON OR EARLY SPRING IF POSSIBLE FOR MAXIMUM PLANTSURVIVABILITY. WETLAND PLANTS SHALL BE KEPT WET AT ALL TIMES PRIOR TO, DURING, AND AFTER PLANTING TO ENSURE SURVIVAL. CONTRACTOR TO ORDER PLANTSWELL IN ADVANCE OF PLANTING TO ENSURE AVAILABILITY / COORDINATION OF ALTERNATES; PLANTS MUST BE PURCHASED FROM A LOCAL NURSERY.6.THE CONTRACTOR SHALL WARRANTY ALL PLANTED MATERIALS FOR A PERIOD OF 2 YEARS FROM DATE OF INSTALLATION. AT THE END OF THE FIRST YEAR AND AT THEEND OF THE SECOND YEAR, THE CONTRACTOR SHALL REPLACE ALL PLANTS WHICH DID NOT SURVIVE. ANY HEALTHY PLANTS DAMAGED DURING PLANT REPLACEMENTSHALL ALSO BE REPLACED.7.WETLAND SEED MIXES SHALL NOT BE ALLOWED.8.PRINCIPAL SPILLWAY PIPES SHALL HAVE A MINIMUM PIPE STRENGTH CONFORMING TO AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) C-76, CLASS IIISTANDARDS. THE RUBBER GASKETTED JOINT PIPE SHALL ALSO BE WRAPPED WITH A LAYER OF GEOTEXTILE FILTER FABRIC ON THE OUTSIDE OF THE PIPE AT EACHJOINT. THE FABRIC SHALL MEET NCDOT SPECIFICATIONS FOR TYPE II FILTER FABRIC. SEE SECTION 1056 (TABLE 1056-1) IN THE NORTH CAROLINA DEPARTMENT OFTRANSPORTATION’S 2012 EDITION OF THE STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES. THE FABRIC WRAP SHALL BE BETWEEN TWO AND THREE FEETWIDE, SHALL BE CENTERED OVER EACH PIPE JOINT, AND SHALL COVER A MINIMUM OF ONE-FOOT LENGTH OF EACH PIPE SEGMENT.9.THE CONTRACTOR SHALL EMPLOY A GEOTECHNICAL ENGINEER TO TEST ALL EMBANKMENTS AND FILL PLACEMENT FOR PROPER COMPACTION. PROPER COMPACTIONSHALL BE PER THE GEOTECHNICAL ENGINEER'S RECOMMENDATIONS OR THESE PLANS, WHICHEVER IS MORE STRINGENT. EMBANKMENTS FOR PONDS SHALL BE PLACEDIN 6 INCH LOOSE LAYERS AND SHALL BE COMPACTED TO A DENSITY OF NO LESS THAN 95% OF THE STANDARD PROCTOR MAXIMUM DENSITY AT A MOISTURE CONTENT OF+ OR - TWO PERCENTAGE POINTS OF THE OPTIMUM MOISTURE CONTENT IN ACCORDANCE WITH ASTM D698. THE CONTRACTOR SHALL TAKE PHOTOGRAPHS OF THEOUTLET STRUCTURE AT ALL PHASES OF INSTALLATION AND SHALL RETAIN WITH GEOTECHNICAL TESTING DATA. THE CONTRACTOR SHALL ALSO RETAIN ALL SHIPPINGRECORDS AND SPECIFICATIONS FOR THE OUTLET STRUCTURE MATERIALS AND STRUCTURES. ALL OF THE ABOVE DATA MAY BE REQUIRED AS PART OF THEMUNICIPALITY AS-BUILT PROCESS AND SHALL BE MADE AVAILABLE TO THE ENGINEER UPON REQUEST. THE CONTRACTOR SHALL HAVE DOCUMENTATION OF THESETESTS AVAILABLE UPON REQUEST.10.TOLERANCES FOR FINAL GRADES SHALL BE WITHIN +/- 0.10 FEET. AN AS-BUILT SURVEY OF THE CONSTRUCTED WETLAND WILL BE REQUIRED, THEREFORE, STRICTADHERENCE TO THE GRADING ON THIS PLAN AND THE TOLERANCES SPECIFIED HEREON SHALL BE REQUIRED PRIOR TO CERTIFICATION BY THE ENGINEER THAT THEWETLAND HAS BEEN BUILT IN COMPLIANCE WITH THESE DRAWINGS. UPON COMPLETION OF THE FINAL GRADING (PRIOR TO PLACEMENT OF ANY PLANT MATERIAL) THECONTRACTOR SHALL CONTACT THE SURVEYOR TO SURVEY THE AS-BUILT CONSTRUCTED WETLAND. THE CONTRACTOR SHALL NOTIFY THE ENGINEER THAT THECONSTRUCTED WETLAND HAS BEEN COMPLETED AND THE ENGINEER SHALL EVALUATE THE AS-BUIT SURVEY DATA FOR COMPLIANCE WITH THESE DRAWINGS. IF THECONSTRUCTED WETLAND IS FOUND TO BE OUT OF COMPLIANCE WITH THESE DRAWINGS, THE CONTRACTOR SHALL RE-GRADE THE WETLAND AS NECESSARY TO BRINGTHE WETLAND INTO COMPLIANCE WITH THESE DRAWINGS. THE COST OF ANY ADDITIONAL SURVEYING FOR ENGINEERING EVALUATION REQUIRED RESULTING FROMINCOMPLETE OR INCORRECT GRADING OF THE CONSTRUCTED WETLAND SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.11.EROSION AND SEDIMENT CONTROL MEASURES MUST BE INSTALLED AND INSPECTION APPROVED PRIOR TO BEGINNING GENERAL SITE WORK, INCLUDING GENERALCLEARING, GRUBBING, AND GRADING.12.ALL EARTHEN FILLS SHALL BE CLEARED, GRUBBED AND STRIPPED OF ALL VEGETATIVE MATERIAL, TOPSOIL, AND ORGANIC MATTER PRIOR TO CONSTRUCTION. NOTETHAT FULL CONSTRUCTION SPECIFICATIONS ARE REQUIRED IN ACCORDANCE WITH CHAPTER 21 OF THE CITY OF DURHAM ADDENDUM TO THE NC DIVISION OF WATERQUALITY STORMWATER BEST MANAGEMENT PRACTICES MANUAL1.UNDER NO CIRCUMSTANCES SHALL THE WETLAND BE FINALIZED AND PLANTED BEFORE THE COMPLETION OF CONSTRUCTION AND STABILIZATION OF ALL AREASWHICH DRAIN TO IT. NOTIFY THE ENGINEER 48 HOURS PRIOR TO BEGINNING CONSTRUCTION ON THE WETLAND AND SCHEDULE A PRECONSTRUCTION CONFERENCEWITH THE ENGINEER TO REVIEW DETAILS OF THE CONSTRUCTION REQUIREMENTS AND THE AS-BUILT REQUIREMENTS. THE CONTRACTOR SHOULD BE FAMILIAR WITHTHE CITY OF DURHAM AS-BUILTS AND CERTIFICATION PROCESS PRIOR TO STARTING WORK.2.CALL DURHAM COUNTY EROSION CONTROL INSPECTOR FOR APPROVAL OF EROSION CONTROL STABILIZATION.3.IF THE WETLAND HAS BEEN PREVIOUSLY ROUGH GRADED, REMOVE AND DISPOSE OF SEDIMENT DEPOSITS WITHIN SEDIMENT BASIN.4.STRIP TOPSOIL AND DISPOSE OF OFFSITE OR STOCKPILE ONSITE FOR SUBSEQUENT SCREENING AND PLACEMENT WITHIN CONSTRUCTED WETLAND. ONSITESTOCKPILE SHALL BE ENCLOSED BY SILT FENCE.5.ROUGH GRADE CONSTRUCTED WETLAND. ALL FILL PLACEMENT SHALL BE IN COMPLIANCE WITH THE SPECIFICATION IN THE CONSTRUCTION NOTES ON THIS SHEET.6.AFTER ROUGH GRADING WETLAND, BEGIN FINE GRADING TO CONSTRUCT FOREBAY, OUTLET AREA, SHALLOW WATER AREAS, AND SHALLOW LAND AREAS. LEAVE ALLAREAS BELOW ELEVATION 372.00 4" BELOW FINISHED GRADE SUCH THAT SCREENED, LOOSE TOPSOIL CAN BE PLACED AND COMPACTED TO ACHIEVE FINAL GRADE.GRADING TOLERANCE FOR THE CONSTRUCTED WETLAND SHALL BE +/- 0.10 FEET.7.CALL SURVEYOR AND ENGINEER FOR AS-BUILT SURVEY AND EVALUATION.8.IF SURVEYOR AND ENGINEER DETERMINE THAT GRADING IS NOT IN COMPLIANCE WITH THESE DRAWINGS, MAKE CORRECTIONS AS REQUIRED BY THE ENGINEER, ANDREPEAT STEP 6. OTHERWISE, PROCEED TO STEP 8.9.UPON NOTIFICATION FROM THE ENGINEER THAT THE CONSTRUCTED WETLAND IS IN COMPLIANCE WITH THESE DRAWINGS, PROVIDE LANDSCAPING IN COMPLIANCEWITH THE LANDSCAPE PLAN. IF TIMING IS SUCH THAT PLANTINGS WOULD OCCUR IN SUMMER MONTHS, COORDINATE WITH THE ENGINEER AND THE CITY ABOUTDELAYING PLANTINGS UNTIL FALL OR EARLY WINTER FOR MAXIMUM SURVIVABILITY OF PLANTINGS. REGARDLESS OF PLANTING SCHEDULE, WETLAND MUST BESTABILIZED WITHIN 14 DAYS OF CONSTRUCTION.10.SEED ALL DISTURBED AREAS PER THE SEEDING SCHEDULE SHOWN ON THE LANDSCAPE PLAN (SHEET L-??).11.AFTER COMPLETING ALL PLANTINGS AND SEEDINGS, FERTILIZE ENTIRE WETLAND AS RECOMMENDED BY USDA SOIL TESTING RECOMMENDATIONS. FERTILIZING SHALLOCCUR ONLY DURING THE FIRST YEAR. THEREAFTER NO FERTILIZING SHALL BE ALLOWED.12.CONTRACTOR SHALL WATER NEW PLANT MATERIAL PLANTED IN THE CONSTRUCTED WETLAND DAILY UNTIL COMPLETION OF ALL OTHER SITE RELATEDCONSTRUCTION. AFTER THE FULL SCOPE OF THE CONTRACTOR'S WORK IS COMPLETED, IT SHALL BE THE OWNER'S RESPONSIBILITY TO WATER PLANTS DAILY UNTILPLANTS HAVE BECOME WELL ESTABLISHED AND WATERING IS NO LONGER NECESSARY.13.CONTACT CITY OF DURHAM STORMWATER ENGINEER TO OBTAIN FINAL STORMWATER CONTROL MEASURES INSPECTION AND APPROVAL.14.SUBMIT ENGINEER'S CERTIFICATION AND REQUIRED AS-BUILT SUBMITTAL PACKAGE INCLUDING ALL MATERIALS TESTING, CERTIFICATIONS, SHOP DRAWINGSUBMITTALS AND PURCHASE RECEIPTS; GEOTECHNICAL DAM CERTIFICATION; WETLANDS AS-BUILT SURVEY (INCLUDING ALL UPSTREAM DRAINAGE AREA) FOR THEWETLAND STORMWATER CONTROL MEASURES.WETLAND CONSTRUCTION NOTESWETLAND CONSTRUCTION SEQUENCETW 393.00BW 388.50TW 391.50BW 388.50TW 390.00BW 389.00387.25387.25TW 394.00BW 388.50388.00TW 390.00BW 389.004" TOPSOILSHWT @ 389.0 ±DAM SETTLEMENT CALC=> 5.5' TALL @ HIGHEST POINT * 5% = 0.28 FEET ADDT'L HEIGHT, MIN.388.00DocuSign Envelope ID: 8C264526-3E7F-4569-8C3F-0ABD8FCCA50D4/17/2019 380385380 380375375 375375375375 370370370370370365365360 382 382 388R/WR/WGARAGE108.87'147.22'S87°41'00"E326.34'222.82'318.67'24TP TPTP TP TP TP TP TP TPTP TP TP TPLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLD LD LD LD LD LD LD LDLDFOREBAYSHALLOWWATERSHALLOWWATERSHALLOWWATERDEEPPOOLDEEPPOOLX 370.25X 370.25X 370.25SPLITTER BOXINV IN = 366.60 (OUTLET PIPE)INV OUT = 366.00 (BYPASS)INV OUT = 366.50 (TO LVL SPRDR)INV = 366.46LS Outlet79 LF 18" RCP @ 3.05%RISERINV OUT = 369.00 (OUTLET PIPE)SHALLOWLANDSHALLOWLAND4 LF12" PVC@ 0.89%INV OUT = 378.44CI - D-01RIM = 382.43INV IN = 375.77INV IN = 376.77INV IN = 378.18INV OUT = 372.90CI - D-24RIM = 381.98INV OUT = 378.54CI - D-18RIM = 381.55INV OUT = 378.12CI - D-17RIM = 381.45INV IN = 377.76INV OUT = 377.51EW-WINV IN = 372.2542 LF 30" RCP @ 6.33%74 LF 18" RCP @ 1.00%50 LF 36" RCP @ 1.29%35 LF 15" RCP @ 1.01%36 LF 15" RCP @ 1.00%INV = 366.00Bypass Outlet373374375 37 5 37 4 372370 373374375375374372370368366375374373LEGENDFLARED END SECTIONFLOW ARROWCATCH BASINSTORM MANHOLEYARD INLETPROPOSED STORM DRAINAGE PIPELDLDPROPOSED LIMITS OF DISTURBANCETPTPPROPOSED TREE PROTECTION FENCEPROPOSED WATER LINEWWPROPOSED GRAVITY SEWERSSSSEXISTING MAJOR CONTOUREXISTING MINOR CONTOURPROPOSED MAJOR CONTOURPROPOSED MINOR CONTOUR140139140139PROPERTY LINE (PL)RIGHT-OF-WAY LINESETBACK LINEUTILITY EASEMENTGRADE CHANGESTORMWATER PLANWETLAND #2C-6.25:130'375.75'5:1STORMWATER WETLAND EMERGENCY SPILLWAYNOT TO SCALETOP OF STORMWATERWETLAND = 377.50'18"FOREBAYSHALLOWWATERDEEPPOOL18"DEEPPOOLPERMANENT POOL ELEVATION = 371.00'TEMPORARY POOL ELEVATION = 372.00'TOP OFSTORMWATERWETLAND100-YR W.S.E = 375.95'2-YR W.S.E = 373.66'3"-6"369.50'BOTTOM= 369.50'NATURAL OR SYNTHETIC LINER WITH ANINFILTRATION RATE OF NO MORE THAN0.01 IN/HR; INFILTRATION RATE MUST BEVERIFIED PRIOR TO COMPLETION OFAS-BUILTS.EMERGENCY SPILLWAY3:13:1NOT TO SCALESTORMWATER WETLANDCROSS SECTION10-YR W.S.E = 375.06'1-YR W.S.E = 373.22'1 ft0.5ftINFLUENT STORMWATERPIPE FROM STORMFLOW SPLITTER4.0'NOT TO SCALEPLUNGE POOL DETAILGEOTEXTILE FABRIC,(NCDOT TYPE 2) KEYED IN1' MINIMUM, ALL SIDESNCDOT CLASS "A"RIPRAP 9" THICKPROVIDE SEAL AROUNDPENETRATIONSOUTLETSTRUCTURE(SEE DETAIL,THIS SHEET)PERMANENT SOILREINFORCEMENT MATTING(LANDLOK 300, OR APPROVEDEQUAL) KEYED IN 1' MINIMUM,ALL SIDES3' MIN.3:1 MIN.LEVELTOP OF DAM10.0' MIN.SEE PLANS2' MIN.PROFILE VIEWCROSS SECTIONLINE EMERGENCY SPILLWAY WITH PERMANENTSOIL REINFORCEMENT MATTING (LANDLOK 300,OR APPROVED EQUAL)1:11:1SEDIMENTSTORAGEAREA1" = 30'STORMWATER PLAN - WETLAND #21 inch = 30 ft.30'030'1.ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH CITY OF DURHAM AND THE STATE OF NORTH CAROLINA DIVISION OF WATER RESOURCES STORMWATERSTORMWATER CONTROL MEASURES MANUAL, STANDARDS AND SPECIFICATIONS.2.A PORTION OF THE PERMANENT STORMWATER WETLAND WILL BE UTILIZED AS A TEMPORARY SEDIMENT AND EROSION CONTROL DEVICE UNTIL ALL UPSTREAM AREASDRAINING TO DEVICE HAVE BEEN STABILIZED AND SITE CONSTRUCTION COMPLETED; CONTRACTOR TO COORDINATE CONSTRUCTION, GRADING, PLANTINGS, ANDCERTIFICATIONS OF WETLANDS INTO SCHEDULE ACCORDINGLY.3.ALL AREAS WITHIN THE WETLAND BELOW ELEVATION 372.00 SHALL INCLUDE 4" OF SCREENED TOPSOIL SPREAD AND LIGHTLY COMPACTED TO ACHIEVE FINAL GRADE.4.SOIL BELOW ELEVATION 372.00 SHALL BE TESTED BY THE USDA AGRICULTURAL EXTENSION OFFICE FOR pH, WHICH MUST FALL BETWEEN 5.5 AND 7.0. TESTS SHALL BEPERFORMED FOR NUTRIENTS SUCH AS NITROGEN, PHOSPHOROUS, AND POTASSIUM, AND FOR MINERALS SUCH AS CHELATED IRON AND LIME. AMENDMENTS TO SOILRECOMMENDED BY USDA SHALL BE INCORPORATED INTO SOIL TO PROMOTE VIGOROUS VEGETATION AND PLANT GROWTH. RECORDS OF TESTS AND AMENDMENTSPROVIDED BY CONTRACTOR SHALL BE PROVIDED TO THE ENGINEER.5.LANDSCAPING PLANTINGS SHOWN ON THE LANDSCAPE PLAN SHALL BE INSTALLED DURING FALL SEASON OR EARLY SPRING IF POSSIBLE FOR MAXIMUM PLANTSURVIVABILITY. WETLAND PLANTS SHALL BE KEPT WET AT ALL TIMES PRIOR TO, DURING, AND AFTER PLANTING TO ENSURE SURVIVAL. CONTRACTOR TO ORDER PLANTSWELL IN ADVANCE OF PLANTING TO ENSURE AVAILABILITY / COORDINATION OF ALTERNATES; PLANTS MUST BE PURCHASED FROM A LOCAL NURSERY.6.THE CONTRACTOR SHALL WARRANTY ALL PLANTED MATERIALS FOR A PERIOD OF 2 YEARS FROM DATE OF INSTALLATION. AT THE END OF THE FIRST YEAR AND AT THEEND OF THE SECOND YEAR, THE CONTRACTOR SHALL REPLACE ALL PLANTS WHICH DID NOT SURVIVE. ANY HEALTHY PLANTS DAMAGED DURING PLANT REPLACEMENTSHALL ALSO BE REPLACED.7.WETLAND SEED MIXES SHALL NOT BE ALLOWED.8.PRINCIPAL SPILLWAY PIPES SHALL HAVE A MINIMUM PIPE STRENGTH CONFORMING TO AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) C-76, CLASS IIISTANDARDS. THE RUBBER GASKETTED JOINT PIPE SHALL ALSO BE WRAPPED WITH A LAYER OF GEOTEXTILE FILTER FABRIC ON THE OUTSIDE OF THE PIPE AT EACHJOINT. THE FABRIC SHALL MEET NCDOT SPECIFICATIONS FOR TYPE II FILTER FABRIC. SEE SECTION 1056 (TABLE 1056-1) IN THE NORTH CAROLINA DEPARTMENT OFTRANSPORTATION’S 2012 EDITION OF THE STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES. THE FABRIC WRAP SHALL BE BETWEEN TWO AND THREE FEETWIDE, SHALL BE CENTERED OVER EACH PIPE JOINT, AND SHALL COVER A MINIMUM OF ONE-FOOT LENGTH OF EACH PIPE SEGMENT.9.THE CONTRACTOR SHALL EMPLOY A GEOTECHNICAL ENGINEER TO TEST ALL EMBANKMENTS AND FILL PLACEMENT FOR PROPER COMPACTION. PROPER COMPACTIONSHALL BE PER THE GEOTECHNICAL ENGINEER'S RECOMMENDATIONS OR THESE PLANS, WHICHEVER IS MORE STRINGENT. EMBANKMENTS FOR PONDS SHALL BE PLACEDIN 6 INCH LOOSE LAYERS AND SHALL BE COMPACTED TO A DENSITY OF NO LESS THAN 95% OF THE STANDARD PROCTOR MAXIMUM DENSITY AT A MOISTURE CONTENT OF+ OR - TWO PERCENTAGE POINTS OF THE OPTIMUM MOISTURE CONTENT IN ACCORDANCE WITH ASTM D698. THE CONTRACTOR SHALL TAKE PHOTOGRAPHS OF THEOUTLET STRUCTURE AT ALL PHASES OF INSTALLATION AND SHALL RETAIN WITH GEOTECHNICAL TESTING DATA. THE CONTRACTOR SHALL ALSO RETAIN ALL SHIPPINGRECORDS AND SPECIFICATIONS FOR THE OUTLET STRUCTURE MATERIALS AND STRUCTURES. ALL OF THE ABOVE DATA MAY BE REQUIRED AS PART OF THEMUNICIPALITY AS-BUILT PROCESS AND SHALL BE MADE AVAILABLE TO THE ENGINEER UPON REQUEST. THE CONTRACTOR SHALL HAVE DOCUMENTATION OF THESETESTS AVAILABLE UPON REQUEST.10.TOLERANCES FOR FINAL GRADES SHALL BE WITHIN +/- 0.10 FEET. AN AS-BUILT SURVEY OF THE CONSTRUCTED WETLAND WILL BE REQUIRED, THEREFORE, STRICTADHERENCE TO THE GRADING ON THIS PLAN AND THE TOLERANCES SPECIFIED HEREON SHALL BE REQUIRED PRIOR TO CERTIFICATION BY THE ENGINEER THAT THEWETLAND HAS BEEN BUILT IN COMPLIANCE WITH THESE DRAWINGS. UPON COMPLETION OF THE FINAL GRADING (PRIOR TO PLACEMENT OF ANY PLANT MATERIAL) THECONTRACTOR SHALL CONTACT THE SURVEYOR TO SURVEY THE AS-BUILT CONSTRUCTED WETLAND. THE CONTRACTOR SHALL NOTIFY THE ENGINEER THAT THECONSTRUCTED WETLAND HAS BEEN COMPLETED AND THE ENGINEER SHALL EVALUATE THE AS-BUIT SURVEY DATA FOR COMPLIANCE WITH THESE DRAWINGS. IF THECONSTRUCTED WETLAND IS FOUND TO BE OUT OF COMPLIANCE WITH THESE DRAWINGS, THE CONTRACTOR SHALL RE-GRADE THE WETLAND AS NECESSARY TO BRINGTHE WETLAND INTO COMPLIANCE WITH THESE DRAWINGS. THE COST OF ANY ADDITIONAL SURVEYING FOR ENGINEERING EVALUATION REQUIRED RESULTING FROMINCOMPLETE OR INCORRECT GRADING OF THE CONSTRUCTED WETLAND SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.11.EROSION AND SEDIMENT CONTROL MEASURES MUST BE INSTALLED AND INSPECTION APPROVED PRIOR TO BEGINNING GENERAL SITE WORK, INCLUDING GENERALCLEARING, GRUBBING, AND GRADING.12.ALL EARTHEN FILLS SHALL BE CLEARED, GRUBBED AND STRIPPED OF ALL VEGETATIVE MATERIAL, TOPSOIL, AND ORGANIC MATTER PRIOR TO CONSTRUCTION. NOTETHAT FULL CONSTRUCTION SPECIFICATIONS ARE REQUIRED IN ACCORDANCE WITH CHAPTER 21 OF THE CITY OF DURHAM ADDENDUM TO THE NC DIVISION OF WATERQUALITY STORMWATER BEST MANAGEMENT PRACTICES MANUAL1.UNDER NO CIRCUMSTANCES SHALL THE WETLAND BE FINALIZED AND PLANTED BEFORE THE COMPLETION OF CONSTRUCTION AND STABILIZATION OF ALL AREASWHICH DRAIN TO IT. NOTIFY THE ENGINEER 48 HOURS PRIOR TO BEGINNING CONSTRUCTION ON THE WETLAND AND SCHEDULE A PRECONSTRUCTION CONFERENCEWITH THE ENGINEER TO REVIEW DETAILS OF THE CONSTRUCTION REQUIREMENTS AND THE AS-BUILT REQUIREMENTS. THE CONTRACTOR SHOULD BE FAMILIAR WITHTHE CITY OF DURHAM AS-BUILTS AND CERTIFICATION PROCESS PRIOR TO STARTING WORK.2.CALL DURHAM COUNTY EROSION CONTROL INSPECTOR FOR APPROVAL OF EROSION CONTROL STABILIZATION.3.IF THE WETLAND HAS BEEN PREVIOUSLY ROUGH GRADED, REMOVE AND DISPOSE OF SEDIMENT DEPOSITS WITHIN SEDIMENT BASIN.4.STRIP TOPSOIL AND DISPOSE OF OFFSITE OR STOCKPILE ONSITE FOR SUBSEQUENT SCREENING AND PLACEMENT WITHIN CONSTRUCTED WETLAND. ONSITESTOCKPILE SHALL BE ENCLOSED BY SILT FENCE.5.ROUGH GRADE CONSTRUCTED WETLAND. ALL FILL PLACEMENT SHALL BE IN COMPLIANCE WITH THE SPECIFICATION IN THE CONSTRUCTION NOTES ON THIS SHEET.6.AFTER ROUGH GRADING WETLAND, BEGIN FINE GRADING TO CONSTRUCT FOREBAY, OUTLET AREA, SHALLOW WATER AREAS, AND SHALLOW LAND AREAS. LEAVE ALLAREAS BELOW ELEVATION 372.00 4" BELOW FINISHED GRADE SUCH THAT SCREENED, LOOSE TOPSOIL CAN BE PLACED AND COMPACTED TO ACHIEVE FINAL GRADE.GRADING TOLERANCE FOR THE CONSTRUCTED WETLAND SHALL BE +/- 0.10 FEET.7.CALL SURVEYOR AND ENGINEER FOR AS-BUILT SURVEY AND EVALUATION.8.IF SURVEYOR AND ENGINEER DETERMINE THAT GRADING IS NOT IN COMPLIANCE WITH THESE DRAWINGS, MAKE CORRECTIONS AS REQUIRED BY THE ENGINEER, ANDREPEAT STEP 6. OTHERWISE, PROCEED TO STEP 8.9.UPON NOTIFICATION FROM THE ENGINEER THAT THE CONSTRUCTED WETLAND IS IN COMPLIANCE WITH THESE DRAWINGS, PROVIDE LANDSCAPING IN COMPLIANCEWITH THE LANDSCAPE PLAN. IF TIMING IS SUCH THAT PLANTINGS WOULD OCCUR IN SUMMER MONTHS, COORDINATE WITH THE ENGINEER AND THE CITY ABOUTDELAYING PLANTINGS UNTIL FALL OR EARLY WINTER FOR MAXIMUM SURVIVABILITY OF PLANTINGS. REGARDLESS OF PLANTING SCHEDULE, WETLAND MUST BESTABILIZED WITHIN 14 DAYS OF CONSTRUCTION.10.SEED ALL DISTURBED AREAS PER THE SEEDING SCHEDULE SHOWN ON THE LANDSCAPE PLAN (SHEET L-??).11.AFTER COMPLETING ALL PLANTINGS AND SEEDINGS, FERTILIZE ENTIRE WETLAND AS RECOMMENDED BY USDA SOIL TESTING RECOMMENDATIONS. FERTILIZING SHALLOCCUR ONLY DURING THE FIRST YEAR. THEREAFTER NO FERTILIZING SHALL BE ALLOWED.12.CONTRACTOR SHALL WATER NEW PLANT MATERIAL PLANTED IN THE CONSTRUCTED WETLAND DAILY UNTIL COMPLETION OF ALL OTHER SITE RELATEDCONSTRUCTION. AFTER THE FULL SCOPE OF THE CONTRACTOR'S WORK IS COMPLETED, IT SHALL BE THE OWNER'S RESPONSIBILITY TO WATER PLANTS DAILY UNTILPLANTS HAVE BECOME WELL ESTABLISHED AND WATERING IS NO LONGER NECESSARY.13.CONTACT CITY OF DURHAM STORMWATER ENGINEER TO OBTAIN FINAL STORMWATER CONTROL MEASURES INSPECTION AND APPROVAL.14.SUBMIT ENGINEER'S CERTIFICATION AND REQUIRED AS-BUILT SUBMITTAL PACKAGE INCLUDING ALL MATERIALS TESTING, CERTIFICATIONS, SHOP DRAWINGSUBMITTALS AND PURCHASE RECEIPTS; GEOTECHNICAL DAM CERTIFICATION; WETLANDS AS-BUILT SURVEY (INCLUDING ALL UPSTREAM DRAINAGE AREA) FOR THEWETLAND STORMWATER CONTROL MEASURES.WETLAND CONSTRUCTION NOTESWETLAND CONSTRUCTION SEQUENCESTANDARD CITY OF DURHAMCATCH BASIN STEPNOT TO SCALESTORMWATER WETLAND #2OUTLET CONTROL STRUCTURE6"4'TOP ELEV.= 375.25'6' x 6' x 24" THICK CONCRETEPAD FOR ANTI-FLOTATION(ATTACH TO BOTTOM OFRISER WITH MECHANICALCONNECTION)5' x 5' (OUTSIDE) PRECASTREINFORCED CONCRETE RISERSTRUCTUREBOTTOM = 368.50'18" O-RING RCP TOFLOW SPLITTERINV = 369.00'4" DIA. PVC DRAWDOWN PIPE W/ REMOVABLECAP ON END (DRILL 2" DIAMETER ORIFICE INTOCAP) ELEV. = 371.00'T.P.E. = 372.00'P.P.E. = 371.00'BOTTOM OF WETLANDDEEP POOL = 369.00'CONCRETE FILLWETLAND ZONES SURFACE AREA·DEEP POOLSFOREBAY - 10%NON-FOREBAY - 10%·SHALLOW WATER - 40%·SHALLOW LAND - 40%NOTE:WETLAND PLANTINGS SHALL CONFORM WITHNCDEQ BMP DESIGN MANUAL. SEE LANDSCAPEPLAN SHEET.VARIABLE WIDTH SCM ACCESS &MAINTENANCE EASEMENT30' WIDE PUBLIC SEWER EASEMENT50' LEVEL SPREADER(ELEV=366.50)(SEE DETAIL SHEET C-6.3)PLUNGE POOL(SEE DETAIL THIS SHEET)OUTLET CONTROL STRUCTURE(SEE DETAIL THIS SHEET)30' EMERGENCY SPILLWAY(SEE DETAIL THIS SHEET)VARIABLE WIDTH SCM ACCESS& MAINTENANCE EASEMENTPROJ. MGR: P R E L I M I N A R YCOPYRIGHT ©2018SEPI ENGINEERING & CONSTRUCTION, INCDRAWN BY:sepiengineering.comE N G I N E E R I N G &C O N S T R U C T I O N1025 WADE AVENUERALEIGH, NORTH CAROLINA919.789.997711020 DAVID TAYLOR DR., SUITE 115CHARLOTTE, NORTH CAROLINA704.714.48805030 NEW CENTRE DR., SUITE BWILMINGTON, NORTH CAROLINA910.523.5715LP16010Construction Drawings02/05/2019Revisions Per Comments04/16/2019................PROJECT:DATEISSUE:CHECKED BY:J. WESTMORELANDREVISIONS:1..NOTICE:3 WORKING DAYSFOR THE LOCATION OFUNDERGROUND FACILITIESBEFORE YOU DIGRCallbefore you dig.below.Know what'sTHE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATEWAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITSREPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALLEXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLEFOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURETO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES.CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THECONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BEEXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THEWORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBYSTRUCTURES, OR OF ANY OTHER PERSONS.CLIENT:Angier Development, LLC7700 Kencot CourtRaleigh, NC 27615Contact:David LazzoPH: (919) 601-2816dlazzo2100@gmail.comL. SMITHJ. BEARD..ANGIER AVENUERESIDENTIALCONSTRUCTIONDRAWINGS3846 Angier AvenueDurham, NCCITY OF DURHAMPUBLIC WORKS DEPARTMENTAPPROVEDENGINEERINGDATESTORMWATERDATETRANSPORTATIONDATEDATEDATEPRELIMINARY - NOT FOR CONSTRUCTIONBENCHMARKTBM: 13 IN. OAKN: 799151.14636E: 2045555.4021EL: 363.381PROVIDE SEAL AROUNDPENETRATIONSSTORM DRAINAGEDISCHARGE PIPE3.0'5.0'(1) 10" DIA. ORIFICESHALLOW LANDCLASS A RIP-RAP O.P.8' L x 6' W x 12" Th(3 Tons)CLASS 2 RIP-RAP O.P.30' L x 9' W x 32" Th(36 Tons)375.75' (SETTLED), 376.25' (CONSTRUCTED)377.50' (SETTLED), 378.00' (CONSTRUCTED)8" PLUG VALVE W/FLYWHEEL, ORAPP'D EQUIV.PRE-FABRICATED TRASH RACKWITH ACCESS OPENING TOWARDSPOND BERM (SEE DETAIL SHEET C-6.3)SLUICE GATE OPERATORMOUNT HANDWHEEL 6"ABOVE RACK OPENING18" RCP TO FLOW SPLITTER @ 1.00% SLOPESEE WETLAND CONSTRUCTION NOTE #8.FLOW SPLITTER BOX(SEE DETAIL)RIPRAP OUTLET(SEE DETAIL,SHEET C-13.2)UNDERCUT AND RECONDITIONSOIL 1' BENEATH DAMCONCRETE CRADLE (SEE DETAIL)CUT-OFF TRENCH; AS SPECIFIEDBY GEOTECHNICAL ENGINEERSEEPAGE DIAPHRAGM(SEE DETAIL)ADVISORY COMMENT: THE DAM SAFETY LAW OF 1967 (15A NCAC 02K .0201) REQUIRES ANY PERSON WHOPROPOSES TO CONSTRUCT, ALTER OR REMOVE A DAM TO FILE A STATEMENT WITH THE STATE DAM SAFETYENGINEER CONCERNING THE LOCATION OF THE DAM, INCLUDING THE NAME OF THE STREAM AND COUNTY,HEIGHT, PURPOSE, AND IMPOUNDMENT CAPACITY, AT LEAST 10 DAYS BEFORE THE START OF CONSTRUCTION.IF THE STATE DETERMINES THAT THE DAM IS NOT EXEMPT FROM THE LAW, ADDITIONAL REQUIREMENTS INACCORDANCE WITH THE DAM SAFETY LAW OF 1967 AS AMENDED WILL BE IMPOSED.4" TOPSOIL4" TOPSOILSHWT @ 367.2 ±DAM SETTLEMENT CALC=> 10.0' TALL @ HIGHEST POINT *5% = 0.50 FEET ADDT'L HEIGHT, MIN.364.00364.00366.00366.00DocuSign Envelope ID: 8C264526-3E7F-4569-8C3F-0ABD8FCCA50D4/17/2019 PROJ. MGR: PRELIMINARYCOPYRIGHT ©2018 SEPI ENGINEERING & CONSTRUCTION, INC DRAWN BY: sepiengineering.com E N G I N E E R I N G & C O N S T R U C T I O N 1025 WADE AVENUE RALEIGH, NORTH CAROLINA 919.789.9977 11020 DAVID TAYLOR DR., SUITE 115 CHARLOTTE, NORTH CAROLINA 704.714.4880 5030 NEW CENTRE DR., SUITE B WILMINGTON, NORTH CAROLINA 910.523.5715 LP16010 Construction Drawings 02/05/2019 Revisions Per Comments 04/16/2019 .. .. .. .. .. .. .. .. PROJECT: DATE ISSUE: CHECKED BY: J. WESTMORELAND REVISIONS: 1 .. NOTICE: 3 WORKING DAYS FOR THE LOCATION OF UNDERGROUND FACILITIES BEFORE YOU DIG R Callbefore you dig. below.Know what's THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. CLIENT: Angier Development, LLC 7700 Kencot Court Raleigh, NC 27615 Contact: David Lazzo PH: (919) 601-2816 dlazzo2100@gmail.com L. SMITH J. BEARD .. ANGIER AVENUE RESIDENTIAL CONSTRUCTION DRAWINGS 3846 Angier Avenue Durham, NC CITY OF DURHAM PUBLIC WORKS DEPARTMENT APPROVED ENGINEERING DATE STORMWATER DATE TRANSPORTATION DATE DATE DATEPRELIMINAR Y - N O T F O R C O N S T R U C T I O N BENCHMARK TBM: 13 IN. OAK N: 799151.14636 E: 2045555.4021 EL: 363.381 STORMWATER DETAILS C-6.3 FROM STORMWATER BMP 30' ENGINEERED FILTER STRIP #57 STONE ON FILTER FABRIC 8% MAX SLOPE (SEE PLANS) NOTE: INSPECT AFTER EACH RAINFALL, UNTIL VEGETATION IS WELL ESTABLISHED, AND MAKE ANY NECESSARY REPAIRS; AFTERWARDS, INSPECT PERIODICALLY AND KEEP VEGETATION HEALTHY AND MAINTAINED. PLAN VIEW 0.5 ft MIN. 3'3'1'1' LEVEL SPREADER & REINFORCED CHANNEL NOT TO SCALE LEVEL SPREADER CROSS SECTION ENGINEERED FILTER STRIP (EFS) 3 INCHES OF NCDOT #57 STONE 3' WIDE STRIP OF FILTER FABRIC LEVEL SPREADER LIP ELEV. = SEE PLANS REINFORCED CHANNEL INSTALL NORTH AMERICAN GREEN P300 PERMANENT EROSION CONTROL MATTING (OR APPROVED EQUIVALENT) - SEE ROLLED EROSION CONTROL PRODUCT DETAIL SOD ZONE 2 STREAM BUFFEROR LEVEL GRADEPUNGE POOL WITH CLASS "A" RIPRAP REINFORCED CHANNEL LEVEL SPREADER CROSS SECTION (THIS SHEET) LEVEL SPREADER LIP 8% MAX SOD SOD JKC D HA G IJFK HEFB A ECDSPLITTER BOX PLAN VIEW FROM BMP UPSTREAM (BY-PASS) TO LEVEL SPREADER NOTES: 1. SPLITTER BOX SHALL MEET ALL MUNICIPALITY AND/OR NCDOT REQUIREMENTS. 2. SEE PLANS FOR INVERT ELEVATION INFORMATION. SPLITTER BOX SIDE VIEW WEIR STEPS 6" THICK PRECAST RISER STRUCTURE LID WITH MANHOLE COVER (SEE DETAIL, THIS SHEET)ESPLITTER BOX SIDE VIEW NOT TO SCALE FLOW SPLITTER BOX FDESCRIPTION A OUTSIDE WIDTH OF DIVERTER BOX W.L.#1 6' B INSIDE WIDTH OF DIVERTER BOX 5' C 5' D OUTSIDE WIDTH OF DIVERTER BOX 6' E DIAMETER OF OUTLET PIPE/OPENING 2' F DIAMETER OF INLET PIPE 18" G TOP WIDTH OF WEIR 3" H HEIGHT OF WEIR 24" J DIAMETER OF PIPE TO BMP 12" K I INSIDE WIDTH OF DIVERTER BOX DEPTH OF BOX BOTTOM WIDTH OF WEIR 5.5' 6" 8" 1 1/2 D SEE NOTE 1 D1/2 D (D=2t) 1/4 D t NOT TO SCALE CONCRETE CRADLE DETAIL NOTES: 1.IF THE PIPE IS LAID IN AN EXCAVATED TRENCH, THEN THE SIDE WALLS MAY CONFORM TO THE TRENCH SHAPE (I.E. THE TRENCH MAY BECOME THE CRADLE FORM). 2.COMPREHENSIVE STRENGTH OF CONCRETE MATERIAL FOR CRADLE SHALL BE 3,000 PSI. 3.PIPE SHALL BE REINFORCED CONCRETE PIPE WITH RUBBER GASKETS IN ACCORDANCE WITH NCDOT ROAD AND BRIDGE STANDARDS AND SPECIFICATIONS, AASHTO M170 (PIPE) AND ASTM C443 (GASKET). 4.CONCRETE CRADLE SHALL BEGIN AT RISER OR INLET END OF PIPE AND SHALL EXTEND TO THE FULL LENGTH OF PIPE. 3xD D 3xD 3xDD1.5'1.5'1.5'1.5' SAND OUTLET PIPE NO. 57 STONE DRAIN PIPE CONCRETE CRADLE CONCRETE CRADLE SAND OUTLET PIPE NO. 57 STONE DRAIN PIPE PERFORATED PIPE END, ONLY PERFORATED IN STONE NOT TO SCALE SEEPAGE DIAPHRAGM PASSING % 100 SIEVE SIZE 3/8 95 - 1004 74 - 9410 35 - 7520 25 - 6030 10 - 3050 2 - 10100 CONSTRUCTION NOTES: 1.NATURAL GROUND OR EARTH SHALL BE COMPACTED TO ABOVE THE TOP OF THE SAND ENVELOPE AND A TRENCH EXCAVATED (PER DETAIL) FOR THE PIPE AND SAND ENVELOPE PLACEMENT. 2.SEEPAGE PROTECTION FILTER AND ENVELOPE MATERIAL SHALL BE COMPACTED AS SPECIFIED IN THE CONSTRUCTION SPECIFICATION. A.EACH LAYER OF SAND MATERIAL SHALL BE FLOODED PRIOR TO COMPACTION. B.COMPACTION SHALL BE ACCOMPLISHED WHILE THE MATERIAL IS WET. C.EACH LAYER SHALL BE COMPACTED BY A MINIMUM OF 2 PASSES OF A HAND-DIRECTED VIBRATORY COMPACTOR OVER THE ENTIRE LAYER SURFACE. D.LAYER THICKNESS SHALL NOT EXCEED 12 INCHES AFTER COMPACTION. NOT TO SCALE SEE PLANS 1.0' ELEVATION = SPREADER LIP + 3" 1.0' ELEVATION = SPREADER LIP + 3" 0.5 ft MIN. W.L.#2 6' 5' 5' 6' 2' 18" 3" 24" 12" 5.5' 6" DIMENSIONS NOT TO SCALE 6' 6" THICK PRECAST RISER LID STANDARD CITY OF DURHAM STORM SEWER MANHOLE COVER CAST FLUSH INTO PRECAST CONCRETE RISER LID6'PRECAST OUTLET CONTROL STRUCTURE LID TRASH RACK DETAIL - MOUNTED (OR APP'D EQUIV.) NOT TO SCALE NOTES: 1.TRASH RACK DIMENSION CRITERIA SPECIFIED IS APPROXIMATE AND VARIES BY MANUFACTURER. 2.INSTALLATION OF TRASH RACK SHALL BE ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. 3.THE TRASH RACK SHALL BE MADE OF NON-CORROSIVE MATERIALS 1.UNDER NO CIRCUMSTANCES SHALL THE LEVEL SPREADER AND ENGINEERED FILTER STRIP BE FINALIZED AND PLANTED BEFORE THE COMPLETION OF CONSTRUCTION AND STABILIZATION OF ALL AREAS WHICH DRAIN TO IT. CONTRACTOR TO PROTECT LS-EFS FROM SEDIMENT AND STORMWATER FLOWS DURING CONSTRUCTION; DIVERT STORMWATER AROUND LS-EFS UNTIL THE DRAINAGE AREA AND THE LS-EFS HAVE FULLY STABILIZED. 2.PRIOR TO CONSTRUCTION, CONTRACTOR TO VERIFY THAT THERE IS ENOUGH ROOM TO INSTALL LS-EFS, AND THE DOWNSTREAM LIP OF THE EFS IS LEVEL. IF NOT, CONTRACTOR TO CONTACT ENGINEER TO SEE IF LS-EFS SHOULD BE ADJUSTED TO MEET FIELD CONDITIONS. NOTIFY THE ENGINEER 48 HOURS PRIOR TO BEGINNING CONSTRUCTION ON THE LS-EFS AND SCHEDULE A PRECONSTRUCTION CONFERENCE WITH THE ENGINEER TO REVIEW DETAILS OF THE CONSTRUCTION REQUIREMENTS AND THE AS-BUILT REQUIREMENTS. THE CONTRACTOR SHOULD BE FAMILIAR WITH THE CITY OF DURHAM AS-BUILTS AND CERTIFICATION PROCESS PRIOR TO STARTING WORK. 3.CALL DURHAM COUNTY EROSION CONTROL INSPECTOR FOR APPROVAL OF EROSION CONTROL STABILIZATION. 4.AFTER ROUGH GRADING LS-EFS AREA, BEGIN FINE GRADING TO THE DESIGN SLOPE; AVOID USING HEAVY EQUIPMENT THROUGH THE ENGINEERED FILTER STRIP TO PREVENT COMPACTION. GRADING TOLERANCE FOR THE CONSTRUCTED LS-EFS SHALL BE +/- 0.10 FEET. 5.CONSTRUCT BLIND SWALE AND LS AS SHOWN IN PLANS. THE LS SHOULD BE CONSTRUCTED ON UNDISTURBED SOIL WHENEVER POSSIBLE. IF THE USE OF FILL IS UNAVOIDABLE, COMPACT THE SOIL TO 95% OF STANDARD PROCTOR TEST PRIOR TO CONSTRUCTION. IF LS IS TO BE CAST IN PLACE, IT IS CRITICAL THAT THE TOP OF THE FORMS ARE LEVEL. LINE BOTTOM OF BLIND SWALE WITH SOD. 6.CONSTRUCT THE FOREBAY PER PLANS AND LINE WITH RIPRAP. 7.INSTALL SPLITTER BOX AND ANY BYPASS CHANNEL(S)/ DEVICE PER PLANS. 8.CALL SURVEYOR AND ENGINEER FOR AS-BUILT SURVEY AND EVALUATION. 9.IF SURVEYOR AND ENGINEER DETERMINE THAT GRADING AND ELEVATIONS ARE NOT IN COMPLIANCE WITH THESE DRAWINGS, MAKE CORRECTIONS AS REQUIRED BY THE ENGINEER, AND REPEAT STEP 6. OTHERWISE, PROCEED TO STEP 8. 10.UPON NOTIFICATION FROM THE ENGINEER THAT THE LS-EFS ITEMS ARE IN COMPLIANCE WITH THESE DRAWINGS, PROVIDE EFS SOD BY FIRST LOOSENING THE EFS AREA. PLACE SIX INCHES OF TOPSOIL IN THE EFS AREA AND ANY ADJACENT SIDE SLOPES CREATED BY GRADING. FERTILIZE EFS AREA BASED ON THE SOIL TEST REPORT RECOMMENDATIONS, AND INCORPORATE INTO THE TOPSOIL USING A DISK OR ROTOTILLER. BEFORE PLACING SOD, WATER AREA TO PROMOTE SETTLING, AND FILL ANY UNEVEN AREAS. INSTALL CERTIFIED SOD PER RECOMMENDTIONS PROVIDED BY NCSU COOPERATIVE EXTENSION SERVICE (2008). 11.CONTRACTOR SHALL WATER SOD DAILY UNTIL COMPLETION OF ALL OTHER SITE RELATED CONSTRUCTION. AFTER THE FULL SCOPE OF THE CONTRACTOR'S WORK IS COMPLETED, IT SHALL BE THE OWNER'S RESPONSIBILITY TO WATER THE SOD DAILY UNTIL IT HAS BECOME WELL ESTABLISHED AND WATERING IS NO LONGER NECESSARY. 12.CONTACT CITY OF DURHAM STORMWATER ENGINEER TO OBTAIN FINAL STORMWATER CONTROL MEASURES INSPECTION AND APPROVAL. 13.SUBMIT ENGINEER'S CERTIFICATION AND REQUIRED AS-BUILT SUBMITTAL PACKAGE INCLUDING ALL MATERIALS TESTING, CERTIFICATIONS, SHOP DRAWING SUBMITTALS AND PURCHASE RECEIPTS; AS-BUILT SURVEY (INCLUDING ALL UPSTREAM DRAINAGE AREA) FOR THE TREATMENT MEASURES. LEVEL SPREADER / EFS CONSTRUCTION SEQUENCE NOTES: 1.INDICATOR SHALL BE 8" SCHEDULE 40 PVC WITH CAP. USE COLOR BANDS TO DISTINGUISH DIFFERENT ELEVATIONS WITHIN THE WETLAND. 2.ONCE THE WETLAND IS CONSTRUCTED, ENGINEERING WILL PROVIDE ELEVATIONS FOR NORMAL POOL, MAXIMUM SEDIMENT DEPTH, AND ALL DESIGN STORM ELEVATIONS. 3.EXPLANATION OF COLORS TO BE PROVIDED BY CONTRACTOR ON OUTLET STRUCTURE. CONTRACTOR TO COORDINATE WITH ENGINEER.2'1'5'REMOVE SEDIMENT AT THIS LEVEL 8" NOT TO SCALE SEDIMENT DEPTH INDICATOR WEIR FILL W/ GROUT; SLOPE TO OUTLET 12"FILL W/ GROUT DocuSign Envelope ID: 8C264526-3E7F-4569-8C3F-0ABD8FCCA50D 4/17/2019 R/W R/WR/WR/WR/WR/W R/ WR/W R /WR/W R/WR/WR/WW W W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/Wxxxxxxxxxxxxxxxxxx20.00' GAR A G E STAGE ROAD - SR 202360' RIGHT-OF-WAY (PUBLIC)17.38' 72" OAK 51" OAK 29" PINE 32" OAK 40.5" TWIN OAK 36" OAK S5 4 ° 2 8 ' 1 8 " E 10 5 . 0 0 ' S5 7 ° 5 5 ' 4 5 " E 99 . 8 1 'N30°51'29"E210.18'N27°42'17"E669.81'S14°56'37"W1601.25' TOTALN27°27 '33 "W179.97 '172.05'137.30'108.84'190.25'99.96'99.88'499.50'108.87'147.22'S87°51'08"E 69.14' S87°41'00"E 326.34'C1N02°07'25"W 2.70'222.82 ' 318.67' C2 C3C4XXXXXXXXXXXXXXXXXXR/WR/WN/F ERIK POTENZAD.B. 4596 PG. 523P.B. 9 PG. 11PIN:0840-04-50-9874PID: 163072ZONING: RS-20USE: VACANT RES/ LOT-SML TRACTN/F ERIK POTENZAD.B. 4596 PG. 523P.B. 9 PG. 110840-04-60-0851PID: 163073ZONING: RS-20USE: RESIDENTIALN/F ERIK POTENZAD.B. 4596 PG. 523P.B. 9 PG. 110840-04-60-1723PID: 163074ZONING: RS-20USE: VACANT RES/WWWWWWWWWWWWWWWWWW W W W W W W W W W WWWWWWWWW W W WWWWWWWWWWWWWWWWWWWWWWS S S S S S S S S S S S S S S S S R/W S S S S IN V : 3 9 9 . 2 6 12" R C P IN V : 3 9 9 . 1 9 IN V : 3 9 6 . 4 5 IN V : 3 9 5 . 4 0 IN V : 3 9 9 . 6 1 IN V : 3 9 9 . 2 6 15" C M P R/WR/WR/WR/WR/WR/WR/WR/WR/WS EXISTING CONCRETE EXISTING SIDEWALK CLEANOUTS GRAVEL ENTRANCE xxS R/ W R/ W R/ W R/ W INV. = 401.15' INV. = 398.35' INV. = 398.53' INV. = 400.68' INV. = 399.64' 15" RCP24" RCP WV WVWV 12" RCP 15" RCP EX. 50' STREAM R/W1 2 3 4 5 6 7 8 9 12 13 14 15 16 18 19 20 21 22 11 10 17 23 24 25 26 27 28 29 30 31 54 55 56 57 58 59 60 61 62 63 64 65 66 67 53 52 51 50 49 48 47 46 45 44 43 42 32 33 34 35 36 37 38 39 40 41 68 69 70 SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPLDLDLDLDLDLDLDLDLD TPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTP LDLDLDLDTPTPTPTPTPTPTPT P TP TP TP TP TP TP TP TP TPTPTPTPTPTPTPTPTPTP TP TP TPTPTPTPS S S SSSSS W W W W W W W W L D L D L D LDLDLDLDLDLDLDLDL D LD LDLD LD LD LD LD LDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLD LD LDLDLDLDLDLDLDLDLDLDLD LD LD L D LDLDLDLDLDLDLDLDLDLDLDLDLD L D L D L D LD LD LDLDLDLDLDLDLDLD LD LD LDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDM I G D F I C G F D C I F I G C AB E F E F E E F PROPOSED OPEN SPACE N 10' NO-BUILD SETBACK O 10' NO-BUILD SETBACK D L P E D F C P G G PROPOSED STORMWATER CONTROL MEASURE 50' STREAM BUFFER PROPOSED TREE COVERAGE AREA PROPOSED TREE COVERAGE AREA L E C G PROPOSED TREE COVERAGE AREA PROPOSED OPEN SPACE PROPOSED TREE COVERAGE AREA 50' STREAM BUFFER MH 1-09 MH 1-10 MH 1-24 MH 1-15 MH 1-11 MH 1-20 MH 1-19 MH 1-23 MH 1-12 MH 1-21 MH 1-14 MH 1-13 MH 1-22 MH 1-18 MH 1-17 MH 1-08 MH 1-16 MH 1-07 MH 1-06 MH 1-05 MH 1-03 MH 1-04 MH 1-02 MH 1-01 MH 2-07 8" PVC SS8" PVC S S 8" PVC SS8" PVC SS8" PVC SS8" PVC SS8" PVC SS8" PVC SS8" PVC SS8" PVC SS8" PVC S S 8" PVC SS8" PVC SS 8" PVC S S 8" P V C S S 8" P V C S S8" PVC SS8" PVC SS8" PVC SS8" PVC SS8" PVC SS8" PVC SS8" PVC SS8" PVC SSD 8" PVC SS PROPERTY LINE (PL) RIGHT-OF-WAY LINE SETBACK LINE R/W UTILITY EASEMENT PROPOSED WATER LINEWW PROPOSED GRAVITY SEWERSSSS TU TU PROPOSED UNDERGROUND TELECOMMUNICATIONS LINE PROPOSED GAS LINEGG UGE PROPOSED UNDERGROUND ELECTRIC LINE S PROPOSED SS MANHOLE PROPOSED SS CLEANOUT PROPOSED WATER METER PROPOSED GATE VALVE PROPOSED FIRE HYDRANT ASSEMBLYPROPOSED STORM DRAINAGE PIPE LEGEND PROPOSED BEND WITH THRUST BLOCKING PROPOSED TEE WITH THRUST BLOCKING WM PROPOSED BLOW-OFF ASSEMBLY PROJ. MGR: PRELIMINARYCOPYRIGHT ©2018 SEPI ENGINEERING & CONSTRUCTION, INC DRAWN BY: sepiengineering.com E N G I N E E R I N G & C O N S T R U C T I O N 1025 WADE AVENUE RALEIGH, NORTH CAROLINA 919.789.9977 11020 DAVID TAYLOR DR., SUITE 115 CHARLOTTE, NORTH CAROLINA 704.714.4880 5030 NEW CENTRE DR., SUITE B WILMINGTON, NORTH CAROLINA 910.523.5715 LP16010 Construction Drawings 02/05/2019 Revisions Per Comments 04/16/2019 .. .. .. .. .. .. .. .. PROJECT: DATE ISSUE: CHECKED BY: J. WESTMORELAND REVISIONS: 1 .. NOTICE: 3 WORKING DAYS FOR THE LOCATION OF UNDERGROUND FACILITIES BEFORE YOU DIG R Callbefore you dig. below.Know what's THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. CLIENT: Angier Development, LLC 7700 Kencot Court Raleigh, NC 27615 Contact: David Lazzo PH: (919) 601-2816 dlazzo2100@gmail.com L. SMITH J. BEARD .. ANGIER AVENUE RESIDENTIAL CONSTRUCTION DRAWINGS 3846 Angier Avenue Durham, NC CITY OF DURHAM PUBLIC WORKS DEPARTMENT APPROVED ENGINEERING DATE STORMWATER DATE TRANSPORTATION DATE DATE DATEPRELIMINAR Y - N O T F O R C O N S T R U C T I O N BENCHMARK TBM: 13 IN. OAK N: 799151.14636 E: 2045555.4021 EL: 363.381 UTILITY PLAN (RESIDENTIAL) C-7.0 GENERAL UTILITY NOTES 1.BEFORE YOU DIG, STOP. CALL THE NC ONE-CALL CENTER AT 1-800-632-4949. IT'S THE LAW. EXISTING UTILITIES ARE SHOWN FROM THE BEST AVAILABLE INFORMATION AND ARE APPROXIMATE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THESE AND OTHER UTILITIES BEFORE STARTING CONSTRUCTION. NOTIFY UTILITY LOCATING COMPANY (ONE CALL @ 1-800-632-4949) OR INDIVIDUAL UTILITY OWNERS FOR UNDERGROUND LOCATIONS AT LEAST 48 HOURS IN ADVANCE. 2.THERE SHALL BE NO TAPS, PIPING BRANCHES, UNAPPROVED BYPASS PIPING, HYDRANTS, FIRE DEPT. CONNECTION POINTS, OR OTHER WATER-USING APPURTENANCES CONNECTED TO THE SUPPLY LINE BETWEEN ANY WATER METER AND BACKFLOW PREVENTER. 3.ANY UTILITY CONSTRUCTION SHALL CONFORM TO CITY OF DURHAM STANDARDS & SPECIFICATIONS. 4.CONTACT THE UTILITY COMPANY TO RELOCATE ANY EXISTING UTILITY POLES. ALL EXISTING UTILITIES WHICH CONFLICT WITH THE IMPROVEMENTS UNDER THE SCOPE OF THIS PROJECT MUST BE RELOCATED. 5.BACKFLOW PREVENTER PERMIT REQUIRED FOR PROJECT. BACKFLOW PREVENTER INSTALLER MUST CONTACT DURHAM CROSS-CONNECTION CONTROL, DEPARTMENT OF OF WATER MANAGEMENT AT (919) 560-4194 TO OBTAIN PERMIT AND INSTALLATION REQUIREMENTS PRIOR TO INITIATING WORK. 6.ALL FIRE HYDRANTS AND FIRE DEPARTMENT CONNECTIONS MUST BE PROVIDED WITH 5" DIAMETER STORZ CONNECTIONS. 7.FIRE DEPARTMENT CONNECTIONS MUST BE ORIENTED 45° TOWARD GRADE. 8.PROVIDE FIRE PLANS EXAMINER ONE COPY OF UTILITY CONSTRUCTION DRAWINGS SHOWING UNDERGROUND PIPING LAYOUT AND ALL FIRE APPURTENANCES. PERMIT FOR INSTALLATION OF PRIVATE FIRE HYDRANT(S) MUST BE ISSUED BY FIRE PLANS EXAMINER PRIOR TO INSTALLATION OF SAID HYDRANT(S). 9.LANDSCAPING AND HARDSCAPING LAYOUT MUST BE ARRANGED TO ALLOW CLEAR VISIBILITY OF ALL FIRE EQUIPMENT UPON APPROACH, WITH READY ACCESS PROVIDED THERETO. 10.ABOVE-GROUND UTILITIES TO BE SCREENED PER UDO SECTION 7.6 11.A UTILITY MAINLINE CONSTRUCTION PERMIT IS REQUIRED PRIOR TO INSTALLATION OF EACH UTILITY. ALL UTILITIES SHALL SUBMIT PLAN DRAWINGS AND APPLICATIONS TO THE CITY ENGINEERING DIVISION. 12.SANITARY SEWER SERVICES SHALL BE 2.0% MINIMUM SLOPE. WATER, SANITARY SEWER AND STORM SEWER SEPARATION NOTES 1.HORIZONTAL AND VERTICAL SEPARATION A.SANITARY SEWERS SHALL BE LAID AT LEAST 10-FEET HORIZONTALLY FROM ANY EXISTING OR PROPOSED WATER MAIN. THE DISTANCE SHALL BE MEASURED EDGE TO EDGE. IN CASES WHERE IT IS NOT PRACTICAL TO MAINTAIN A 10-FOOT SEPARATION, THE CITY OF DURHAM MAY ALLOW DEVIATION ON A CASE-BY-CASE BASIS, IF SUPPORTED BY DATA FROM THE DESIGN ENGINEER. SUCH DEVIATION ON MAY ALLOW THE INSTALLATION OF THE SANITARY SEWER CLOSER TO A WATER MAIN, PROVIDED THAT THE WATER MAIN IS IN A SEPARATE TRENCH OR ON AN UNDISTURBED EARTH SHELF LOCATED ON ONE SIDE OF THE SANITARY SEWER AND AT AN ELEVATION SO THE BOTTOM OF THE WATER MAIN IS AT LEAST 18-INCHES ABOVE THE TOP OF THE SEWER. B.IF IT IS IMPOSSIBLE TO OBTAIN PROPER HORIZONTAL AND VERTICAL SEPARATION AS DESCRIBED ABOVE OR ANYTIME THE SANITARY SEWER IS OVER THE WATER MAIN, BOTH THE WATER MAIN AND SANITARY SEWER MUST BE CONSTRUCTED OF FERROUS PIPE COMPLYING WITH THE PUBLIC WATER SUPPLY DESIGN STANDARDS AND BE PRESSURE TESTED TO 150- PSI TO ASSURE WATER TIGHTNESS BEFORE BACKFILLING. C.A 24-INCH VERTICAL SEPARATION SHALL BE PROVIDED BETWEEN STORM SEWER AND SANITARY SEWER LINES OR FERROUS PIPE SPECIFIED. A 12-INCH VERTICAL SEPARATION SHALL BE PROVIDED BETWEEN STORM SEWER AND WATER MAINS. 1. IF A 12-INCH VERTICAL SEPARATION IS NOT MAINTAINED AT A CROSSING BETWEEN STORM SEWER AND WATER MAINS (OR PRESSURE SEWERS). THE WATER MAIN SHALL BE CONSTRUCTED OF FERROUS PIPE AND A CONCRETE COLLAR SHALL BE POURED AROUND WATER MAINS AND STORM SEWER TO IMMOBILIZE THE CROSSING. 2.CROSSINGS A.SANITARY SEWER CROSSING WATER MAINS SHALL BE LAID TO PROVIDE A MINIMUM VERTICAL DISTANCE OF 18-INCHES BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF THE SANITARY SEWER. THE CROSSING SHALL BE ARRANGED SO THAT THE SANITARY SEWER JOINTS WILL BE EQUIDISTANT AND AS FAR AS POSSIBLE FROM THE WATER MAIN JOINTS. B.WHEN IT IS IMPOSSIBLE TO OBTAIN PROPER HORIZONTAL AND VERTICAL SEPARATION AS STIPULATED ABOVE, ONE OF THE FOLLOWING METHODS MUST BE SPECIFIED. 1. THE SANITARY SEWER SHALL BE DESIGNED AND CONSTRUCTED OF FERROUS PIPE AND SHALL BE PRESSURE TESTED AT 150-PSI TO ASSURE WATER TIGHTNESS PRIOR TO BACKFILLING, OR 2. EITHER THE WATER MAIN OR THE SANITARY SEWER LINE MAY BE ENCASED IN A WATERTIGHT CARRIER PIPE, WHICH EXTENDS 10-FEET ON BOTH SIDES OF THE CROSSING, MEASURED PERPENDICULAR TO THE WATER MAIN. THE CARRIER PIPE SHALL BE OF MATERIALS APPROVED BY THE CITY OF DURHAM FOR USE IN WATER MAIN CONSTRUCTION. SANITARY SEWER SERVICE @ 2.0% MIN. TRAFFIC RATED SANITARY SEWER CLEANOUT, TYPICAL. SANITARY SEWER MAIN @ 0.50 % MIN. UTILITY KEYNOTES TAP TO EXISTING 16" WATERMAIN WITH 8" x 16" TAPPING SLEEVE AND 8" VALVE FIRE HYDRANT ASSEMBLY SPACED AT 500' MAXIMUM INTERVALS 8" X 8" TEE WITH 8" GATE VALVE AND THRUST BLOCKING GATE VALVE OPEN CUT AND PATCH EXISTING ROAD FOR PROPOSED WATERLINE SERVICE CONNECTION WITH EXISTING 16" WATER MAIN SANITARY SEWER MANHOLE SPACED AT 400' MAXIMUM INTERVALS, TYPICAL (SEE PLAN AND PROFILE SHEETS FOR ADDITIONAL INFORMATION) 8" DIP WATERLINE PIPE WITH BENDS (MIN. COVER = 3') CONNECT PROPOSED SEWER OUTFALL TO EXISTING UPSTREAM OUTFALL OF CITY OF DURHAM STAGE ROAD PUMP STATION (APPROX. 18,000 GPD EXISTING FLOW & 113,000 GPD EXISTING PEAK FLOW ); FUTURE FLOW TO BE DIVERTED FROM PUMP STATION TO PROPOSED SEWER OUTFALL FUTURE OFFSITE SANITARY SEWER MAIN TO BE CONSTRUCTED PRIOR TO DEVELOPMENT OF THIS PROJECT. CONTRACTOR TO COORDINATE WITH CITY AND ENGINEER. A B C D F G H I J K L E M VALVE AND BLOW OFF ASSEMBLY (C.O.D. STD. DETAIL 514.04) 30' PUBLIC SANITARY SEWER EASEMENTN TYPICAL LOT LAYOUT NOT TO SCALE25'75'40' MIN.* 30'5' 18'20'120'PROPERTY LINE BUILDING ENVELOPE DRIVEWAY 5' SETBACKSETBACK SETBACKWWWWSSSSSSSSC.O. PVC SANITARY SEWER WATER METER TYPE K COPPER WATER LINE *NOTE:ALL LOTS SHALL HAVE A MINIMUM 40' WIDTH AT THE 20' BUILDING SETBACK OR THE 25' REAR SETBACK, AS APPLICABLE BASED ON THE LOT CONFIGURATION. 8' STREETYARD 1 inch = 80 ft. 80'0 80' PROPOSED GATE VALVE CONNECT TO PROPOSED "ANGIER AVENUE SANITARY SEWER EXTENSION" MANHOLE (BY OTHERS). CONTRACTOR TO COORDINATE AS-BUILT MANHOLE LOCATION AND PIPE INVERTS; NOTIFY ENGINEER IF DISCREPANCY FROM DESIGN PLANS O 8" CAP/PLUG WITH THRUST BLOCKINGP 8" DWL 8" DWL8" DWL8" DWLDocuSign Envelope ID: 8C264526-3E7F-4569-8C3F-0ABD8FCCA50D 4/17/2019 R/WR/WR/ W R/W R/WR/WR/W R/WR/WEIP0.18' NW OF EIPEIPIRSR/WR/WR/WR/WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWSSSSSSR/WR/WWEOPR/WR/WR/W12" RCPINV: 396.45INV: 395.40INV: 399.61INV: 399.2615" CMPR/ W SR/WR/WR/WR/WR/WINV. = 398.35'INV. = 398.53'15" RCP24" RCPWVWVWVR/WR/W R/W12 34564443423738394041686970SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTP TP TP TPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPWWWWWWWWWWWWWWWR/WR/W15+00.0016+00.0017+00.0018+00.0014+50.0015+50.0016+50.0017+50.0018+50.00 9+70.0 0 10+00. 0 0 11+00. 0 0 12+00. 0 0 13+00.00 14+00. 0 0 15 + 0 0 . 0 0 16+ 0 0 . 0 0 17+00.00 10+50. 0 0 11+50. 0 0 12+50. 0 0 13+50.00 14 + 5 0 . 0 0 15 + 5 0 . 0 0 16+50.009+75.0010+00.0011+00.0010+50.0011+50.00EW-L B-04 CI B-03 CI B-02 MH B-01 EW B-00 B-P04 18" R C P B-P0315" RCP B-P02 36" RC P B-P0136" RCP CI C-09 CI C-08 CI C-11 CI C-10 CI C-02 C-P0915" RCPC- P 0 8 15 " R C P C-P11 18" CL IV MH 1-15 MH 1-14 MH 1-13 MH 1-12 8" PVC SS 8" PV C S S 8" PVC SS8" PVC SS8" PVC S S MH C-01 TBJB B-06 CI C-15 CI C-12 YI C-14 CI C-13 CI C-03 TBJB B-05 CB B-07 OE Ex. A-01 CB B-10 CI C-04 CI C-05 CI C-06 CI C-07 B-P0715" RCPB - P 0 6 3 6 " R C P B-P1015" RCPC-P15 15" RCP C-P1415" RCPC-P1218" CL IVC-P13 15" RCP C-P1018" CL IV C-P02 24" RCP C-P0130" RCPC-P03 18" RC P C-P0418" RCPC- P 0 5 18 " R C PC-P0615" RCPC-P07 15" R C P B-P05 36" RC P CB B-08B-P0915" RCP CB B-08 B-P0815" RCP  ROAD A 370     375     380     385     390     395     400     405     410     415     420     425     430     435     440 370    375    380    385    390    395    400    405    410    415    420    425    430    435    440          9+70.00 10+00.00 10+50.00 11+00.00 11+50.00 12+00.00 12+50.00 13+00.00 13+50.00 14+00.00 14+50.00 15+00.00 15+50.00 16+00.00 16+50.00 -3.50%1.25%-1.25%1.25% 0.90%-3.50%-1.63%PVI STA = 9+88.84PVI ELEV = 401.34PVI STA = 10+00.00PVI ELEV = 401.44PVI STA = 10+11.27PVI ELEV = 401.05PVI STA = 10+26.50PVI ELEV = 400.52HIGH POINT STA = 11+39.98 HIGH POINT ELEV = 400.38 PVI STA = 11+40.00 PVI ELEV = 400.54 A.D. = -2.50% K = 19.99 V.C. = 50.00'BVCS: 11+15.00BVCE: 400.23EVCS: 11+65.00EVCE: 400.23HIGH POINT STA = 16+40.62 HIGH POINT ELEV = 401.65 PVI STA = 16+52.10 PVI ELEV = 402.04 A.D. = -3.25% K = 30.74 V.C. = 100.00'BVCS: 16+02.10BVCE: 401.41LOW POINT STA = 13+36.46 LOW POINT ELEV = 398.39 PVI STA = 13+36.50 PVI ELEV = 398.08 A.D. = 2.51% K = 39.92 V.C. = 100.00'BVCS: 12+86.50BVCE: 398.71EVCS: 13+86.50EVCE: 398.71LOW POINT STA = 10+79.91 LOW POINT ELEV = 399.99 PVI STA = 10+75.00 PVI ELEV = 399.73 A.D. = 2.88% K = 26.07 V.C. = 75.00'BVCS: 10+37.50BVCE: 400.34EVCS: 11+12.50EVCE: 400.20401.44401.44397.14397.14395.78395.78394.53394.53394.59394.59394.38394.38394.63394.63396.12396.12398.98398.98402.88402.88405.43405.43406.06406.06403.53403.5388.14 LF 8" PVC @ 0.75% 64.40 LF 8" PVC @ 0.75% 260.86 LF 8" PVC @ 0.75%1-15STA 10+15.87, 6.27' RRIM = 400.941-14STA 12+76.72, 7.00' RRIM = 398.691-13STA 13+69.42, 7.00' RRIM = 398.4118" RCP36" RCP 36" RCPB-04B-03B-02B-0115" RCP15" RCP 18" RCP 24" RCP18" RCP C-09C-08C-11C-01C-10C-02260.86 LF 8" PVC @ 0.75%INV IN = 389.36INV OUT = 389.16INV IN = 388.50INV OUT = 388.30260.86 LF 8" PVC @ 0.75%260.86 LF 8" PVC @ 0.75%260.86 LF 8" PVC @ 0.75%260.86 LF 8" PVC @ 0.75%C-15C-13C-12INV IN = 387.82INV OUT = 387.621-12STA 14+36.75, 6.75' RRIM = 399.2136" RCP 36" RCP INV OUT = 391.32B-06B-05C-03STORM SYSTEM "X" DRAINAGE SCHEDULE STRUCT NO. B-00 B-01 B-02 B-03 B-04 B-05 B-06 C-01 C-02 C-03 C-08 C-09 C-10 C-11 C-12 C-13 C-14 C-15 GRT/RIM ELEV. 396.04 +/- 400.00 +/- 399.71 +/- 399.71 +/- 397.75 +/- 400.58 +/- 400.73 +/- 397.51 +/- 399.18 +/- 399.43 +/- 400.77 +/- 400.77 +/- 398.38 +/- 398.11 +/- 398.11 +/- 398.26 +/- 399.18 +/- 398.61 +/- INVERT IN 392.75 (B-P01) 392.95 (B-P02) 394.70 (B-P04) 395.92 (B-P03) 393.89 (B-P05) 395.94 (B-P10) 394.19 (B-P06) 396.27 (B-P07) 395.52 (Ex.-P1) 393.14 (C-P10) 393.35 (C-P02) 394.78 (C-P08) 394.28 (C-P03) 394.76 (C-P04) 396.99 (C-P09) 393.47 (C-P11) 393.99 (C-P12) 394.68 (C-P15) 394.68 (C-P13) 395.16 (C-P14) UPSTRM STRUCT B-01 B-02 B-04 B-03 B-05 B-10 B-06 B-07 Ex. A-01 C-10 C-02 C-08 C-03 C-04 C-09 C-11 C-12 C-15 C-13 C-14 INVERT OUT 392.85 (B-P01) 393.79 (B-P02) 396.25 (B-P03) 395.54 (B-P04) 394.19 (B-P05) 394.50 (B-P06) 392.14 (C-P01) 393.78 (C-P02) 394.66 (C-P03) 396.89 (C-P08) 397.33 (C-P09) 393.37 (C-P10) 393.89 (C-P11) 394.33 (C-P12) 395.03 (C-P13) 396.24 (C-P14) 395.38 (C-P15) DWNSTRM STRUCT B-00 B-01 B-02 B-01 B-02 B-05 C-00 C-01 C-02 C-02 C-08 C-01 C-10 C-11 C-12 C-12 C-12 DEPTH 2.8 ft +/- 7.4 ft +/- 6.2 ft +/- 3.7 ft +/- 2.0 ft +/- 6.6 ft +/- 6.5 ft +/- 5.6 ft +/- 5.7 ft +/- 5.0 ft +/- 4.1 ft +/- 3.7 ft +/- 5.3 ft +/- 4.5 ft +/- 4.0 ft +/- 3.2 ft +/- 3.2 ft +/- 3.2 ft +/- STRUCT TYPE EW MH CI CI EW-L TBJB TBJB MH CI CI CI CI CI CI CI CI YI CI DWNSTRM PIPE INFORMATION 15' of 36" RCP @ 0.7% (B-P01) 136' of 36" RCP @ 0.6% (B-P02) 34' of 15" RCP @ 1.0% (B-P03) 89' of 18" RCP @ 0.9% (B-P04) 49' of 36" RCP @ 0.6% (B-P05) 50' of 36" RCP @ 0.6% (B-P06) 17' of 30" RCP @ 0.8% (C-P01) 43' of 24" RCP @ 1.0% (C-P02) 39' of 18" RCP @ 1.0% (C-P03) 126' of 15" RCP @ 1.7% (C-P08) 34' of 15" RCP @ 1.0% (C-P09) 24' of 18" CL IV @ 1.0% (C-P10) 42' of 18" CL IV @ 1.0% (C-P11) 34' of 18" CL IV @ 1.0% (C-P12) 35' of 15" RCP @ 1.0% (C-P13) 17' of 15" RCP @ 6.6% (C-P14) 70' of 15" RCP @ 1.0% (C-P15) W W W SS SS SS S LEGEND C.O. WM PLAN & PROFILE - ROAD A C-8.1 1.BEFORE YOU DIG, STOP. CALL THE NC ONE-CALL CENTER AT 1-800-632-4949. IT'S THE LAW. EXISTING UTILITIES ARE SHOWN FROM THE BEST AVAILABLE INFORMATION AND ARE APPROXIMATE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THESE AND OTHER UTILITIES BEFORE STARTING CONSTRUCTION. NOTIFY UTILITY LOCATING COMPANY (ONE CALL @ 1-800-632-4949) OR INDIVIDUAL UTILITY OWNERS FOR UNDERGROUND LOCATIONS AT LEAST 48 HOURS IN ADVANCE. 2.THERE SHALL BE NO TAPS, PIPING BRANCHES, UNAPPROVED BYPASS PIPING, HYDRANTS, FIRE DEPT. CONNECTION POINTS, OR OTHER WATER-USING APPURTENANCES CONNECTED TO THE SUPPLY LINE BETWEEN ANY WATER METER AND BACKFLOW PREVENTER. 3.ANY UTILITY CONSTRUCTION SHALL CONFORM TO CITY OF DURHAM STANDARDS & SPECIFICATIONS. 4.CONTACT THE UTILITY COMPANY TO RELOCATE ANY EXISTING UTILITY POLES. ALL EXISTING UTILITIES WHICH CONFLICT WITH THE IMPROVEMENTS UNDER THE SCOPE OF THIS PROJECT MUST BE RELOCATED. 5.BACKFLOW PREVENTER PERMIT REQUIRED FOR PROJECT. BACKFLOW PREVENTER INSTALLER MUST CONTACT DURHAM CROSS-CONNECTION CONTROL, DEPARTMENT OF OF WATER MANAGEMENT AT (919) 560-4194 TO OBTAIN PERMIT AND INSTALLATION REQUIREMENTS PRIOR TO INITIATING WORK. 6.ALL FIRE HYDRANTS AND FIRE DEPARTMENT CONNECTIONS MUST BE PROVIDED WITH 5" DIAMETER STORZ CONNECTIONS. 7.FIRE DEPARTMENT CONNECTIONS MUST BE ORIENTED 45° TOWARD GRADE. 8.PROVIDE FIRE PLANS EXAMINER ONE COPY OF UTILITY CONSTRUCTION DRAWINGS SHOWING UNDERGROUND PIPING LAYOUT AND ALL FIRE APPURTENANCES. PERMIT FOR INSTALLATION OF PRIVATE FIRE HYDRANT(S) MUST BE ISSUED BY FIRE PLANS EXAMINER PRIOR TO INSTALLATION OF SAID HYDRANT(S). 9.LANDSCAPING AND HARDSCAPING LAYOUT MUST BE ARRANGED TO ALLOW CLEAR VISIBILITY OF ALL FIRE EQUIPMENT UPON APPROACH, WITH READY ACCESS PROVIDED THERETO. 10.ABOVE-GROUND UTILITIES TO BE SCREENED PER UDO SECTION 7.6 11.A UTILITY MAINLINE CONSTRUCTION PERMIT IS REQUIRED PRIOR TO INSTALLATION OF EACH UTILITY. ALL UTILITIES SHALL SUBMIT PLAN DRAWINGS AND APPLICATIONS TO THE CITY ENGINEERING DIVISION. 12.SANITARY SEWER SERVICES SHALL BE 2.0% MINIMUM SLOPE. WATER, SANITARY SEWER AND STORM SEWER SEPARATION NOTES 1.HORIZONTAL AND VERTICAL SEPARATION A.SANITARY SEWERS SHALL BE LAID AT LEAST 10-FEET HORIZONTALLY FROM ANY EXISTING OR PROPOSED WATER MAIN. THE DISTANCE SHALL BE MEASURED EDGE TO EDGE. IN CASES WHERE IT IS NOT PRACTICAL TO MAINTAIN A 10-FOOT SEPARATION, THE CITY OF DURHAM MAY ALLOW DEVIATION ON A CASE-BY-CASE BASIS, IF SUPPORTED BY DATA FROM THE DESIGN ENGINEER. SUCH DEVIATION ON MAY ALLOW THE INSTALLATION OF THE SANITARY SEWER CLOSER TO A WATER MAIN, PROVIDED THAT THE WATER MAIN IS IN A SEPARATE TRENCH OR ON AN UNDISTURBED EARTH SHELF LOCATED ON ONE SIDE OF THE SANITARY SEWER AND AT AN ELEVATION SO THE BOTTOM OF THE WATER MAIN IS AT LEAST 18-INCHES ABOVE THE TOP OF THE SEWER. B.IF IT IS IMPOSSIBLE TO OBTAIN PROPER HORIZONTAL AND VERTICAL SEPARATION AS DESCRIBED ABOVE OR ANYTIME THE SANITARY SEWER IS OVER THE WATER MAIN, BOTH THE WATER MAIN AND SANITARY SEWER MUST BE CONSTRUCTED OF FERROUS PIPE COMPLYING WITH THE PUBLIC WATER SUPPLY DESIGN STANDARDS AND BE PRESSURE TESTED TO 150- PSI TO ASSURE WATER TIGHTNESS BEFORE BACKFILLING. C.A 24-INCH VERTICAL SEPARATION SHALL BE PROVIDED BETWEEN STORM SEWER AND SANITARY SEWER LINES OR FERROUS PIPE SPECIFIED. A 12-INCH VERTICAL SEPARATION SHALL BE PROVIDED BETWEEN STORM SEWER AND WATER MAINS. 1. IF A 12-INCH VERTICAL SEPARATION IS NOT MAINTAINED AT A CROSSING BETWEEN STORM SEWER AND WATER MAINS (OR PRESSURE SEWERS). THE WATER MAIN SHALL BE CONSTRUCTED OF FERROUS PIPE AND A CONCRETE COLLAR SHALL BE POURED AROUND WATER MAINS AND STORM SEWER TO IMMOBILIZE THE CROSSING. 2.CROSSINGS A.SANITARY SEWER CROSSING WATER MAINS SHALL BE LAID TO PROVIDE A MINIMUM VERTICAL DISTANCE OF 18-INCHES BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF THE SANITARY SEWER. THE CROSSING SHALL BE ARRANGED SO THAT THE SANITARY SEWER JOINTS WILL BE EQUIDISTANT AND AS FAR AS POSSIBLE FROM THE WATER MAIN JOINTS. B.WHEN IT IS IMPOSSIBLE TO OBTAIN PROPER HORIZONTAL AND VERTICAL SEPARATION AS STIPULATED ABOVE, ONE OF THE FOLLOWING METHODS MUST BE SPECIFIED. 1. THE SANITARY SEWER SHALL BE DESIGNED AND CONSTRUCTED OF FERROUS PIPE AND SHALL BE PRESSURE TESTED AT 150-PSI TO ASSURE WATER TIGHTNESS PRIOR TO BACKFILLING, OR 2. EITHER THE WATER MAIN OR THE SANITARY SEWER LINE MAY BE ENCASED IN A WATERTIGHT CARRIER PIPE, WHICH EXTENDS 10-FEET ON BOTH SIDES OF THE CROSSING, MEASURED PERPENDICULAR TO THE WATER MAIN. THE CARRIER PIPE SHALL BE OF MATERIALS APPROVED BY THE CITY OF DURHAM FOR USE IN WATER MAIN CONSTRUCTION. GENERAL UTILITY NOTES EXIST. ANGIER AVENUE C/L STA. 16+10.00 = PROP. ROAD A STA.10+00.00 PROPOSED MANHOLE PROPOSED SS CLEANOUT PROPOSED WATER METER PROPOSED GATE VALVE PROPOSED HYDRANT ASSEMBLY PROPOSED BEND WITH THRUST BLOCKING PROPOSED TEE WITH THRUST BLOCKING PROPOSED BLOW-OFF ASSEMBLY PROPERTY LINE (PL) RIGHT-OF-WAY LINE SETBACK LINE UTILITY EASEMENT PROPOSED GRAVITY SEWER PROPOSED WATER LINE PROPOSED STORM DRAINAGE PIPE MATCHLINE - STA 16+50.00SEE SHEET C8.2SE E S H E E T C 8 . 3 MATCHLINE - STA 16+50.00SEE SHEET C7.2P U B L I C R O A D APUBLIC ROAD B PROPOSED STORMWATER PONDANGIER AVENUESR 1926EXIST 60 ' PUBL IC R /W PROP. ROAD B STA. 10+0.00 = PROP. ROAD A STA. 14+28.43 PROP. ROAD BSTA. 0+0.00=STA. 14+28.43PROP. ROAD AEXIST. ANGIER AVENUE (CL)STA. 16+10.00=STA. 10+00.00PROP. ROAD AR/WR/WR/W PROP. RETAINING WALL 1" = 40' HORIZONTAL 1" = 4' VERTICAL 1 inch = 40 ft. 40'0 40' 1" = 40' PROJ. MGR: PRELIMINARYCOPYRIGHT ©2018 SEPI ENGINEERING & CONSTRUCTION, INC DRAWN BY: sepiengineering.com E N G I N E E R I N G & C O N S T R U C T I O N 1025 WADE AVENUE RALEIGH, NORTH CAROLINA 919.789.9977 11020 DAVID TAYLOR DR., SUITE 115 CHARLOTTE, NORTH CAROLINA 704.714.4880 5030 NEW CENTRE DR., SUITE B WILMINGTON, NORTH CAROLINA 910.523.5715 LP16010 Construction Drawings 02/05/2019 Revisions Per Comments 04/16/2019 .. .. .. .. .. .. .. .. PROJECT: DATE ISSUE: CHECKED BY: J. WESTMORELAND REVISIONS: 1 .. NOTICE: 3 WORKING DAYS FOR THE LOCATION OF UNDERGROUND FACILITIES BEFORE YOU DIG R Callbefore you dig. below.Know what's THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. CLIENT: Angier Development, LLC 7700 Kencot Court Raleigh, NC 27615 Contact: David Lazzo PH: (919) 601-2816 dlazzo2100@gmail.com L. SMITH J. BEARD .. ANGIER AVENUE RESIDENTIAL CONSTRUCTION DRAWINGS 3846 Angier Avenue Durham, NC CITY OF DURHAM PUBLIC WORKS DEPARTMENT APPROVED ENGINEERING DATE STORMWATER DATE TRANSPORTATION DATE DATE DATEPRELIMINAR Y - N O T F O R C O N S T R U C T I O N BENCHMARK TBM: 13 IN. OAK N: 799151.14636 E: 2045555.4021 EL: 363.381 12" MIN. SEPARATION (WAT/STORM) 12" MIN. SEPARATION (WAT/STORM) PROPOSED GATE VALVE 8X8 TEE W/ GV & TB GV GV EXISTING GRADE PROPOSED GRADE 8" DW M 8" D W M GV 8" DWMTAP TO EXIST. 16" WATERMAIN W/ 8" X 16" TS&V EXIST. 16" WM TAP TO EXIST.16" WATERMAINW/ 8" X 16" TS&V12" MIN. SEPARATION (WAT/STORM) 24" MIN. SEPARATION (STORM/SAN) 12" MIN. SEPARATION (WAT/STORM) 3' MIN. COVER 8" DIP WM 8" DIP W M 24" MIN. SEPARATION (STORM/SAN) 12" MIN. SEPARATION (WAT/STORM) 24" MIN. SEPARATION (STORM/SAN) 18" MIN. SEPARATION (WAT/SAN) 12" MIN. SEPARATION (WAT/STORM) DocuSign Envelope ID: 8C264526-3E7F-4569-8C3F-0ABD8FCCA50D 4/17/2019   ROAD A 370     375     380     385     390     395     400     405     410     415     420     425     430     435     440 370    375    380    385    390    395    400    405    410    415    420    425    430    435    440           16+50.00 17+00.00 17+50.00 18+00.00 18+50.00 19+00.00 19+50.00 20+00.00 20+50.00 21+00.00 21+50.00 22+00.00 22+50.00 23+00.00 23+50.00 24+00.00 24+45.09 -2.00% -2.00% -2.00%2.00% -4.50% 1.39%-2.00%EVCS: 17+02.10EVCE: 401.04HIGH POINT STA = 20+75.69 HIGH POINT ELEV = 400.29 PVI STA = 20+84.73 PVI ELEV = 400.70 A.D. = -3.38% K = 29.56 V.C. = 100.00'BVCS: 20+34.73BVCE: 400.01EVCS: 21+34.73EVCE: 399.70HIGH POINT STA = 21+71.00 HIGH POINT ELEV = 398.98 PVI STA = 22+21.00 PVI ELEV = 397.98 A.D. = -2.50% K = 39.96 V.C. = 100.00'BVCS: 21+71.00BVCE: 398.98EVCS: 22+71.00EVCE: 395.73LOW POINT STA = 18+77.65 LOW POINT ELEV = 398.12 PVI STA = 18+68.58 PVI ELEV = 397.71 A.D. = 3.39% K = 29.53 V.C. = 100.00'BVCS: 18+18.58BVCE: 398.71EVCS: 19+18.58EVCE: 398.40399.00399.00396.35396.35395.48395.48394.73394.73394.47394.47394.94394.94395.84395.84396.27396.27397.90397.90399.17399.17400.77400.77399.59399.59396.01396.01391.25391.25383.83383.8324" RCP 18" RCP15" RCP 24" RCP 24" RCP 15" R C P 24" RCPD-07D-08D-11D-09D-10D-05D-03D-04D-1915" RCPD-20D-2124" RCP 24" RCP 15" R C PD-0650.10 LF 8" P V C @ 3 . 9 9 % 80.20 LF 8" PV C @ 3 . 3 6 % 80.00 LF 8" PVC @ 0.75% 80.93 LF 8" PVC @ 0.75% 80.00 LF 8" PVC @ 0.75% 80.00 LF 8" PVC @ 0.75% 130.62 LF 8" PVC @ 0.75% 76.27 LF 8" PVC @ 1.38% 91.98 LF 8" PVC @ 1.90%1-20STA 20+48.25, 7.00' RRIM = 400.021-23STA 17+64.39, 3.77' RRIM = 399.711-19STA 21+26.55, 7.00' RRIM = 399.711-24STA 16+73.33, 3.82' RRIM = 401.391-21STA 19+69.95, 7.00' RRIM = 398.971-22STA 18+39.33, 7.00' RRIM = 398.251-18STA 22+05.77, 7.00' RRIM = 397.971-17STA 22+84.07, 7.00' RRIM = 394.991-16STA 23+62.58, 7.00' RRIM = 391.48INV OUT = 395.70INV IN = 393.95INV OUT = 393.55INV IN = 392.50INV OUT = 391.93INV IN = 390.95INV OUT = 390.75INV IN = 390.15INV OUT = 389.95INV IN = 388.55INV OUT = 388.35INV IN = 387.75INV OUT = 387.55INV IN = 384.85INV OUT = 384.65INV IN = 389.35INV OUT = 389.15INV IN = 381.75INV IN = 382.65INV OUT = 382.251-07STA 16+73.62, 8.00' RRIM = 389.55R/WR/WR/WR/WR/W R/ W R/WR/W R/W R/W R/W R/WR/W R/W R/W R/W R/WR/WR/WWWWWWWxxxxxxx36" OAKN27°42'17"E669.81'XXXXXXXWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWSSSSSSSSWSSSSR/W R/W R/W R/W R/W R/WR/WR/W19202122232829303154555664656667535251504948474645444342323334353637686970SS SS SS SS SS SS SS SS SS SS SS SS SS S S S S S SSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSTPTPTPTPTPTPTP16+00.001 7 + 0 0 . 0 0 18+ 0 0 . 0 0 19+0 0 . 0 0 20+00.0 0 21+00.00 22+00. 0 0 23+00.0024+00.0024+45.0915+50.0016+50.00 1 7 + 5 0 . 0 0 18+5 0 . 0 0 19+5 0 . 0 0 20+50.00 21+50.00 22+50.0023+50.0015+ 0 0 . 0 0 16+ 0 0 . 0 0 17+ 0 0 . 0 0 18 + 0 0 . 0 0 14+ 5 0 . 0 0 15+ 5 0 . 0 0 16+ 5 0 . 0 0 17 + 5 0 . 0 0 1 8 + 5 0 . 0 09+75.0010+00.0011+00.0010+50.0011+50.00MH 1-20 MH 1-23 MH 1-19 MH 1-24 MH 1-21 MH 1-22 MH 1-18 MH 1-17 MH 1-16 MH 1-07 8" P V C S S 8" P V C S S 8" P V C S S8" PVC SS8" PVC SS8" PVC S S 8" PVC S S 8" PVC SS 8" PVC S S 8" P V C S S 8" P V C S S 8 " P V C S S CI D-07CI D-08 CI D-11 CI D-09 CI D-10 CI D-06 CI D-20CI D-19 CI D-05 CI D-21 CI D-04 D- P 0 3 30 " R C P 3 0 " R C P D-P0424" RCP D-P 2 1 15" R C P D-P1 0 18" R C P D-P1 1 15" R C P D-P12 15" RCP D-P0624" RCP D-P07 24" RC P D-P08 24" RCP D-P09 24" R C P D - P 2 0 1 5 " R C PD-P1915" RCPD-P0524" RCPCI D-12 CI D-13 CI C-09 CI C-08 CI D-02 CI D-23 CI D-03 CI D-14 CI D-15 CI D-16 CI D-22 D- P 1 3 15 " C L I V D-P 1 4 18" R C PD-P2215" RCPD-P 1 5 15" R C PD-P1615" RCPD-P 2 5 15" R C P D-P2 315" R C P DRAINAGE SCHEDULE STRUCT NO. D-03 D-04 D-05 D-06 D-07 D-08 D-09 D-10 D-11 D-12 D-13 D-14 D-15 D-16 D-19 D-20 D-21 D-22 GRT/RIM ELEV. 387.63 +/- 390.84 +/- 394.16 +/- 397.17 +/- 399.60 +/- 399.58 +/- 398.59 +/- 397.84 +/- 398.61 +/- 397.54 +/- 397.54 +/- 392.18 +/- 395.23 +/- 395.42 +/- 397.84 +/- 397.34 +/- 390.99 +/- 392.19 +/- INVERT IN 384.16 (D-P14) 383.34 (D-P04) 387.21 (D-P21) 385.38 (D-P05) 386.69 (D-P06) 387.66 (D-P07) 393.56 (D-P20) 388.95 (D-P08) 390.00 (D-P09) 391.43 (D-P10) 394.44 (D-P19) 392.86 (D-P11) 393.65 (D-P12) 394.17 (D-P13) 388.37 (D-P15) 388.42 (D-P22) 391.74 (D-P25) 391.64 (D-P16) UPSTRM STRUCT D-14 D-04 D-21 D-05 D-06 D-07 D-20 D-08 D-09 D-10 D-19 D-11 D-12 D-13 D-15 D-22 D-25 D-16 INVERT OUT 382.74 (D-P03) 385.38 (D-P04) 386.59 (D-P05) 387.46 (D-P06) 388.75 (D-P07) 390.05 (D-P08) 390.73 (D-P09) 392.31 (D-P10) 393.55 (D-P11) 394.07 (D-P12) 394.51 (D-P13) 387.62 (D-P14) 391.15 (D-P15) 391.98 (D-P16) 394.77 (D-P19) 393.90 (D-P20) 387.55 (D-P21) 388.75 (D-P22) DWNSTRM STRUCT D-02 D-03 D-04 D-05 D-06 D-07 D-08 D-09 D-10 D-11 D-12 D-03 D-14 D-15 D-10 D-06 D-04 D-14 DEPTH 5.1 ft +/- 5.7 ft +/- 7.8 ft +/- 9.9 ft +/- 11.1 ft +/- 9.6 ft +/- 8.1 ft +/- 5.8 ft +/- 5.3 ft +/- 3.7 ft +/- 3.0 ft +/- 4.8 ft +/- 4.3 ft +/- 3.7 ft +/- 3.3 ft +/- 3.7 ft +/- 3.7 ft +/- 3.7 ft +/- STRUCT TYPE CI CI CI CI CI CI CI CI CI CI CI CI CI CI CI CI CI CI DWNSTRM PIPE INFORMATION 107' of 30" RCP @ 3.5% (D-P03) 74' of 24" RCP @ 2.8% (D-P04) 78' of 24" RCP @ 1.6% (D-P05) 77' of 24" RCP @ 1.0% (D-P06) 108' of 24" RCP @ 1.0% (D-P07) 107' of 24" RCP @ 1.0% (D-P08) 74' of 24" RCP @ 1.0% (D-P09) 75' of 18" RCP @ 1.2% (D-P10) 70' of 15" RCP @ 1.0% (D-P11) 42' of 15" RCP @ 1.0% (D-P12) 34' of 15" CL IV @ 1.0% (D-P13) 120' of 18" RCP @ 2.9% (D-P14) 80' of 15" RCP @ 3.5% (D-P15) 34' of 15" RCP @ 1.0% (D-P16) 34' of 15" RCP @ 1.0% (D-P19) 34' of 15" RCP @ 1.0% (D-P20) 34' of 15" RCP @ 1.0% (D-P21) 34' of 15" RCP @ 1.0% (D-P22) PLAN & PROFILE - STREET A C-8.2 1.BEFORE YOU DIG, STOP. CALL THE NC ONE-CALL CENTER AT 1-800-632-4949. IT'S THE LAW. EXISTING UTILITIES ARE SHOWN FROM THE BEST AVAILABLE INFORMATION AND ARE APPROXIMATE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THESE AND OTHER UTILITIES BEFORE STARTING CONSTRUCTION. NOTIFY UTILITY LOCATING COMPANY (ONE CALL @ 1-800-632-4949) OR INDIVIDUAL UTILITY OWNERS FOR UNDERGROUND LOCATIONS AT LEAST 48 HOURS IN ADVANCE. 2.THERE SHALL BE NO TAPS, PIPING BRANCHES, UNAPPROVED BYPASS PIPING, HYDRANTS, FIRE DEPT. CONNECTION POINTS, OR OTHER WATER-USING APPURTENANCES CONNECTED TO THE SUPPLY LINE BETWEEN ANY WATER METER AND BACKFLOW PREVENTER. 3.ANY UTILITY CONSTRUCTION SHALL CONFORM TO CITY OF DURHAM STANDARDS & SPECIFICATIONS. 4.CONTACT THE UTILITY COMPANY TO RELOCATE ANY EXISTING UTILITY POLES. ALL EXISTING UTILITIES WHICH CONFLICT WITH THE IMPROVEMENTS UNDER THE SCOPE OF THIS PROJECT MUST BE RELOCATED. 5.BACKFLOW PREVENTER PERMIT REQUIRED FOR PROJECT. BACKFLOW PREVENTER INSTALLER MUST CONTACT DURHAM CROSS-CONNECTION CONTROL, DEPARTMENT OF OF WATER MANAGEMENT AT (919) 560-4194 TO OBTAIN PERMIT AND INSTALLATION REQUIREMENTS PRIOR TO INITIATING WORK. 6.ALL FIRE HYDRANTS AND FIRE DEPARTMENT CONNECTIONS MUST BE PROVIDED WITH 5" DIAMETER STORZ CONNECTIONS. 7.FIRE DEPARTMENT CONNECTIONS MUST BE ORIENTED 45° TOWARD GRADE. 8.PROVIDE FIRE PLANS EXAMINER ONE COPY OF UTILITY CONSTRUCTION DRAWINGS SHOWING UNDERGROUND PIPING LAYOUT AND ALL FIRE APPURTENANCES. PERMIT FOR INSTALLATION OF PRIVATE FIRE HYDRANT(S) MUST BE ISSUED BY FIRE PLANS EXAMINER PRIOR TO INSTALLATION OF SAID HYDRANT(S). 9.LANDSCAPING AND HARDSCAPING LAYOUT MUST BE ARRANGED TO ALLOW CLEAR VISIBILITY OF ALL FIRE EQUIPMENT UPON APPROACH, WITH READY ACCESS PROVIDED THERETO. 10.ABOVE-GROUND UTILITIES TO BE SCREENED PER UDO SECTION 7.6 11.A UTILITY MAINLINE CONSTRUCTION PERMIT IS REQUIRED PRIOR TO INSTALLATION OF EACH UTILITY. ALL UTILITIES SHALL SUBMIT PLAN DRAWINGS AND APPLICATIONS TO THE CITY ENGINEERING DIVISION. 12.SANITARY SEWER SERVICES SHALL BE 2.0% MINIMUM SLOPE. GENERAL UTILITY NOTES W W W SS SS SS LEGEND WM PROPOSED MANHOLE PROPOSED SS CLEANOUT PROPOSED WATER METER PROPOSED GATE VALVE PROPOSED HYDRANT ASSEMBLY PROPOSED BEND WITH THRUST BLOCKING PROPOSED TEE WITH THRUST BLOCKING PROPOSED BLOW-OFF ASSEMBLY PROPERTY LINE (PL) RIGHT-OF-WAY LINE SETBACK LINE UTILITY EASEMENT PROPOSED GRAVITY SEWER PROPOSED WATER LINE PROPOSED STORM DRAINAGE PIPE PU B L I C R O A D B END PROP. ROAD C STA. 11+47.00 PUBL IC ROAD APUBLIC ROAD CPROP. RETAINING WALL MATCH LI N E - S T A 1 6 + 5 0. 0 0 SEE SH E E T C 8. 1 PROP. ROAD C STA. 10+00.00 = PROP.ROAD A STA. 17+68.32 PROP. ROAD B STA. 16+67.75 = PROP.ROAD A STA. 24+20.08SEE SHEET C8.3SEE SHEET C8.4MATCHLINE - STA. 16+50.00SEE SHEET C7.1PROP. RETAINING WALL PROP. ROAD CSTA. 10+00.00 = STA. 17+68.32PROP. ROAD APROP. ROAD BSTA. 16+67.75 = STA. 24+20.08PROP. ROAD A1" = 40' HORIZONTAL 1" = 4' VERTICAL 1 inch = 40 ft. 40'0 40' 1" = 40' PROPOSED GRADE EXISTING GRADE PROJ. MGR: PRELIMINARYCOPYRIGHT ©2018 SEPI ENGINEERING & CONSTRUCTION, INC DRAWN BY: sepiengineering.com E N G I N E E R I N G & C O N S T R U C T I O N 1025 WADE AVENUE RALEIGH, NORTH CAROLINA 919.789.9977 11020 DAVID TAYLOR DR., SUITE 115 CHARLOTTE, NORTH CAROLINA 704.714.4880 5030 NEW CENTRE DR., SUITE B WILMINGTON, NORTH CAROLINA 910.523.5715 LP16010 Construction Drawings 02/05/2019 Revisions Per Comments 04/16/2019 .. .. .. .. .. .. .. .. PROJECT: DATE ISSUE: CHECKED BY: J. WESTMORELAND REVISIONS: 1 .. NOTICE: 3 WORKING DAYS FOR THE LOCATION OF UNDERGROUND FACILITIES BEFORE YOU DIG R Callbefore you dig. below.Know what's THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. CLIENT: Angier Development, LLC 7700 Kencot Court Raleigh, NC 27615 Contact: David Lazzo PH: (919) 601-2816 dlazzo2100@gmail.com L. SMITH J. BEARD .. ANGIER AVENUE RESIDENTIAL CONSTRUCTION DRAWINGS 3846 Angier Avenue Durham, NC CITY OF DURHAM PUBLIC WORKS DEPARTMENT APPROVED ENGINEERING DATE STORMWATER DATE TRANSPORTATION DATE DATE DATEPRELIMINAR Y - N O T F O R C O N S T R U C T I O N BENCHMARK TBM: 13 IN. OAK N: 799151.14636 E: 2045555.4021 EL: 363.381 WATER, SANITARY SEWER AND STORM SEWER SEPARATION NOTES 1.HORIZONTAL AND VERTICAL SEPARATION A.SANITARY SEWERS SHALL BE LAID AT LEAST 10-FEET HORIZONTALLY FROM ANY EXISTING OR PROPOSED WATER MAIN. THE DISTANCE SHALL BE MEASURED EDGE TO EDGE. IN CASES WHERE IT IS NOT PRACTICAL TO MAINTAIN A 10-FOOT SEPARATION, THE CITY OF DURHAM MAY ALLOW DEVIATION ON A CASE-BY-CASE BASIS, IF SUPPORTED BY DATA FROM THE DESIGN ENGINEER. SUCH DEVIATION ON MAY ALLOW THE INSTALLATION OF THE SANITARY SEWER CLOSER TO A WATER MAIN, PROVIDED THAT THE WATER MAIN IS IN A SEPARATE TRENCH OR ON AN UNDISTURBED EARTH SHELF LOCATED ON ONE SIDE OF THE SANITARY SEWER AND AT AN ELEVATION SO THE BOTTOM OF THE WATER MAIN IS AT LEAST 18-INCHES ABOVE THE TOP OF THE SEWER. B.IF IT IS IMPOSSIBLE TO OBTAIN PROPER HORIZONTAL AND VERTICAL SEPARATION AS DESCRIBED ABOVE OR ANYTIME THE SANITARY SEWER IS OVER THE WATER MAIN, BOTH THE WATER MAIN AND SANITARY SEWER MUST BE CONSTRUCTED OF FERROUS PIPE COMPLYING WITH THE PUBLIC WATER SUPPLY DESIGN STANDARDS AND BE PRESSURE TESTED TO 150- PSI TO ASSURE WATER TIGHTNESS BEFORE BACKFILLING. C.A 24-INCH VERTICAL SEPARATION SHALL BE PROVIDED BETWEEN STORM SEWER AND SANITARY SEWER LINES OR FERROUS PIPE SPECIFIED. A 12-INCH VERTICAL SEPARATION SHALL BE PROVIDED BETWEEN STORM SEWER AND WATER MAINS. 1. IF A 12-INCH VERTICAL SEPARATION IS NOT MAINTAINED AT A CROSSING BETWEEN STORM SEWER AND WATER MAINS (OR PRESSURE SEWERS). THE WATER MAIN SHALL BE CONSTRUCTED OF FERROUS PIPE AND A CONCRETE COLLAR SHALL BE POURED AROUND WATER MAINS AND STORM SEWER TO IMMOBILIZE THE CROSSING. 2.CROSSINGS A.SANITARY SEWER CROSSING WATER MAINS SHALL BE LAID TO PROVIDE A MINIMUM VERTICAL DISTANCE OF 18-INCHES BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF THE SANITARY SEWER. THE CROSSING SHALL BE ARRANGED SO THAT THE SANITARY SEWER JOINTS WILL BE EQUIDISTANT AND AS FAR AS POSSIBLE FROM THE WATER MAIN JOINTS. B.WHEN IT IS IMPOSSIBLE TO OBTAIN PROPER HORIZONTAL AND VERTICAL SEPARATION AS STIPULATED ABOVE, ONE OF THE FOLLOWING METHODS MUST BE SPECIFIED. 1. THE SANITARY SEWER SHALL BE DESIGNED AND CONSTRUCTED OF FERROUS PIPE AND SHALL BE PRESSURE TESTED AT 150-PSI TO ASSURE WATER TIGHTNESS PRIOR TO BACKFILLING, OR 2. EITHER THE WATER MAIN OR THE SANITARY SEWER LINE MAY BE ENCASED IN A WATERTIGHT CARRIER PIPE, WHICH EXTENDS 10-FEET ON BOTH SIDES OF THE CROSSING, MEASURED PERPENDICULAR TO THE WATER MAIN. THE CARRIER PIPE SHALL BE OF MATERIALS APPROVED BY THE CITY OF DURHAM FOR USE IN WATER MAIN CONSTRUCTION. PROPOSED GATE VALVE 8X8 TEE W/ (2) GV & TB GV GV GV FH FH GV 8X8 TEE W/ (2) GV & TB 6X6 TEE W/ TB BOA GV 12" MIN. SEPARATION (WAT/STORM) 24" MIN. SEPARATION (STORM/SAN)18" MIN. SEPARATION (WAT/SAN) 18" MIN. SEPARATION (WAT/SAN) 8" DIP WM 8" DIP WM 12" MIN. SEPARATION (WAT/STORM) 3' MIN. COVER 12" MIN. SEPARATION (WAT/STORM) 24" MIN. SEPARATION (STORM/SAN) 24" MIN. SEPARATION (STORM/SAN)8" DWM8" D W M 8" D W M S C.O. DocuSign Envelope ID: 8C264526-3E7F-4569-8C3F-0ABD8FCCA50D 4/17/2019   360    365    370    375    380    385    390    395    400    405    410    415    420    425    430    435    440360    365    370    375    380    385    390    395    400    405    410    415    420    425    430    435    440          9+75.0010+00.0010+50.0011+00.0011+50.0012+00.0012+50.0013+00.0013+50.0014+00.0014+50.0015+00.0015+50.0016+00.0016+50.0017+00.0017+50.002.00%-2.00%2.50%-3.80%-3.80%HIGH POINT STA = 12+49.72HIGH POINT ELEV = 404.10PVI STA = 12+65.20PVI ELEV = 405.23A.D. = -6.30%K = 23.81V.C. = 150.00'BVCS: 11+90.20BVCE: 403.36EVCS: 13+40.20EVCE: 402.38401.01401.01404.04404.04406.73406.73407.78407.78410.31410.31409.57409.57408.35408.35406.37406.37 402.52 402.52 399.37 399.37 395.64 395.64 390.83 390.83 387.63 387.63 383.76 383.76 381.40 381.40 C-07C-06C-0518" RCP15" RCP15" RCPC-04C-02 15" RCP18" RCP15" RCP D-16 D-15 D-14 D-22 D-0315" RCP70.73 LF 8" PVC @ 0.75%62.08 LF 8" PVC @ 0.75%62.08 LF 8" PVC @ 0.75%399.92 LF 8" PVC @ 0.75%81.28 LF 8" PVC @ 0.75%88.84 LF 8" PVC @ 3.49%1-09STA 11+92.42, 8.00' RRIM = 403.241-10STA 11+28.11, 8.00' RRIM = 401.651-11STA 10+63.80, 8.00' RRIM = 400.051-12STA 14+36.75, 6.75' RRIM = 399.21 1-08 STA 15+92.35, 8.00' R RIM = 392.64 1-07 STA 16+73.62, 8.00' R RIM = 389.55 INV IN = 382.56 INV OUT = 382.36 INV IN = 381.75 INV IN = 382.65 INV OUT = 382.25 INV IN = 385.78INV OUT = 385.56INV IN = 386.42INV OUT = 386.25INV IN = 387.09INV OUT = 386.89INV IN = 387.82INV OUT = 387.62 15" RCPD-2515" RCPD-2618" RCP18" RCPC-03 R/W R/WR/WR/WR/W R/W R/WR/WR/W51" OAK WWWWWWWWW W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWS S S SSS S S S SR/W R/WWR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W34567891213 14 15 16 18 19 20 21 22 1110 17 23 29 30 3154 5352 51 32 33 34 35363738394041 SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTPTP13+00.0014+00.0015+00.00 23+00 . 0 0 24+00.00 24+45.0913+50.0014+50.0015+50.00 22+ 5 0 . 0 0 23+50.009+75.0010+00.0011+00.0012+00.0013+00.0014+00.0015+00.0016+00.0017+00.0018+00.0010+50.0011+50.0012+50.0013+50.0014+50.0015+50.0016+50.0017+50.00CIC-05CIC-04CIC-02C-P0815" RCP C-P0518" RCPMH1-09MH1-10MH1-11MH1-12MH1-08MH1-078" PVC SS8" PVC SS8" PVC SS8" PVC SS8" PVC SS8" PVC SS8" PVC SS8" PVC SS8" PVC SS8" PVC SS 8" PVC S S 8" P V C S S CID-16CID-15CID-22CID-14D- P 2 3 15" R C P D-P22 15" RCP D-P16 15" RCP CIC-06CIC-07CID-26CID-25C-P0615" RCPC-P0715" RCPD-P2515" RCPCIC-03MHC-01CIC-10CIC-11CIC-13YIC-14EW-WC-00CID-03CID-21CID-04CID-05CIC-P1515" RCPC-P1415" RCPC-P1218" CL IVC-P1118" CL IVC-P1018" CL IVC-P0130" RCPC-P0224" RCPC-P0318" RCPC-P0418" RCP D-P05 24" RCP D-P2115" RCPD- P 0 4 24" R C P D-P0330" RCPD-P1515" RCPD-P1418" RCPD - P 2 6 1 5 " R C P D-P 0 6 24" R C P C-P1315" RCPDRAINAGE SCHEDULESTRUCTNO.C-00C-01C-02C-03C-04C-05C-06C-07C-10C-11C-12C-13C-14D-03D-04D-05D-14D-15D-16D-21D-22D-25D-26GRT/RIMELEV.395.29 +/-397.51 +/-399.18 +/-399.43 +/-399.54 +/-399.67 +/-401.62 +/-402.02 +/-398.38 +/-398.11 +/-398.11 +/-398.26 +/-399.18 +/-387.63 +/-390.84 +/-394.16 +/-392.18 +/-395.23 +/-395.42 +/-390.99 +/-392.19 +/-399.79 +/-400.99 +/-INVERTIN392.00 (C-P01)393.14 (C-P10)393.35 (C-P02)394.78 (C-P08)394.28 (C-P03)394.76 (C-P04)395.30 (C-P05)395.89 (C-P06)398.18 (C-P07)393.47 (C-P11)393.99 (C-P12)394.68 (C-P15)394.68 (C-P13)395.16 (C-P14)384.16 (D-P14)383.34 (D-P04)387.21 (D-P21)385.38 (D-P05)386.69 (D-P06)388.37 (D-P15)388.42 (D-P22)391.74 (D-P25)391.64 (D-P16)396.35 (D-P26)UPSTRMSTRUCTC-01C-10C-02C-08C-03C-04C-05C-06C-07C-11C-12C-15C-13C-14D-14D-04D-21D-05D-06D-15D-22D-25D-16D-26INVERTOUT392.14 (C-P01)393.78 (C-P02)394.66 (C-P03)395.20 (C-P04)395.64 (C-P05)398.08 (C-P06)398.58 (C-P07)393.37 (C-P10)393.89 (C-P11)394.33 (C-P12)395.03 (C-P13)396.24 (C-P14)382.74 (D-P03)385.38 (D-P04)386.59 (D-P05)387.62 (D-P14)391.15 (D-P15)391.98 (D-P16)387.55 (D-P21)388.75 (D-P22)396.25 (D-P25)397.56 (D-P26)DWNSTRMSTRUCTC-00C-01C-02C-03C-04C-05C-06C-01C-10C-11C-12C-12D-02D-03D-04D-03D-14D-15D-04D-14D-15D-25DEPTH4.8 ft +/-5.6 ft +/-5.7 ft +/-5.0 ft +/-4.6 ft +/-4.3 ft +/-3.8 ft +/-3.7 ft +/-5.3 ft +/-4.5 ft +/-4.0 ft +/-3.2 ft +/-3.2 ft +/-5.1 ft +/-5.7 ft +/-7.8 ft +/-4.8 ft +/-4.3 ft +/-3.7 ft +/-3.7 ft +/-3.7 ft +/-3.8 ft +/-3.7 ft +/-STRUCTTYPEEW-WMHCICICICICICICICICICIYICICICICICICICICICICIDWNSTRM PIPEINFORMATION17' of 30" RCP@ 0.8% (C-P01)43' of 24" RCP@ 1.0% (C-P02)39' of 18" RCP@ 1.0% (C-P03)44' of 18" RCP@ 1.0% (C-P04)34' of 18" RCP@ 1.0% (C-P05)82' of 15" RCP@ 2.7% (C-P06)37' of 15" RCP@ 1.1% (C-P07)24' of 18" CL IV@ 1.0% (C-P10)42' of 18" CL IV@ 1.0% (C-P11)34' of 18" CL IV@ 1.0% (C-P12)35' of 15" RCP@ 1.0% (C-P13)17' of 15" RCP@ 6.6% (C-P14)107' of 30" RCP@ 3.5% (D-P03)74' of 24" RCP@ 2.8% (D-P04)78' of 24" RCP@ 1.6% (D-P05)120' of 18" RCP@ 2.9% (D-P14)80' of 15" RCP@ 3.5% (D-P15)34' of 15" RCP@ 1.0% (D-P16)34' of 15" RCP@ 1.0% (D-P21)34' of 15" RCP@ 1.0% (D-P22)120' of 15" RCP@ 3.8% (D-P25)46' of 15" RCP@ 2.6% (D-P26)PLAN & PROFILE - ROAD BC-8.31.BEFORE YOU DIG, STOP. CALL THE NC ONE-CALL CENTER AT 1-800-632-4949. IT'S THE LAW.EXISTING UTILITIES ARE SHOWN FROM THE BEST AVAILABLE INFORMATION AND ARE APPROXIMATE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THESE AND OTHERUTILITIES BEFORE STARTING CONSTRUCTION. NOTIFY UTILITY LOCATING COMPANY (ONE CALL @ 1-800-632-4949) OR INDIVIDUAL UTILITY OWNERS FOR UNDERGROUNDLOCATIONS AT LEAST 48 HOURS IN ADVANCE.2.THERE SHALL BE NO TAPS, PIPING BRANCHES, UNAPPROVED BYPASS PIPING, HYDRANTS, FIRE DEPT. CONNECTION POINTS, OR OTHER WATER-USING APPURTENANCESCONNECTED TO THE SUPPLY LINE BETWEEN ANY WATER METER AND BACKFLOW PREVENTER.3.ANY UTILITY CONSTRUCTION SHALL CONFORM TO CITY OF DURHAM STANDARDS & SPECIFICATIONS.4.CONTACT THE UTILITY COMPANY TO RELOCATE ANY EXISTING UTILITY POLES. ALL EXISTING UTILITIES WHICH CONFLICT WITH THE IMPROVEMENTS UNDER THE SCOPE OFTHIS PROJECT MUST BE RELOCATED.5.BACKFLOW PREVENTER PERMIT REQUIRED FOR PROJECT. BACKFLOW PREVENTER INSTALLER MUST CONTACT DURHAM CROSS-CONNECTION CONTROL, DEPARTMENT OFOF WATER MANAGEMENT AT (919) 560-4194 TO OBTAIN PERMIT AND INSTALLATION REQUIREMENTS PRIOR TO INITIATING WORK.6.ALL FIRE HYDRANTS AND FIRE DEPARTMENT CONNECTIONS MUST BE PROVIDED WITH 5" DIAMETER STORZ CONNECTIONS.7.FIRE DEPARTMENT CONNECTIONS MUST BE ORIENTED 45° TOWARD GRADE.8.PROVIDE FIRE PLANS EXAMINER ONE COPY OF UTILITY CONSTRUCTION DRAWINGS SHOWING UNDERGROUND PIPING LAYOUT AND ALL FIRE APPURTENANCES. PERMIT FORINSTALLATION OF PRIVATE FIRE HYDRANT(S) MUST BE ISSUED BY FIRE PLANS EXAMINER PRIOR TO INSTALLATION OF SAID HYDRANT(S).9.LANDSCAPING AND HARDSCAPING LAYOUT MUST BE ARRANGED TO ALLOW CLEAR VISIBILITY OF ALL FIRE EQUIPMENT UPON APPROACH, WITH READY ACCESS PROVIDEDTHERETO.10.ABOVE-GROUND UTILITIES TO BE SCREENED PER UDO SECTION 7.611.A UTILITY MAINLINE CONSTRUCTION PERMIT IS REQUIRED PRIOR TO INSTALLATION OF EACH UTILITY. ALL UTILITIES SHALL SUBMIT PLAN DRAWINGS AND APPLICATIONS TOTHE CITY ENGINEERING DIVISION.12.SANITARY SEWER SERVICES SHALL BE 2.0% MINIMUM SLOPE.WATER, SANITARY SEWER AND STORM SEWER SEPARATION NOTES1.HORIZONTAL AND VERTICAL SEPARATIONA.SANITARY SEWERS SHALL BE LAID AT LEAST 10-FEET HORIZONTALLY FROM ANY EXISTING OR PROPOSED WATER MAIN. THE DISTANCE SHALL BE MEASURED EDGE TO EDGE. IN CASES WHERE IT IS NOT PRACTICAL TO MAINTAIN A 10-FOOT SEPARATION, THE CITY OF DURHAM MAY ALLOW DEVIATIONON A CASE-BY-CASE BASIS, IF SUPPORTED BY DATA FROM THE DESIGN ENGINEER. SUCH DEVIATION ON MAY ALLOW THE INSTALLATION OF THE SANITARY SEWER CLOSER TO A WATER MAIN, PROVIDED THAT THE WATER MAIN IS IN A SEPARATE TRENCH OR ON AN UNDISTURBED EARTH SHELFLOCATED ON ONE SIDE OF THE SANITARY SEWER AND AT AN ELEVATION SO THE BOTTOM OF THE WATER MAIN IS AT LEAST 18-INCHES ABOVE THE TOP OF THE SEWER.B.IF IT IS IMPOSSIBLE TO OBTAIN PROPER HORIZONTAL AND VERTICAL SEPARATION AS DESCRIBED ABOVE OR ANYTIME THE SANITARY SEWER IS OVER THE WATER MAIN, BOTH THE WATER MAIN AND SANITARY SEWER MUST BE CONSTRUCTED OF FERROUS PIPE COMPLYING WITH THE PUBLIC WATERSUPPLY DESIGN STANDARDS AND BE PRESSURE TESTED TO 150- PSI TO ASSURE WATER TIGHTNESS BEFORE BACKFILLING.C.A 24-INCH VERTICAL SEPARATION SHALL BE PROVIDED BETWEEN STORM SEWER AND SANITARY SEWER LINES OR FERROUS PIPE SPECIFIED. A 12-INCH VERTICAL SEPARATION SHALL BE PROVIDED BETWEEN STORM SEWER AND WATER MAINS.1. IF A 12-INCH VERTICAL SEPARATION IS NOT MAINTAINED AT A CROSSING BETWEEN STORM SEWER AND WATER MAINS (OR PRESSURE SEWERS). THE WATER MAIN SHALL BE CONSTRUCTED OF FERROUS PIPE AND A CONCRETE COLLAR SHALL BE POURED AROUND WATER MAINS AND STORMSEWER TO IMMOBILIZE THE CROSSING.2.CROSSINGSA.SANITARY SEWER CROSSING WATER MAINS SHALL BE LAID TO PROVIDE A MINIMUM VERTICAL DISTANCE OF 18-INCHES BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF THE SANITARY SEWER. THE CROSSING SHALL BE ARRANGED SO THAT THE SANITARY SEWER JOINTS WILL BEEQUIDISTANT AND AS FAR AS POSSIBLE FROM THE WATER MAIN JOINTS.B.WHEN IT IS IMPOSSIBLE TO OBTAIN PROPER HORIZONTAL AND VERTICAL SEPARATION AS STIPULATED ABOVE, ONE OF THE FOLLOWING METHODS MUST BE SPECIFIED.1. THE SANITARY SEWER SHALL BE DESIGNED AND CONSTRUCTED OF FERROUS PIPE AND SHALL BE PRESSURE TESTED AT 150-PSI TO ASSURE WATER TIGHTNESS PRIOR TO BACKFILLING, OR2. EITHER THE WATER MAIN OR THE SANITARY SEWER LINE MAY BE ENCASED IN A WATERTIGHT CARRIER PIPE, WHICH EXTENDS 10-FEET ON BOTH SIDES OF THE CROSSING, MEASURED PERPENDICULAR TO THE WATER MAIN. THE CARRIER PIPE SHALL BE OF MATERIALS APPROVED BY THE CITY OFDURHAM FOR USE IN WATER MAIN CONSTRUCTION.GENERAL UTILITY NOTESR/WWWWSSSSSSSLEGENDC.O.WMPROPOSED MANHOLEPROPOSED SS CLEANOUTPROPOSED WATER METERPROPOSED GATE VALVEPROPOSED HYDRANT ASSEMBLYPROPOSED BEND WITH THRUST BLOCKINGPROPOSED TEE WITH THRUST BLOCKINGPROPOSED BLOW-OFF ASSEMBLYPROPERTY LINE (PL)RIGHT-OF-WAY LINESETBACK LINEUTILITY EASEMENTPROPOSED GRAVITY SEWERPROPOSED WATER LINEPROPOSED STORM DRAINAGE PIPER/WR/WPROP. RETAINING WALLSEE SHEET C8.1 MATCHLINE - STA. 17+50. 0 0 SEE SHEET C8.4PROP. ROAD ASTA. 24+20.08 =PROP.ROAD BSTA. 16+67.75PROP. ROAD ASTA. 14+28.43 = STA. 10+00.00PROP. ROAD B MATCHLINE - STA. 17+50.00SEE SHEET C8.4PUBLIC ROAD BPUBLIC ROAD APROPOSED STORMWATER PONDPU B L I C R O A D A SEE SHEET C8.2PROP. ROAD A STA. 14+28.43 = STA. 10+00.00 PROP. ROAD B PROP. ROAD ASTA. 14+28.43 =PROP.ROAD BSTA. 10+00.001" = 40' HORIZONTAL1" = 4' VERTICAL1 inch = 40 ft.40'040'1" = 40'PROPOSED GRADEEXISTING GRADEPROJ. MGR: P R E L I M I N A R YCOPYRIGHT ©2018SEPI ENGINEERING & CONSTRUCTION, INCDRAWN BY:sepiengineering.comE N G I N E E R I N G &C O N S T R U C T I O N1025 WADE AVENUERALEIGH, NORTH CAROLINA919.789.997711020 DAVID TAYLOR DR., SUITE 115CHARLOTTE, NORTH CAROLINA704.714.48805030 NEW CENTRE DR., SUITE BWILMINGTON, NORTH CAROLINA910.523.5715LP16010Construction Drawings02/05/2019Revisions Per Comments04/16/2019................PROJECT:DATEISSUE:CHECKED BY:J. WESTMORELANDREVISIONS:1..NOTICE:3 WORKING DAYSFOR THE LOCATION OFUNDERGROUND FACILITIESBEFORE YOU DIGRCallbefore you dig.below.Know what'sTHE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATEWAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITSREPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALLEXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLEFOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURETO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES.CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THECONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BEEXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THEWORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBYSTRUCTURES, OR OF ANY OTHER PERSONS.CLIENT:Angier Development, LLC7700 Kencot CourtRaleigh, NC 27615Contact:David LazzoPH: (919) 601-2816dlazzo2100@gmail.comL. SMITHJ. BEARD..ANGIER AVENUERESIDENTIALCONSTRUCTIONDRAWINGS3846 Angier AvenueDurham, NCCITY OF DURHAMPUBLIC WORKS DEPARTMENTAPPROVEDENGINEERINGDATESTORMWATERDATETRANSPORTATIONDATEDATEDATEPRELIMINARY - NOT FOR CONSTRUCTIONBENCHMARKTBM: 13 IN. OAKN: 799151.14636E: 2045555.4021EL: 363.381PROPOSED GATE VALVE8X8 TEEW/ (2) GV & TBGVFHGVGVFH8X8 TEEW/ (2) GV & TBGVGV8" DWM8" DWM8" D W M8" DIP WM8" DIP WM3' MIN.COVER12" MIN.SEPARATION(WAT/STORM)12" MIN.SEPARATION(WAT/STORM)12" MIN.SEPARATION(WAT/STORM)12" MIN.SEPARATION(WAT/STORM)12" MIN.SEPARATION(WAT/STORM)24" RCP24" MIN.SEPARATION(STORM/SAN)12" MIN.SEPARATION(WAT/STORM)30" RCPDocuSign Envelope ID: 8C264526-3E7F-4569-8C3F-0ABD8FCCA50D4/17/2019    ROAD B360    365    370    375    380    385    390    395    400    405    410    415    420    425360    365    370    375    380    385    390    395    400    405    410    415    420    425     17+50.0018+00.0018+50.0019+00.0019+50.0020+00.0020+19.74375.94 375.94 373.70 373.70 376.49 376.49 377.61 377.61 379.20 379.20 95.58 LF 8" PVC @ 3.30%47.39 LF 8" PVC @ 1.05%72.57 LF 8" PVC @ 0.75%1-05 STA 18+61.20, 6.00' R RIM = 382.65 1-03 STA 19+83.55, 6.00' R RIM = 381.9730" RCP30" RCP18" RCP15" RCP15" RCPD-02 D-23 D-01 D-17 D-24 D-18 1-06 ROAD "A"STA 17+63.24, 6.00' R RIM = 386.20 1-04 STA 19+09.61, 6.00' R RIM = 381.76 INV IN = 379.15 INV OUT = 378.95 INV IN = 375.79 INV OUT = 375.59 INV IN = 375.10 INV OUT = 374.90 INV IN = 374.35 INV OUT = 374.15 15" RCP1.25%0.87%PVI STA = 19+98.74 PVI ELEV = 382.28 PVI STA = 20+14.05 PVI ELEV = 382.42 LOW POINT STA = 19+36.39LOW POINT ELEV = 381.72PVI STA = 19+01.00PVI ELEV = 381.06A.D. = 5.05%K = 27.72V.C. = 140.00'BVCS: 18+31.00 BVCE: 383.73 EVCS: 19+71.00 EVCE: 381.94 1.25%0.87%PVI STA = 19+98.74 PVI ELEV = 382.28 PVI STA = 20+14.05 PVI ELEV = 382.42 LOW POINT STA = 19+36.39LOW POINT ELEV = 381.72PVI STA = 19+01.00PVI ELEV = 381.06A.D. = 5.05%K = 27.72V.C. = 140.00'BVCS: 18+31.00 BVCE: 383.73 EVCS: 19+71.00 EVCE: 381.94 R/ W R/W R/WR/WR/WR/WR/ W R/WR/WWWWWWW W W WWWWWWWWWWWWS S S S S S S R/W20 21 22 23 24 25 27 28 29 30 3154 55 OPEN 2 SSSSSSSSSSSSSSSSSSSSSSS S S S S S S S S S S S S S S SSSSSSSSSSSSS TPTPTPTPTPTP23+00 . 0 0 24+00.00 24+45.0923+50.00 17+00.0018+00.0019+00.002 0 + 0 0 . 0 0 2 0 + 1 9 . 7 4 16+50.0017+50.0018+50.0019+50.00MH1-06MH1-05MH1-04MH1-031-028" PVC SS8" PVC SS8" PVC SS8" PVC SS8 " P V C S S 8" PVC SS 8" PVC S S CID-04CID-23CID-02CID-01CID-18CID-24CID-17EW-WD-00D-P0330" RCPD-P0230" RCPD-P1718" RCPD- P 0 1 36 " R C P D- P 1 8 15" R C P D-P24 15" RCP D- P 2 3 15 " R C P CID-03D-P1418" RCPR/WR/W R/WR/WR/W R/W R/WWWWWWWR/W xxxxxxxxxxxxxx36" OAKN27°42'17"E669.81'XXXXXXXXXXXXXXWWWWWWWWWWWWWWWWSSSR/W R/W 65666748474645444342686970SSSSSSSSSSSSSSSSSSSSTPTPTPTPTPTPTPTPTP16+00.00 17+00.00 18+00.00 19+00.0016+50.00 17+50.00 18+50.00 19+50.00MH1-23MH1-24MH1-228" PVC SS8" PVC SS8" PVC SS CID-11CID-12CID-13D-P1215" RCPD-P1315" CL IV9+75.0010+00.0011+00.0012+00.0010+50.0011+50.00CID-10CID-19  ROAD C365    370    375    380    385    390    395    400    405    410    415    420    425    430    435    440365    370    375    380    385    390    395    400    405    410    415    420    425    430    435    440     9+75.0010+00.0010+50.0011+00.0011+50.0012+00.0012+50.002.00%-2.00%-4.30%-8.31%-3.13%HIGH POINT STA = 10+19.82HIGH POINT ELEV = 399.18PVI STA = 10+44.82PVI ELEV = 398.11A.D. = -4.01%K = 12.48V.C. = 50.00'BVCS: 10+19.82BVCE: 399.18EVCS: 10+69.82EVCE: 396.03 LOW POINT STA = 12+25.00LOW POINT ELEV = 387.03PVI STA = 11+50.00PVI ELEV = 389.37A.D. = 5.18%K = 28.97V.C. = 150.00'BVCS: 10+75.00BVCE: 395.60EVCS: 12+25.00EVCE: 387.03D-12 D-1315" RCP DRAINAGE SCHEDULESTRUCTNO.D-00D-01D-02D-03D-04D-05D-10D-11D-12D-13D-17D-18D-19D-23D-24GRT/RIMELEV.376.08 +/-382.43 +/-383.73 +/-387.63 +/-390.84 +/-394.16 +/-397.84 +/-398.61 +/-397.54 +/-397.54 +/-381.45 +/-381.55 +/-397.84 +/-384.09 +/-381.98 +/-INVERTIN372.25 (D-P01)375.77 (D-P02)376.77 (D-P17)378.18 (D-P24)378.94 (D-P03)380.09 (D-P23)384.16 (D-P14)383.34 (D-P04)387.21 (D-P21)385.38 (D-P05)386.69 (D-P06)394.44 (D-P19)392.86 (D-P11)393.65 (D-P12)394.17 (D-P13)377.76 (D-P18)UPSTRMSTRUCTD-01D-02D-17D-24D-03D-23D-14D-04D-21D-05D-06D-19D-11D-12D-13D-18INVERTOUT372.90 (D-P01)378.44 (D-P02)382.74 (D-P03)385.38 (D-P04)386.59 (D-P05)392.31 (D-P10)393.55 (D-P11)394.07 (D-P12)394.51 (D-P13)377.51 (D-P17)378.12 (D-P18)394.77 (D-P19)380.65 (D-P23)378.54 (D-P24)DWNSTRMSTRUCTD-00D-01D-02D-03D-04D-09D-10D-11D-12D-01D-17D-10D-02D-01DEPTH2.1 ft +/-9.8 ft +/-5.5 ft +/-5.1 ft +/-5.7 ft +/-7.8 ft +/-5.8 ft +/-5.3 ft +/-3.7 ft +/-3.0 ft +/-4.2 ft +/-3.7 ft +/-3.3 ft +/-3.7 ft +/-3.7 ft +/-STRUCTTYPEEW-WCICICICICICICICICICICICICICIDWNSTRM PIPEINFORMATION50' of 36" RCP@ 1.3% (D-P01)42' of 30" RCP@ 6.3% (D-P02)107' of 30" RCP@ 3.5% (D-P03)74' of 24" RCP@ 2.8% (D-P04)78' of 24" RCP@ 1.6% (D-P05)75' of 18" RCP@ 1.2% (D-P10)70' of 15" RCP@ 1.0% (D-P11)42' of 15" RCP@ 1.0% (D-P12)34' of 15" CL IV@ 1.0% (D-P13)74' of 18" RCP@ 1.0% (D-P17)35' of 15" RCP@ 1.0% (D-P18)34' of 15" RCP@ 1.0% (D-P19)35' of 15" RCP@ 1.6% (D-P23)36' of 15" RCP@ 1.0% (D-P24)PLAN & PROFILE - ROAD B AND ROAD CC-8.41.BEFORE YOU DIG, STOP. CALL THE NC ONE-CALL CENTER AT 1-800-632-4949. IT'S THE LAW.EXISTING UTILITIES ARE SHOWN FROM THE BEST AVAILABLE INFORMATION AND ARE APPROXIMATE. IT IS THE CONTRACTOR'SRESPONSIBILITY TO VERIFY THESE AND OTHER UTILITIES BEFORE STARTING CONSTRUCTION. NOTIFY UTILITY LOCATING COMPANY (ONECALL @ 1-800-632-4949) OR INDIVIDUAL UTILITY OWNERS FOR UNDERGROUND LOCATIONS AT LEAST 48 HOURS IN ADVANCE.2.THERE SHALL BE NO TAPS, PIPING BRANCHES, UNAPPROVED BYPASS PIPING, HYDRANTS, FIRE DEPT. CONNECTION POINTS, OR OTHERWATER-USING APPURTENANCES CONNECTED TO THE SUPPLY LINE BETWEEN ANY WATER METER AND BACKFLOW PREVENTER.3.ANY UTILITY CONSTRUCTION SHALL CONFORM TO CITY OF DURHAM STANDARDS & SPECIFICATIONS.4.CONTACT THE UTILITY COMPANY TO RELOCATE ANY EXISTING UTILITY POLES. ALL EXISTING UTILITIES WHICH CONFLICT WITH THEIMPROVEMENTS UNDER THE SCOPE OF THIS PROJECT MUST BE RELOCATED.5.BACKFLOW PREVENTER PERMIT REQUIRED FOR PROJECT. BACKFLOW PREVENTER INSTALLER MUST CONTACT DURHAMCROSS-CONNECTION CONTROL, DEPARTMENT OF OF WATER MANAGEMENT AT (919) 560-4194 TO OBTAIN PERMIT AND INSTALLATIONREQUIREMENTS PRIOR TO INITIATING WORK.6.ALL FIRE HYDRANTS AND FIRE DEPARTMENT CONNECTIONS MUST BE PROVIDED WITH 5" DIAMETER STORZ CONNECTIONS.7.FIRE DEPARTMENT CONNECTIONS MUST BE ORIENTED 45° TOWARD GRADE.8.PROVIDE FIRE PLANS EXAMINER ONE COPY OF UTILITY CONSTRUCTION DRAWINGS SHOWING UNDERGROUND PIPING LAYOUT AND ALL FIREAPPURTENANCES. PERMIT FOR INSTALLATION OF PRIVATE FIRE HYDRANT(S) MUST BE ISSUED BY FIRE PLANS EXAMINER PRIOR TOINSTALLATION OF SAID HYDRANT(S).9.LANDSCAPING AND HARDSCAPING LAYOUT MUST BE ARRANGED TO ALLOW CLEAR VISIBILITY OF ALL FIRE EQUIPMENT UPON APPROACH,WITH READY ACCESS PROVIDED THERETO.10.ABOVE-GROUND UTILITIES TO BE SCREENED PER UDO SECTION 7.611.A UTILITY MAINLINE CONSTRUCTION PERMIT IS REQUIRED PRIOR TO INSTALLATION OF EACH UTILITY. ALL UTILITIES SHALL SUBMIT PLANDRAWINGS AND APPLICATIONS TO THE CITY ENGINEERING DIVISION.12.SANITARY SEWER SERVICES SHALL BE 2.0% MINIMUM SLOPE.GENERAL UTILITY NOTESWWWSSSSSSSLEGENDC.O.WMPROPOSED MANHOLEPROPOSED SS CLEANOUTPROPOSED WATER METERPROPOSED GATE VALVEPROPOSED HYDRANT ASSEMBLYPROPOSED BEND WITH THRUST BLOCKINGPROPOSED TEE WITH THRUST BLOCKINGPROPOSED BLOW-OFF ASSEMBLYPROPERTY LINE (PL)RIGHT-OF-WAY LINESETBACK LINEUTILITY EASEMENTPROPOSED GRAVITY SEWERPROPOSED WATER LINEPROPOSED STORM DRAINAGE PIPER/WR/WR/WMATCHLINE - STA. 17+50. 0 0 SEE SHEET C8.3PROP. ROAD ASTA. 24+20.08 =PROP.ROAD BSTA. 16+67.75SEE SHEET C8.2MATCHLINE - STA. 17+50.00SEE SHEET C8.3 PROPOSED STORMWATER PONDPUBLIC ROAD BPU B L I C R O A D A PROP. CUL-DE-SAC CENTER STA. 20+19.741" = 40' HORIZONTAL1" = 4' VERTICAL1 inch = 40 ft.40'040'1" = 40'PROPOSEDGRADEEXISTING GRADE1" = 40' HORIZONTAL1" = 4' VERTICAL1" = 40'PROP ROAD ASTA. 17+68.32 =PROP.ROAD CSTA. 10+00.00SEE SHEET C8.2PUBLIC ROAD CPUBLIC ROAD APROP. RETAINING WALLPROP. RETAINING WALLEND PROP. ROAD CSTA. 11+47.00PROP ROAD ASTA. 17+68.32 = STA. 10+00.00PROP. ROAD CPROPOSED GRADEEXISTING GRADEFUTURE GRADEPROJ. MGR: P R E L I M I N A R YCOPYRIGHT ©2018SEPI ENGINEERING & CONSTRUCTION, INCDRAWN BY:sepiengineering.comE N G I N E E R I N G &C O N S T R U C T I O N1025 WADE AVENUERALEIGH, NORTH CAROLINA919.789.997711020 DAVID TAYLOR DR., SUITE 115CHARLOTTE, NORTH CAROLINA704.714.48805030 NEW CENTRE DR., SUITE BWILMINGTON, NORTH CAROLINA910.523.5715LP16010Construction Drawings02/05/2019Revisions Per Comments04/16/2019................PROJECT:DATEISSUE:CHECKED BY:J. WESTMORELANDREVISIONS:1..NOTICE:3 WORKING DAYSFOR THE LOCATION OFUNDERGROUND FACILITIESBEFORE YOU DIGRCallbefore you dig.below.Know what'sTHE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATEWAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITSREPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALLEXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLEFOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURETO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES.CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THECONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BEEXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THEWORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBYSTRUCTURES, OR OF ANY OTHER PERSONS.CLIENT:Angier Development, LLC7700 Kencot CourtRaleigh, NC 27615Contact:David LazzoPH: (919) 601-2816dlazzo2100@gmail.comL. SMITHJ. BEARD..ANGIER AVENUERESIDENTIALCONSTRUCTIONDRAWINGS3846 Angier AvenueDurham, NCCITY OF DURHAMPUBLIC WORKS DEPARTMENTAPPROVEDENGINEERINGDATESTORMWATERDATETRANSPORTATIONDATEDATEDATEPRELIMINARY - NOT FOR CONSTRUCTIONBENCHMARKTBM: 13 IN. OAKN: 799151.14636E: 2045555.4021EL: 363.3813:1 SLOPE TOROAD GRADEPROPERTY LINEWATER, SANITARY SEWER AND STORM SEWER SEPARATION NOTES1.HORIZONTAL AND VERTICAL SEPARATIONA.SANITARY SEWERS SHALL BE LAID AT LEAST 10-FEET HORIZONTALLY FROM ANY EXISTING OR PROPOSED WATER MAIN. THE DISTANCE SHALL BE MEASURED EDGE TO EDGE. IN CASES WHERE IT IS NOT PRACTICAL TO MAINTAIN A 10-FOOT SEPARATION, THE CITY OF DURHAM MAY ALLOW DEVIATIONON A CASE-BY-CASE BASIS, IF SUPPORTED BY DATA FROM THE DESIGN ENGINEER. SUCH DEVIATION ON MAY ALLOW THE INSTALLATION OF THE SANITARY SEWER CLOSER TO A WATER MAIN, PROVIDED THAT THE WATER MAIN IS IN A SEPARATE TRENCH OR ON AN UNDISTURBED EARTH SHELFLOCATED ON ONE SIDE OF THE SANITARY SEWER AND AT AN ELEVATION SO THE BOTTOM OF THE WATER MAIN IS AT LEAST 18-INCHES ABOVE THE TOP OF THE SEWER.B.IF IT IS IMPOSSIBLE TO OBTAIN PROPER HORIZONTAL AND VERTICAL SEPARATION AS DESCRIBED ABOVE OR ANYTIME THE SANITARY SEWER IS OVER THE WATER MAIN, BOTH THE WATER MAIN AND SANITARY SEWER MUST BE CONSTRUCTED OF FERROUS PIPE COMPLYING WITH THE PUBLIC WATERSUPPLY DESIGN STANDARDS AND BE PRESSURE TESTED TO 150- PSI TO ASSURE WATER TIGHTNESS BEFORE BACKFILLING.C.A 24-INCH VERTICAL SEPARATION SHALL BE PROVIDED BETWEEN STORM SEWER AND SANITARY SEWER LINES OR FERROUS PIPE SPECIFIED. A 12-INCH VERTICAL SEPARATION SHALL BE PROVIDED BETWEEN STORM SEWER AND WATER MAINS.1. IF A 12-INCH VERTICAL SEPARATION IS NOT MAINTAINED AT A CROSSING BETWEEN STORM SEWER AND WATER MAINS (OR PRESSURE SEWERS). THE WATER MAIN SHALL BE CONSTRUCTED OF FERROUS PIPE AND A CONCRETE COLLAR SHALL BE POURED AROUND WATER MAINS AND STORMSEWER TO IMMOBILIZE THE CROSSING.2.CROSSINGSA.SANITARY SEWER CROSSING WATER MAINS SHALL BE LAID TO PROVIDE A MINIMUM VERTICAL DISTANCE OF 18-INCHES BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF THE SANITARY SEWER. THE CROSSING SHALL BE ARRANGED SO THAT THE SANITARY SEWER JOINTS WILL BEEQUIDISTANT AND AS FAR AS POSSIBLE FROM THE WATER MAIN JOINTS.B.WHEN IT IS IMPOSSIBLE TO OBTAIN PROPER HORIZONTAL AND VERTICAL SEPARATION AS STIPULATED ABOVE, ONE OF THE FOLLOWING METHODS MUST BE SPECIFIED.1. THE SANITARY SEWER SHALL BE DESIGNED AND CONSTRUCTED OF FERROUS PIPE AND SHALL BE PRESSURE TESTED AT 150-PSI TO ASSURE WATER TIGHTNESS PRIOR TO BACKFILLING, OR2. EITHER THE WATER MAIN OR THE SANITARY SEWER LINE MAY BE ENCASED IN A WATERTIGHT CARRIER PIPE, WHICH EXTENDS 10-FEET ON BOTH SIDES OF THE CROSSING, MEASURED PERPENDICULAR TO THE WATER MAIN. THE CARRIER PIPE SHALL BE OF MATERIALS APPROVED BY THE CITY OFDURHAM FOR USE IN WATER MAIN CONSTRUCTION.PROPOSED GATE VALVEFH8X8 TEEW/ (2) GV & TBGVFHBOA12" MIN.SEPARATION(WAT/STORM)8" DWM8" DWMGVGV8" DWM8" DWM8" DWM8" SS18" MIN.SEPARATION(WAT/SEW)12" MIN.SEPARATION(WAT/STORM)8" DIP WM3' MIN.COVER8" DIP WM3' MIN.COVER8" DIP WM24" MIN.SEPARATION(STORM/SAN)12" MIN.SEPARATION(WAT/STORM)24" MIN.SEPARATION(STORM/SAN)24" MIN.SEPARATION(STORM/SAN)8X8 TEEW/ (2) GV & TBDocuSign Envelope ID: 8C264526-3E7F-4569-8C3F-0ABD8FCCA50D4/17/2019 400400400400400 400 400 R/W R/WR/WR/WW W W W W W EOPR/WR/WR/WS R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WCATCH BAS INTOP GRATE : 401 .37 ' INV . (S .E . ) : 398 .05 ' INV . (N .W . ) : 397 .91 'CATCH BAS INTOP GRATE : 402 .35 ' INV . (N .E . ) : 399 .18 ' INV . (S .E . ) : 399 .22 ' INV . (N .W . ) : 398 .97 ' INV . = 397 .82 ' INV . = 399 .76 ' INV . = 401 .43 ' INV . = 401 .47 ' INV. = 397.97'INV. = 397.38'INV. = 396.12'INV. = 395.02' 15" RCP 18"RCP15"RCP24" RCP24" RCPSSANITARY MHRIM : 407 .18 ' INV . (S .W . ) : 400 .97 ' INV . (S .E . ) : 400 .93 'SANITARY MH 8" DIP WWVWVWWWVWVWWWVWWV15" RCP15" CPPR/WR/WSS SS SS SS SS TP TP TP TPTPTPTP TP TPTPTPTPTPTP TPTPTPTPTPTPWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW398400402402400400398 R/WR/WR/WR/WR/WR/WR/W R/WLD LD LD LDLDLDL D LDLDLDLDLDLDLDLDLDLDLDLDLDLDLD LDLDLDLDLDLD LD LDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLD LDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLD12+00.0013+00.0014+00.0015+00.0016+00.0017+00.0018+00.0019+00.0020+00.0021+00.0022+00.0012+50.0013+50.0014+50.0015+50.0016+50.0017+50.0018+50.0019+50.0020+50.0021+50.0022+50.009+70.0010+00.0011+00.00 10+50.00 CIB-03CIB-02B-P0315" RCPCBB-07OEEx. A-01Ex.- P 1 24" E x . R C P TBJBB-06B-P0715" RCPB-P0636" RCPTBJBB-05B-P0536" RCP B-P1015" RCPCBB-10MH1-15CBB-08CBB-09B-P0915" RCPB-P0815" RCP   ANGIER AVE370    375    380    385    390    395    400    405    410    415    420370    375    380    385    390    395    400    405    410    415    420            12+00.0012+50.0013+00.0013+50.0014+00.0014+50.0015+00.0015+50.0016+00.0016+50.0017+00.0017+50.0018+00.0018+50.0019+00.0019+50.0020+00.0020+50.0021+00.0021+50.0022+00.0022+50.0023+00.001-15 STA 10+15.87, 6.27' R RIM = 400.94 B-0715" RCPB-0636" RCPB-0515" RCPB-10 B-0815" RCP15" RCPB-09 INV OUT = 391.32 STORM SYSTEM "X"DRAINAGE SCHEDULESTRUCTURENO.B-02B-03B-05B-06B-07B-08B-09B-10Ex. A-01GRATE/RIMELEV.399.71 +/-399.71 +/-400.58 +/-400.73 +/-400.10 +/-400.95 +/-402.35 +/-400.86 +/-399.53 +/-INVERTIN395.92 (B-P03)393.89 (B-P05)395.94 (B-P10)394.19 (B-P06)396.27 (B-P07)395.52 (Ex.-P1)396.70 (B-P08)397.45 (B-P09)UPSTREAMSTRUCTUREB-03B-05B-10B-06B-07Ex. A-01B-08B-09INVERTOUT393.79 (B-P02)396.25 (B-P03)394.19 (B-P05)394.50 (B-P06)396.60 (B-P07)397.35 (B-P08)398.69 (B-P09)396.90 (B-P10)396.45 (Ex.-P1)DOWNSTREAMSTRUCTUREB-01B-02B-02B-05B-06B-07B-08B-05B-06DEPTH6.2 ft3.7 ft6.6 ft6.5 ft3.7 ft3.8 ft3.9 ft4.2 ft5.1 ftSTRUCTURETYPECICITBJBTBJBCBCBCBCBOEDOWNSTREAM PIPEINFORMATION136' of 36" RCP@ 0.6% (B-P02)34' of 15" RCP@ 1.0% (B-P03)49' of 36" RCP@ 0.6% (B-P05)50' of 36" RCP@ 0.6% (B-P06)31' of 15" RCP@ 1.1% (B-P07)54' of 15" RCP@ 1.2% (B-P08)166' of 15" RCP@ 0.8% (B-P09)36' of 15" RCP@ 2.6% (B-P10)34' of 24" Ex. RCP@ 2.8% (Ex.-P1)PROPERTY LINE (PL)RIGHT-OF-WAY LINESETBACK LINEUTILITY EASEMENTLEGEND (SEE ALSO KEYNOTES)ABEHFSITE KEYNOTESGCDNCDOT APPROVED ASPHALT PAVEMENTI30" NCDOT CURB AND GUTTER (SEE NCDOT STANDARD DETAIL 846.01)JK4" THICK CONCRETE SIDEWALK (SEE SITE DETAIL SHEETS)LANE, EDGE AND CENTER LINE ROADWAY MARKINGS PER NCDOTSTANDARD DRAWINGS 1205.01; 1205.02; 1205.03; 1205.04; AND 1205.05ADA COMPLIANT ACCESSIBILITY RAMP (SEE SITE DETAILS)HIGH VISIBILITY PEDESTRIAN CROSSWALK (SEE SITE DETAIL SHEETS)MUTCD R1-1 "STOP" SIGN (SEE SITE DETAIL SHEETS)KADJACENT PROPERTY LINEPLAN AND PROFILE -ANGIER AVENUEC-8.51 inch = 40 ft.40'040'HEAVY DUTY ASPHALT PAVEMENT (SEE SITE DETAIL SHEETS)8' STREET YARDSETBACK320'90'DANGIER AVENUE - SR 1926EX. 60' RIGHT-OF-WAY (PUBLIC)BUNGALOW AVENUESR 2036EX. 50' R/W (PUBLIC)D11.0'KR30.0'R30.0'C520' SIGHT DISTANCE TRIANGLE FOR 35 MPH (40 MPH DESIGN SPEED)2-LANE ROADWAYGJDITRANSITION FROM 30" NCDOT CURB AND GUTTER TO 24" CITY OF DURHAMCURB AND GUTTERTIE TO EXISTING ASPHALTL10'X70' CLEAR SIGHT TRIANGLEM25'X25' CLEAR SIGHT TRIANGLEMMLL12.0'11.0'4.0'12.0'EX. UTILITYEASEMENTHEX. R/WPROP. 10' R/WDEDICATIONEHEX. 10' CITY OFDURHAM PERMANENTWATER EASEMENT(PB191, PG21)OPEN SPACETREE COVERAGEAREATREE COVERAGEAREA25'110'110'10'15'45'185'1.BEFORE YOU DIG, STOP. CALL THE NC ONE-CALL CENTER AT 1-800-632-4949. IT'S THE LAW.EXISTING UTILITIES ARE SHOWN FROM THE BEST AVAILABLE INFORMATION AND ARE APPROXIMATE. IT IS THE CONTRACTOR'SRESPONSIBILITY TO VERIFY THESE AND OTHER UTILITIES BEFORE STARTING CONSTRUCTION. NOTIFY UTILITY LOCATING COMPANY (ONECALL @ 1-800-632-4949) OR INDIVIDUAL UTILITY OWNERS FOR UNDERGROUND LOCATIONS AT LEAST 48 HOURS IN ADVANCE.2.ANY UTILITY CONSTRUCTION SHALL CONFORM TO CITY OF DURHAM STANDARDS & SPECIFICATIONS.3.CONTACT THE UTILITY COMPANY TO RELOCATE ANY EXISTING UTILITY POLES. ALL EXISTING UTILITIES WHICH CONFLICT WITH THEIMPROVEMENTS UNDER THE SCOPE OF THIS PROJECT MUST BE RELOCATED.4.A UTILITY MAINLINE CONSTRUCTION PERMIT IS REQUIRED PRIOR TO INSTALLATION OF EACH UTILITY. ALL UTILITIES SHALL SUBMIT PLANDRAWINGS AND APPLICATIONS TO THE CITY ENGINEERING DIVISION.GENERAL UTILITY NOTESWATER, SANITARY SEWER AND STORM SEWER SEPARATION NOTES1.HORIZONTAL AND VERTICAL SEPARATIONA.SANITARY SEWERS SHALL BE LAID AT LEAST 10-FEET HORIZONTALLY FROM ANY EXISTING OR PROPOSED WATER MAIN. THEDISTANCE SHALL BE MEASURED EDGE TO EDGE. IN CASES WHERE IT IS NOT PRACTICAL TO MAINTAIN A 10-FOOT SEPARATION, THECITY OF DURHAM MAY ALLOW DEVIATION ON A CASE-BY-CASE BASIS, IF SUPPORTED BY DATA FROM THE DESIGN ENGINEER. SUCHDEVIATION ON MAY ALLOW THE INSTALLATION OF THE SANITARY SEWER CLOSER TO A WATER MAIN, PROVIDED THAT THE WATERMAIN IS IN A SEPARATE TRENCH OR ON AN UNDISTURBED EARTH SHELF LOCATED ON ONE SIDE OF THE SANITARY SEWER AND AT ANELEVATION SO THE BOTTOM OF THE WATER MAIN IS AT LEAST 18-INCHES ABOVE THE TOP OF THE SEWER.B.IF IT IS IMPOSSIBLE TO OBTAIN PROPER HORIZONTAL AND VERTICAL SEPARATION AS DESCRIBED ABOVE OR ANYTIME THE SANITARYSEWER IS OVER THE WATER MAIN, BOTH THE WATER MAIN AND SANITARY SEWER MUST BE CONSTRUCTED OF FERROUS PIPECOMPLYING WITH THE PUBLIC WATER SUPPLY DESIGN STANDARDS AND BE PRESSURE TESTED TO 150- PSI TO ASSURE WATERTIGHTNESS BEFORE BACKFILLING.C.A 24-INCH VERTICAL SEPARATION SHALL BE PROVIDED BETWEEN STORM SEWER AND SANITARY SEWER LINES OR FERROUS PIPESPECIFIED. A 12-INCH VERTICAL SEPARATION SHALL BE PROVIDED BETWEEN STORM SEWER AND WATER MAINS.1. IF A 12-INCH VERTICAL SEPARATION IS NOT MAINTAINED AT A CROSSING BETWEEN STORM SEWER AND WATER MAINS (ORPRESSURE SEWERS). THE WATER MAIN SHALL BE CONSTRUCTED OF FERROUS PIPE AND A CONCRETE COLLAR SHALL BE POUREDAROUND WATER MAINS AND STORM SEWER TO IMMOBILIZE THE CROSSING.PROPOSED EOP GRADEEXISTING CENTERLINE GRADEPROJ. MGR: P R E L I M I N A R YCOPYRIGHT ©2018SEPI ENGINEERING & CONSTRUCTION, INCDRAWN BY:sepiengineering.comE N G I N E E R I N G &C O N S T R U C T I O N1025 WADE AVENUERALEIGH, NORTH CAROLINA919.789.997711020 DAVID TAYLOR DR., SUITE 115CHARLOTTE, NORTH CAROLINA704.714.48805030 NEW CENTRE DR., SUITE BWILMINGTON, NORTH CAROLINA910.523.5715LP16010Construction Drawings02/05/2019Revisions Per Comments04/16/2019Erosion Control Submittal05/06/2019..............PROJECT:DATEISSUE:CHECKED BY:J. WESTMORELANDREVISIONS:1..NOTICE:3 WORKING DAYSFOR THE LOCATION OFUNDERGROUND FACILITIESBEFORE YOU DIGRCallbefore you dig.below.Know what'sTHE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATEWAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITSREPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALLEXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLEFOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURETO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES.CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THECONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BEEXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THEWORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBYSTRUCTURES, OR OF ANY OTHER PERSONS.CLIENT:Angier Development, LLC7700 Kencot CourtRaleigh, NC 27615Contact:David LazzoPH: (919) 601-2816dlazzo2100@gmail.comL. SMITHJ. BEARD..ANGIER AVENUERESIDENTIALCONSTRUCTIONDRAWINGS3846 Angier AvenueDurham, NCCITY OF DURHAMPUBLIC WORKS DEPARTMENTAPPROVEDENGINEERINGDATESTORMWATERDATETRANSPORTATIONDATEDATEDATEPRELIMINARY - NOT FOR CONSTRUCTIONBENCHMARKTBM: 13 IN. OAKN: 799151.14636E: 2045555.4021EL: 363.381NMAINTAIN ACCESS TO ALL PUBLIC ROADS AND PRIVATE DRIVEWAYSDURING CONSTRUCTIONNNNN15" DRAINAGEPIPE15" DRAINAGEPIPE15" DRAINAGEPIPEN15" DRAINAGEPIPEN15" DRAINAGEPIPEPROPOSED 8" DIP WLEX. 16" WATERLINEA3" TYPE S9.5B SURFACE COURSEB4" TYPE I19.0B BINDER COURSEC10" AGGREGATE BASE COURSE (4" LIFTS MAX.)ED30" STANDARD CONCRETE CURB AND GUTTER (SEE DETAIL SHEET C-9.0)F6" MINIMUM BASE COURSE UNDER CURB AND GUTTER. EXTEND 6" BEYOND BACK OF CURBCOMPACTED SUBGRADE (COMPACTED TO 98% MODIFIED PROCTOR MAXIMUM DRY DENSITY)GH5' WIDE CONCRETE SIDEWALK ( 14" / FT.)MILLED LAP JOINT ( 1 1/2" DEEP x 2' WIDE)FOR AREAS 6 FEET WIDE OR GREATER:A3" TYPE S9.5B SURFACE COURSEB4" TYPE I19.0B BINDER COURSEC5" TYPE B25.0B BASE COURSEFOR AREAS 6 FEET WIDE OR LESS:ABR/W16.0' PROPOSED ROADWIDENING3:1 MAX30"5'5'CDE0' - 10.0' MIDDLE /LEFT TURN LANE℄FHG11.0' EXISTINGTHRU LANE2% MIN. G3:1 MAXABR/W0' - 12.0' PROPOSED ROADWIDENING3:1 MAX30"3'C0' - 10.0' MIDDLE /LEFT TURN LANE℄HG11.0' EXISTINGTHRU LANE2% MIN. G3:1 MAX70' R/WR/WABR/W0' - 12.0' PROPOSED ROADWIDENING2:1 MAX4'C0' - 10.0' MIDDLE /LEFT TURN LANE℄HG11.0' EXISTINGTHRU LANE2% MIN. G2:1 MAXEXIST. 60' R/WR/WR/WEXIST. 60' R/W2:1 MAX3'2:1 MAX2.CROSSINGSA.SANITARY SEWER CROSSING WATER MAINS SHALL BE LAID TO PROVIDE A MINIMUM VERTICAL DISTANCE OF 18-INCHES BETWEENTHE OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF THE SANITARY SEWER. THE CROSSING SHALL BE ARRANGED SO THAT THESANITARY SEWER JOINTS WILL BE EQUIDISTANT AND AS FAR AS POSSIBLE FROM THE WATER MAIN JOINTS.B.WHEN IT IS IMPOSSIBLE TO OBTAIN PROPER HORIZONTAL AND VERTICAL SEPARATION AS STIPULATED ABOVE, ONE OF THEFOLLOWING METHODS MUST BE SPECIFIED.1. THE SANITARY SEWER SHALL BE DESIGNED AND CONSTRUCTED OF FERROUS PIPE AND SHALL BE PRESSURE TESTED AT150-PSI TO ASSURE WATER TIGHTNESS PRIOR TO BACKFILLING, OR2. EITHER THE WATER MAIN OR THE SANITARY SEWER LINE MAY BE ENCASED IN A WATERTIGHT CARRIER PIPE, WHICH EXTENDS10-FEET ON BOTH SIDES OF THE CROSSING, MEASURED PERPENDICULAR TO THE WATER MAIN. THE CARRIER PIPE SHALL BE OFMATERIALS APPROVED BY THE CITY OF DURHAM FOR USE IN WATER MAIN CONSTRUCTION.5/7/2019