Loading...
HomeMy WebLinkAbout20190455 Ver 1_Pre-Construction Notification (PCN) Form_20190520DWR Division of water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) September 29, 2018 Ver 3 Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Also, if at any point you Nish to print a copy of the E-PCN, all you need to do is right -click on the document and you can print a copy of the form. Below is a link to the online help file. https://edocs.deq. nc.gov/WaterResources/0/edoc/624704/PCN % 2OHeip%20F ile%202018-1-30. pdf A. Processing Information County (or Counties) where the project is located:* Beaufort Is this project a public transportation project? r Yes r No This is any publicly funded by rrunicipaistate or federal funds road, rail, airport transportation project. Is this a NCDOT Project? * r Yes r No (NCDOT only) T.I.P. or state project number: WBS#* 17. BP.2. R.86 (for NCOOT use only) la. Type(s) of approval sought from the Corps:* 9 Section 404 Permit (wetlands, streams and waters, Clean Water Act) F Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* V Nationwide Permit (NWP) I` Regional General Permit (RGP) I— Standard (IP) This form may be used to initiate the standard/individual permit process with the Corps. Please contact your Corps representative concerning submittals for standard permits. All required items that are not provided in the E-PCN can be added to the miscellaneous upload area located at the bottom of this form. 1c. Has the NWP or GP number been verified by the Corps?* r Yes (" No Nationwide Permit (NWP) Number: 03 - Maintenance NWP Numbers (for multiple NW1l List all WV nurrbers you are applying for not on the drop down list. 1d. Type(s) of approval sought from the DWR:* check all that apply W 401 Water Quality Certification - Regular r 401 Water Quality Certification - l f— Non-404 Jurisdictional General Permit W Riparian Buffer Authorization I— Individual Permit le. Is this notification solelyfor the record because written approval is not required? * For the record only for DWR401 Certification: r Yes r No For the record only for Corps Permit: r` Yes r No 1f. Is this an after -the -fact permit application?* r' Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program C Yes r No Acceptance Letter Attachment Clickthe upload button a drag and drop files here to attach document F ENFEIut14f BEFCF 1 h. lathe project located in any of NC's twenty coastal counties?* 0' Yes O No 11. lathe project located within a NC DCM Area of Environmental Concern (AEC)?* [•S Yes O No O Unknown 1j. Is the project located in a designated trout watershed?* 6Yes rNo Link to trout information: http://www.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency-Coordination/-rrout.aspx B. Applicant Information 1a. Who is the Primary Contact?* NCDOT (Attn: Michael C. Anan, PE) 1 b. Primary Contact Email:* mcaman@ncdot.gov 1d. Who is applying for the permit?* V Owner (Check all that apply) 1e. Is there an Agant/Conaultant for this project?* E Yes O No 2. Owner Information 2a. Name(s) on recorded deed:* NCDOT 2b. Deed book and page no.: 2c. Responsible party: (fa Corporations) 2d. Address* Street Address 1037 W.H. Smith Boulevard Address Line 2 P.O. Box 1587 City Greenville Postal / Zip Code 27834 2e. Telephone Number:* (xxx)xxx-xxxx (252)439-2812 2f. Fax Number: (xxx)xxx-xxxx 2g. Email Address:* mcaman@ncdot.gov 4. Agent/Consultant (if applicable) 4a. Name:* Robert Turnbull 4b. Business Name: (if applicable) Environmental Services, Inc. 4c. Address* 1c. Primary Contact Phone:* (xxx)xxx-xxxx (252)439-2812 r" Applicant (other than owner) State / Bovine / Region NC Country USA Street Address 4901 Trademark Drive Address Line 2 (lty State / F o irce / Riagion Raleigh NC Postal / Zip Code Country 27610 US 4d. Telephone Number:* (919)212-1760 4e. Fax Number: 4f. Email Address:* rturnbull@esinc.cc Agent Authorization Letter* Beale provide the Agent Aufi rEabcn Letter if you are sul witting tlti docunent. Beaufort159_AgentAuth_ESl.pdf 226.4KB FLETYFEK&STBEFCF C. Project Information and Prior Project History 1. Project Information U 1a. Name of project:* Beaufort Bridge 159 1b. Subdivision name: (if appropriate) 1c. Nearest municipality /town:* Pinetown, NC 2. Project Identification U 2a. Property Identification Number: (tax RN or parcel Q 2b. Property size: WA (in acres) 2c. Project Address Street Address Jones Bridge Road (SR 1611) Address Line 2 C7ty State / Frovinoe / Region Pinetown NC Postal / Zip Code (buntry 27865 USA 2d. Site coordinates in decimal degrees Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey -grade GPS device) after the decimal place as appropriate, based on howthe location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude: * Longitude:* 35.53603-76.77418 ex: 34.208504-77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Pungo Creek 3b. Water Resources Classification of nearest receiving water:* C;Sw,NSW Surface Water Lookup 3c. What river basin(s) is your project located in?* Tar -Pamlico 3d. Please provide the 12-digit HUC in which the project is located.* 030201040602 River Basin Lookup 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The project area and vicinity consist of rural residential and agricultural areas, silvicultural areas, and undeveloped forested communities. The proposed project and associated impacts are within and immediately adjacent to ebsting NCDOT right-of-way. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4d. Attach an 81/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) nick the upload button or drag and drop files here to attach document Beaufort159_USGS_Topo.pdf File type must be pdf 431.2KB 4e. Attach an 81/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) dick the upload button a drag and drop files here to attach document Beaufort159_NRCS_Soils.pdf 502.58KB File type must be pdr 4f. List the total estimated acreage of all existing wetlands on the property: 0.5 acre 4g. List the total estimated linear feet of all existing streams on the property: (intermttent and perennial) 125 4h.Explain the purpose of the proposed project:* Replace ebsting Bridge 159 on SR 1611 (Jones Bridge Street) over Pungo Swamp. The sufficiency rating of the ebsting bridge is 37.36. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The proposed project Will replace the wasting bridge on Jones Bridge Road (SR 1611) over Pungo Creek in Beaufort County. The project will replace the ebsting prestressed concrete channels, concrete caps, and timber piles with a cored slab bridge at the same location. The project work will consist of grading, widening, drainage improvements, bridge replacement, and pavement markings. The work will be conducted using standard road construction equipment. Equipment will be stored on -site in upland areas. No in -water construction moratoria Will apply to this project. 4j. Please upload project drawings for the proposed project. dickthe upload button a drag and drop files here to attach docunent 17BP.2.R.86_Beaufort 159_Permit Package.pdf 3.75MB File type mist be pdr 5. Jurisdictional Determinations Sa. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes Comments: r No 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary f Approved r Not Verified r Unknown r WA Corps AID Number: B(ample: SAW-2017-99999 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Robert Turnbull Agency/Consultant Company: Environmental Services, Inc. Other: f Unknown 5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR. Documentation not available. 5dl. Jurisdictional determination upload dick the upload button or drag and drop files here to attach document File type must be FLF 6. Future Project Plans 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre -construction notification. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): rd Wetlands 17 Streams -tributaries r Open Waters r Pond Construction P Buffers 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. "W." will be used in the table below to represent the word "wetland". 2al Reason * (?) 2b. Impact type * (?) 2c. Type of W. * 2d. W. name" 2e. Forested" f. Type of Impact �Jurlsdlcltlon*M J12g. area* Fill P Bottomland Hardwood Forest W1 Yes Corps 0.028 (acres) Fill P Bottomland Hardwood Forest W3 Yes Corps 0.007 (acres) Fill P Bottomland Hardwood Forest W1 0.000 _Jorps (acres) 2g. Total Temporary Wetland Impact 0.000 2g. Total Permanent Wetland Impact 0.035 2g. Total Wetland Impact 0.035 2h. Comments: Impact area at Site 2 is 15 square feet (0.0003 acre). 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. "S." will be used in the table below to represent the word "stream". 3a. Reason for impact * (?) 3b.lmpact type * 3c. Type of impact * 3d. S. name * 3e. Stream Type * 3f. Type of 3g. S. width * 3h. Impact lu M Jurisdiction* length* gt Drainage Improvements Permanent Rip Rap Fill Pungo Swamp Perennial Both 60 Average (feet) 18 (linear feet) S2 Drainage Improvements Temporary Rip Rap Fill Pungo Svvamp Perennial Both 60 Average (feet) 38 (linear feet) ** All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 18 31. Total temporary stream impacts: 38 31. Total stream and ditch impacts: 56 3j. Comments: 6. Buffer Impacts (for DWR) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below. 6a. Project is in which protect basin(s)?* []lack all that apply. f Neuse V Tar -Pamlico r Catawba r Randleman r Goose Creek r Jordan Lake r Other 6b. Impact Type*(?) 6c. Per or Temp* (?) 6d. Stream name* 6e. Buffer mitigation required?* 6f. Zone 1 impact* 6g. Zone 2 impact* B1-Allowable P Pungo Swamp No 1,779 2,155 (square feet) (square feet) B2-Allowable P Pungo Swamp No 1,757 1,915 (square feet) (squarefeet) B3-Allowable P Pungo Swamp No 2,925 2,150 (square feet) (square feet) B4-Allowable P Pungo Swamp No 217 �t2 re feet) (square feet) 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 0.00 0.00 Zone 1 Zone 2 Total Permanent impacts: 6,853.00 6,437.00 Zone 1 Zone 2 Total combined buffer impacts: 6,853.00 6,437.00 61. Comments: Supporting Documentation - i.e. Impact Maps, Plan Sheet, etc. pick the upload button a drag and drop files here to attach docurrent 17BP.2.R.86_Beaufort 159_Permit Package.pdf 3.75MB File crust be PCF E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Spa cificallydescribe measures taken to avoid or minimize the proposed impacts in designing the project:* The proposed bridge replacement will occur as much as practicable within the footprint of the eAsting bridge. Fill has been minimized as much as practicable within the wetland areas and stream channel. Riparian buffer impacts have been minimized as much as practicable. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* Al necessary sediment and erosion control BMPs will be installed and maintained through construction. Disturbed ground will be restored and stabilized with permanent vegetative cover. NCDOT Best Management Practices will be implemented throughout construction. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? t Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Stream and impacts are minimized as much as practicable and are <150 feet. Wetland impacts are minimized as much as practicable and area <0.1 acre in size. Buffer impacts result from the perpendicular crossing of Pungo Swamp. NC Stream Temperature Classification Maps can be found under the Mitigation Concepts tab on the Wilmington District's RIBITS website. F. Stormwater Management and Diffuse Flow Plan (required by DWR) — Recent changes to the stormwater rules have required updates to this section .*** 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? f• Yes r No 1b. All buffer impacts and high ground impacts require diffuse flow or other form of stormwater treatment. If the project is subject to a state implemented riparian buffer protection program, include a plan that fully documents how diffuse flow will be maintained. All Stormwater Control Measures (SCM)s must be designed in accordance with the NC Stormwater Design Manual. Associated supplement forms and other documentation shall be provided. What type of SCM are you providing? r Level Spreader V Vegetated Conveyance (lower SHWT) r Wetland Swale (higher SHWT) fJ Other SCM that removes minimum 30 % nitrogen r Proposed project will not create concentrated stormwater flow through the buffer (check all that apply) For a list of options to meet the diffuse flow requirements, click here. Diffuse Flow Documentation nick the upload button a drag and drop files here to attach document 17BP.2.R.86_Beaufort 159_SMP.pdf File type must be FDF 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? r Yes r No Comments: G. Supplementary Information 1. Environmental Documentation 426.34KB 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? * r Yes r No 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPAfinal approval letter.)* r Yes r No Comments:* A Categorical Exclusion is being prepared. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. The proposed project will result in minimum new impervious surface and will not result in any downstream impacts or growth -stimulating effects. The existing use of Pungo Swamp (C) should not change as a result of this project. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor WA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes t: No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5d. Is another Federal agency involved?* r Yes r No 5e. Is this a DOT project located within Division's 1-8? r Yes r No r Unknown 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?* North Carolina Natural Heritage Program data and on -site evaluation by ESI staff. Consultation Documentation Upload dickthe upload button a drag and drop files here to attach document File type must be FDF 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* vmw.habitat.noaa.gov/protection/efh/efhmapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.nGdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* Archaeology and historic architecture reviews were conducted by NCDOT. Documentation for those reviews is attached. 7c. Historic or Prehistoric Information Upload dickthe upload button a drag and drop files here to attach document 17-05-0039NoSurveyRevised.pdf 2.43MB Beaufort 159 No NRHP form.pdf 1.85MB File must be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplairl r Yes r No 8b. If yes, explain how project meets FEMA requirements: A FEMA Preliminary Detailed Study was completed. 8c. What source(s) did you use to make the floodplain determination? * www.ncfloodmaps.com Miscellaneous Comments Miscellaneous attachments not previously requested. dickthe upload button a drag and drop files here to attach document File must be FDF a KKV Signature fJ By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name:* Robert Turnbull Signature Date 4/10/2019