HomeMy WebLinkAbout20051143 Ver 1_Complete File_20050627
1'"-'---.'.-- -l~ C.-:.~'.- -
,
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
July 5. 2005
,
DWQ Project # 05-1143
Yancey County
Michele Lawhern, County Manager
Yancey County
Room 11, Courthouse /iiJ 1Ci1(N
BU[nsville, NC 29714 IA[ IS~&OW&,
Su~jecl Property: Little Crabtree Creek EWP (OSR 2004-36) SEP 26 ?005 0
__WATER OUALITY
Approval of 401 Water Quality Certification with Additional Condition~ATER BRANcH
Dear Mrs. Lawhern:
YOU[ have our approval, in accordance with the attached conditions and those listed
beloW, to place fill within or otherwise impact 160 feet of streams for the purpose of
streambank stabilization at the subject properties, as described within your application
received by the N.C. Division of Water Quality (DWQ) on June 27. 2005. After
reviewing your application, we have decided that the impacts are covered by General
Water Quality Certification Number(s) 3367 (3367). The Certification(s) allows you to
use '[Nationwide Permit(s) 37 when issued by the US Army Corps of Engineers
(USACE). In addition, you should obtain or otherwise comply with any other required
fede~al, state or local permits before you go ahead with your project including (but not
limited to) Erosion and Sediment Control, Non-discharge. and stormwater regulations.
Also, this approval to proceed with your proposed impacts or to conduct impacts
to waters as depicted in your application shall expire upon expiration of the 404
or CAMA Permit.
This ~pproval is for the purpose and design that you described in your application. If
you crange your project, you must notify us and you may be required to send us a new
appliqation. If the property is sold, the new owner must be given a copy of this
Certification and approval letter and is thereby responsible for complying with all
conditions. If total fills for this project (now or in the future) exceed one acre of wetland
or 150 linear feet of stream, compensatory mitigation may be required as described in
15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in
~hea,aChedcertification and any additional conditions listed below.
The APditional Conditions of the Certification are:
N~~Carolina
Nlltllrt1ll!l
.tV 1 Wetlands CertificatiOn Unit
1650 Mail Seffice Center, Raleigh, North Carolina 27699-1650
2321 Crabtree! Boul~, Suite 250, Raleigh, North Carolina 27604
'~hone: 919-733-1786/ FfAX 919-733-6893/lntemet htto1/h2o.enr.state.nc.uslncwetlands
I
An Equal Opportunily/Aflinnalive Action Employer - 50% Recycledl10% Post Consumer Paper
Yancey County:
Page 2 of6
July 5, 2005
,'-
~
1. Impacts Approved
The, following impacts are hereby approved as long as all of the other specific
and general conditions of this Certification (or Isolated Wetland Permit) are met.
No other impacts are approved including incidental impacts:
~
Stream
Plan Location or Reference
Little Crabtree Creek
2, Erosion & Sediment Control Practices
Erosion and sediment control practices must be in full compliance with all
specifications governing the proper design, installation and operation and
maintenance of such Best Management Practices in order to protect st,Jrface
waters standards:
a. The erosion and sediment control measures for the project must be
designed, installed, operated, and maintained in accordance with the most
recent version of the North Carolina Sediment and Erosion Control Planning
and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and
erosion control measures must be such that they equal, or exceed, the
requirements specified in the most recent version of the North Carolina
Sediment and Erosion Control Manual. The devices shall be maintained on
all construction sites, borrow sites, and waste pile (spoil) projects, including
contractor-owned or leased borrow pits associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be
designed, installed, operated, and maintained in accordance with the most
recent version of the North Carolina Surface Mining Manual.
d. The reclamation measures and implementation must comply with the
reclamation in accordance with the requirements of the Sedimentation
Pollution Control Act.
3. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian
areas beyond the footprint of the impacts depicted in .the Pr~-Construc~ion
Notification. All construction activities, including the design, installation, operation,
and maintenance of sediment and erosion control Best Management Practices,
shall be performed so that no violations of state water quality standards, statutes,
or rules occur.
--
1
"
Yancey County:
Page 3 of6
July 5, 2005
#-
4. 'No Sediment & Erosion Control Measures wIn Wetlands or Waters
Sediment and erosion control measures shall not be placed in wetlands or waters
to the maximum extent practicable. If placement of sediment and erosion control
devices in wetlands and waters is unavoidable, they shall be removed and the
;
natural gracje restored within six months of the date that the Division of Land
Resources has released the project.
5. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification
or applicable Buffer Rules, and any subsequent modifications, the applicant is
required to return the attached certificate of completion to the 4011Wetlands Unit,
North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC,
27699-1650.
6. Construction in this creek and disturbance within a 25-foot trout buffer should be
avoided during the January 1 to April 15 rainbow trout spawning period to avoid
adverse effects of sediment on eggs and larvae. However, Wildlife Resources
Commission will not object to construction of Natural Resources Conservation
Service "urgent and compelling" sites during the spawning period provided these
projects are, to the extent appropriate and practical, constructed by: (1). using flow
di~ersion structures such as sand bags, (2) placing large-sized rock toes and filter
cloth backing for stabilization sites before backfilling, and (3) excavating new
channel alignments in dry areas. Construction at the other non-"urgent and
compelling" sites should not occur during the spawning period to minimize the
potential adverse effects of multiple construction activities on trout resources in this
creek.
.7. 8Etdiment and erosion control measures must be implemented prior to construction
an~ maintained on the sites to minimize sediment in downstream areas. Seeding for
a ~emporary cover of wheat, millet, or similar annual grain or permanent herbaceous
cover should occur on all bare soil within five (5) days of ground disturbing activities
to provide long-term erosion control. The projects should be accomplished in stages
instead of leaving large tracts exposed to further storm events. Erosion control
matting should be used in conjunction with appropriate seeding on disturbed soils in
st~ep slope and riparian areas. Matting should be secured in place with staples,
st~kes, or, wherever possible, live stakes of native trees. Straw mulch and tall
fescue should not be used in riparian areas. In addition, because of an anticipated
diffffculty in establishing ground cover during the winter, reseeding should be
cornducted, as necessary, in the spring-time with a native annual and perennial seed
mix with a temporary nursery crop of wheat, millet or other grain.
Yancey County:
Page 4 of6
July 5, 2005
~
~
8. Only c::lean, large, a':lgular rock, large woody material, or other natural stream design
matenals and techniques should be used for bank stabilization. Rock should not be
placed in the stream channel in a manner that constricts stream flow or that will
impede aquatic life movements during low flow conditions. Filter cloth should be
placed behind large rock that is used for bank stabilization. Properly designed rock
vanes should be constructed wherev~r appropriate on bank stabilization and
chan~el rea.lignment stream reaches t? improve channel stability and to improve
aquatic habitat. Root wads should be Installed low enough in the bank so that a
significant portion (at least one-third) the root wad is inundated during normal flows.
9. The channel should be restored to a more stable condition. However, under no
circumstances should river rock, sand or other materials be dredged from the stream
channel under authorization of this permit except, if necessary, in the immediate
vicinity of the eroding banks for the explicit purpose of anchoring stabilizing or
flow/grade control structures or for reestablishing the natural and more stable stream
channel dimensions. Stream bed materials are unstable in flowing-water situations
and are unsuitable for bank stabilization. In stream dredging has catastrophic effects
on aquatic life and disturbance of the natural form of the stream channel can cause
downstream erosion problems. The natural dimension, pattern, and profile of the
stream upstream and downstream of the permitted area should not be modified by
widening the stream channel or changing its depth.
10.Stabilization measures should only be applied on or near existing erosion sites,
leaving other stable stream bank areas in a natural condition. Grading and
backfilling should be minimized and tree and shrub growth should be retained where"
possible to ensure long term availability of stream bank cover for aquatic life and
wildlife. Backfill materials should be obtained from upland sites except in cases
where excess stream bed materials are available. Berms should not be permitted
because they block the floodplain, constrict and accelerate flood flows, and often fail
and sometimes impede drainage during large flood events.
11. Repairs to eroded banks should be conducted in a dry work area where po~sible.
Sandbags or other clean diversion structures sho~ld be used where pOSSible to
minimize excavation in flowing water. Channel realignments should be con~tru~ted
by excavating the new channel from downstream to upstream before connecting It to
the old channel.
12. Heavy equipment should be operated from the bank whenever .possible. All
mechanized equipment operated near surface waters should be Inspected and
maintained regularly to prevent contamination of stre~m waters fr?m fuels,
lubricants, hydraulic fluids or other toxic materials. EqUipment used In stream
channel must be clean, new or low hour equipment.
13. Disturbed stream banks and a 25-foot vegetated zone, or the wides.t width that is
practical under the site cond!tio~s, shoul~. be re~tored. where pOSSible along the
construction sites to natural riparian conditions With native trees and shrubs (e.g.,
silky dogwood, rhododendron, dog hobble, red maple, silky willow, tag ~Ider, black
willow, sycamore) to provide long'-term bank stability and stre':im shading. Note,
silky dogwood, silky willow and black willow can be planted as live stakes collected
during the dormant growing season. Cuttings should be randomly planted on four
(4) foot centers from the waters edge to the top of the bank. Trees should be planted
on ten (10) to twelve (12) foot centers. Stream banks in these areas should also be
seeded with a native annual and perennial seed mix with a temporary nursery crop
of wheat, millet or other grain.
Yancey County:
Page 5 of6
July 5, 2005
14.lf pasture along the stream is to be used for grazing, a fence must be constructed
outside of the riparian zone and the stream to prevent livestock from entering these
a~eas.
15. Diffuse Flow
,
All constructed stormwater conveyance outlets shall be directed and maintained
as diffuse flow at non-erosive velocities through the protected riparian zones
such that it will not re-concentrate before discharging into a stream. If this is not
possible, it may be necessary to provide stormwater facilities that are considered
to remove nitrogen. This may require additional approval from this Office.
16. Riparian Zone Replanting
Replanting of vegetation within disturbed areas located within 25 feet of the
streambank associated with any land disturbing activity, repair, replacement
and/or maintenance must be done in a manner consistant with the Guidelines
for Riparian Buffer Restoration immediately following construction. (Please
. see attached.) .
17. Deed Notifications
Deed notifications or similar mechanisms shall be placed on all retained
jurisdictional wetlands, waters and protective woody riparian zones in order to
assure compliance for future wetland, water and buffer impact. These
mechanisms shall be put in place prior to impacting any wetlands, waters and/or
. buffers approved for impact under this Certification Approval and Authorization
Certificate. A sample deed notification can be downloaded from the
401NVetlands Unit web site at http://h20.enr.state.nc.us/ncwetlands. The text of
ithe sample deed notification may be modified as appropriate to suit to this
jproject.
18. Turbidity Standard
The turbidity standard of 10 NTUs (Nephelometric Turbidity Units) shall not be
exceeded as described in 15 A NCAC 28. .0200. Appropriate sediment and
~rosion control practices must be used to meet this standard.
i
19. No Sediment and Erosion Control Measures in Wetlands
Sediment and erosion control measures shall not be placed in wetlands or waters
to the maximum extent practicable. If placement of sediment and erosion control
devices in wetlands and waters is unavoidable, they shall be removed and the
natural grade restored within six months of the date that the Division of Land
Resources or locally delegated program has released the project.
Yancey County:
Page 6 of6
July 5, 2005
~
Violations of any condition herein set forth may result in revocation of this Certification
and may result in criminal and/or civil penalties. The authorization to proceed with your
proposed impacts or to conduct impacts to waters as depicted in your application and
as avthorized by this Certification, shall expire upon expiration of the 404 or CAMA
Permit.
..
If you do not accept any of the conditions of this Certification (associated with the
approved wetland or stream impacts), you may ask for an adjudicatory hearing. You
must act within 60 days of the date that you receive this letter. To ask for a hearing,
send a written petition, which conforms to Chapter 150B of the North Carolina General
Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh,
N.C. 27699-6714. This certification and its conditions are final and binding unless you
ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of
the Clean Water Act. If you have any qLiestions, please telephone Cyndi Karoly in the
Central Office in Raleigh at 919-733-9721 or Mr. Kevin Barnett in the DWQ Asheville
Regional Office at 828-296-4657.
Sincerely,
t (} ~~ iff ~~4.P
't Alan W. Klimek, P.E., Director
j-"02/ Division of Water Quality
AWKlkhb
Enclosures: GC 3367
Certificate of Completion
Guidelines for Riparian Buffer Restoration
cc: Altamont Environmental, Inc.
50 College Street
Asheville, NC 28801
USACE Asheville Regulatory Field Office
DWQ Asheville Regional Office
DLR Asheville Regional Office
File Copy
Central Files
Filename: 05-1143. EWP. LittleCrabtreeCreek.Approval
Triage Check List
Date: 06/29/05
FILE COpy
"""..,-f..,..-:-,-......,~"~',<-.-.__...,....,......,'f."... ..__~""_:_ ,__,,___~"..,. '.'d'_ n--:."..."~""""',.....,...,-=_-".~'.~~,~..""
Project Name: Yancey County EWP -
Little Crabtree Creek DSR 2004-35
DWQ#: 05-1143
County: Yancey
To:
K~vin Barnett, Asheville Regional Office
6ID-day Processing Time: 6/27/05 to 8/25/05
From: ~yndi Karoly Telephone: (919) 733-9721
l11e fIle attached is being forwarded to your for your evaluation.
Please call if you need assistance.
o Stream length impacted
o Stream determination
O Wetland determination and distance to blue-line surface waters on USFW topo maps
. Minimization/avoidance issues
01 Buffer Rules (Neuse, Tar-Pamlico, Catawba, Randleman)
01 Pond fill
O. Mitigation Ratios
Ditching
0' Are the stream and or wetland mitigation sites available and viable?
01 Check drawings for accuracy
[j Is the application consistent with pre-application meetings?
I Cumulative impact concern
o UT to Young's Creek (TROUT WATERS)
o
o
Comments: As per our discussion regarding revision of the triage and delegation processes,
please re~iew the attached file. Note that you arethe first reviewer, so this file will need to be
reviewed!for administrative as well as technical details. If you elect to place this project on hold,
please ask the applicant to provide your requested information to both the Central Office in
Raleigh as well as the Asheville Regional Office. As we discussed, this is an experimental, interim
procedure as we slowly transition to electronic applications. Please apprise me of any
complications you encounter, whether related to workload, processing times, or lack of a "second
reviewer'!' as the triage process in Central had previously provided. Also, if you think of ways to
improve this process, especially so that we can plan for the electronic applications, let me know.
Thanks!
\P-loo'-'
.J~;-"'"-=::--"':':-r-"'"';-"7:~:-.."'--:-'='-;:""-'--'-:-:-.'~""~'.~~,....--.,.,,,,,,,_,.,.~.~.,..:,=-...,--~._-,~~~
AL T AMONT ENVIRONMENTAL, INC.
50 COLLEGE STREET, ASHEVILLE, NC 28801
TEL. 828.281.3350 FAC.828.281.3351
www.altamontenvironmental.com
051143
Ms. Cyndi Karoly
Divisipn of Water Quality
401 Wetlands Unit
1650 Mail Service Center
Raleigh, NC 27699-1650
FILE COpy
W r::;:I r:;,
@@~ t'\ '\'~:?:j \~.~'..:.'."
~ _\\'r '._' ,'.,'
~~- If"'..' ,-~.~
o ~,-~, - . :"J
jU~ "it '7 1\}05
OENR - WP;i~~~~i~:~~H
~""'OS\VI'I"" .'
June 23, 2005
Subject:
Yancey County EWP Project Pre-Construction Notification Applications for Recovery
Sites Little Crabtree Creek DSR 34, Little Crabtree Creek DSR 35, and Little Crabtree
Creek DSR 36
Dear Ms. Karoly:
,~ -:
.~~~.
Enclosed are the Little Crabtree Creek DSR 34, Little Crabtree Creek DSR 35, and Little Crabtree Creek
DSR 36 EWP recovery site applications for Section 404 nation.~ide permit 37, and corresponding DWQ
401 'Yater quality certification. Recovery work applied for in t:lijs permit includes streambank
stabilization and debris removal. Mr. Stuart Ryman has signed ~e application as an authorized agent for
Yancey County. A letter of authorization is included. Additionally, we have sent one copy of the
enclo~ed permit application directly to Mr. Kevin Barnett in the Swannanoa office, Mr. Scott McLendon
of the U.S. Army Corps of Engineers, Mr. Brian Cole in the Asheville U.S. Fish and Wildlife Service
office, and Mr. Dave McHenry in the Waynesville N.C. Wildlife Resources Commission office.
.1U!,7-'
AI1:aqlont appreciates your assistance with this application. If you would like additional information,
please contact the undersigned.
Sincerely,
Stuart A. Ryman, P.G.
Enclpsures:
PCN - Little Crabtree Creek DSR 34
PCN - Little Crabtree Creek DSR 35
PCN - Little Crabtree Creek DSR 36
Letter of Authorization
CC:
Michele Lawhern - Yancey County Manager (transmittal letter only)
Cliff Vinson - District Conservation Officer NRCS (transmittal letter only)
Kevin Barnett - NCDENR Division of Water Quality (with attachments)
P:\Yancey-EWP\Correspondence\DWQ permit cover letter-Karoly-DSE 34,35, 36.doc
r ~
"......'1"{','.- ~ - .. ',. ..1-><.."......... ,-,:_.- ;:c-...."""~~':~i','..":~':.."..,-,,.;,.'i!.-;;C~"""~F.~::-..'1""""-'.:~..... .<.,.-. .:""'....,"""'1:'....,-"'7"":'.. :'_.Xt-r:o'-......-,"
... _ _C .~
\
FILE COpy
Office IUse Only:
Form Version May 2002
051143
USACE Action ill No. DWQ No.
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
I. I Processing
1. Check all of the approval( s) requested for this project:
[gJ Section 404 Permit 0
o Section 10 Permit 0
[gJ 401 Water Quality Certification
Riparian or Watershed Buffer Rules
Isolated Wetland Permit from DWQ
.2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide 37
,
13. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: 0
4. Ifpayment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (verify availability with NCWRP prior to submittal ofPCN), complete
section Vill and check here: 0
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: 0
II. Applicant Information
~ . Owner/Applicant Information
Name: MicheleLawhern, CountyManager
Mailing Address: 110 Town Square
Yancey County Courthouse, Room 1
BurnftJille, NC 28714
~~@~ow~~
JUN 2 7 2005
OENR - WATER QUAi.lTY
WETLANDS AND STORMWATER BRANCH
Telephone Number: (828) 682-3971 Fax Number: (828) 682-4301
E-mail Address: m.lawhern@countymanager.yanceycounty.org
~. Agent/Consultant Information (A signed and dated copy. of the Agent Authorization letter
I
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: Stuart A. Ryman
Company Affiliation: Altamont Environmental, Inc.
Mailing Address: 50 College Street, Asheville, NC 28801
Telephone Number: (828) 281-3350 Fax Number: (828) 281-3351
E-mail Address:sryman@altamontenvironmental.com
~
r~___
ill. Projed Information
~:~r:
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Little Crabtree Creek EWP DSR 2004-35
2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A
3. Property Identification Number (Tax PIN): See attached Table 1
4. Location
County: Yancey County Nearest Town: Burnsville
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers, landmarks, etc.): From downtown Burnsville, go
east on Hwy 19E. The project starts at Windom on Hwy 19E approximately 3 milesfrom
downtown Burnsville.
5. Site coordinates, if available (UTM or Lat/Long): 35.9108775 ON / 82.2306350 oW
(approximate center of project area) See Table 2 for specific repair area coordinates
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Property size (acres): Multiple - See attached Table 1
7. Nearest body of water (stream/river/sound/ocean/lake): Little Crabtree Creek
8. River Basin: French Broad
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at htto://h2o.enr.state.nc.us/admin/maps/.)
Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application:
2
"'''''''-.''7,!,",'''~<'';';-=-''=''~''''''F~~'-r~'~-0'<--'''''-'~'''''''~'''''''''.'''t-.'.''':'--_--,.X.-~-~ .....
!I"
Land use in the vicinity of the proposed project site consists of residential, industrial, and
retail uses. Portions of Little Crabtree Creek were heavily impacted during Tropical Storms
Frances and Ivan. Severe stream bank erosion has occurred throughout various locations of
Little Crabtree Creek In some locations, the stream is cloggedwith woody, mineral, and/or
non-native debris, reducing the hydraulic capacity of the channel. The streambank erosion
and reduced channel capacity threatens the stability of roads, driveways, structures and
property.
9. Describe the overall project in detail, including the type of equipment to be used:
This Pre-Construction Notificationform addresses the entirety ofDSR 35. DSR 35 covers
&amagefrom Tropical Storms Frances and Ivan from Highway 19E at Windom upstream to
Highway 19E at Micaville. Streambank erosion at two locations occurred as a result of
flooding during the Tropical Storms. The locations of these sites are shown on Figures 2a, and
2b. The post-jlood condition threatens the stability and safety of property, driveways, roads
and associated structures.
Less than 0.2-acre will be disturbed during stream bank stabilization and planting activities.
Less than 100 feet of trout buffer will be disturbed during bank stabilization activities.
'l'herefore neither formal Erosion and Sediment Control Plan, nor a Trout Waiver will be
rzecessary for this DSR.
All work will be performed as per conversations between Altamont Environmental, US Army
Corps of Engineers, NC Wildlife Resources Commission, and on-site consultation with the US
Fish and Wildlife Service personnel on other EWP sites in this watershed. Work will include
streambank stabilization in the area described below as well as localized removal of organic
tlnd mineral debris and stream bank re-vegetation.
tittle Crabtree Creek is classified as 'C " 'Trout' waters throughout the project area.
The following activities are proposed in the project area:
1) Streambank stabilization measures totaling approximately 160 linear feet have been
identified. Repairs in this area will involve the following:
· Stabilize the riverbanks by removing unstable vegetation, placing large angular stone or
coir logs, where applicable, at the toe of the slope to an elevation above the normal
water level, backfilling behind and above the stone and/or coir logs with rocky debris
removed from the floodplain or imported to the site, topping with soil and planting
native vegetation. Additionally, in-stream structures will be used to deflect flow from
the stream bank where appropriate.
:2) Removal of organic, mineral, and non-native material from areas where the hydraulic
capacity .of the stream channel has been reduced based upon evaluation of existing cross-
sections and regional curves.
:3) Softening of minor over-steepened banks and riparian planting.
3
,-,~'
Work will include: streambank reconstruction and stabilization in the areas described belDw.
Equipment used to accomplish the above tasks includes: rubber tired skidders, 15 ton dump
truck, hydraulic track mounted excavator with thumb, and chainsaws.
The location of the stream bank repair area is provided in Figures 2a, and 2b. A representative
typical photograph of damage for the stream bank stabilization area is included as Figures 3,
and 4. Repair for each of these areas are detailed in Figures 3a, and 4a.
Streambank StobiIizP1ion
Streambank stabilization is needed on approximately 160 linear feet of banks within this project
area.
A key in trench will be excavated at the base of the existing slope as necessary. Large (two to
three foot diameter) angular rock will be used to stabilize the toe of the bank. The area behind
the boulders will be backfilled with rocky debris material excavated from the floodplain or
imported material, and soil will be placed on the top of the reconstructed bank to aid in the
establishment of vegetation. Where sufficient space is available, a bankfull bench will be
constructed in the fill area to increase hydraulic capacity and enhance future bank stability.
The area will be seeded with grasses upon completion of heavy equipment work With the
landowner's permission, live stakes and bare root stock native trees and shrubs will be planted
on top of the bank stabilization work
Stabilization of streambanks and construction of structures will require placement of material
in wet conditions. In such cases, sand bags, or the equivalent, will be used to deflect water flow
away from the work area, as well as prevent water from accumulating in the work area.
Standard erosion and sedimentation control measures will be utilized throughout the project.
The work addressed in this application is intended to improve the post-jlood hydraulic capacity
of the stream reaches discussed, stabilize severely eroded streambanks that are threatening
structures, and to return the areas to pre-jlood conditions. The proposed actions are not
intended to enhance existing conditions or restore the stream reaches using natural channel
design techniques. Such activities would require detailed engineering evaluation and design,
which are beyond the intent of the EWP program.
A summary of affected property owners is included as Table 1. All property owners affected by
the proposed work have signed access agreements.
At each work site, work shall proceed from downstream to upstream to reduce sediment
loading. All staging areas will be less than half an acre in size. Work will proceed as follows
at each work area (as applicable):
1. Flag the work limits.
2. Mark live trees and shrubs to be protected.
3. Construct temporary construction entrance/exits, where necessary.
4. Install sediment fence around staging areas.
4
~-=- - U. ..'l . "~
,4. Install sediment fence around staging areas.
5. At the end of each workday install erosion control matting or geotextile fabric on exposed
soil using removable stakes. Erosion control mats will be constructed of coir fiber or a coir
fiber mixture for maximum erosion protection, vegetation establishment assistance, and for
minimal impact on wildlife.
6. During construction, place large boulders and/or coir logs at the toe of repaired
streambanks where necessary.
7. Fill and compact behind boulders and/or coir logs. Cover with soil, install erosion control
mat, and seed
8. Inspect and maintain repairs.
IA site-specific engineering design based on a specific storm event was not completed because
I the EWP program is not intended to fund stream restoration design or construction work
iRather, the EWP program is designed to quickly stabilize eroding stream banks to prevent on-
going erosion, sedimentation and possible loss of property or life. Because natural channel
design methods are beyond the scope of the EWP program, published literature values were
consulted in order to specify the bank stabilization and erosion control materials and methods
described in this document. For example, we have specified thatfilter cloth will be placed
,behind large rock usedfor streambank stabilization or for in-stream structures to increase the
'stability of the repair measures and minimize sediment loading to the stream. Clean, large,
j1angular rock, large woot(y material, coir logs and natural fiber erosion control mats will be
usedfor streambank stabilization.
Once site construction has ceased, the banks of the restored channel will be seeded with a
native floodplain seed mix and the high stress areas will be lined with erosion control (EC)
matting to ensure bank stability. Furthermore, sod matting will be grubbed on-site and used
(when available) to line the near bank regions of the constructed/stabilized channel to provide
immediate stability. Live stakes and matting staples will be used to secure the EC fabriclsod-
,matting in these high stress areas. Broadcast seeding rates will be as specifiedfrom the local
[nursery, generally 15-20 lbs/acre depending on species. With landowner permission, native
shrub and tree species will be planted throughout the project reach at a rate of 320 stems/acre,
securing near bank areas and providingfuture shading to the channel.. Existing woody
vegetation will be preserved to minimize project impacts. The following steps will be observed
with respect to vegetation:
1. Exposed soil will be covered with erosion control matting at the end of every workday.
Mats will be secured using removable stakes.
2. The project riparian zone and/or buffer areas will be re-vegetated with a combination of
native trees, shrubs and herbs/grasses. All disturbed areas will be seeded with a temporary
native grass mixture immediately following completion of the work in those areas. Straw
mulch and tall fescue will not be used in riparian areas.
3. When possible sod will be taken from adjacent areas (with landowner permission) and
placed on exposed soil to provide immediate stabilization within five days of ground
disturbing activities.
5
l.._____.
~
4. If sod is not available on-site temporary seeding will occur on all bare soil within jive days
of ground disturbing activities to provide long-term erosion control. If sod is used, the bare
area left after removal of sod will be planted
5. Re-seeding will be conducted, as necessary, with a native annual and perennial seed mix
with a temporary nursery crop of wheat, millet, or other grain.
6. Woody vegetation will b.e planted during the normal growing season assuming landowner
permission.
10. Explain the purpose of the proposed work:
The work being described is recovery work under the Emergency Watershed Protection program
to protect existing property and structures. Stream bank stabilization will also prevent further
erosion and sedimentation to the South Toe River.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the US ACE Action ill Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
N/A
v. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
No
VI. Proposed Impacts to Waters of the United StateslWaters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the pr9ject. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
6
~-.:--o/'--'-.'.._.._'-~--,-?~~~~~~~:'~"-'''''':''''c':f'''''''3'--'-~''-''::;'-,=;;"..,.",:-..:"""!"~~---,...--.~--~,~...-.~,~.~~ ...",
<:;
u,.cluded at the applicant's discretion. If this proposed impact is strictly for wetland or stream
~tigation, list and describe the impact in Section VIII below. If additional space is needed for
lfting or description, please attach a separate sheet.
1l Provide a written description of the proposed impacts:
Proposed impacts include channel realignment and streambank stabilization. Precautions will
be taken to keep heavy equipment out of the stream channel except where absolutely necessary to
install bank stabilization measures. Work will be conducted in the dry to the extent practicable.
~diment and erosion control measures, including sand bags, silt fences and reseeding, will be
uplized to minimize sedimentation.
2. Individually list wetland impacts below:
There will be no wetlands impacted at this site.
Wetland Impact Area of Located within Distance to
Site Nun,.ber Type of Impact* Impact 100-year Floodplain** Nearest Stream Type ofWetland***
(lndicatej on map) (acres) (yes/no) (linear feet)
,
!
.
,
* i List each im act se aratel and identi tern or im acts. Im acts include, but are not limited to: mechanized clearin din , fill,
p p y fy p ary p p g,gra g
excavjition. flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at http://www.femagov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.) Indicate ifwetland is isolated (determination of isolation to be made by USACE only).
List the total acreage (estimated) of all existing wetlands on the property: None
Total area of wetland impact proposed: N/A
t Individually list all intermittent and perennial stream impacts below:
7
>--J
Stream Impact Length of Average Width
Stream of Stream Perennial or
Site N~mber (see Type of Impact* Impact Name** Before Impact Intermittent?
. Figure 2) (linear feet) (ft)
Area 1 Streambank Stabilization 75 Little Crabtree 10 Perennial
Creek
Area 2 Stream bank Stabilization 85 Little Crabtree 10 Perennial
Creek
List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
darns (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
WWW.USgs.gov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com.
www.mapquest.com.. etc.).
*
Cumulative impacts (linear distance in feet) to all streams on site: 160 linear feet
4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water ofthe U.S.) below:
There will be no impacts to open waters.
Open Water Impact Area of Name of Water body Type of Waterbody
Site Number Type of Impact* Impact (lake, pond, estuary, sound,
(indicate on map) (acres) (if applicable) bay, ocean, etc.)
*
List each lffipact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads, etc.
5. Pond Creation
8
'";.:'..,,....... --=.:~,.--,"~ ,_.--,.-_.t""__.-'_c"-:,,,,,,=-~~~,, ~--'=<.7_~'O"~"",~-,,,"~""~~''''__'"''r''"''''''~--:'.'''''''''''''~_'''-''-~'''__''''''''''''''--~.._-.~~~.."'~. '
.~
If construction of a .pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): 0 uplands 0 stream 0 wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.): N/A
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.): N/A
Size of watershed draining to pond: N/A
Expected pond surface area: N/ A
~. I~pact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
tmancial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
'"Yere minimized once the desired site plan was developed. If applicable, discuss construction
t~chniques to be followed during construction to reduce impacts.
Qn behalf of Yancey County, Altamont will provide contractors engaged in the implementation of
tIJ-is work both written and verbal instructions of all impact avoidance statements provided below.
All heavy equipment will be kept out of the stream channel during streambank stabilization and
stream relocation work, except where absolutely necessary to install bank stabilization measures.
Disturbance of channel bottom and banks and equipment access areas shall be held to the
11Jinimum necessary to allow for bank stabilization and debris removal sufficient to restore the
hydraulic capacity of the stream channel. Temporary grass cover shall be planted on all bare soil
within 5 days of ground disturbing activities. Provided landowners give permission, herbaceous
dnd woody shrub and tree vegetation will also be installed on the riverbank upon completion of
bank stabilization work Yancey County will provide a site manager to routinely inspect and
supervise contractor work to help ensure impact avoidance instructions are beingfollowed
VID. Mitigation
IpWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
IPivision of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet oftotal impacts to perennial
streams.
USACE - In accordance with the Final Notice oflssuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
~ecessary to ensure that adverse effects to the aquatic environment are minimal. Factors
!
9
L__--.
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc. us/ncwetlands/ strmgide.html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
N/A
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at
(919) 733-5208 to determine availability and to request written approval of mitigation prior
to submittal of a PCN. For additional information regarding the application process for the
NCWRP, check the NCWRP web site at http://h2o.enr.state.nc.us/wrp/index.htm. Ifuse of
the NCWRP is proposed, please check the appropriate box on page three and provide the
following information:
Amount of stream mitigation requested (linear feet): N/A
Amount of buffer mitigation requested (square feet): N/A
Amount of Riparian wetland mitigation requested (acres): N/A
Amount of Non-riparian wetland mitigation requested (acres): N/A
Amount of Coastal wetland mitigation requested (acres): N/A
IX. Environmental Documentation (required by DWQ)
Does the project involve an expenditure of public (federal/state) funds or the use of public
(federal/state) land?
Yes ~ No 0
10
.. ,r
If yes, does the project require preparation of an environmental document pursuant to the
r~quirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
~ordinator at (919) 733-5083 to review current thresholds for environmental documentation.
. Yes 0 No I2SI
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes 0 No 0
x. Irroposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
qtap, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
1pplicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Neuse), 15A NCAC 2B .0259 (Tar-Parnlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify)?
Yes 0 No I2SI If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone * Impact Multiplier Required
(square feet) Mitigation
I 3
2 1.5
Total
*
Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
<!>fProperty, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
fayment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
~entified within 15A NCAC 2B .0242 or .0260.
11
'--~ ~
XI. Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
Impervious acreage will not change. Erosion and sedimentation prevention and control will be
maintained throughout this project primarily through proper water management, construction
sequencing, proper staging and stockpiling of materials, and the maintenance, at all times, of
suitable channel capacity for expectedjlow events. Equipment, fuels; lubricants, or other
potential sources of water pollution will not be stored in areas that could be jlooded during this
project.
X1I~ Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity ofthe subject facility.
Portable facilities shall be provided at the work site.
XIll. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes 0 No ~
Is this an after-the-fact permit application?
Yes 0 No ~
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
N/A
6-2Z-tJ5
Applicant/Agent's Si ature Date
(Agent's signature is valid 0 y if an authorization letter from the applicant is provided.)
12
1.::_
. ~..k
YANCEY COUNTY
Michele P. Lawhem, Count;l Manager
John Renfro, Chairman
Dean Hicks, Commissioner
Blaine Whitson, Commissioner
* County Courthonse, Room 11 - Burnsville, North Carolina 28714
PHONE: (828) 682-3971- FAX: (828) 682-4301- EMAlL:mlawhem@yancey.main.nc.us
November 10, 2004
Altamont Environmental, Inc.
50 College Street
Asheville, North Carolina 28801
Stu,
At the regular monthly meeting of the Yancey County Board of Commissioners last
evening, the enclosed contract for professional services was executed, relative to EWP
Section 216 work. Pursuant to, or in the spirit of the further intent of this contract, this
Yancey County Local Government hereby authorizes Altamont Environmental, Inc. to
sign and execute all necessary permits and coordinate communications with said
regulatory agencies.
If there should be any questions about the above, please feel free to call me at any time.
~elY,
If "~~hern
. Yancey County Manager
Work: 828/682-3971; Cellular 828/284-0746
~n'~l 1T:TIT lr- ~'T~~ ~" ~1.V- I~ I ';;1~('C1'r::::'r' ,r '..:;,;"" .,;, "-:;~~ -'I.r~ ;:,~~. !',~ " ;jltf:;;'fVT=fl - I :7''".::~~8:(~m-;- 1
I ",' -,', (.,,,~'l '1;'1Ir<1~1'lolr -, 1:'1 '.;,' -ifol"l
f I I II ;
~.b __ ~ uJI ,~ ~~ _h' = .h.. . ~. 'I ,I j
083 04 38729 MCENTYRE. LEWIS J JR & BRENDA S
084020802835000 TAYLOR TOGS INC
084020800997000 SHUFORD, MARTIN J, & IRENE
2.0
1.3
2.3
TABLE 1
AFFECTED PARCELS
LITTLE CRABTREE CREEK
DSR 2004-35
YANCEY COUNTY, NC
POBOX 62
P.O. BOX 160
419 HWY 80 SOUTH
MICAVILLE
MICAVILLE
BURNSVILLE
...
I
,,4
28755
28755
28714
.
.
.
P;/DSRS/DSR 54 BANKS CREEK/parcels_LITTLE CRABTREE CREEK 35
N
N
N
'""~"':.>=_:"'~-<<'::-e"<';~4_o..~~,."""-,'",,:r.;,~:'- ,'=":"'~~c.-.-,.-__-_,_," ..~-- --..--< -,'~~ ~---- ,'"
'(
TABLE 2
REPAIR AREA COORDINATES
LITTLE CRABTREE CREEK
DSR 2004-35
YANCEY COUNTY, NORTH CAROLINA
Area Latitude Longitude
1 35.9153978 82.2498751
2 35.9087662 82.2142261
~CT~~'- ~~' -, -' ~-~--~---<-~~,~~.-- --~'--~-,,- -- 'r-, --~ ~,,-"'~--~--~'--,---. --~-
Figure la
Site Location Map
May 23, 2005
USGS Micaville Quadrangle
Scale I inch = 2000 feet
Little Crabtree Creek - EWP 2004-35
Yancey County. North Carolina
P:\TeIVplates\Figures in Word\Figure Border.doc
ALTAt"\10NT ENVIRONMENTAL, INC.
~llif-ID.,It,~~~-:a;~~Gitt.'iij
50 COllEGE STREET, AsHEVILLE, NC 28801
TEL.828.281.3350 FAC.828.281.3351
www.altamontenvironmental.com
'-1-,..
-=...
J
.I
4i
1
'J
~
'.
:1
1
1
,
,
'~
i
Source: USGS Burnsville
and Micaville Quadrangles
Figure 1 b
Little Crabtree Creek DSR 2004-35
EWP Project Area
Yancey County, North Carolina
300 0 300 Feet
I I
ALTAMONT ENVIRONMENTAL, INC.
I ENGINEERING & HYDROGEOLOGY I
50 COLLEGE STREET, ASHEVILLE, NC 28801
TEL 8282813350 FAC.8282813351
www.altamontenvironmental.com
01-15-05
N
.' --,-
--
W E
s
x
f
J!
-4
..
"
\1
Ii
j
'1
,1
~
'i
j
"
'~
1
, .~
;f
'I
~
I
~
Source: USGS Micaville Quadrangle
Figure 1 c
Little Crabtree Creek DSR 2004-35
EWP Project Area
Yancey County, North Carolina
300 0 300 Feet
I I
ALTAMONT ENVIRONMENTAL, INC.
01-15-05
.;
~
;~
~
,
.,~
'~
I ENGINEERING & HYDROGEOLOGY I
50 COLLEGE STREET. ASHEVILLE, NC 28801
TEL. 828.281.3350 FAC.828.281.3351
www.altamontenvironmental.com
,j
I
Property Boundary
""-_,/ Surface Water
~ Roads
Figure 2a
Little Crabtree Creek DSR 2004-35
EWP Project Area
Yancey County, North Carolina
300 0 300 Feet
I I
ALTAMONT ENVIRONMENTAL, INC.
I ENGINEERING & HYDROGEOLOGY I
50 COLLEGE STREET, ASHEVILLE, NC 28801
TEL. 828.281.3350 F AC. 828.281.3351
www.a\tamontenvironmental.com
01-15-05
'-
Legend
Property Boundary
/' Surface Water
~ Roads
NT .
NT ENVIRONME
ROGEOLOGY I
G & HYD
I E N GIN E E R I N ASHEVILLE, NC 28801
50 COLLEGE STRE~~ FAC 828281 3351
TEL 828 281.33 . onrnental com
www altamontenvlr
01-15-05
.~
Figure 3
Streambank Stabilization Area 1
Little Crabtree Creek
DSR No. 2004-35
Yancey County, North Carolina
TAMONT ENVIRONMENTAL, INC.
ENGINEERING & HYDROGEOLOGY
50 COLLEGE STREET, ASHEVILLE, NC 28801
TEL. 828.281.3350 F AC. 828.28 I .3351
www.attamontenvironmental.com
J,
-!->.
;i,C lO ;12.... "~~~.-"i;Y~ ..{
!4~&i~"-
II
T ENVIRONMENT, .
FIGURE
IE N G I
OLOGY!
& HYOROGE
N E E R I N G ASHEVILLE. NC 28801
50 COLLEGE ST~~. FAC.828.281.3351
TEL. 828a.2It~~ontenvironmental.col11
www.
LI TTLE
3a
DRAWN BYM: ANP~~~~OW STU RYMAN
PROJECT . Y
CLIENT: YANCEY COUNT
DATE: 06/09/05
NOT TO SCALE
~.
~ -==
"-
-....::......:..~
Figure 4
Stream bank Stabilization Area 2
Little Crabtree Creek
DSR No. 2004-35
Yancey County, North Carolina
...~ "-:,0
-;> - -:. -......
... ..
"
~
..~-"...
..0;
~i-';'fW....._'--:-
...."
.-h-...
~-
~
TAMONT ENVIRONMENTAL, INC.
I ENGINEERING & HYDROGEOLOGyl
50 COLLEGE STREET, ASHEVILLE, NC 2880 I
TEL. 828.281.3350 F AC. 828.281.335 I
www.altamontenvironmental.com
~.
.
.....1..'... _...
~
,;;
"
'.-
L
"
r
:.. ..!:.......
..
.~
:~
-.-.:
"':.~=
.....
-,
'.
....
NOT TO SCALE
PROPOSED BANK
REPAIRS
LITTLE CRABTREE CREEK-AREA 2
EWP 2004-35
YANCEY COUNTY, NC
FIGURE
ALTAMONT ENVIRONMENTAL, INC.
~- .- ,... ';;..~ .....
- ~.~..;,."'=-.'
- _.~ = ,... '.-.-; ..
., . ._ -~. ....-~..F~.~
., .,~~-
. ~ ._c _ .4~~' .
--"""~~,.,z~--.,#.-~ "'"~ DRAWN BY: PAUL Dow
........ ..,:;.-.r.z:....-:~ ~ - -. ~ ~ , PROJECT MANAGER: STU RYMAN
~~. "'" ..... ~-=;. "'" ~" od-- ~ ~.:: CLIENT: YANCEY COUNTY
'"--'"_~ ~~~_ . d=i"::'_ .. -_ DATE: 06/09/05
[ENGINEERING & HYDROGEOLOGYI
50 COLLEGE STREET. ASHEVILLE. NC 28801
TEL.828,281.3350 FAC.828,281.3351
www.altamontenvironmental.com
4A
FILE PATH P:\YANCEV-EWPIDSRsIDSR K~5,~b-lITTLE CRABTREE CREEK IPCN ~51~5-CONCEPTUAL DESIGN PHOTOS,DWG
[Fwd: [Fwd: [Fwd: STream Clearing Activities]]]
Subject: [Fwd: [Fwd: [Fwd: STream Clearing Activities]]]
From: Cyndi Karoly <cyndi.karoly@ncmail.net>
Date: Wed, 16 Mar 2005 15:58:57 -0500
To: Laurie J Dennison <Laurie.J.Dennison@ncmail.net>
fyi - so please note that fees are waived when you create these files - perhaps a
brief handwritten note in the file jacket, or we can add a copy of this message
Subject: [Fwd: [Fwd: STream Clearing Activities]]
From: Tom Reeder <tom.reeder@ncmail.net>
Date: Wed, 16 Mar 2005 15:43:18 -0500
To: Cyndi Karoly <cyndi.karoly@ncmail.net>
Cyndi - In answer to your question yesterday it appears that the fees are being
waived for the EWP associated 401s.
,
"
Subject: [Fwd: STream Clearing Activities]
From: Alan Klimek <alan.klimek@ncmai1.net>
Date: Wed, 16 Mar 2005 15:37:40 -0500
To: Tom Reeder <Tom.Reeder@ncmail.net>
Yes, the fees are being waived. See attachment.
Alan
_____m Original Message --------
Subject:STream Clearing Activities
Date:Mon, 28 Feb 2005 09:40:08 -0500
From:"Robin W. Smith" <robin.w.smith@ncmai1.net>
Organization:NC DENR
To:Alan Klimek <Alal1.Klimek(c~ncmail.net>, Jim Simons <Jim.Simons(a)l1cmail.net>,
David Vogel <David.Vogel@ncmail.net>
CC:Johanna Reese <Johanna.Reese@ncmail.net>, Nann Guthrie
<N ann. Guthrie(a:ncmai l.net>
'I:,~'
~)l: Attached is an electronic copy of the letter and information sheet
sent to the 19 counties and one town that have contracts with NRCS for
stream clearing projects. Those letters went out over the Secretary's
signature on Friday. We will hand-deliver a memo containing the same
basic information to the mountain area legislators tomorrow. We are
also working with the Governor's Office on a news release; I am not sure
how soon that will go out. Give me a call if you have any questions.
Thanks for working toward getting meetings set up. Robin.
10f2
1/17/?00'i o'4() AM
" ..~"..-=",._=F~."
,~4
[Fwd: [Fw4: [Fwd:1 STream Clearing Activities]]]
I
Robin W. Smith <robin.w.smith~ncmaiLnet>
A>.ssistant Secretary of Planning & Policy
Office of the Secretary
NC DENR
[Fwd: [Fwd: STream Clearing Activities]]
[Fwd: STream Clearing Activities] Content-Type: message/rfc822
Content-Encoding: ?bit
~ ! __.=:::.::::==:===--==---=-=-=:........-. - -- -- - T
EWP lette~:to ~ounties.doc! Content-Type: applicationlmswo;-dil
=-__C:--'='_==-==-- ___ _ ~;. I Content-Encoding: base64 ';
. :======--=--=--=:.....:__:=:=:-.....;..---.-ll
.--.--<
;:.::::::;:::::.:':::.::.::::::::::::::::::::::::::::::::,:::::::::::==.:::-,::::::::::::::::====.::::::::::::::--=---=--.:..--.::.._- -=_:-=- -===.- ---- --- \
_,::==:::=-=::::=--==-======::::=:===:=__ ~_~~~:c~__~___:~~~~}:-::-~~:~~~-~~~~:~==~~~==-==~==~=~~~~::=:::'=-=:=7::
i ISlream-Clearing Aetivities-3.doe! I Content- Ty~,e: applicatio';;;;;;';";ord Ii
,:____________ !I Content-Encoding: base64
___ n_.:-__._----,-_.__...!
~, '
2of2
3/17/20056:46 AM
. -"~-":""""":-T-" .-.,,;_.-., ~ ,.-.r":''':.~;~ .--":"'-~~<"'Y"'"~-":T~"-:""':""c::;"",<'T"--";-"""'C~""'7T""'~""'~'~~'".""""""'~~--7'~-~':'---"'C-~~'''!V'~-_-_~~~~-,:",,",~
..t
; February 25,2005
Page 1 of2
February 25, 2005
RE: Emergency Watershed Protection Stream-Clearing Projects
Dear
-~,!;;..::'
#.-:
'''':;';:,',
I know that County experienced stli,eam damage as a result of the fall
hurricanes. Our department would like to work clos~Jy with your county to insure that
stream restoration projects receiving state and fed~ral funds under the Emergency
Watershed Protection (EWP) program move as smoothly as possible through the
environmental review and permitting process. I have enclosed. for your information a
brief summary of the types of permits and approvals that may be required for these
projects. For projects that involve work directly affecting the streambed, the United
States Army Corps of Engineers will be the primary environmental permitting agency.
For those projects, our staff in the Division of Water Quality and the Division of Land
ResoUrces playa supporting role and issue related state approvals.
I have asked our staff to meet with all of the western counties, either individually or in
small groups, to talk about each county's proposed stream restoration projects and answer
your questions about permit requirements. Our staff will ask the Corps of Engineers and
Soil and Water Conservation staff to join in those meetings in an effort to put together a
plan of action for reviewing and approving stream restoration projects as quickly as
possible. You should receive a telephone call from DENR staff soon to talk about a date
I and time that would be convenient to meet and talk about your projects.
I have also directed our staff to waive fees for state water quality certifications (under
Section 401 of the Clean Water Act) and for approval of erosion and sedimentation
'~ -'
-f"
-~'~"l-~"--:';"~?"---,--:~~~~~,,,!,~7'~,,,,,,,:~,~~- ."' ~'r',,..,'~='
l1ebruary 25,2005
Page 2 of2
I
dontrol plans for stream-clearing projects funded under EWP. Fees will be waived for all
EWP permit s requested by Septenaber 1, 2005. '
I hope these efforts will ease the burden on county governments already challenged by
the demands of reconstruction and recovery. If we can help you in any other way, please
do not hesitate to call. I have asked Assistant Secretary Robin Smith to be a'primary
~ontact on these projects for DENR; you can reach Ms. Smith at (919) 715-4141. The
<rnclosed information sheet also provides contact information for DENR staff in both the
Asheville and Winston-Salem Regional Offices and for the Corps of Engineers office in
Asheville.
_~ 'J
,w.,,;;.:'
~};':'-
Sincerely,
William G. Ross, Jr.