HomeMy WebLinkAboutRoxboro Coal Pile Assessment Plant Comments FINAL_20190521ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Director
Paul Draovitch
Senior Vice President
Environmental, Health & Safety
Duke Energy
526 South Church Street
Mail Code EC3XP
Charlotte, North Carolina 28202
NORTH CAROLINA
Environmental Quality
May 21, 2019
Subject: Roxboro Steam Electric Plant Coal Pile Groundwater Assessment Plan Comments
Dear Mr. Draovitch:
On May 7, 2019, the North Carolina Department of Environmental Quality Division of Water Resources
(Division) received the proposed Groundwater Assessment Plan for the Coal Pile at the Roxboro Steam
Electric Plant. The Division has reviewed and hereby approves the proposed assessment activities under
the condition that the following item is addressed as part of the plan implementation and the results reported
in the facility's Corrective Action Plan (CAP) that includes the subject area.
• If the physical well locations of the proposed monitoring wells deviate by more than one hundred
(100) feet from the original proposed locations, please contact the Raleigh Regional Office prior to
boring/well installation.
The results should also be incorporated into the CAP's geochemical and groundwater fate and transport
models. If the results of the modeling show current or future impacts to groundwater and/or surface water
from this area, then appropriate remedial strategies shall be proposed in the CAP.
If you have any questions, please contact Eric Rice (Raleigh Regional Office) at (919) 791-4200 or Steve
Lanter (Central Office) at (919) 707-3667.
Sincer y,
on R;Feeding
rd, Chief
Anim on
and Groundwater Section
cc: RRO WQROS Regional Office
WQROS Central File Copy
-f,- North Carolina Department of Environmental Quality I Division of Water Resources
E `� 512 North Salisbury Street 1 1636 Mail Service Center I Raleigh. North Carolina 27699-1636
m
`�M��ra.�er� 919.707.9000